CN206788354U - A kind of metering automation terminal comprehensive test platform - Google Patents

A kind of metering automation terminal comprehensive test platform Download PDF

Info

Publication number
CN206788354U
CN206788354U CN201720474103.0U CN201720474103U CN206788354U CN 206788354 U CN206788354 U CN 206788354U CN 201720474103 U CN201720474103 U CN 201720474103U CN 206788354 U CN206788354 U CN 206788354U
Authority
CN
China
Prior art keywords
stage body
main stage
energy meter
test platform
comprehensive test
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720474103.0U
Other languages
Chinese (zh)
Inventor
田钦瑜
李正元
林洪国
朱梦华
过红辉
李巍
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ZHUHAI TAIYI AUTOMATION EQUIPMENT CO Ltd
Original Assignee
ZHUHAI TAIYI AUTOMATION EQUIPMENT CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ZHUHAI TAIYI AUTOMATION EQUIPMENT CO Ltd filed Critical ZHUHAI TAIYI AUTOMATION EQUIPMENT CO Ltd
Priority to CN201720474103.0U priority Critical patent/CN206788354U/en
Application granted granted Critical
Publication of CN206788354U publication Critical patent/CN206788354U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model provides a kind of electric energy meter and metering automation terminal comprehensive test platform, including main stage body.Main stage body front is provided with standard metering devices, industrial computer, three-phase program-controlled inverter, the Key board drawer of holding keyboard, control panel from the bottom to top.Main stage body is built-in with industry control mechatronics I/O modules, power-off simulated operation module.The upper surface of main stage body is provided with platform patch panel, pocket watch inclined-plane.Platform patch panel is provided with electrically connects voltage link port with program control inverter, and remote signalling Wiring port, remote control Wiring port, pulse input Wiring port, pulse output connection port, 485 Wiring ports with industry control mechatronics are electrically connected with I/O modules.Pocket watch inclined-plane is provided with electrically connects current socket with power-off simulated operation module.The back side fixed setting display bracket upper end of main stage body is provided with display.Terminal comprehensive test platform is integrated with multiple functions, realizes the integrated testing to electric energy meter.

