Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720638219.3U
Other languages
Chinese (zh)
Inventor
胡建锋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201720638219.3U priority Critical patent/CN206828012U/en
Application granted granted Critical
Publication of CN206828012U publication Critical patent/CN206828012U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Jib Cranes (AREA)

Abstract

The central jack-up system of internally climbing tower crane provided by the utility model, including:Jacking cylinder and be connected with each other in climb up section and it is interior climb down section, inside climb up section provided with spandrel girder and climb crossbeam, the crossbeam that climbs is connected with spandrel girder;Inside climb down and jacking cross beam is provided with section, jacking cross beam can vertically move relative to the interior section that climbs down;Jacking cylinder, which is supported on, to climb between crossbeam and jacking cross beam;The crossbeam that climbs be provided with can to both sides stretch out the pawl that swashes, jacking cross beam be provided with can to both sides stretch out under climb pawl.The central jack-up system of internally climbing tower crane provided by the utility model, it is not required to dismantle jack-up system when climbing, easy to use, operating efficiency is high.

Description

The central jack-up system of internally climbing tower crane
Technical field
The utility model belongs to hoisting machinery technical field, the central jack-up system of more particularly to a kind of internally climbing tower crane.
Background technology
The internally climbing tower crane that China generally uses at present is the smooth internally climbing tower crane of ripple.The climbing technique of the smooth internally climbing tower crane of ripple uses frame Frame laterally pushed type, be characterized in using three sets it is in bulk in climb framework and weight that the bulky load-bearing load bearing beam tower crane of the six roots of sensation is climbed, Hydraulic station is placed in outside tower body with hydraulic jack, realizes that tower crane is climbed using side jack-up method.Tower crane, which is often climbed, once just will By it is nethermost it is a set of in climb framework and the dismounting of two spandrel girders, move one layer of progress of reinstalling, weld and detect a flaw topmost to Safe handling.Meanwhile three or four floors will be removed on hydraulic station and hydraulic jack again and reinstalled, carry out side next time and jack. If operation is smooth, also to hurry two days or so can just climb once, be got into trouble just in case side jacks, and can just climb within several days one It is secondary.
The content of the invention
For in the prior art the defects of, the utility model provides a kind of central jack-up system of internally climbing tower crane, and tower crane is climbed It is not required to dismantle the central jack-up system when rising, easy to use, operating efficiency is high.
The central jack-up system of internally climbing tower crane provided by the utility model, including:Jacking cylinder and the interior of interconnection are climbed Upper section climbs down section with interior, and the interior section of climbing up is connected provided with spandrel girder and the crossbeam that climbs, the crossbeam that climbs with the spandrel girder; Climbed down in described and jacking cross beam is provided with section, the jacking cross beam can vertically move relative to the interior section that climbs down;Institute State jacking cylinder and be supported on described climb between crossbeam and the jacking cross beam;The crossbeam that climbs is provided with and can stretched out to both sides The pawl that swashes, the jacking cross beam also be provided with can to both sides stretch out under climb pawl.
According to an embodiment provided by the utility model, interior climb down saves the jacking passage provided with vertically, The jacking cross beam is slidably arranged in the jacking passage.
According to an embodiment provided by the utility model, the jacking cross beam is connected by locating wheel and the jacking passage Connect.
According to an embodiment provided by the utility model, the crossbeam that climbs is provided with load-bearing bi-lug plate, and the jacking is horizontal Beam is equipped with jacking bi-lug plate, and the both ends of the jacking cylinder are respectively by hinge in corresponding bi-lug plate.
According to an embodiment provided by the utility model, in addition to it is arranged on interior first operation for climbing up section and puts down Platform.
According to an embodiment provided by the utility model, first operating platform is provided with hydraulic oil container, the hydraulic pressure Fuel tank is provided with hydraulic power unit, and the hydraulic power unit is connected by high-pressure oil pipe with the jacking cylinder.
According to an embodiment provided by the utility model, in addition to it is arranged on interior second operation for climbing down section and puts down Platform.
According to an embodiment provided by the utility model, the internal climbing foundation is provided with the 3rd operating platform.
According to an embodiment provided by the utility model, the internal climbing foundation is provided with telescopic outrigger.
The operation principle of the central jack-up system of internally climbing tower crane provided by the utility model is as follows:During original state, swash Pawl is protruding, is fastened on climbing on gusset for cat ladder, and the gusset that climbs provides support force to central jack-up system, maintains center top The height of the system of liter;Because jacking cylinder is connected to the lower end for the crossbeam that climbs, when jacking cylinder shrinks, jacking oil can be driven The jacking cross beam of cylinder lower end moves up, and when moving on to predeterminated position on jacking cross beam, pawl is climbed under protruding, and drive jacking cylinder Piston rod be displaced outwardly, pawl climbed under making be fastened on the another of cat ladder and climb on gusset, so as to provide support by jacking cross beam Power, section is climbed up in jack-up upwards, and section is climbed down in drive while is acted, realize that tower crane is climbed.Center jacking of the present utility model When system is climbed, disassembly mechanism is not required to, easy to use, operating efficiency is high.
