CN209618736U - Jacking apparatus is climbed in a kind of derrick crane - Google Patents

Jacking apparatus is climbed in a kind of derrick crane Download PDF

Info

Publication number
CN209618736U
CN209618736U CN201920415395.XU CN201920415395U CN209618736U CN 209618736 U CN209618736 U CN 209618736U CN 201920415395 U CN201920415395 U CN 201920415395U CN 209618736 U CN209618736 U CN 209618736U
Authority
CN
China
Prior art keywords
frame
climb
oil cylinder
otic placode
girder
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201920415395.XU
Other languages
Chinese (zh)
Inventor
毛伟
谢国涛
屈伟
李绍俊
黄旭
聂峰
赵蓉
蔡美莲
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sichuan Jincheng Construction Machinery Co Ltd
Original Assignee
Sichuan Jincheng Construction Machinery Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sichuan Jincheng Construction Machinery Co Ltd filed Critical Sichuan Jincheng Construction Machinery Co Ltd
Priority to CN201920415395.XU priority Critical patent/CN209618736U/en
Application granted granted Critical
Publication of CN209618736U publication Critical patent/CN209618736U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Jib Cranes (AREA)

Abstract

The utility model discloses climbing jacking apparatus in a kind of derrick crane, including be set in turn in upper on standard knot from top to bottom climb frame, in climb frame and lower interior climb frame;Climbed in upper frame, in climb frame and it is lower it is interior climb frame be all set in climb on frame spandrel girder, it is upper in climb frame, in climb frame and lower interior climb include two girders and two crossbeams on frame;Girder and crossbeam are disposed adjacent, and are connected by welding;An idler wheel is respectively set on the both ends of cross rail inner, the jacking block of one with idler wheel cooperation are respectively set on the both ends on the inside of girder;Girder upper surface middle position is respectively mounted an oil cylinder otic placode, installs piston cylinder on oil cylinder otic placode;At the top of the piston cylinder with climb pawl and connect by pin shaft;A lifting-up support otic placode is installed in oil cylinder otic placode two sides respectively, installs lifting-up support on lifting-up support otic placode;It inside climbs and fixes oil cylinder support rod on frame spandrel girder vertically, the two sides of oil cylinder support rod are separately connected an oil cylinder attachment beam being laterally arranged.

