CN206842928U - People's passage on a kind of regularization tower crane - Google Patents

People's passage on a kind of regularization tower crane Download PDF

Info

Publication number
CN206842928U
CN206842928U CN201720706086.9U CN201720706086U CN206842928U CN 206842928 U CN206842928 U CN 206842928U CN 201720706086 U CN201720706086 U CN 201720706086U CN 206842928 U CN206842928 U CN 206842928U
Authority
CN
China
Prior art keywords
stupefied
tower crane
rectangle frame
passage
people
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720706086.9U
Other languages
Chinese (zh)
Inventor
隋海涛
张小红
孔明亮
孙春娥
王进平
谢建成
尚鹏彪
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Second Engineering Bureau Co Ltd
Original Assignee
Second Construction Engineering Co Ltd of China Construction Second Engineering Bureau Co Ltd East China Branch
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Second Construction Engineering Co Ltd of China Construction Second Engineering Bureau Co Ltd East China Branch filed Critical Second Construction Engineering Co Ltd of China Construction Second Engineering Bureau Co Ltd East China Branch
Priority to CN201720706086.9U priority Critical patent/CN206842928U/en
Application granted granted Critical
Publication of CN206842928U publication Critical patent/CN206842928U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Jib Cranes (AREA)

Abstract

The utility model proposes people's passage on a kind of regularization tower crane, include bottom platform, two side shields, protective door, it is secondary stupefied that bottom platform includes 4 stupefied and some of masters, 4 masters are stupefied to form a rectangle frame, stupefied 2 long sides for forming rectangle frame of two longer master during master is stupefied, stupefied 2 short sides for forming rectangle frame of two shorter master during master is stupefied, between some stupefied 2 long sides for being equally spacedly connected to rectangle frame, two side shields include some vertical rods and at least 2 horizon bars, some vertical rods equidistantly arrange, horizon bar is perpendicular to vertical rod, and it is connected with vertical rod, two side shields are connected using bolt with bottom platform, protective door is arranged between two side shields.People's passage uses modular construction, assembling and easy removal on the regularization tower crane, and safety coefficient is high, and it is high to have enough to meet the need utilization rate.

