CN204166720U - Single-phase intelligent expense control electric energy meter is installed concentratedly and training set - Google Patents

Single-phase intelligent expense control electric energy meter is installed concentratedly and training set Download PDF

Info

Publication number
CN204166720U
CN204166720U CN201420516946.9U CN201420516946U CN204166720U CN 204166720 U CN204166720 U CN 204166720U CN 201420516946 U CN201420516946 U CN 201420516946U CN 204166720 U CN204166720 U CN 204166720U
Authority
CN
China
Prior art keywords
energy meter
electric energy
electric device
training
control electric
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420516946.9U
Other languages
Chinese (zh)
Inventor
赵喜云
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Training Center of State Grid Hebei Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
Training Center of State Grid Hebei Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, Training Center of State Grid Hebei Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201420516946.9U priority Critical patent/CN204166720U/en
Application granted granted Critical
Publication of CN204166720U publication Critical patent/CN204166720U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Instructional Devices (AREA)

Abstract

The utility model discloses a kind of single-phase intelligent expense control electric energy meter to install concentratedly and training set, relate to electricity teaching apparatus technical field.Described device comprises cabinet, the top of described cabinet is electric device installation room, the bottom of cabinet is material storage room, several fixed cross beams are height-adjustable to be fixed in described electric device installation room, electric device in cabinet is fixed on described fixed cross beam, and described electric device comprises table case power switch, single-phase local charge control electric energy meter, user prepayment on-load switch, simulation on-load switch and simulation load terminal block.Described device can carry out the training on installation of single-phase intelligent expense control electric energy meter, energising also carries out the training of power transmission debugging and fault handling when on-load, and takes control electric energy meter for single-phase intelligent specially, uses one case multilist, training function is expanded greatly, and result of training has had and has significantly improved.

