CN202730737U - Tamping system for pipeline sinking basic construction - Google Patents

Tamping system for pipeline sinking basic construction Download PDF

Info

Publication number
CN202730737U
CN202730737U CN2012202627273U CN201220262727U CN202730737U CN 202730737 U CN202730737 U CN 202730737U CN 2012202627273 U CN2012202627273 U CN 2012202627273U CN 201220262727 U CN201220262727 U CN 201220262727U CN 202730737 U CN202730737 U CN 202730737U
Authority
CN
China
Prior art keywords
chassis
tamping
tamping plate
hammer
suspension bracket
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN2012202627273U
Other languages
Chinese (zh)
Inventor
李建明
孟凡利
孟学林
孔令磊
张一戈
王希祥
吴志宏
王道令
王成然
徐文华
郭宝华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
TIANJIN GANGHANG INSTALLATION ENGINEERING Co Ltd
No 1 Engineering Co Ltd of CCCC First Harbor Engineering Co Ltd
Original Assignee
TIANJIN GANGHANG INSTALLATION ENGINEERING Co Ltd
No 1 Engineering Co Ltd of CCCC First Harbor Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by TIANJIN GANGHANG INSTALLATION ENGINEERING Co Ltd, No 1 Engineering Co Ltd of CCCC First Harbor Engineering Co Ltd filed Critical TIANJIN GANGHANG INSTALLATION ENGINEERING Co Ltd
Priority to CN2012202627273U priority Critical patent/CN202730737U/en
Application granted granted Critical
Publication of CN202730737U publication Critical patent/CN202730737U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Abstract

The utility model discloses a tamping system for pipeline sinking basic construction. The tamping system for the pipeline sinking basic construction is characterized by comprising a trolley. A winch system, a crane jib and a crane support are arranged on the trolley. A steel wire cable pulley set is arranged on the crane jib. The winch system lifts a vibration hammer and a tamping plate through a steel wire cable and the steel wire cable pulley set. A safety cable is arranged on the upper end of the crane support in lifted mode and connected with the vibration hammer and the tamping plate. The tamping system for the pipeline sinking basic construction is reasonable in design, flexible in operation and can be applied to rail loading of a barge. The tamping system can be integrated on the trolley and tamping construction can be safe, high-efficiency, rapid and convenient. The crane jib as a main bearing body for the vibration hammer can provide stable support and the crane support can provide relevant safety protection and control elevation of hydraulic power pipelines of the vibration hammer, thus safety in the process of construction is guaranteed.