Description

Jacking apparatus is climbed in a kind of derrick crane
Technical field
The utility model belongs to the technical field of tower crane, and in particular to climbs jacking apparatus in a kind of derrick crane.
Background technique
The significant components that device is internal-climbing tower crane are inside climbed, are set in medium position during climbing Device is climbed in climbing, the own wt of internal-climbing tower crane is passed into shear wall carrying, by being set to bottom in use process In climb device by the own wt of internal-climbing tower crane pass to shear wall carrying.When internal-climbing tower crane is installed, peace Loaded on being reserved on building shear wall reserved opening or the pre-buried bracket of shear wall, with the raising building shear wall of building Thickness constantly reducing, the distance of building shear wall reserved opening or the pre-buried bracket of shear wall is constantly increasing, just The girder steel length that device is climbed in it is required that constantly increases;It is welded H section steel beam or case that device is climbed in existing general derrick crane Type girder construction is climbed frame in internal-climbing tower crane and climbs device with interior and be attached using bolt, inside climbed device and cut with building The connection of power wall is using the connection of pre-buried bracket or reserved opening connection.Device use is climbed in existing general internal-climbing tower crane When climbing the use of device in reserved opening connection, convert, have bad luck, need to be fallen using itself tower crane suspension hook with chain block Conversion is carried out after fortune overturning or uses tower crane to convert interior climb after architecture enclosing is transported out at device pull-out hole.Now lead to When climbing device in derrick crane using climbing the use of device in the connection of pre-buried bracket, converting, have bad luck, girder steel is inside climbed Length constantly increases, and needs to make the interior of different length and climbs girder steel.
To sum up, device is climbed in existing general derrick crane to be drawn using manpower with tower crane lifting, there are the shortcomings that Or shortcoming has: 1, staff's operating difficulties;2, operation timeliness rate is low;3, large labor intensity when operation.
Utility model content
The purpose of this utility model is that being directed to above-mentioned deficiency in the prior art, provides in a kind of derrick crane and climb top Device is risen, it is above-mentioned to solve the problems, such as or improve.
In order to achieve the above objectives, the technical scheme adopted by the utility model is that:
Jacking apparatus is climbed in a kind of derrick crane comprising is set in turn in upper on standard knot and is climbed from top to bottom Frame, in climb frame and lower interior climb frame;Climbed in upper frame, in climb frame and it is lower it is interior climb frame be all set in climb on frame spandrel girder, it is upper in Climb frame, in climb frame and lower interior climb on frame include two girders and two crossbeams;Girder and crossbeam are disposed adjacent, and pass through weldering It connects connected;An idler wheel is respectively set on the both ends of cross rail inner, one is respectively set on the both ends on the inside of girder With the jacking block of idler wheel cooperation;Girder upper surface middle position is respectively mounted an oil cylinder otic placode, installs piston cylinder on oil cylinder otic placode;It is described At the top of piston cylinder with climb pawl and connect by pin shaft;Oil cylinder otic placode two sides are installed by one lifting-up support otic placode, lifting-up support ear respectively Lifting-up support is installed on plate;It inside climbs and fixes oil cylinder support rod on frame spandrel girder vertically, the two sides of oil cylinder support rod are separately connected one The oil cylinder attachment beam being laterally arranged;Two oil cylinder attachment beams are sheathed on piston cylinder two sides.
Preferably, four main chords of standard knot are caught between idler wheel and jacking block.
Preferably, oil cylinder attachment beam is fixed on oil cylinder support rod by pin shaft.
Preferably, lifting-up support is fixed on lifting-up support otic placode by sliding bearing.
Jacking apparatus is climbed in derrick crane provided by the utility model, is had the advantages that
For the utility model during jacking, piston cylinder jacking is primary, and tower crane is climbed 1.5 meters upwards, repeated multiple times, can make Tower-body standard section lower end surface be slightly less than in climb frame lower plane, at this time stop jacking.Inwardly rotation lifting-up support makes jacking branch Frame is caught in standard knot marks time, at this point, application piston cylinder retraction make the weight of entire tower crane fall in in climb the jacking branch of frame On frame, then the jacking block climbed on the inside of frame in every set held out against into tower body main chord, unload hoist, lock the screw rod of jacking block, completes the Once climb.Tower crane climb it is primary after, it is nethermost it is lower in climb frame departing from interior climbing tower body, no longer work, thus by its Remove and be installed to topmost, as it is upper it is interior climb frame, in this way, climbing frame rotation in upper, middle and lower during jacking makes With can effectively reduce working strength, improve working efficiency, reduce operation difficulty.