Description

Single-phase intelligent expense control electric energy meter is installed concentratedly and training set
Technical field
The utility model relates to electricity teaching apparatus technical field, particularly relates to a kind of single-phase intelligent expense control electric energy meter and installs concentratedly and training set.
Background technology
Along with the construction of intelligent grid, the whole country has been carried out intelligent electric energy meter and has been installed and more change jobs, and the single-phase user of the low pressure of enormous amount generally adopts single-phase intelligent to take control electric energy meter, single-phase intelligent takes control electric energy meter installation and adjustment, workload is large, operation number is many, and the single-phase user of low pressure concentrates adopt of dress table to concentrate dress table more, very easily go wrong between family and family, so be badly in need of connecing in electricity, power information collection specialty at electric energy metrical, dress table the training carried out single-phase intelligent expense control electric energy meter and install concentratedly and debug.
Electric energy meter training on installation in the past adopts common electric energy meter training on installation equipment, training apparatus has very large difference with the on-the-spot batch meter run, and the training of single electric energy meter installation can only be carried out, can not be energized, can not on-load, can not carry out hot-line test training, more can not carry out specially for the training of expense control intelligent electric energy meter, result of training is poor.
Utility model content
Technical problem to be solved in the utility model is to provide a kind of single-phase intelligent expense control electric energy meter and installs concentratedly and training set, described device can carry out electric energy meter training on installation, energising also gives the training of power transmission debugging and fault handling training when on-load, and take control electric energy meter for single-phase intelligent specially, one case multilist, training function is expanded greatly, result of training has had and has significantly improved, this training set can complete single-phase intelligent expense control electric energy meter and install concentratedly, check, power transmission debugging and fault handling, the overall process training of the jobs such as low pressure centralized automatic meter-reading.
For solving the problems of the technologies described above, technical solution adopted in the utility model is: a kind of single-phase intelligent expense control electric energy meter is installed concentratedly and training set, it is characterized in that described device comprises cabinet, the top of described cabinet is electric device installation room, the bottom of cabinet is material storage room, several fixed cross beams are height-adjustable to be fixed in described electric device installation room, electric device in cabinet is fixed on described fixed cross beam, described electric device comprises table case power switch, single-phase local charge control electric energy meter, user prepayment on-load switch, simulation on-load switch and simulation load terminal block, training set power switch outside cabinet is electrically connected through wire one end with the table case power switch in cabinet, the other end of table case power switch is unsettled, the terminals of single-phase local charge control electric energy meter are unsettled, one end of described user prepayment on-load switch is electrically connected with simulation load terminal block through simulation on-load switch, other end of described user prepayment on-load switch is unsettled.
Preferred technical scheme is further: described electric device installation room is provided with two, described table case power switch, single-phase local charge control electric energy meter and user prepayment on-load switch are fixed in the first electric device installation room, and simulation on-load switch and simulation load terminal block are fixed in the second electric device installation room.
Preferred technical scheme is further: described simulation load terminal block is provided with two or more.
Preferred technical scheme is further: described electric device installation room and material storage room are separately positioned on the tow sides of cabinet.
Preferred technical scheme is further: the outside of described electric device installation room and material storage room is provided with door, door outside electric device installation room is provided with window, the position of described window is relative with the electric device in electric device installation room, by opening described window operation or observing electric device.
The beneficial effect adopting technique scheme to produce is: described device can be energized and carry out training on installation when on-load, and take control electric energy meter for single-phase intelligent specially, use one case multilist, training function is expanded greatly, result of training has had and has significantly improved, and this training set can complete that single-phase intelligent expense control electric energy meter is installed concentratedly, checked, the overall process training of power transmission debugging and the job such as fault handling, low pressure centralized automatic meter-reading.In addition, the height of described simulation load terminal block can regulate as required, easy to use; Employing two sides operates, and double designs, and improves utilization factor, has saved cost.
Accompanying drawing explanation
Below in conjunction with the drawings and specific embodiments, the utility model is described in further detail.
Fig. 1 is structural representation of the present utility model;
Fig. 2 is the structural representation that electric device installation room of the present utility model opens behind the door;
Fig. 3 is electrical principle block diagram of the present utility model;
Wherein: 1, cabinet 2, electric device installation room 21, first electric device installation room 22, second electric device installation room 3, material storage room 4, fixed cross beam 5, table case power switch 6, single-phase local charge control electric energy meter 7, user prepayment on-load switch 8, simulation on-load switch 9, simulation load terminal block 10, training set power switch.
Embodiment
Below in conjunction with the accompanying drawing in the utility model embodiment, be clearly and completely described the technical scheme in the utility model embodiment, obviously, described embodiment is only a part of embodiment of the present utility model, instead of whole embodiments.Based on the embodiment in the utility model, those of ordinary skill in the art are not making the every other embodiment obtained under creative work prerequisite, all belong to the scope of the utility model protection.
Set forth a lot of detail in the following description so that fully understand the utility model, but the utility model can also adopt other to be different from alternate manner described here to implement, those skilled in the art can when doing similar popularization without prejudice to when the utility model intension, and therefore the utility model is by the restriction of following public specific embodiment.