Description

A kind of metering automation terminal comprehensive test platform
Technical field
It the utility model is related to a kind of electric energy meter data acquisition and analytical equipment, and in particular to a kind of electricity of Highgrade integration Can table and metering automation terminal comprehensive test platform.
Background technology
Intelligent electric energy meter is now more and more extensive to be applied to various places, and existing intelligent electric energy meter species is also more numerous More, its corresponding detection device of electric energy meter also emerges in an endless stream.At present, often a kind of corresponding electric energy meter detection fills a kind of electric energy meter Put, it is impossible to detect other kinds of end product using same detection device of electric energy meter;And integrated detection device of electric energy meter is big All it is that multilist class multi-line combines detection device, not only in-convenience in use, and floor space is big.
Power industry staff is pre-job will to pass through training on electric power study, and traditional training apparatus is mostly simple function Class, in practical application user training and detection it is used electric energy meter it is often constant, or even many fault simulations indoors can not be complete Into, thus to training bring huge inconvenience.
The content of the invention
The purpose of this utility model is to provide for the electric energy meter and metering automation terminal synthesis of a kind of Highgrade integration Test platform, be integrated with an industrial standard architectures rack three-phase program-controlled inverter, industrial computer, standard metering devices and Other synthesis auxiliary equipments etc., to solve the problems, such as that detection device of electric energy meter uses and training function is single.
To achieve the above object, electric energy meter and metering automation terminal comprehensive test platform provided by the utility model includes Main stage body.The front of main stage body is provided with standard metering devices, and high-performance industrial computer, work are provided with above standard metering devices Three-phase program-controlled inverter is provided with above control machine, a Key board drawer, keyboard are provided with above three-phase program-controlled inverter Keyboard is installed in drawer, control panel is provided with above Key board drawer.Wherein, standard metering devices, three-phase inversion electricity Source, keyboard, control panel with industry control mechatronics.I/O modules and power-off simulated operation are additionally provided with the inside of main stage body Module, and I/O modules include pulse counter;I/O modules with power-off simulated operation module with industry control mechatronics.Main The upper surface of body is provided with a platform patch panel, and voltage link port, remote signalling terminals are provided with above platform patch panel Mouth, remote control Wiring port, pulse input Wiring port, pulse output connection port, 485 Wiring ports.Wherein, voltage terminal Mouth electrically connects with three-phase program-controlled inverter;Remote signalling Wiring port, remote control Wiring port, pulse input Wiring port, pulse are defeated Go out Wiring port to electrically connect with I/O modules;485 Wiring ports and industry control mechatronics.The back side fixed setting of main stage body is aobvious Show device support, the upper end of display bracket is provided with display, display and industry control mechatronics;The upper surface of main stage body is also set A pocket watch inclined-plane is equipped with, one group of current socket is installed on pocket watch inclined-plane, current socket electrically connects with power-off simulated operation module.
Standard metering devices include standard electric energy meter and error meter.Error meter reception processing standard electric energy meter and tested electricity The pulse output signals of energy table, and the pulse output signals of the standard electric energy meter after reception processing and tested electric energy meter are sent to Industrial computer.
Industrial computer receives the control instruction from other functional control modules, and the control instruction received is sent into phase Corresponding operational module.
Three-phase program-controlled inverter to voltage link port export three-phase sine wave voltage, three-phase program-controlled inverter also to Current socket exports alternating current.
Keyboard is used to send corresponding function control order to industrial computer
I/O modules are received from remote signalling Wiring port with being remotely controlled the status signal of Wiring port and being connect from pulse output The terminal pulse output signal of line end mouth;I/O modules are also to pulse input Wiring port output pulse signal.
Power off analog module and receive the current state signal from current socket, and the current state signal received is sent out It is sent to industrial computer.
Each controlling switch of control panel sends control command to corresponding each functional module.
Preferably, the control panel of electric energy meter and metering automation terminal comprehensive test platform is obliquely installed, control panel It it is 60 degree with horizontal plane angle.
Preferably, the angle on the pocket watch inclined-plane and horizontal plane of electric energy meter and metering automation terminal comprehensive test platform is 60 Degree.
Preferably, it is additionally provided with one below the standard metering devices of electric energy meter and metering automation terminal comprehensive test platform Individual mobilizable tool box, tool box can place other synthesis auxiliary equipments and instrument etc..
Preferably, the bottom of electric energy meter and metering automation terminal comprehensive test platform is provided with lower margin and castor, wherein Castor is universal wheel.
From such scheme, the beneficial effects of the utility model are:Three are integrated with an industry standard cabinet Mutually program control inverter, industrial computer, standard metering devices, I/O modules, power-off simulated operation module and other comprehensive detections are set It is standby, solve the problems, such as that detection device of electric energy meter uses and training function is single, can meet different size electric energy meter and its The testing requirements of his terminal.Carried out indoors with an electric energy meter and metering automation terminal comprehensive test platform can a variety of The simulation of electric field problem failure, facilitates teaching, training.
The control panel of the utility model terminal comprehensive test platform is obliquely installed so that people can more intuitive and convenient control System operation detection means;The main stage body of detection means is additionally provided with a mobilizable tool box, can place other auxiliary and set Standby and instrument etc., the service efficiency of detection means is improved, eliminate the trouble for finding other aids;The bottom of detection means Insulation lower margin and universal caster wheel are installed, on the one hand ensure that user uses the safety of detection means, on the other hand can be at any time Motion detection device everywhere.
