CN206800350U - A kind of energy-saving offshore drilling platformses - Google Patents
A kind of energy-saving offshore drilling platformses Download PDFInfo
- Publication number
- CN206800350U CN206800350U CN201720611886.2U CN201720611886U CN206800350U CN 206800350 U CN206800350 U CN 206800350U CN 201720611886 U CN201720611886 U CN 201720611886U CN 206800350 U CN206800350 U CN 206800350U
- Authority
- CN
- China
- Prior art keywords
- platform
- pulley
- energy
- offshore drilling
- generator
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/30—Energy from the sea, e.g. using wave energy or salinity gradient
Abstract
The utility model discloses a kind of energy-saving offshore drilling platformses,Including upper platform and lower floor's platform,Derrick is provided with the top of upper platform,The side of derrick is provided with crane,The bottom of lower floor's platform is provided with four guide pile pipes,The bottom of guide pile pipe is provided with pile pipe,The side of pile pipe, which is provided with, issues radio station,Issue and upper generating platform in parallel is provided with the top of radio station,The surface for issuing radio station is provided with first pulley and second pulley,The surface of upper generating platform is provided with the 3rd pulley,The side of 3rd pulley is provided with generator,Runner is provided with the top of generator,Upper generating platform and issue and be provided with floating body between radio station,Floating body,Runner,First pulley,Connected between second pulley and the 3rd pulley by steel strand rope,The bottom of generator is provided with energy-storage box,The device is provided with the device using seawave power generation on existing offshore drilling platform,Generate electricity simple and practical,It make use of from heat energy,Substantial amounts of electric energy is saved.
Description
Technical field
It the utility model is related to a kind of drilling platforms, and in particular to a kind of energy-saving offshore drilling platformses, belong to stone
Oily field of mechanical technique.
Background technology
Offshore drilling platform is mainly used in drilling the offshore structures of well.The equipment such as upper dress drilling well, power, communication, navigation,
And safe life-saving and personnel's living facilities.Exploratory engineering of off-shore petroleum/gas reservoir develops indispensable means.Mainly there are jack up and partly latent
Formula drilling platforms.Existing offshore drilling platform needs to consume substantial amounts of electric energy in drilling well, the mode of movement of the electric energy and its
Trouble, and substantial amounts of energy waste is caused, but existing technology is difficult to overcome above mentioned problem.
Utility model content
The technical problems to be solved in the utility model is to overcome existing offshore drilling platform to need consumption big in drilling well
The electric energy of amount, the mode of movement and its trouble of the electric energy, and the problem of cause substantial amounts of energy waste, there is provided a kind of energy-saving sea
Upper oil drilling platform.
In order to solve the above-mentioned technical problem, the utility model provides following technical scheme:
The utility model provides a kind of energy-saving offshore drilling platformses, including upper platform and lower floor's platform, institute
State and derrick is provided with the top of upper platform, the side of the derrick is provided with crane, and the bottom of lower floor's platform is set
There are four guide pile pipes, the bottom of the guide pile pipe is provided with pile pipe, and the side of the pile pipe, which is provided with, issues radio station, described to issue
Upper generating platform in parallel is provided with the top of radio station, the surface for issuing radio station is provided with first pulley and second and slided
Wheel, the surface of the upper generating platform are provided with the 3rd pulley, and the side of the 3rd pulley is provided with generator, the generator
Top be provided with runner, the upper generating platform and described issue are provided with floating body between radio station, the floating body, the runner,
Connected between the first pulley, the second pulley and the 3rd pulley by steel strand rope, the bottom of the generator is set
It is equipped with energy-storage box.
As a kind of optimal technical scheme of the present utility model, the generator is electrically connected with the energy-storage box.
As a kind of optimal technical scheme of the present utility model, riser pipe is provided between the pile pipe.
As a kind of optimal technical scheme of the present utility model, elevating mechanism is additionally provided with the pile pipe.
As a kind of optimal technical scheme of the present utility model, the inside of the floating body is sealing structure.
The beneficial effect that the utility model is reached is:The device is a kind of energy-saving offshore drilling platformses, the dress
The device being provided with existing offshore drilling platform using seawave power generation is put, generates electricity simple and practical, make use of from heat energy,
Substantial amounts of electric energy is saved, whole device is reasonable in design, easy to use, and solve existing offshore drilling platform needs in drilling well
The problem of consuming substantial amounts of electric energy, the mode of movement and its trouble of the electric energy, and causing substantial amounts of energy waste.