As illustrated in fig. 1 and 2, the utility model discloses a kind of single-phase intelligent expense control electric energy meter to install concentratedly and training set, described device comprises cabinet 1, the top of described cabinet 1 is electric device installation room 2, the bottom of cabinet 1 is material storage room 3, several fixed cross beams 4 are height-adjustable to be fixed in described electric device installation room 2, electric device in cabinet 1 is fixed on described fixed cross beam 4, described electric device installation room 2 is provided with two, table case power switch 5, single-phase local charge control electric energy meter 6 and user prepayment on-load switch 7 are fixed in the first electric device installation room 21, simulation on-load switch 8 and simulation load terminal block 9 are fixed in the second electric device installation room 22.
The outside of described electric device installation room 2 and material storage room 3 is provided with door, and the door outside electric device installation room 2 is provided with window, and the position of described window is relative with the electric device in electric device installation room, by opening described window operation or observing electric device.
As shown in Figure 3, training set power switch 10 outside cabinet 1 is electrically connected through wire one end with the table case power switch 5 in cabinet 1, the other end of table case power switch 5 is unsettled, the terminals of single-phase local charge control electric energy meter 6 are unsettled, one end of described user prepayment on-load switch 7 is electrically connected with simulation load terminal block 9 through simulation on-load switch 8, other end of described user prepayment on-load switch 7 is unsettled, number and the model of described simulation load terminal block 9 can be arranged as required, number can be two or more, and model can be diplopore and/or three holes.In figure, except dotted portion, each accessory position is fixing, and wire connects, and the accessory in dotted portion is installed and fixed and lead connection and need complete in training.
The appearance design of described training set closer to actual, handsome in appearance, be convenient to install and training.Employing console mode is installed, and the single-phase meter case that scene is installed concentratedly generally adopts suspension type or to be insertedly fixed on a face wall.This mode is not easy to training, and installation site is limited, installs so this device uses console mode instead when designing.
Two sides operates, and double designs.Actual metered case thickness only has 140mm, directly fixedly cannot land installation, and must strengthen training set thickness, whole training set is divided into two sides for this reason, and middle increasing is cut off, and two sides is identical, and every one side is all one and independently trains station.Make training set install more firm, handsome in appearance and not limit by place, add station, improve utilization factor, saved cost.
Adopt levels structure.Upper strata is actual table box structure, adopts the embedded batch meter pattern of 4 epi-position entire combination; Lower floor is storage cabinet, can anti-placement training material and Work tool.There is partition centre, and as the base of batch meter, during training, student's operating surface height is between 1.3-1.6 rice, meets base of principle of human engineering, convenient operation.
Powering-on function.Single phase poaer supply is guided on connection terminal, makes device can install electric energy meter, can be energized again and carry out the relevant training of hot line job.
Pre-payment controlling functions.After table, outlet switch adopts single-phase intelligent electric energy meter pre-payment gauge tap, can give training for single-phase intelligent expense control electric energy meter specially.
Multi-epitope designs.One side can have four epi-positions, and the training set of two sides design, has eight epi-positions, also can install collector or concentrator as required.
Real burden functional.This actual training device adds simulation loading module, the load of simulation different user.Install simulation on-load switch and simulation load terminal block from four customer charge switch end openings, each household can be accessed by single-phase load, makes electric energy meter load carrying, carries out electric energy meter debugging and trouble shooting training.
Described device can complete the overall process training of measuring apparatus from installation, power transmission, debugging and fault handling, low pressure centralized automatic meter-reading.Comprise the training of following items:
(1) single-phase intelligent expense control electric energy meter installs training concentratedly
(2) single-phase intelligent takes control electric energy meter debugging training
(3) single-phase intelligent takes control electric energy meter on-line checking method and fault handling training
(4) low pressure centralized automatic meter-reading training
When using " single-phase intelligent expense control electric energy meter installs debugging training apparatus concentratedly " to give training, method is as follows:
(1) single-phase intelligent expense control electric energy meter installs training concentratedly
First need disconnect training set power switch and load side switch, can carry out at front panel the training that four epi-position single-phase intelligent expense control electric energy meters install wiring, comprise front panel main electrical scheme distribution (table case power switch-electric energy meter-pre-payment load side switch) and control line installation.
(2) single-phase intelligent takes control electric energy meter debugging training
After completing single-phase intelligent expense control electric energy meter installing concentratedly, close training set power switch, table case power switch, simulation load control switch, close user prepayment on-load switch more one by one, whether chargedly check that each user simulates load terminal block, ammeter, load side master switch, each customer charge whether one_to_one corresponding.
(3) single-phase intelligent takes control electric energy meter on-line checking method and fault handling training
After completing single-phase intelligent expense control electric energy meter debugging training, each customer charge terminal block accesses single-phase load (as hair-dryer etc.) successively, checks that single-phase intelligent takes control electric energy ruuning situation, whether voltage, electric current be normal, whether pulses etc. glimmer, and if any fault, process.
(4) low pressure centralized automatic meter-reading training
After electric energy meter normal operation, coordinate low pressure meter reading terminal and power information main website, the training of low pressure centralized automatic meter-reading can be carried out, as meter reading terminal optimum configurations, main website file and the training of associative operation.
To sum up, described device can be energized and carry out training on installation when on-load, and take control electric energy meter for single-phase intelligent specially, use one case multilist, training function is expanded greatly, result of training has had and has significantly improved, and this training set can complete that single-phase intelligent expense control electric energy meter is installed concentratedly, checked, the overall process training of power transmission debugging and the job such as fault handling, low pressure centralized automatic meter-reading.In addition, the height of described simulation load terminal block can regulate as required, easy to use; Employing two sides operates, and double designs, and improves utilization factor, has saved cost.