Description

The immersed tube foundation construction is with ramming flat system
Technical field
The utility model belongs to water body island wall cofferdam construction equipment, the flat system of rammer when being specifically related to a kind of immersed tube foundation construction for wall cofferdam, water body island.
Background technology
Along with domestic and international coastal development upsurge, corresponding coastal engineering construction increases, and need to carry out the construction of island, cofferdam when carrying out the tunnel construction of island, cofferdam in the marine site, adopt steel pipe pile to make up island, cofferdam wall, then carry out the jackstone operation of rockfilling, ram again flatly, form firmly island wall cofferdam structure.The flat construction of jackstone and rammer is the important engineering of immersed tube Foundation Design, rams flat system and need to tamp the flat operation of rammer to the zone behind the jackstone, to guarantee the sealing of island, cofferdam wall.Because under water the flat operation of rammer need to be by loading barge, so its integrally-built reasonability can directly have influence on effect and the safety of ramming flat construction.
The utility model content
The utility model provides a kind of immersed tube foundation construction usefulness reasonable in design, flexible operation to ram flat system, this rams flat system applicable to the track loading of barge, ramming flat system can be integrated on the chassis, ram flat constructing operation safe and efficient, efficient and convenient, arm can provide stable support as the main weight body of vibrating hammer, and suspension bracket can provide the elevating control of the hydraulic power pipeline of corresponding security protection and vibrating hammer, has guaranteed the safety of work progress.
The technical scheme that the utility model adopts is as follows:
A kind of immersed tube foundation construction is with ramming flat system, it is characterized in that the flat system of described rammer comprises a chassis, be provided with hoister system, arm and suspension bracket on this chassis, be provided with the wire rope pulley group on the described arm, described hoister system is by wire rope and described wire rope pulley group lifting vibrating hammer and tamping plate, described suspension bracket upper end lifting one safety rope, this safety rope connects described vibrating hammer and tamping plate.
In the specific embodiment, the upper shelf of described chassis is provided with described suspension bracket, and the upper end of described suspension bracket is provided with pulley, is provided with the fluid pressure line hoist on the described chassis, is connected with described vibration hammer behind the pulley of described fluid pressure line by the setting of suspension bracket top.
In one embodiment, be provided with a described arm on the described chassis, the setting that stretches out of an end of described arm, arm has the two parallel adjutages that arrange, be respectively arranged with the fixed pulley group on this adjutage, this fixed pulley group lifts described vibrating hammer and tamping plate by wire rope and running block.
In one embodiment, the bottom of described chassis is provided with sliding part, and this sliding part is two slide masses that relatively arrange, and this slide mass has bottom surface, lateral surface and upper surface, is provided with slide plate on bottom surface, lateral surface and the upper surface.
In another embodiment, be provided with the vibration hammer vibration source on the described chassis, this vibration hammer vibration source connects described vibrating hammer by fluid pressure line.
In the embodiment, described vibrating hammer lower end connects tamping plate again, and a side of described tamping plate is provided with the location otic placode, and this tamping plate realizes that by the location otic placode location arranges.
This immersed tube foundation construction adopts chassis as supporting body with ramming flat system, and chassis can slide along the track that arranges on the barge, realizes ramming the lasting uninterrupted operation of putting down in diverse location.The arm that arranges on the chassis can provide the load-bearing lifting of vibrating hammer and tamping plate, arm has the adjutage that stretches out and arrange, be fixedly installed two groups of fixed pulley groups on this adjutage, the fixed pulley group forms the wire rope pulley group by wire rope lifting running block, can carry out depth localization and lift adjustment by hoister system to vibrating hammer and tamping plate to the operation of wire rope pulley group.The driving force of vibrating hammer adopts fluid pressure line to connect, fluid pressure line is by the suspension bracket setting, and the suspension bracket upper end also can arrange pulley, and safety rope is connected being connected with tamping plate with vibrating hammer by this pulley, consider the deadweight of vibrating hammer and tamping plate, suspension bracket can adopt the steel plate integral solder.Under vibrating hammer and tamping plate off working state, arm can carry out the lifting of vibrating hammer and tamping plate to be fixed, and in order to prevent the swing of tamping plate when barge is advanced, can otic placode be set in a side of tamping plate, is connected between tamping plate and the barge.
The beneficial effects of the utility model are, flat system is reasonable, flexible operation with ramming in this immersed tube foundation construction, this rams flat system applicable to the track loading of barge, ramming flat system can be integrated on the chassis, ram flat constructing operation safe and efficient, efficient and convenient, arm can provide stable support as the main weight body of vibrating hammer, and suspension bracket can provide the elevating control of the hydraulic power pipeline of corresponding security protection and vibrating hammer, has guaranteed the safety of work progress.
Below in conjunction with the drawings and specific embodiments the utility model is further elaborated.
Description of drawings
Fig. 1 is the structural representation of the utility model specific embodiment.
The specific embodiment
As shown in Figure 1, this immersed tube foundation construction is with ramming flat system loading on a chassis 10, and this chassis is arranged on the barge 20, and the bottom of chassis is provided with sliding part, this sliding part is two slide masses that relatively arrange, and this slide mass has the slide plate that bottom surface, lateral surface and upper surface arrange.Can be along the effect lower slider of the track that arranges on the barge at the drag cable of winch driving by this chassis of this sliding part.Be provided with hoister system 12, arm 11 and suspension bracket 14 on this chassis, be provided with wire rope pulley group 16 on the arm 11, hoister system is by wire rope and described wire rope pulley group lifting vibrating hammer 17 and tamping plate 18, suspension bracket 14 upper ends lift a safety rope 15, and this safety rope 15 connects vibrating hammer and tamping plate.Suspension bracket is positioned at the top of chassis, is provided with fluid pressure line hoist 13 on the chassis, is connected with described vibration hammer behind the pulley of fluid pressure line by the setting of suspension bracket top.The setting that stretches out of one end of the arm that arranges on the chassis, arm have the two parallel adjutages that arrange, and are respectively arranged with the fixed pulley group on this adjutage, and this fixed pulley group lifts described vibrating hammer and tamping plate by wire rope and running block.Be provided with the vibration hammer vibration source on the chassis, this vibration hammer vibration source connects described vibrating hammer by fluid pressure line.The vibrating hammer lower end connects tamping plate, and a side of tamping plate is provided with location otic placode 19, and this tamping plate realizes that by the location otic placode location arranges.Fixed at vibrating hammer and tamping plate.

Claims (6)