Detailed description of the invention
Fig. 1 is the structure chart that jacking apparatus is climbed in derrick crane.
Fig. 2 is to climb in jacking apparatus the structure chart for climbing frame in derrick crane.
Fig. 3 is to climb jacking apparatus in derrick crane to jack state diagram.
Wherein, 1, frame is climbed in upper;2, frame is climbed in;3, frame is climbed in lower;4, lifting-up support;5, standard knot;6, piston cylinder;7, Oil cylinder support rod;8, oil cylinder attachment beam;9, interior to climb frame spandrel girder;10, main chord;11, oil cylinder otic placode;12, lifting-up support otic placode; 13, crossbeam;14, girder;15, idler wheel;16, jacking block;17, pawl is climbed.
Specific embodiment
Specific embodiment of the present utility model is described below, in order to facilitate understanding by those skilled in the art The utility model, it should be apparent that the utility model is not limited to the range of specific embodiment, to the common skill of the art For art personnel, if various change the attached claims limit and determine the utility model spirit and scope in, These variations are it will be apparent that all are created using the utility model of the utility model design in the column of protection.
According to one embodiment of the application, with reference to Fig. 1 and Fig. 2, jacking apparatus is climbed in the derrick crane of this programme, is wrapped Include be set in turn in upper on standard knot 5 from top to bottom climb frame 1, in climb frame 2 and lower interior climb frame 3;Climbed in upper frame 1, in It climbs frame 2 and lower interior frame 3 of climbing is all set in interior climb on frame spandrel girder 9.
Climbed in upper frame 1, in climb frame 2 and lower interior climb include two girders 14 and two crossbeams 13,14 He of girder on frame 3 Crossbeam 13 is disposed adjacent, and is connected by welding.
An idler wheel 15 is respectively set on the both ends of 13 inside of crossbeam, is set respectively on the both ends of 14 inside of girder The jacking block 16 cooperated with idler wheel 15 is set, four main chords 10 of standard knot 5 are caught between idler wheel 15 and jacking block 16, can use Guiding during jacking.
Except this, jacking block 16 is fixed on 13 inside of crossbeam by screw rod, can realize jacking block 16 and main chord by adjusting screw rod It is elastic between 10.
14 upper surface middle position of girder is respectively mounted an oil cylinder otic placode 11, installs piston cylinder 6, piston cylinder on oil cylinder otic placode 11 6 tops with climb pawl 17 and connect by pin shaft, during jacking, climb 17 claw clip of pawl on main chord 10, the promotion of piston cylinder 6, reality Now jack;After jacking, the release of pawl 17 is climbed, as shown in Figure 3.
A lifting-up support otic placode 12 is installed in 11 two sides of oil cylinder otic placode respectively, installs lifting-up support on lifting-up support otic placode 12 4;It inside climbs and fixes oil cylinder support rod 7 on frame spandrel girder 9 vertically, the two sides of oil cylinder support rod 7 are separately connected the oil being laterally arranged Cylinder attachment beam 8, two oil cylinder attachment beams 8 are sheathed on 6 two sides of piston cylinder, and the guiding of process is jacked for realizing piston cylinder 6, makes to live Plug cylinder 6 can accurate operation, avoid piston cylinder 6 shake.
Lifting-up support 4 is fixed on lifting-up support otic placode 12 by sliding bearing, after jacking reaches certain height, is needed By lifting-up support 4, inwardly rotation is caught in the marking time of standard knot 5, make its bear tower crane from heavy load;When the primary top of completion After rising operation, outward rotate.
According to one embodiment of the application, the workflow that jacking apparatus is climbed in this programme derrick crane is as follows:
The screw rod on jacking block 16 is adjusted, it is made not contact (release) between main chord 10,6 operation of piston cylinder jacking one Secondary, tower crane is climbed 1.5 meters upwards, make 5 lower end surface of tower-body standard section be slightly less than in climb 2 frame lower plane of frame, at this time stop jacking.
Inwardly rotation lifting-up support 4 is caught in lifting-up support 4 in standard knot 5 marks time, at this point, the retraction of application piston cylinder 6 makes The weight of entire tower crane fall in in climb on the lifting-up support 4 of 2 frame of frame, then the jacking block 16 climbed on the inside of frame in every set is held out against into tower Body main chord 10 unloads hoist, locks the screw rod of jacking block 16, completes to climb for the first time.
Tower crane climb it is primary after, it is nethermost it is lower in climb 3 frame of frame departing from interior climbing tower body, no longer work, interior climbed lower Frame 3 remove and be installed to topmost, as it is upper it is interior climb 1 frame of frame, in this way, 3 frame wheel of frame is climbed in upper, middle and lower during jacking Use is changed, can effectively reduce working strength, improves working efficiency, reduces operation difficulty.
Although being described in detail in conjunction with specific embodiment of the attached drawing to utility model, should not be construed as to this The restriction of the protection scope of patent.In range described by claims, those skilled in the art are without creative work The various modifications and deformation that can make still belong to the protection scope of this patent.