The beneficial effects of the utility model are as follows:
1st, the central lifting body of internally climbing tower crane provided by the utility model, all dexterously it is arranged on the interior section and interior of climbing up Section is climbed down, so as to realize mechanization and automation that new internally climbing tower crane climbs.
2nd, the utility model eliminates the burden that framework and six roots of sensation spandrel girder are climbed in three sets of former " ripple is smooth " internally climbing tower crane, knot Structure is compact, elegant in appearance, can be arranged in elevator and use, both save equipment funds, and expand internally climbing tower crane again uses model Enclose.
3rd, the utility model is jacked using hydraulic central, tower-body standard section corner uniform stressed when tower crane is climbed, and is eradicated A variety of hidden danger of " ripple is smooth " internally climbing tower crane side jacking.
4th, the central lifting body of the internally climbing tower crane of offer of the present utility model can also climb up section inside, interior climb down section respectively First operating platform and the second operating platform are set, so as to ensure the safety of operating personnel, the 3rd operation is set on internal climbing foundation Platform, wherein, the first operating platform and the second operating platform can be semi-closed structure, and the 3rd operating platform is totally-enclosed knot Structure.Tens sets of safe struts and sissy bar can be also installed, personnel carry out comprehensive safeguard protection to climbing on tower body.
Brief description of the drawings
, below will be right in order to illustrate more clearly of the utility model embodiment or technical scheme of the prior art The required accompanying drawing used is briefly described in embodiment or description of the prior art.In all of the figs, it is similar Element or part are typically identified by similar reference.In accompanying drawing, each element or part might not be according to the ratios of reality Draw.
Fig. 1 is the structural representation of the central jack-up system for the internally climbing tower crane that an embodiment provides;
Fig. 2 is that to swash that pawl is fastened on the gusset that climbs be the structural representation of crossbeam of climbing;
Fig. 3 is the structural representation of jacking cross beam.
Description of reference numerals
Section is climbed up in 1-
11- spandrel girders
12- climbs crossbeam
13- load-bearing bi-lug plates
14- swashes pawl
Section is climbed down in 2-
21- jacks passage
22- jacking cross beams
221- locating wheels
23- jacks bi-lug plate
Pawl is climbed under 24-
3- jacking cylinders
31- cylinder sleeves
32- piston rods
33- hydraulic oil containers
4- cat ladder gussets
Embodiment
The embodiment of technical solutions of the utility model is described in detail below in conjunction with accompanying drawing.Following examples are only For clearly illustrating the technical solution of the utility model, therefore example is only used as, and this practicality can not be limited with this New protection domain.
It should be noted that unless otherwise indicated, technical term or scientific terminology used in this application should be this reality The ordinary meaning understood with new one of ordinary skill in the art.
Referring to figs. 1 to Fig. 3, in an embodiment, the central jack-up system of internally climbing tower crane provided by the utility model, including: Jacking cylinder 3 and be connected with each other in climb up section 1 and it is interior climb down section 2, inside climb up section 1 and be provided with spandrel girder 11 and climb crossbeam 12, The crossbeam 12 that climbs is connected with spandrel girder 11;Inside climb down in section 2 and be provided with jacking cross beam 22, jacking cross beam 22 relatively interior can climb down section 2 vertically move;Jacking cylinder 3, which is supported on, to climb between crossbeam 12 and jacking cross beam 22;The crossbeam 12 that climbs is provided with can To both sides stretch out the pawl 14 that swashes, jacking cross beam 22 be provided with can to both sides stretch out under climb pawl 24.
During original state, the pawl 14 that swashes is protruding, is fastened on climbing on gusset 4 for cat ladder, and the gusset 4 that climbs pushes up to center The system of liter provides support force, maintains the height of central jack-up system;Because jacking cylinder 3 is connected to the lower end for the crossbeam 12 that climbs, When jacking cylinder 3 shrinks, the jacking cross beam 22 of the lower end of jacking cylinder 3 can be driven to move up, it is pre- when being moved on on jacking cross beam 22 If during position, pawl 24 is climbed under protruding, and drive the piston rod 32 of jacking cylinder 3 to be displaced outwardly, pawl 24 is climbed under making and is fastened on Another level of cat ladder is climbed on gusset, so as to provide support force by jacking cross beam 22, climbs up section 1 in jack-up upwards, and drive Inside climb down section 2 while act, realize that tower crane is climbed.When the central jack-up system of the present embodiment climbs, it is not required to dismantle central jacking System, easy to use, operating efficiency is high.
In the present embodiment, jacking cylinder 3 includes cylinder sleeve 31 and piston rod 32, and cylinder sleeve 31 is connected with the crossbeam 12 that climbs, piston Bar 32 is connected with jacking cross beam 22.