1. an immersed tube foundation construction is with ramming flat system, it is characterized in that the flat system of described rammer comprises a chassis, be provided with hoister system, arm and suspension bracket on this chassis, be provided with the wire rope pulley group on the described arm, described hoister system is by wire rope and described wire rope pulley group lifting vibrating hammer and tamping plate, described suspension bracket upper end lifting one safety rope, this safety rope connects described vibrating hammer and tamping plate.
2. immersed tube foundation construction according to claim 1 is with ramming flat system, the upper shelf that it is characterized in that described chassis is provided with described suspension bracket, the upper end of described suspension bracket is provided with pulley, be provided with the fluid pressure line hoist on the described chassis, be connected with described vibration hammer behind the pulley of described fluid pressure line by the setting of suspension bracket top.
3. immersed tube foundation construction according to claim 1 is with ramming flat system, it is characterized in that being provided with on the described chassis a described arm, the setting that stretches out of one end of described arm, arm has the two parallel adjutages that arrange, be respectively arranged with the fixed pulley group on this adjutage, this fixed pulley group lifts described vibrating hammer and tamping plate by wire rope and running block.
4. immersed tube foundation construction according to claim 1 is with ramming flat system, the bottom that it is characterized in that described chassis is provided with sliding part, this sliding part is two slide masses that relatively arrange, and this slide mass has bottom surface, lateral surface and upper surface, is provided with slide plate on bottom surface, lateral surface and the upper surface.
5. immersed tube foundation construction according to claim 1 is characterized in that being provided with on the described chassis vibration hammer vibration source with ramming flat system, and this vibration hammer vibration source connects described vibrating hammer by fluid pressure line.
6. immersed tube foundation construction according to claim 1 is characterized in that with ramming flat system described vibrating hammer lower end connects tamping plate, and a side of described tamping plate is provided with the location otic placode, and this tamping plate realizes that by the location otic placode location arranges.
CN2012202627273U 2012-06-06 2012-06-06 Tamping system for pipeline sinking basic construction Expired - Lifetime CN202730737U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012202627273U CN202730737U (en) 2012-06-06 2012-06-06 Tamping system for pipeline sinking basic construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012202627273U CN202730737U (en) 2012-06-06 2012-06-06 Tamping system for pipeline sinking basic construction

Publications (1)

Publication Number Publication Date
CN202730737U true CN202730737U (en) 2013-02-13

Family

ID=47656450

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012202627273U Expired - Lifetime CN202730737U (en) 2012-06-06 2012-06-06 Tamping system for pipeline sinking basic construction

Country Status (1)

Country Link
CN (1) CN202730737U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103820136A (en) * 2014-03-20 2014-05-28 武汉科技大学 Tamping equipment for material sample of experimental coking furnace
CN103911982A (en) * 2014-04-02 2014-07-09 中交一航局第二工程有限公司 High-precision compacting and leveling device and method for underwater rubble-mound foundation
CN109763535A (en) * 2019-02-28 2019-05-17 泰安夯神机械有限公司 A kind of hammering constructing device and construction method under water

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103820136A (en) * 2014-03-20 2014-05-28 武汉科技大学 Tamping equipment for material sample of experimental coking furnace
CN103911982A (en) * 2014-04-02 2014-07-09 中交一航局第二工程有限公司 High-precision compacting and leveling device and method for underwater rubble-mound foundation
CN109763535A (en) * 2019-02-28 2019-05-17 泰安夯神机械有限公司 A kind of hammering constructing device and construction method under water

Similar Documents

Publication Publication Date Title
CN201801319U (en) Crane for pipe pile production
CN101907202A (en) Portable support type jack-based pipe installation construction method
CN201089696Y (en) Spar boom of explosion-proof suspension crane
CN202730737U (en) Tamping system for pipeline sinking basic construction
CN104120723B (en) Downwash static pressure pile-sinking method
CN214532784U (en) Lifting anchoring slope protection drilling machine
CN202169995U (en) Hydraulic dredger with positioning piles
CN204661163U (en) A kind of Multifunction transformer sleeve pipe lifting support
CN206034519U (en) Excavator economizer
CN204917793U (en) A rope guide device for revolving dig rig
CN102720178A (en) Flat ramming system for immersed tube foundation construction
CN202866653U (en) Drilling machine double-main-rod guide rail type hydraulic lifting mechanism
CN207759970U (en) A kind of single cylinder pulley blocks formula applied to Open TBM promotes platform
CN113356179B (en) Treatment method of hydraulic structure foundation
CN203007843U (en) Variable amplitude deck derrick crane
CN206069234U (en) Multi-functional crawler crane
CN2723413Y (en) Novel multifunction pipe hoist
CN206570810U (en) A kind of roof pressing type pile compacting equipment
CN206128160U (en) Operation device that open caisson sinks unearthedly
CN201144432Y (en) Crawler type multifunctional rotary drilling rig
CN204551494U (en) Construction equipment is transferred in a kind of steel sheet-pile cofferdam inner support superposition
CN102704508B (en) Immersed tube bottom end fork truck type deviation correcting fine adjusting system and regulating process of system
CN202787314U (en) Immersed tube bottom end forklift-type rectifying and fine adjusting system
CN202220329U (en) Bridge installation positioning support
CN108952568B (en) Drilling machine

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CX01 Expiry of patent term

Granted publication date: 20130213

CX01 Expiry of patent term
DD01 Delivery of document by public notice

Addressee: Patent of Tianjin Port and Shipping Installation Engineering Co., Ltd. The person in charge

Document name: Notice of Patent Expiration and Termination

DD01 Delivery of document by public notice