Claims (5)

1. a single-phase intelligent expense control electric energy meter is installed concentratedly and training set, it is characterized in that: described device comprises cabinet (1), the top of described cabinet (1) is electric device installation room (2), the bottom of cabinet (1) is material storage room (3), several fixed cross beams (4) are height-adjustable to be fixed in described electric device installation room (2), electric device in cabinet (1) is fixed on described fixed cross beam (4), described electric device comprises table case power switch (5), single-phase local charge control electric energy meter (6), user prepayment on-load switch (7), simulation on-load switch (8) and simulation load terminal block (9), cabinet (1) training set power switch (10) is outward electrically connected through wire one end with the table case power switch (5) in cabinet (1), the other end of table case power switch (5) is unsettled, the terminals of single-phase local charge control electric energy meter (6) are unsettled, one end of described user prepayment on-load switch (7) is electrically connected with simulation load terminal block (9) through simulation on-load switch (8), other end of described user prepayment on-load switch (7) is unsettled.
2. single-phase intelligent expense control electric energy meter according to claim 1 is installed concentratedly and training set, it is characterized in that: described electric device installation room (2) is provided with two, described table case power switch (5), single-phase local charge control electric energy meter (6) and user prepayment on-load switch (7) are fixed in the first electric device installation room (21), and simulation on-load switch (8) and simulation load terminal block (9) are fixed in the second electric device installation room (22).
3. single-phase intelligent expense control electric energy meter according to claim 2 is installed concentratedly and training set, it is characterized in that: described simulation load terminal block (9) is provided with two or more.
4. single-phase intelligent expense control electric energy meter according to claim 1 is installed concentratedly and training set, it is characterized in that: described electric device installation room (2) and material storage room (3) are separately positioned on the tow sides of cabinet (1).
5. single-phase intelligent expense control electric energy meter according to claim 1 is installed concentratedly and training set, it is characterized in that: the outside of described electric device installation room (2) and material storage room (3) is provided with door, the door in electric device installation room (2) outside is provided with window, the position of described window is relative with the electric device in electric device installation room, by opening described window operation or observing electric device.
CN201420516946.9U 2014-09-10 2014-09-10 Single-phase intelligent expense control electric energy meter is installed concentratedly and training set Expired - Fee Related CN204166720U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420516946.9U CN204166720U (en) 2014-09-10 2014-09-10 Single-phase intelligent expense control electric energy meter is installed concentratedly and training set

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420516946.9U CN204166720U (en) 2014-09-10 2014-09-10 Single-phase intelligent expense control electric energy meter is installed concentratedly and training set

Publications (1)

Publication Number Publication Date
CN204166720U true CN204166720U (en) 2015-02-18

Family

ID=52540386

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420516946.9U Expired - Fee Related CN204166720U (en) 2014-09-10 2014-09-10 Single-phase intelligent expense control electric energy meter is installed concentratedly and training set

Country Status (1)

Country Link
CN (1) CN204166720U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105608949A (en) * 2016-03-16 2016-05-25 国家电网公司 Split type electric energy metering device and terminal installation wiring practical training apparatus
CN108648549A (en) * 2018-05-10 2018-10-12 杭州佳和电气股份有限公司 A kind of the power information acquisition closed-loop simulation system and control method of object-oriented

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105608949A (en) * 2016-03-16 2016-05-25 国家电网公司 Split type electric energy metering device and terminal installation wiring practical training apparatus
CN108648549A (en) * 2018-05-10 2018-10-12 杭州佳和电气股份有限公司 A kind of the power information acquisition closed-loop simulation system and control method of object-oriented

Similar Documents

Publication Publication Date Title
CN207198262U (en) A kind of charging pile test system with feedback function
CN105390053B (en) Intelligent electric energy meter and power information collection site simulation training platform
CN202102624U (en) Integral experiment system for preventing electricity fraudulent use
CN202649448U (en) Large user information collection terminal detection apparatus completely simulating scene
CN104298127B (en) Micro-grid semi-digital semi-physical real-time simulation system based on RT-LAB
CN211578191U (en) High-low voltage measurement anti-electricity-stealing training set
CN103021157A (en) Device and method for completely simulating site to detect electricity consumption information acquisition terminal
CN105608949A (en) Split type electric energy metering device and terminal installation wiring practical training apparatus
CN203178388U (en) Micro-grid test platform based on RTDS (Real Time Digital Simulator)
CN103235223A (en) Micro grid experimental testing platform on basis of RTDS (Real Time Digital System)
CN202650245U (en) Resident low-voltage centralized meter-reading terminal detecting device completely simulating spots
CN204166720U (en) Single-phase intelligent expense control electric energy meter is installed concentratedly and training set
CN104091502B (en) Low-tension centralized meter reading and installation training device based on carrier technology
CN203191816U (en) Test system for automatic control equipment of power distribution network
CN106405301A (en) Parameter acquisition cabinet
CN204228947U (en) A kind of single-phase real load electric energy table calibration equipment
CN205665872U (en) Resident smart electric meter copies nuclear and receives simulation teching device
CN211124488U (en) Low-voltage centralized meter reading intelligent simulation device
CN202059085U (en) Modular intelligent power distribution system
CN102062819B (en) Intelligent nuclear phase device
CN103944191A (en) Grid-connected detection integrated device for portable distributed power supply
CN104793083B (en) A kind of communication unit interchangeability test system and its exchange method
CN201590148U (en) Intelligent concentrator with low voltage power line carrier communication and LCD display
CN204496748U (en) A kind of energy storage monitoring experiment and development platform
CN103064054A (en) Electric energy measure device simulation system and wiring matrix control method thereof

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150218