Section 2 is inside climbed down provided with jacking passage 21 vertically, jacking cross beam 22 is slidably arranged in jacking passage 21. Guide effect is formed to jacking cross beam 22 by jacking passage 21 so that jacking cross beam 22 can glide along jacking passage 21 It is dynamic.
More specifically, jacking cross beam 22 is connected by locating wheel 221 with jacking passage 21.By locating wheel 221 to jacking The horizontal level of crossbeam 22 is defined, and prevents jacking cross beam 22 from swinging, during so as to ensure jacking, the perpendicularity of jacking cylinder 3, Prevent jacking cylinder 3 from tilting, cause potential safety hazard.
More specifically, the crossbeam 12 that climbs is provided with load-bearing bi-lug plate 13, jacking cross beam 22 is equipped with jacking bi-lug plate 23, jacking The both ends of oil cylinder 3 are respectively by hinge in corresponding bi-lug plate.In the present embodiment, pass through be hinged form so that top Oil-lifting jar 3 can rotate relative to crossbeam, so as to eliminate stress concentration phenomenon caused by crossbeam tilts.
More specifically, also include being arranged on interior the first operating platform for climbing up section 1.The first operating platform is in the present embodiment Semi-closed structure, it is made up of expanded metal lath.
More specifically, the first operating platform is provided with hydraulic oil container 33, hydraulic oil container 33 is provided with hydraulic power unit, hydraulic power unit It is connected by high-pressure oil pipe with jacking cylinder 3.Start hydraulic power unit, hydraulic oil can promote jacking horizontal to enter jacking cylinder 3 Beam 22 is descending.Pawl 24 is climbed under jacking cross beam 22 just to pass to the top lift of jacking cylinder 3 on the gusset of cat ladder.Due to cat ladder Gusset is welded on the girder of inner climbing jacket frame, and the telescopic outrigger of girder extend into shear wall fixed, inner climbing jacket frame and cat ladder again Can not be descending, and reaction force can only be produced, promote internally climbing tower crane to climb upwards.In the present embodiment, internally climbing tower crane climbs upwards 800-1000 millimeters, the pawl 14 that swashes for the crossbeam 12 that climbs can carry out jacking on the upper level gusset of cat ladder and change step to be pressed in.
More specifically, also include being arranged on interior the second operating platform for climbing down section 2.The second operating platform is in the present embodiment Semi-closed structure, it is made up of expanded metal lath.
The central jack-up system for the internally climbing tower crane that the present embodiment provides also includes:It is arranged on and the interior of section lower section is climbed down in described Climbing foundation.The internal climbing foundation is provided with the 3rd operating platform and telescopic outrigger of full-closed structure.The internal climbing foundation is provided with peace Full strut and/or sissy bar.After the completion of climbing, operating personnel pull out the telescopic outrigger of internal climbing foundation, and telescopic outrigger is inserted In preformed hole on shear wall, internally climbing tower crane base is fixed, while safe strut and sissy bar are fastened, can be with continuation The lifting operation of internally climbing tower crane.
In the description of the present application, it is to be understood that term " on ", " under ", "front", "rear", "left", "right", " water It is flat ", " interior ", the orientation of the instruction such as " outer " or position relationship for based on orientation shown in the drawings or position relationship, merely to just In description the utility model and simplified description, rather than indicate or imply that signified device or element must be with specifically square Position, with specific azimuth configuration and operation, therefore it is not intended that to limitation of the present utility model.
In addition, term " first ", " second " etc. are only used for describing purpose, and it is not intended that indicating or implying relatively important Property or the implicit quantity for indicating indicated technical characteristic.In description of the present utility model, " multiple " are meant that two More than, unless otherwise specifically defined.
In specification of the present utility model, numerous specific details are set forth.It is to be appreciated, however, that reality of the present utility model Applying example can put into practice in the case of these no details.In some instances, known method, knot is not been shown in detail Structure and technology, so as not to obscure the understanding of this description.
In the description of this specification, specific features, structure, material or feature can be in any one or more embodiments Or combined in an appropriate manner in example.In addition, in the case of not conflicting, those skilled in the art can say this Different embodiments or example and the feature of different embodiments or example described in bright book are combined and combined.
Finally it should be noted that:Various embodiments above is only to illustrate the technical solution of the utility model, rather than it is limited System;Although the utility model is described in detail with reference to foregoing embodiments, one of ordinary skill in the art should Understand:It can still modify to the technical scheme described in foregoing embodiments, either to which part or whole Technical characteristic carries out equivalent substitution;And these modifications or replacement, the essence of appropriate technical solution is departed from this practicality newly The scope of each embodiment technical scheme of type, it all should cover among claim of the present utility model and the scope of specification.