Description

People's passage on a kind of regularization tower crane
Technical field
It the utility model is related to people's passage on building construction technology neighborhood, more particularly to a kind of regularization tower crane.
Background technology
In architectural engineering, tower crane is conventional crane gear.With constantly increasing for construction floor, in order to facilitate tower crane Driver enters tower crane operating room, generally, people's passage on tower crane is set up between building and tower crane.So, tower crane driver can be with From building, by people's passage on tower crane, then tower crane operating room is reached.
People's passage is set up and formed using steel pipe and fastener mostly on existing tower crane.Specific practice is:Tower crane jacks every time After being required to regulation, bottom platform is first laid between building and standard section of tower crane, bottom platform is typically pressed using 4 steel pipes Being set according to certain spacing, the master as longitudinal direction is stupefied, and main stupefied steel pipe is connected with standard section of tower crane using steel tube fastener anchor ear, to prevent Anti-avulsion falls.Length of steel pipe can be chosen according to the spacing of building and standard section of tower crane.The horizontal secondary stupefied steel pipe grown using 1m, And pass through fastener and main stupefied fastener for connection.Then, then the guard rails of both sides is set up, guard rail is set up using steel pipe, fastener, The vertical rod of guard rail is connected with bottom platform by fastener, and the horizon bar of guard rail is connected with vertical rod by fastener, inner side Completely hang safety net.Steel basketry piece is finally laid in bottom platform.However, although people's passage meets on this steel tube fastener formula tower crane The primary demand passed through for tower crane driver, but have the following disadvantages:
1st, it is both needed to set up people's passage again after each tower crane jacking, it is time-consuming;
2nd, during setting up, worker's work high above the ground, potential safety hazard be present;
3rd, simply set up lack of standardization, leave potential safety hazard;
4th, the typically unshielded door of upper people's passage, it is impossible to effectively forbid idler to climb;
5th, Inspection and maintenance is needed during upper people's passage use, usage time is longer, is also easy to produce potential safety hazard.
In order to reduce the potential safety hazard of people's passage on above-mentioned steel tube fastener formula tower crane, occurs a kind of sizing in the prior art Change people's passage on tower crane, people's passage is a single unit system on this regularization tower crane, and its bottom platform and two side shields are welded It is connected in an entirety.On the regularization tower crane although people's passage solves the problems, such as to set up repeatedly and work high above the ground, but is transporting During defeated, this integral channel is due to that can not dismantle, so space-consuming is larger, when engineering is directly used in turn with engineering When, transport is inconvenient, in addition, being such as damaged in use, repairs or changes and be more troublesome.
The content of the invention
The problem of existing for prior art, the purpose of this utility model are to provide a kind of improved regularization tower Hang on people's passage, people's passage has higher safety coefficient on the regularization tower crane, without repeat set up, and assemble, dismantle compared with For convenience, it is used in turn rate height.
To achieve the above object, people's passage includes bottom platform, two side shields, prevented on regularization tower crane of the present utility model Shield door, bottom platform is secondary stupefied comprising 4 main stupefied and some, and 4 masters are stupefied to form a rectangle frames, and two longer masters are stupefied during master is stupefied Form 2 long sides of rectangle frame, it is main it is stupefied in stupefied 2 short sides for forming rectangle frame of two shorter master, some times it is stupefied equally spacedly It is connected between 2 long sides of rectangle frame, two side shields include some vertical rods and at least 2 horizon bars, some vertical rods etc. Spacing is arranged, and horizon bar is connected perpendicular to vertical rod, and with vertical rod, and two side shields are connected using bolt with bottom platform, protective door It is arranged between two side shields.
Further, 4 masters are stupefied includes that 2 root long masters are stupefied and 2 short masters are stupefied, and 2 root long masters are stupefied and 2 short masters are stupefied forms respectively The long side and short side of rectangle frame, bolt connection vertical rod and long master are stupefied, then are fixed with Double-ended nut.
Further, bottom platform is also comprising being laid on landing slab on rectangle frame, the length and width of landing slab and rectangle frame Length and width are roughly equal.
Further, two side shields also include protection network, and protection network is using on iron wire colligation to two side shields.
Further, welding one is used to bottom platform being connected to tower crane below one end of tower crane on rectangle frame Hook portion.
Further, hook portion includes 4 extension legs, is arranged on two of rectangle frame below one end of tower crane two-by-two Side, 2 per side are hung long side direction arrangement of the leg along rectangle frame.
Further, protective door is arranged between the relative 2 piece vertical rod of two side shields, and chain is housed, protective door Side is hinged wherein in a vertical rod, and another vertical rod is provided with the lock being used cooperatively with chain.
People's passage uses modular construction on regularization tower crane of the present utility model, and assembly and disassembly are convenient, also allow for office Portion's damage maintenance, and occupied little space after removing, next engineering is readily transported, improves the rate of being used in turn.
Brief description of the drawings
The utility model is made below in conjunction with the accompanying drawings further to describe and illustrate.
Fig. 1 is the structure expansion plan of people's passage on the regularization tower crane of the utility model first choice embodiment, wherein Two side shields of bottom platform turn over to left and right respectively turn 90 degrees displaying.
Fig. 2 is the A-A sectional views of people's passage on regularization tower crane in Fig. 1.
Fig. 3 is the B-B sectional views of people's passage on regularization tower crane in Fig. 1.
Fig. 4 is the scheme of installation of people's passage on regularization tower crane in Fig. 1.
Embodiment
As Figure 1-4, people's passage uses modularization assembling on the regularization tower crane of the utility model first choice embodiment Structure, mainly comprising 3 three bottom platform 1, two side shields 2 and protective door modules.
Bottom platform 1 includes 4 main stupefied 11, some times stupefied 12 and landing slab 13.It is stupefied that 4 masters stupefied 11 include 2 root long masters It is stupefied with 2 short masters, and it is welded into a rectangle frame.Equally spacedly it is arranged in two long sides of rectangle frame (i.e. some times stupefied 12 Long master is stupefied) between and perpendicular to long side, secondary stupefied 12 both ends respectively with the main stupefied welding of two length, so as to form bottom skeleton.Bottom Landing slab 13 is laid on portion's skeleton, landing slab 13 is connected with main stupefied 11 colligation, the length and width of landing slab 13 and the length and width phase of rectangle frame Deng.Landing slab 13 uses steel basketry piece.
Rectangle frame is welding a hook portion 4 below tower crane one end, for being stuck in the horizontal cross bar 5 of standard section of tower crane On, so as to which bottom platform 1 is connected into tower crane.Hook portion 4, which includes 4, hangs legs 40,4 and hangs legs 40 two-by-two positioned at the end along short The both sides in main stupefied direction, hang leg 40 for 2 per side and arranged along rectangle frame long side direction, the horizontal cross bar 5 of tower crane can be stuck in 2 Root is hung between leg 40.