Brief description of the drawings
Fig. 1 is the structural front view of the utility model terminal comprehensive test platform.
Fig. 2 is the structure left view of the utility model terminal comprehensive test platform.
Fig. 3 is the platform patch panel Wiring port distribution schematic diagram of the utility model terminal comprehensive test platform.
Fig. 4 is the structure rearview of the utility model terminal comprehensive test platform.
Below in conjunction with drawings and Examples, the utility model is described in further detail.In order to which the present embodiment is better described, The some annexes of accompanying drawing have omission, zoomed in or out;To those skilled in the art, in accompanying drawing some known features and It illustrates to omit will be understood by.
Embodiment
Referring to Fig. 1 and Fig. 2, the utility model electric energy meter and metering automation terminal comprehensive test platform include main stage body 1. The front of main stage body 1 is provided with tool box 16, and tool box 16 is similar to drawer, and some detection electricity can be placed in the inside of tool box 16 The auxiliary equipment or maintenance tool of energy table, such as various test connecting lines, universal meter, electroprobe.Pacify in guide rail in tool box 16 Fill to pass in and out on bar 161 and slide.Tool box 16 is provided with standard metering devices 15 above, and standard metering devices 15 include standard electric Can table and error meter.The top of standard metering devices 15 is provided with three-phase program-controlled inverter 14, three-phase program-controlled inverter 14 Three-phase sine wave voltage, the electric current of continuously adjustabe can be provided.The top of three-phase program-controlled inverter 14 is provided with the high property of 4U units Energy industrial computer 13, communication interface system of the industrial computer 13 containing extension, such as RS232 serial ports, RS485 serial ports, and Installation is configured with a variety of read-write softwares.The top of industrial computer 13 is provided with a Key board drawer 12 and is used to place industrial computer 13 keyboard(Do not represented in figure), Key board drawer 12 passes in and out slip on guide rail mounting bar 121.The top of Key board drawer 12 is set There is control panel 11, the controlling switch for controlling each functional module is provided with control panel 11.In order to allow a user to More convenient observation operational control, control panel 11 are obliquely installed, and the angle of control panel 11 and horizontal plane is 60 degree.Standard metering Equipment 15, three-phase program-controlled inverter 14, keyboard, control panel 11 electrically connect with industrial computer 13.
Main stage body 1 is also built-in with I/O modules(Do not represented in figure)With simulation power-off modular(Do not represented in figure).I/O modules Including pulse counter module, I/O modules electrically connect with simulation power-off modular with industrial computer 13.
The back side of main stage body 1 is installed with display bracket 31, and one end of display bracket 31 is consolidated by bolt assembly The back side of main stage body 1 is scheduled on, the other end is installed with display 3.Wherein, display 3 electrically connects with industrial computer 13.It is main The bottom of stage body is provided with 4 height adjustable insulation lower margins 41 and 4 universal caster wheels 42.Detection means is in use state When, 4 insulation lower margins 41 are support feet, protect terminal comprehensive test platform and the safety of tester;When needing mobile terminal During comprehensive test platform, the height of 4 insulation lower margins 41 is adjusted, 4 universal caster wheels is switched to support feet, it is possible to easily to move Dynamic terminal comprehensive test platform.The left side of main stage body 1 is provided with two dissipation hot-air mouths 181 and radiating air port 182.Need what is illustrated It is that the right side of main stage body 1 is also provided with the same radiating air port of two rows, and because the left and right sides of main stage body 1 is symmetrically the same, Gu Tuzhong is not Displaying right side radiating air port, does not do excessive explanation herein yet.
The upper surface of main stage body 1 is provided with a pocket watch inclined-plane 2, and pocket watch inclined-plane 2 is installed above a pair of support short circuit currents Current socket 21 and current socket 22.Current socket 21 and current socket 22 all electrically connect with simulation turn-off module.Pocket watch is oblique Face 2 passes through metal plate connector(Do not represented in figure)Tilt 60 degree of upper surfaces for being fixed on main stage body 1.Certainly, pocket watch inclined-plane 2 also may be used Fix in a manner of by welding etc., do not state one by one here.Pocket watch inclined-plane 2 is obliquely installed, and simplifies manufacturing process, is also caused Measured terminal can be more smoothly placed on pocket watch inclined-plane 2.
The upper surface of main stage body 1 is provided with platform patch panel 17.Referring to Fig. 3, platform patch panel 17 is provided with above Remote signalling Wiring port 171, remote control Wiring port 172, pulse output end mouth 173, RS485 Wiring ports 174, voltage link port 175th, pulse input Wiring port 176.Wherein, voltage link port 175 electrically connects with three-phase program-controlled inverter 14;Remote signalling connects Line end mouth 171, remote control Wiring port 172, pulse input Wiring port 176, pulse output connection port 173 with I/O modules Electrical connection;RS485 Wiring ports 174 electrically connect with industrial computer 13.
Referring to Fig. 4, the back side of main stage body 1 is provided with back door 5.Lock 51, heat dissipation ventilation mouth 52 are set on back door 5.Open lock Button 51 can open back door 5, and place under repair maintenance etc. to terminal comprehensive test platform.End is provided with the lower right corner at back door 5 Hold comprehensive test platform working power socket 19.External power source is transported to terminal comprehensive test platform by outlet 19, carries For the electric energy needed for the work of terminal comprehensive test platform.
The systemic-function of terminal comprehensive test platform is illustrated below, it is to those skilled in the art, some Known technology and principle process will be understood by without detailed description.
Measuring accuracy detection is that mistake is adopted in the friendship for the method measuring terminals electric energy meter that pulse is contrasted by on-load voltage electric current Difference, its principle are as follows:The voltage link port 175 electric energy meter to be measured being linked into platform patch panel 17, open chain of command Plate measuring accuracy functional module controlling switch, and select to open the measuring accuracy detection function software of industrial computer 13.Standard The standard electric energy meter that measuring equipment 15 carries exports a standard scale pulse to error meter;Meanwhile voltage link port 175 will hand over The pulse output for the tested electric energy meter adopted is sent to error meter.Pass through the program control on-load voltage electric current of inverter 14, standard electric energy The output pulse of table and tested electric energy meter constantly changes.Error meter is by the standard output pulse of standard electric energy meter and tested electric energy meter Output pulse ratio to integrating, and testing result is shown on the display 3 by the processing of industrial computer 13.