Claims (10)

1. the central jack-up system of internally climbing tower crane, it is characterised in that including:Jacking cylinder (3) and the interior of interconnection climb up section (1) and it is interior climb down section (2), it is described in climb up section (1) and be provided with spandrel girder (11) and the crossbeam that climbs (12), the crossbeam that climbs (12) It is connected with the spandrel girder (11);Climbed down in described in section (2) and be provided with jacking cross beam (22), the jacking cross beam (22) being capable of phase The interior section (2) that climbs down vertically is moved;The jacking cylinder (3) is supported on climb crossbeam (12) and the top Between liter crossbeam (22);The crossbeam that climbs (12) is provided with the pawl that swashes (14) that can be stretched out to both sides, the jacking cross beam (22) it is provided with being stretched out to both sides and climbs pawl (24).
2. the central jack-up system of internally climbing tower crane according to claim 1, it is characterised in that climb down section (2) in described and set There is jacking passage (21) vertically, the jacking cross beam (22) is slidably arranged in the jacking passage (21).
3. the central jack-up system of internally climbing tower crane according to claim 2, it is characterised in that the jacking cross beam (22) is logical Locating wheel (221) is crossed to be connected with the jacking passage (21).
4. the central jack-up system of internally climbing tower crane according to claim 1, it is characterised in that the crossbeam that climbs (12) sets There is load-bearing bi-lug plate (13), the jacking cross beam (22) is equipped with jacking bi-lug plate (23), the both ends point of the jacking cylinder (3) Not by hinge in corresponding bi-lug plate.
5. the central jack-up system of internally climbing tower crane according to claim 1, it is characterised in that also include being arranged in described Climb up the first operating platform of section (1).
6. the central jack-up system of internally climbing tower crane according to claim 5, it is characterised in that first operating platform is set Have a hydraulic oil container (33), the hydraulic oil container (33) is provided with hydraulic power unit, the hydraulic power unit by high-pressure oil pipe with it is described Jacking cylinder (3) connects.
7. the central jack-up system of internally climbing tower crane according to claim 1, it is characterised in that also include being arranged in described Climb down the second operating platform of section (2).
8. the central jack-up system of internally climbing tower crane according to claim 1, it is characterised in that also include being arranged in described Climb down the internal climbing foundation of section lower section.
9. the central jack-up system of internally climbing tower crane according to claim 8, it is characterised in that the internal climbing foundation is provided with the Three operating platforms.
10. the central jack-up system of internally climbing tower crane according to claim 8, it is characterised in that the internal climbing foundation is provided with Telescopic outrigger.
CN201720638219.3U 2017-06-02 2017-06-02 The central jack-up system of internally climbing tower crane Expired - Fee Related CN206828012U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720638219.3U CN206828012U (en) 2017-06-02 2017-06-02 The central jack-up system of internally climbing tower crane