Two side shields 2 include some vertical rods 21, at least 2 horizon bars 22 and protection network 23.Between some grades of vertical rod 21 Arranged away from ground.In the present embodiment, weld and connect with vertical rod 21 perpendicular to vertical rod 21 using 2 horizon bars 22, horizon bar 22 Connect, so as to form protective framework.Specifically, wherein one of 2 horizon bars 22 and one end of vertical rod 21 are welded, and another substantially It is welded on the middle part of vertical rod 21.Protection network 23 is using on iron wire colligation to protective framework.Vertical rod 21, horizon bar 22 and protection network 23 Form damper modules, the damper modules are connected using plain bolt with bottom platform 1, specifically, plain bolt by vertical rod 21 and Long main stupefied 11 connection of bottom platform 1, and fixed using double nut, therefore the peace installation and dismantling of damper modules and bottom platform module Unload more convenient.After installing, place plane of the plane residing for the protection network of damper modules perpendicular to landing slab 13.
Protective door 3 is arranged between two side shields 2, specifically, be arranged on two side shields 22 relative vertical rods 21 it Between, protective door 3 is hinged wherein in a vertical rod, and lock is set in another vertical rod, so as to realize opening for protective door 3 Open and lock, be effectively prevented from idler by people's passage on tower crane, into tower crane operating room.Preferably, protective door 3 is high 1.8m。
Before lifting, first by three modules of people's passage on regularization tower crane:Bottom platform 1, two side shields 2 and protection Door 3 is assembled, then is lifted.The assembling of people's passage is simple on regularization tower crane of the present utility model, saves man-hour.In work After journey terminates, people's passage on regularization tower crane is hung to ground, dismantled, after being disassembled into three modules, entrucking is transported down One engineering is used in turn.It is dismantled simply, and is readily transported, and drastically increases efficiency of construction.
The technological process of people's passage is on regularization tower crane:Module set up and assembling → lifting it is in place → turnover utilizes.
Module is set up and assembled
The step includes following sub-step:
1. bottom skeleton welds
According to layout design, the welding of bottom skeleton is carried out.A rectangle frame first is welded into by 4 main stupefied 11, if then will Dry root times stupefied 12 be equally spacedly welded on rectangle frame 2 root long masters it is stupefied between, so as to form bottom skeleton.Preferably, main stupefied 11 Using L63*5 equal leg angles, the size of rectangle frame is 4.5m*0.8m, and its length can determine according to the position of live tower crane, is led to Often, the length of rectangle frame is tower crane away from main building exterior wall length+1.5m.For example, engineering tower crane is 3m away from wall, the overall length of rectangle frame is then For 4.5m, if, the material of bigger specification should be used, notice that overlapping exterior wall length is not less than 1.5m apart from exterior wall farther out.It is secondary stupefied 12 use the spirals of φ 16, and the spacing between adjacent twice stupefied 12 is 145-155mm, preferably 150mm.
Hook portion 4 is welded below tower crane one end in rectangle frame, for bottom platform to be connected into tower crane specifically, 2 are respectively welded in the both sides of the end and hangs 40,2 extension legs 40 of leg along long main stupefied direction arrangement.The level of standard section of tower crane Cross bar 5 can be stuck between 2 extension legs 40.2 spacing hung between leg 40 are 95-105mm, preferably 100mm.
2. both sides protective framework welds and assembling
After bottom platform is constructed, both sides protective framework of constructing.Some vertical rods 21 are equidistantly arranged, 2 levels Bar 22 is perpendicular to vertical rod 21, wherein a horizon bar 22 is welded on one end of vertical rod 21, another horizon bar 22 is welded on vertical rod 21 middle part, so as to form protective framework.Preferably, vertical rod 21 and horizon bar 22 use L36*3 equal leg angles, are highly 1200mm, vertical rod spacing are 1000mm.Spacing between 2 horizon bars 22 is 600mm.All pads of the present utility model are equal Antirust treatment is carried out brushed with antirust paint.
Both sides protective framework is connected to by bottom skeleton using plain bolt, specifically, plain bolt connects vertical rod 21 Long master to rectangle frame is stupefied, then is fixed using double nut.Therefore, two side shields 2 and bottom platform 1 are assembled together.
Both sides protection network 23 is installed, protection network 23 uses iron wire banding fixed with both sides protective framework.Preferably, protection network 23 use the reinforced mesh of φ 4.It is of course also possible to first install protection network, then assemble two side shields 2 and bottom platform 1.
3. landing slab is laid
The length and width of landing slab 13 are identical with the length and width of rectangle frame, are laid on rectangle frame, and connect with stupefied colligation of master Connect.Preferably, landing slab 13 uses steel basketry piece.
4. protective door is installed
Between protective door 3 is arranged on into two side shields 2, and chain is installed.Specifically, 2 phases of two side shields 2 are arranged on To vertical rod 21 between, the side of protective door 3 is hinged with a wherein vertical rod, and another vertical rod is provided with and be used cooperatively with chain Lock, so as to realize the unlatching of protective door 3 and lock.
The sub-steps of the above 4 complete setting up and assembling for each module of people's passage on regularization tower crane.
Lifting is in place
Lifting installation is carried out according to tower crane top lifting height and site operation progress, by the hook of people's passage on regularization tower crane Portion 4 is stuck on standard section of tower crane horizon bar 5, and the other end of people's passage is snapped on skin 6 on regularization tower crane.
Turnover utilizes
After each tower crane jacking, people's passage on the regularization tower crane of bottom is lifted to top (the tower crane attached wall of topmost Top correct position).Specific practice is:The end of upper people's passage positioned at tower crane side is sling with tower crane, close to building The other end of upper people's passage of side is slowly sent out, when upper people's passage is lifted to installation position, first by building side The end of upper people's passage fix, then the end of upper people's passage of fixed tower crane side.
During engineering tower crane is removed, upper people's passage is hung to ground, is divided into bottom platform, two side shields, protective door and zero Star component carries out classification and piled up, and entrucking is transported next engineering and is used in turn.
Compared with prior art, on regularization tower crane of the present utility model people's passage in engineering in use, need not Repeatedly set up repeatedly, save manpower and man-hour, and avoid the potential safety hazard during setting up.In addition, the utility model Regularization tower crane on people's passage use modularized design, its assembly and disassembly is more convenient, not only may be reused, and It is high to have enough to meet the need utilization rate.
Only preferred embodiment of the present utility model is described for above-mentioned embodiment, and not to this practicality New protection domain is defined.On the premise of the utility model design conception and scope is not departed from, this area Those of ordinary skill is according to word description provided by the utility model, accompanying drawing to made by the technical solution of the utility model Various modifications, replacement and improvement, protection category of the present utility model all should be belonged to.The scope of protection of the utility model will by right Ask determination.