Brief description of the drawings
Accompanying drawing is used for providing further understanding to of the present utility model, and a part for constitution instruction, with this practicality
New embodiment is used to explain the utility model together, does not form to limitation of the present utility model.In the accompanying drawings:
Fig. 1 is structural representation of the present utility model;
In figure:1st, upper platform;2nd, lower floor's platform;3rd, guide pile pipe;4th, pile pipe;5th, riser pipe;6th, radio station is issued;7th, on
Generating platform;8th, floating body;9th, steel strand rope;10th, first pulley;11st, second pulley;12nd, the 3rd pulley;13rd, runner;14th, generator;
15th, energy-storage box;16th, derrick;17th, crane.
Embodiment
Preferred embodiment of the present utility model is illustrated below in conjunction with accompanying drawing, it will be appreciated that described herein excellent
Select embodiment to be merely to illustrate and explain the utility model, be not used to limit the utility model.
Embodiment 1
As shown in figure 1, the utility model provides a kind of energy-saving offshore drilling platformses, including upper platform 1 is with
Layer platform 2, the top of upper platform 1 are provided with derrick 16, and the side of derrick 16 is provided with crane 17, the bottom of lower floor's platform 2
Portion is provided with four guide pile pipes 3, and the bottom of guide pile pipe 3 is provided with pile pipe 4, and the side of pile pipe 4, which is provided with, issues radio station 6, issues
The top in radio station 6 is provided with upper generating platform 7 in parallel, and the surface for issuing radio station 6 is provided with the cunning of first pulley 10 and second
Wheel 11, the surface of upper generating platform 7 is provided with the 3rd pulley 12, and the side of the 3rd pulley 12 is provided with generator 14, generator 14
Top be provided with runner 13, upper generating platform 7 and issue and be provided with floating body 8, floating body 8, runner 13, first pulley between radio station 6
10th, connected between the pulley 12 of second pulley 11 and the 3rd by steel strand rope 9, the bottom of generator 14 is provided with energy-storage box 15.
Generator 14 is electrically connected with energy-storage box 15, is easy to store electricity.
Riser pipe 5 is provided between pile pipe 4, resistance sleet accumulation, isolates surface flow sand bed.
Elevating mechanism is additionally provided with pile pipe 4, is easy to implement the lifting of platform.
The inside of floating body 8 is sealing structure, the buoyancy of increase floating body 8 in the seawater.
The device is a kind of energy-saving offshore drilling platformses, when needing with the device, upper generating platform 7 and lower generating
Platform 6 targeted by the direction of wave, under the slap up and down of wave, drive floating body 8 to swing up and down, while driven by steel strand rope 9
Runner 13 is rotated to drive generator 14 to generate electricity, and the electric power that generator 14 is sent is stored in energy-storage box 15.
The beneficial effect that the utility model is reached is:The device is a kind of energy-saving offshore drilling platformses, the dress
The device being provided with existing offshore drilling platform using seawave power generation is put, generates electricity simple and practical, make use of from heat energy,
Substantial amounts of electric energy is saved, whole device is reasonable in design, easy to use, and solve existing offshore drilling platform needs in drilling well
The problem of consuming substantial amounts of electric energy, the mode of movement and its trouble of the electric energy, and causing substantial amounts of energy waste.
Finally it should be noted that:Preferred embodiment of the present utility model is these are only, is not limited to this practicality
It is new, although the utility model is described in detail with reference to the foregoing embodiments, for those skilled in the art,
It can still modify to the technical scheme described in foregoing embodiments, or which part technical characteristic is carried out etc.
With replacement.All any modification, equivalent substitution and improvements within the spirit and principles of the utility model, made etc., all should be included
Within the scope of protection of the utility model.