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720638219.3U CN206828012U (en) 2017-06-02 2017-06-02 The central jack-up system of internally climbing tower crane

Publications (1)

Publication Number Publication Date
CN206828012U true CN206828012U (en) 2018-01-02

Family

ID=60774297

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720638219.3U Expired - Fee Related CN206828012U (en) 2017-06-02 2017-06-02 The central jack-up system of internally climbing tower crane

Country Status (1)

Country Link
CN (1) CN206828012U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107055367A (en) * 2017-06-02 2017-08-18 胡建锋 The central jack-up system of internally climbing tower crane
CN109399432A (en) * 2018-11-23 2019-03-01 燕山大学 A kind of hoistway job platform that climbs certainly

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107055367A (en) * 2017-06-02 2017-08-18 胡建锋 The central jack-up system of internally climbing tower crane
CN109399432A (en) * 2018-11-23 2019-03-01 燕山大学 A kind of hoistway job platform that climbs certainly
CN109399432B (en) * 2018-11-23 2019-12-03 燕山大学 A kind of hoistway job platform that climbs certainly

Similar Documents

Publication Publication Date Title
CN106939707B (en) A kind of restricted clearance large-scale steel structure supporting platform from method for improving
US11629033B2 (en) Integral lifting system and lifting method for assembled members
CN103243930B (en) System and method for modularized construction of super high-rise steel structures
CN107191676A (en) Buried pipeline construction method
CN103643800A (en) Lifting installation system for buckling restrained supporting member and construction method thereof
CN212689520U (en) Quick butt-joint type operation platform
CN103572763B (en) Large-span steel supports pattern foundation pit supporting structure Demolition Construction method
CN204644884U (en) High pier over-form construction reinforced bar installs mobile stock
CN106894342A (en) Pipe installing job platform and construction method
CN206828012U (en) The central jack-up system of internally climbing tower crane
CN106759909B (en) Bearing structure system and its construction method are hung up under one kind
CN206233546U (en) A kind of elevator hoistways workbench
CN110565937A (en) Door type integral lifting steel platform
CN110820950A (en) Integral synchronous jacking construction method for large-span combined type overweight eccentric slope angle steel structure
CN111039197B (en) Construction method for reverse-order joint addition of jacking of internal-climbing tower crane
CN107055367A (en) The central jack-up system of internally climbing tower crane
CN206784891U (en) A kind of prefabricated hoistway operation platform
CN209618736U (en) Jacking apparatus is climbed in a kind of derrick crane
CN202882374U (en) Novel elevator shaft lifting type diagonal bracing operation steel platform
CN108439266B (en) Jacking device for crane
CN111705931A (en) Construction method of large-span grid structure
CN206034874U (en) Elevartor shaft combination formula integrally lift up operation platform
CN205531262U (en) Steel construction construction platform can rise automatically
CN206544855U (en) Supporting apparatus for large spatial structure construction elevator wall-attached frame
CN101709344B (en) Method for hoisting terrace for furnace top raw gas pipeline

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180102

Termination date: 20210602