Infrared communications ports test is the RS232 ends by the infrared head of absorption type by terminal electric energy meter and industrial computer 13 Mouth is connected, and selects to open the infrared communications ports test software of industrial computer 13.Infrared communications ports test software passes through RS232 serial ports, infrared head communicate with terminal electric energy meter.Communicate successfully, then judging the work of terminal electric energy meter infrared communications ports just Often;Communication failure, then judge terminal electric energy meter infrared communications ports operation irregularity.
The test of RS485 communication ports is to utilize two normal 485 electric energy meters, with 485 cables by normal electric energy meter and quilt Survey energy meter terminal to be connected, and tested energy meter terminal be linked into the RS485 Wiring ports 174 in platform patch panel 17, 485 test softwares of industrial computer 13 are opened by interface operation, RS485 communication port surveys are carried out to tested energy meter terminal Examination.Judge whether communication port normally has two ways:One kind is to read tested energy meter terminal by test software to connect pair The data for normal 485 electric energy meter answered, tested electric energy is judged according to the data of normal 485 electric energy meter shown by test software Whether meter terminal communicates normally with normal 485 electric energy meter.If the data of normal 485 electric energy meter are shown normally, electric energy meter is tested The RS485 communication ports of terminal are normal;If the data of normal 485 electric energy meter show abnormal, the RS485 of tested energy meter terminal Communication port is abnormal.Another method of testing is to enter row write table to normal 485 electric energy meter by test software.If normal 485 Electric energy meter reply data is correct, then it is normal to be tested energy meter terminal RS485 communication ports;If normal 485 electric energy meter reply data is not Correctly, then it is abnormal that energy meter terminal RS485 communication ports are tested.
Remote signalling port test is the remote signalling Wiring port tested energy meter terminal being linked into platform patch panel 17 171, terminal comprehensive test platform is in parallel by four tunnel remote signalling ports of tested energy meter terminal, and is connected to first via Switch(I/O Module), remote control first via Switch progress state switchings, pass through the remote signalling port test software reading of industrial computer 13 Remote signalling status word is judged.Switch is in " conjunction ", and four tunnel remote signalling are all " conjunction ";Switch is in " dividing ", and four tunnel remote signalling are all For " dividing ".If remote signalling test software dispaly state meets with above-mentioned state, it is normal to be tested electric energy meter remote signalling port;If remote signalling is surveyed Examination software dispaly state is not met with above-mentioned state, then it is abnormal to be tested electric energy meter remote signalling port.
Remote control port test is the remote control Wiring port being linked into tested energy meter terminal in platform patch panel 17 172.Input detection mouth in I/O modules is that every relay all the way of tested energy meter terminal carries out condition adjudgement, judges to be remotely controlled Whether relay is normal in " operating a switch " and " combined floodgate " operation, and will determine that result calculates the remote-controlled test of meter 13 by industry control Software is shown on the display 3.Tested energy meter terminal remote control port is normal, and remote-controlled test software shows as follows:Closing Lock state, normally opened end is in "ON", normally closed to be in " conjunction " state;In the state of operating a switch, normally opened end is in " conjunction ", normally closed to be in " dividing " State.If remote-controlled test software shows that situation is not inconsistent with above-mentioned state, it is abnormal to be tested energy meter terminal remote control port.
Pulse input test is the pulse input terminals being linked into tested energy meter terminal in platform patch panel 17 Mouth 176, the clock of terminal comprehensive test platform sends pulse signal to pulse input Wiring port 176, and is sent to tested Energy meter terminal.Meanwhile the pulse measuring point of terminal comprehensive test platform will calculate the pulse data of storage pulse source transmission, industry control The pulse read module of machine shows the pulse data read on the display 3.If the measuring point read has number, it is tested Energy meter terminal pulse input port is normal;If the measuring point read does not count, energy meter terminal pulse input port is tested not Normally;If copy reading data are all FF, tested energy meter terminal is not detected by pulse input.
Pulse output test is the pulse input terminals being linked into tested energy meter terminal in platform patch panel 17 Mouth 173, by adjusting program control inverter 14, to tested energy meter terminal on-load voltage electric current.Step-by-step counting in I/O modules Device calculates and stores the pulse input quantity of tested energy meter terminal, meanwhile, the data read module of industrial computer 13 reads pulse Pulse input data on counter, and pulse input data are shown on the display 3.It is defeated that if pulse counter reads pulse Enter data, then the pulse output end mouth for being tested energy meter terminal is normal;If pulse counter does not read pulse input data, The pulse output end mouth for being then tested energy meter terminal is abnormal.
It is the current socket 21 being linked into tested energy meter terminal on pocket watch inclined-plane 2 to power off simulation test, a period of time Afterwards by the short circuit of current socket 21.Breaker in power-off simulated operation functional module carries out simulating electric energy meter tripping operation, at the same time, The breaking simulation & testing software of industrial computer 13 will read the trip time of breaker, and the trip time will be sent to display On 3.
Terminal comprehensive test platform also has other systems detection function, such as AC sampling function test, GPRS communication functions Test, meter reading test, terminal parameter/data reading system etc., here without detailed description one by one.On basis described above On, the utility model can also make other various forms of variations or improvement, such as keyboard and one touch-control of display Display screen substitutes, and changes shapes and sizes of rack etc..There is no need and unable to be put down to the utility model terminal integration test All embodiments of platform are exhaustive.All any modifications made within the spirit and principles of the utility model, equally replace Change and improve, should be included within the utility model scope of the claims.