Claims (7)

1. people's passage on a kind of regularization tower crane, include bottom platform, two side shields, protective door, it is characterised in that the bottom Platform is secondary stupefied comprising 4 main stupefied and some, and 4 masters are stupefied to form a rectangle frame, and two longer masters are stupefied during the master is stupefied 2 long sides of the rectangle frame are formed, stupefied 2 short sides for forming the rectangle frame of two shorter master during the master is stupefied, if described Between stupefied 2 long sides for being equally spacedly connected to rectangle frame of dry root time, two side shield includes some vertical rods and at least 2 Horizon bar, some vertical rods are equidistantly arranged, and the horizon bar is connected perpendicular to vertical rod, and with vertical rod, two side block Plate is connected using bolt with bottom platform, and the protective door is arranged between two side shields.
2. people's passage on regularization tower crane as claimed in claim 1, it is characterised in that 4 masters are stupefied, and to include 2 root long masters stupefied Stupefied with 2 short masters, 2 root long masters are stupefied and the stupefied long side and short side for forming the rectangle frame respectively of 2 short masters, the bolt connection institute State vertical rod and the long master is stupefied, then fixed with Double-ended nut.
3. people's passage on regularization tower crane as claimed in claim 1, it is characterised in that the bottom platform is also included and is laid on Landing slab on rectangle frame, the length and width of landing slab and the length and width of rectangle frame are roughly equal.
4. people's passage on regularization tower crane as claimed in claim 1, it is characterised in that two side shield is also comprising protection Net, protection network is using on iron wire colligation to two side shields.
5. people's passage on regularization tower crane as claimed in claim 1, it is characterised in that close to the one of tower crane on the rectangle frame Welding one is used for the hook portion that bottom platform is connected to tower crane below end.
6. people's passage on regularization tower crane as claimed in claim 5, it is characterised in that the hook portion include 4 extension legs, two Two are arranged on both sides of the rectangle frame below one end of tower crane, and 2 per side hang length of the leg along the rectangle frame Edge direction arranges.
7. people's passage on regularization tower crane as claimed in claim 1, it is characterised in that the protective door is arranged on two side shields Relative 2 piece vertical rod between, and chain is housed, the side of the protective door is be hinged wherein in a vertical rod, and another is vertical Bar is provided with the lock being used cooperatively with chain.
CN201720706086.9U 2017-06-17 2017-06-17 People's passage on a kind of regularization tower crane Active CN206842928U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720706086.9U CN206842928U (en) 2017-06-17 2017-06-17 People's passage on a kind of regularization tower crane