Claims (4)

1. climbing jacking apparatus in a kind of derrick crane, it is characterised in that: including being set in turn on standard knot from top to bottom Climbed in upper frame, in climb frame and lower interior climb frame;It is described it is upper in climb frame, in climb frame and it is lower it is interior climb frame be all set in climb frame load-bearing Liang Shang, it is upper in climb frame, in climb frame and lower interior climb on frame include two girders and two crossbeams;The girder and crossbeam are adjacent Setting, and be connected by welding;It is respectively set an idler wheel on the both ends of the cross rail inner, two on the inside of girder The jacking block of one with idler wheel cooperation are respectively set on end;Girder upper surface middle position is respectively mounted an oil cylinder otic placode, oil cylinder Piston cylinder is installed on otic placode;At the top of the piston cylinder with climb pawl and connect by pin shaft;Oil cylinder otic placode two sides are installed by one top respectively Ascending branch frame otic placode installs lifting-up support on lifting-up support otic placode;It is climbed in described and fixes oil cylinder support rod on frame spandrel girder vertically, oil The two sides of cylinder support rod are separately connected an oil cylinder attachment beam being laterally arranged;Two oil cylinder attachment beams are sheathed on piston cylinder two Side.
2. climbing jacking apparatus in derrick crane according to claim 1, it is characterised in that: four masters of the standard knot Chord member is caught between idler wheel and jacking block.
3. climbing jacking apparatus in derrick crane according to claim 1, it is characterised in that: the oil cylinder attachment beam passes through Pin shaft is fixed on oil cylinder support rod.
4. climbing jacking apparatus in derrick crane according to claim 1, it is characterised in that: the lifting-up support passes through cunning Dynamic bearing is fixed on lifting-up support otic placode.
CN201920415395.XU 2019-03-28 2019-03-28 Jacking apparatus is climbed in a kind of derrick crane Expired - Fee Related CN209618736U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920415395.XU CN209618736U (en) 2019-03-28 2019-03-28 Jacking apparatus is climbed in a kind of derrick crane

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920415395.XU CN209618736U (en) 2019-03-28 2019-03-28 Jacking apparatus is climbed in a kind of derrick crane

Publications (1)

Publication Number Publication Date
CN209618736U true CN209618736U (en) 2019-11-12

Family

ID=68458048

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920415395.XU Expired - Fee Related CN209618736U (en) 2019-03-28 2019-03-28 Jacking apparatus is climbed in a kind of derrick crane

Country Status (1)

Country Link
CN (1) CN209618736U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113479792A (en) * 2021-06-30 2021-10-08 中建七局第一建筑有限公司 Steel pipe bundle structure reinforced tower crane attachment system

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113479792A (en) * 2021-06-30 2021-10-08 中建七局第一建筑有限公司 Steel pipe bundle structure reinforced tower crane attachment system
CN113479792B (en) * 2021-06-30 2024-01-05 中建七局第一建筑有限公司 Steel tube bundle structure reinforced tower crane attachment system

Similar Documents

Publication Publication Date Title
CN100522793C (en) Installing method of portal crane
CN106219419B (en) The large-scale swing arm tower crane original position of high-rise building is converted to plug-in construction method by interior climb
CN101537976B (en) Dual-tower-mast giant self-lifting crane and following-carrying lifting method thereof
CN102953553B (en) Method for mounting large-span pipe truss by using boom luffing mechanism
CN201376848Y (en) Large-scale double-tower automatic-elevation hoisting equipment
CN102251483A (en) Construction method for hoisting concrete-filled steel tube lattice bridge pier through self-lifting attached crane
CN105540446A (en) Interior-climbing type lifting platform
CN107720575B (en) A kind of towing type construction method for hanging of tower crane support system
CN209618736U (en) Jacking apparatus is climbed in a kind of derrick crane
US4274542A (en) Method for transfer of crane from tower
CN204625045U (en) A kind of steel structure hoisting door shaped stent formula hanging apparatus
CN206692230U (en) A kind of skyscraper row is hung
CN113445426A (en) Construction device and construction method for upper bridge tower of cable-stayed bridge
CN203684113U (en) Automatic beam placement platform device
CN103147401B (en) Construction method of self-climbing portal frame
CN205500579U (en) Moving die carrier for lock
CN203794505U (en) Internal climbing steel beam conveying device of internal climbing movable arm tower crane
CN206828012U (en) The central jack-up system of internally climbing tower crane
CN211110630U (en) Multifunctional lifting appliance for lifting high-speed rail concrete box girder
CN101664963B (en) Multifunctional operating platform for large-volume prestressed concrete box girder tensioning
CN210735995U (en) Box girder transportation high-low position conversion device
CN201649667U (en) Reinforcement cage immersion guide frame
CN204643648U (en) Pylon and hanging basket thereof
CN201980890U (en) Herringbone hoisting mast for hoisting under special situation of high altitude
CN111285229A (en) Super high-rise power distribution room equipment hoisting engineering construction structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20191112

Termination date: 20210328

CF01 Termination of patent right due to non-payment of annual fee