Claims (5)

1. a kind of metering automation terminal comprehensive test platform, including main stage body, it is characterised in that:
The main stage body front is provided with standard metering devices, and industrial computer, the work are provided with above the standard metering devices Three-phase program-controlled inverter is provided with above control machine, is provided with a Key board drawer above the inverter, the keyboard is taken out Keyboard is installed in drawer, control panel is provided with above the Key board drawer;The standard metering devices, the inverter, The keyboard, the control panel with the industry control mechatronics;
The main stage body be built-in with I/O modules, power-off simulated operation module, the I/O modules, power-off simulated operation module with The industry control mechatronics;
The upper surface of the main stage body is provided with platform patch panel, the platform patch panel be provided with voltage link port, Remote signalling Wiring port, remote control Wiring port, pulse input Wiring port, pulse output end mouth, 485 Wiring ports;
Wherein, the voltage link port electrically connects with the inverter, the remote signalling Wiring port, the remote control terminals Mouth, the pulse input Wiring port, the pulse output end mouth electrically connect with the I/O modules, 485 Wiring port With the industry control mechatronics;
The back side of the main stage body is fixedly installed display bracket, and the display bracket upper end is provided with display, described Display and the industry control mechatronics;The upper surface of the main stage body is provided with a pocket watch inclined-plane, and the pocket watch inclined-plane is set One group of current socket is equipped with, the current socket electrically connects with the power-off simulated operation module.
2. metering automation terminal comprehensive test platform according to claim 1, it is characterised in that:The control panel inclines Tiltedly set, the control panel is 60 degree with horizontal plane angle.
3. metering automation terminal comprehensive test platform according to claim 1 or 2, it is characterised in that:The pocket watch is oblique Face is 60 degree with horizontal plane angle.
4. metering automation terminal comprehensive test platform according to claim 1 or 2, it is characterised in that:The standard meter A mobilizable tool box is provided with below amount equipment.
5. metering automation terminal comprehensive test platform according to claim 1 or 2, it is characterised in that:The main stage body Bottom is equipped with lower margin and castor, and the castor is universal wheel.
CN201720474103.0U 2017-04-28 2017-04-28 A kind of metering automation terminal comprehensive test platform Active CN206788354U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720474103.0U CN206788354U (en) 2017-04-28 2017-04-28 A kind of metering automation terminal comprehensive test platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720474103.0U CN206788354U (en) 2017-04-28 2017-04-28 A kind of metering automation terminal comprehensive test platform