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720706086.9U CN206842928U (en) 2017-06-17 2017-06-17 People's passage on a kind of regularization tower crane

Publications (1)

Publication Number Publication Date
CN206842928U true CN206842928U (en) 2018-01-05

Family

ID=60799294

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720706086.9U Active CN206842928U (en) 2017-06-17 2017-06-17 People's passage on a kind of regularization tower crane

Country Status (1)

Country Link
CN (1) CN206842928U (en)

Similar Documents

Publication Publication Date Title
CN202706503U (en) Electric lifting discharging platform for main building construction
CN211691387U (en) Steel column is assembled operation platform for butt joint construction
CN109653484B (en) Roofing superelevation faces external hanging flower basket mounting structure of empty curtain engineering
CN107217836A (en) A kind of construction hanging basket suspension arrangement for steel construction shelter bridge
CN109763563B (en) Building construction
CN206842928U (en) People's passage on a kind of regularization tower crane
CN107010548A (en) People's passage and its construction method on a kind of regularization tower crane
CN210439081U (en) Magnetic suspension type platform
CN204212065U (en) Bridge crossing anticollision barrier punching block erection equipment
CN211338618U (en) Tower crane pedestrian passageway
CN111236603A (en) Comprehensive construction method for steel plate mesh overhanging scaffold
CN203499259U (en) Tool type cantilevered unloading platform
CN203129581U (en) Slip form system
CN204983135U (en) Elevator discrepancy floor regularization passageway
CN109944422A (en) Inspection platform and building method for boiler second level energy-saving appliance
CN115095118A (en) Method for constructing coke quenching tower by suspended integrally-installed support
CN211946009U (en) Tower crane pedestrian passageway device
CN111608377B (en) Comprehensive construction method for building overhanging scaffold
CN205077886U (en) Shaped steel protection canopy of encorbelmenting
CN204298741U (en) Working platform in a kind of bridge pier rapid construction
CN207538492U (en) A kind of combination tool formula faces side hole protector
CN207063488U (en) A kind of construction hanging basket suspension arrangement for steel construction shelter bridge
CN219672088U (en) Convenient assembled steel construction welding operation platform
CN111608376A (en) Comprehensive construction method for shaping component
CN206360391U (en) A kind of architectural stair temporary guard rail

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CB03 Change of inventor or designer information
CB03 Change of inventor or designer information

Inventor after: Zhang Leiming

Inventor after: Sui Haitao

Inventor after: Kong Mingliang

Inventor after: Zhang Xiaohong

Inventor after: Wang Jinping

Inventor after: Wu Qiang

Inventor after: Xia Jinxia

Inventor after: Sun Chune

Inventor after: Xie Jiancheng

Inventor after: Shang Pengbiao

Inventor before: Sui Haitao

Inventor before: Zhang Xiaohong

Inventor before: Kong Mingliang

Inventor before: Sun Chune

Inventor before: Wang Jinping

Inventor before: Xie Jiancheng

Inventor before: Shang Pengbiao

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20180105

Address after: 450003, Henan, Zhengzhou Jinshui District Garden Road West, agricultural road south 6, 1 units, 22, 2207

Patentee after: The Second Construction Company Of China Construction Second Engineering Bureau

Address before: 210000 Jiangsu city of Nanjing Province along the Yangtze River Industrial Development Zone geguan Road No. 815

Patentee before: China Construction two Bureau Second Construction Engineering Co., Ltd. Huadong branch