Claims (5)
1. a kind of energy-saving offshore drilling platformses, including upper platform(1)With lower floor's platform(2), it is characterised in that it is described
Upper platform(1)Top be provided with derrick(16), the derrick(16)Side be provided with crane(17), the lower floor puts down
Platform(2)Bottom be provided with four guide pile pipes(3), the guide pile pipe(3)Bottom be provided with pile pipe(4), the pile pipe(4)'s
Side, which is provided with, issues radio station(6), it is described to issue radio station(6)Top be provided with upper generating platform in parallel(7), under described
Generating platform(6)Surface be provided with first pulley(10)And second pulley(11), the upper generating platform(7)Surface be provided with
Three pulleys(12), the 3rd pulley(12)Side be provided with generator(14), the generator(14)Top be provided with
Runner(13), the upper generating platform(7)Radio station is issued with described(6)Between be provided with floating body(8), the floating body(8), described turn
Wheel(13), the first pulley(10), the second pulley(11)With the 3rd pulley(12)Between pass through steel strand rope(9)Even
Connect, the generator(14)Bottom be provided with energy-storage box(15).
A kind of 2. energy-saving offshore drilling platformses according to claim 1, it is characterised in that the generator(14)
With the energy-storage box(15)It is electrically connected with.
A kind of 3. energy-saving offshore drilling platformses according to claim 1, it is characterised in that the pile pipe(4)It
Between be provided with riser pipe(5).
A kind of 4. energy-saving offshore drilling platformses according to claim 1, it is characterised in that the pile pipe(4)On
It is additionally provided with elevating mechanism.
A kind of 5. energy-saving offshore drilling platformses according to claim 1, it is characterised in that the floating body(8)'s
Inside is sealing structure.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720611886.2U CN206800350U (en) | 2017-05-29 | 2017-05-29 | A kind of energy-saving offshore drilling platformses |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720611886.2U CN206800350U (en) | 2017-05-29 | 2017-05-29 | A kind of energy-saving offshore drilling platformses |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206800350U true CN206800350U (en) | 2017-12-26 |
Family
ID=60743188
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720611886.2U Expired - Fee Related CN206800350U (en) | 2017-05-29 | 2017-05-29 | A kind of energy-saving offshore drilling platformses |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206800350U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111485539A (en) * | 2020-03-16 | 2020-08-04 | 吴常文 | Self-lifting rack and pinion type ocean oil gas exploitation structure device |
-
2017
- 2017-05-29 CN CN201720611886.2U patent/CN206800350U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111485539A (en) * | 2020-03-16 | 2020-08-04 | 吴常文 | Self-lifting rack and pinion type ocean oil gas exploitation structure device |
CN111485539B (en) * | 2020-03-16 | 2020-12-22 | 吴常文 | Self-lifting rack and pinion type ocean oil gas exploitation structure device |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103967713B (en) | Based on the wind energy-wave energy integrated generation structure of floating tension leg platform (TLP) | |
CN101475127A (en) | Amphibious caterpillar crane | |
CN202482093U (en) | Tower well seawater lifting system | |
CN107620298A (en) | Ultra-large type water-power plant | |
CN106351782A (en) | Wave current combined power generation platform | |
CN206800350U (en) | A kind of energy-saving offshore drilling platformses | |
CN106638530A (en) | Process for lifting offshore booster station jacket in shallow water | |
CN201358707Y (en) | Pump suction direct and reverse circulation percussion drill | |
CN201338915Y (en) | Amphibious crawling crane | |
CN204589969U (en) | Be applicable to the small modular jack-up unit of greater coasting area operation | |
CN106368197A (en) | Mat type self-mounted platform with large wellheads | |
CN104369846B (en) | Movable offshore nuclear power platform | |
CN206141788U (en) | Utilize platform that solar energy and ocean current can generate electricity | |
CN203238654U (en) | Self-lifting tidal current energy generating base structure | |
CN206477949U (en) | A kind of seawater Pumped Storage Power Stations | |
CN201971133U (en) | Bottom-supported blower installation platform | |
CN106988284A (en) | A kind of energy-saving offshore drilling platformses | |
CN103381881A (en) | Floating-type offshore power generation platform adopting reinforced concrete structure | |
CN104058072B (en) | Deep-sea bottom-sitting type glass-felt plastic exploration platform | |
CN202730737U (en) | Tamping system for pipeline sinking basic construction | |
CN106555391B (en) | Marine embedding rock job platform | |
CN201626782U (en) | Amphibious crawler crane | |
CN206128160U (en) | Operation device that open caisson sinks unearthedly | |
CN203684191U (en) | Fan construction system of offshore intertidal zone | |
CN103670890A (en) | Wave-energy power generation sailing ship |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20171226 Termination date: 20200529 |
|
CF01 | Termination of patent right due to non-payment of annual fee |