Publications (1)

Publication Number Publication Date
CN206788354U true CN206788354U (en) 2017-12-22

Family

ID=60709802

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720474103.0U Active CN206788354U (en) 2017-04-28 2017-04-28 A kind of metering automation terminal comprehensive test platform

Country Status (1)

Country Link
CN (1) CN206788354U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110018342A (en) * 2019-05-17 2019-07-16 南方电网科学研究院有限责任公司 A kind of program-controlled power signal test device based on transformer

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110018342A (en) * 2019-05-17 2019-07-16 南方电网科学研究院有限责任公司 A kind of program-controlled power signal test device based on transformer

Similar Documents

Publication Publication Date Title
CN201765729U (en) Training simulation equipment for electric energy metering device
CN202649448U (en) Large user information collection terminal detection apparatus completely simulating scene
CN108777089A (en) A kind of correct errors with wiring connects electric training system with the dress table of fabrication evaluation
CN202650245U (en) Resident low-voltage centralized meter-reading terminal detecting device completely simulating spots
CN204720060U (en) A kind of low voltage electric energy measure device is installed and test training device
CN204009053U (en) A kind of three-in-one acquisition terminal pick-up unit
CN210200112U (en) Electric energy measurement training device
CN206788354U (en) A kind of metering automation terminal comprehensive test platform
CN203966413U (en) A kind of band imitation screen feeder automation operation bench
CN207380211U (en) A kind of device of detecting magnetic holding relays in batches
CN104614622A (en) Intelligent aging rack
CN102136215A (en) Modularized detection and control meter comprehensive practical training device
CN205920669U (en) Automatic experimental apparatus of electric power system
CN104794968A (en) Low-voltage electric energy measuring, mounting and connection analyzing comprehensive practical training device
CN207832960U (en) A kind of circuit board testing system
CN102062819B (en) Intelligent nuclear phase device
CN102707117A (en) Relaying multifunctional tester
CN106023748A (en) Low-voltage metering training device
CN201965485U (en) Automatic verifying device for adjustor parameters
CN208314145U (en) A kind of combination switch intelligent detection device
CN102508487B (en) Efficient detection device for motor control modules
CN201285426Y (en) Intelligent detection apparatus for transforming plant computer monitoring system
CN109305614A (en) A kind of elevator peripheral signal simulation system
CN204166720U (en) Single-phase intelligent expense control electric energy meter is installed concentratedly and training set
CN201331856Y (en) System for simulating electric energy measuring secondary loop

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant