CN205594947U - Real device of instructing of split type energy metering equipment and terminal installation wiring - Google Patents

Real device of instructing of split type energy metering equipment and terminal installation wiring Download PDF

Info

Publication number
CN205594947U
CN205594947U CN201620204001.2U CN201620204001U CN205594947U CN 205594947 U CN205594947 U CN 205594947U CN 201620204001 U CN201620204001 U CN 201620204001U CN 205594947 U CN205594947 U CN 205594947U
Authority
CN
China
Prior art keywords
electric energy
phase
cabinet
split type
voltage
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620204001.2U
Other languages
Chinese (zh)
Inventor
李国胜
向保林
任涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Wuhan Electric Power Technical College
Original Assignee
State Grid Corp of China SGCC
Wuhan Electric Power Technical College
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, Wuhan Electric Power Technical College filed Critical State Grid Corp of China SGCC
Priority to CN201620204001.2U priority Critical patent/CN205594947U/en
Application granted granted Critical
Publication of CN205594947U publication Critical patent/CN205594947U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Instructional Devices (AREA)

Abstract

The utility model discloses a real device of instructing of split type energy metering equipment and terminal installation wiring, include and personally experience sth. Part of the body with the cabinet of style with on -the -spot electric -energy metering box cabinet, the cabinet body is the split type cabinet body, including the over -The -Counter body and the lower cabinet body, the over -The -Counter body and function is in laying energy metering equipment, power consumption information acquisition terminal and experimental terminal box, the cabinet body and function is in laying the mutual -inductor device down, electric energy metering device and mutual -inductor device pass through the wire to be connected, and the over -The -Counter body all adopts the card formula of pegging graft to connect with two junctions of the lower cabinet body, the cabinet body is including left surface, front and the three operating surface of right flank, through type electric energy metering device, three -phase four -wire low pressure electric energy metering device and high -tension electricity are laid respectively to three operating surface can metering device, the mutual -inductor device includes voltage transformer and current transformer. The utility model discloses a split type design, it is unanimous with typical metering method used in the real work, increased the on -the -spot sense of reality of measurement.

Description

Split type electric energy measuring equipment and terminal install wiring actual training device
Technical field
This utility model relates to training on electric power analog, particularly relates to a kind of split type electric energy measuring equipment and terminal installs wiring actual training device.
Background technology
Over nearly 20 years, for overwhelming majority electric energy metrical analog training device or emulation training device, its cabinet is that integral type, its outward appearance and operating table surface electrical energy metering tank true with scene is far from each other, in case, element configuration makes operator imperceptible is on-the-spot electric power meter, relevant metering analog loopback design too complex, high expensive, operation software function is convergent and a lot of function is out-of-date or without practical value, connection type is changeable and inconsistent with scene, operational danger is relatively big, and power consumption is the highest.And, what existing electric energy metrical analog or simulator only laid particular emphasis on on-the-spot false wiring classification arranges function, it is fitted without connection function, bigger with on-the-spot actual metered device difference, the employee or the personnel that transfer that newly work usually lack corresponding practical work experience, scene is not familiar with yet, if training set is inconsistent with field electric energy measurement device, if and the operational approach of training set is inconsistent with the operational approach of situ metrology device, inherently mislead effect, necessarily lose the meaning of training.
It addition, tradition routine training device is a kind of to take an examination especially to identify that examination takes type product as the leading factor, though exercise question quantity is big but of low quality, it is often more important that: not having discrimination between exercise question, out-of-date invalid useless exercise question is more, and it is random that old complexity is deposited in the design of phasor diagram;This utility model is that one is especially trained for leading type product with installation wiring with on-site training, and be closely connected electric energy metrical real work, and instructs real work to train to lead, and is entirely capable of meeting current production technology training many new demands.
Therefore, this utility model had both overcome the shortcoming that in on-the-spot electrical network, electric energy measuring equipment can not arbitrarily arrange fault, on-site training can not be repeated standardized connections training, change again the shortcoming that conventional general Training Simulation Installation presence is not true, practicality is not strong, result of training is the best, allow trainee learn, with (can real work), with then standard (be operated to energy standardization), thus the maximization of result of training can be reached.
Utility model content
The technical problems to be solved in the utility model is the various defects for existing training set, there is provided a kind of from cabinet appearance design, operating table surface design, training function, functional design, wiring technique, production technology, equipment component, current source designs, New technical use, and all many-sides such as drive software all have and break through and the electric energy measuring equipment of innovation and terminal install wiring actual training device.
This utility model solves its technical problem and be the technical scheme is that
A kind of split type electric energy measuring equipment and terminal install wiring actual training device, including with field electric energy measurement bin cabinet in specie, and be arranged in cabinet electric power meter, transformer device, for emulating the data wire of secondary circuit wire, power information acquisition terminal and power supply;It is characterized in that, described cabinet is split type cabinet, and including upper wardrobe body and lower cabinet body, described upper wardrobe body is used for laying electric energy measuring equipment, power information acquisition terminal and test connecting box;Described lower cabinet body is used for laying transformer device;Electric power meter and transformer device in upper wardrobe body and lower cabinet body are connected by data wire, and the junction between data wire and upper wardrobe body and lower cabinet body uses grafting cassette joint;
Described electric power meter includes through type electric power meter, three-phase and four-line low voltage electric energy measure device and high-voltage electric-energy meter;Described cabinet includes left surface, front and three operating surfaces of right flank, and described three operating surfaces lay through type electric power meter, three-phase and four-line low voltage electric energy measure device and high-voltage electric-energy meter respectively;
Described transformer device includes that voltage transformer summation current transformer, described current transformer are not open type current transformer.
By such scheme, described through type electric power meter includes carrying earth leakage protective low-voltage air switch and single-phase or three-phase intelligent table;Described three-phase and four-line low voltage electric energy measure device includes three-phase and four-line low pressure active electric energy meter and three-phase and four-line low-voltage acquisition terminal;Described high-voltage electric-energy meter includes three-phase and four-line high pressure active electric energy meter and three-phase and four-line high-voltage acquisition terminal, or phase three-wire three high pressure active electric energy meter and phase three-wire three high-voltage acquisition terminal.
By such scheme, built-in scalable, Concealable measuring instrument shelf in described upper wardrobe body cabinet;Built-in scalable, the Concealable measurement overhead lighting shelf of described upper wardrobe body.
By such scheme, described rosette is external, China's electrical network electric energy metrical special actual experimental rosette.
This split-type design, not only consistent with field electric energy measurement device, and can extract therefore convenient carrying and installation because connecting the data wire of wire for emulating secondary circuit, reduce the requirement to place specification simultaneously.
Test connecting box is external, and the mains side of rosette is completely the same with scene with the wiring of load side;Normal practice or without external rosette, or it is provided with one for feedback power table physical cabling in the feedback device controlling computer.This feedback device is at all without much practical values, and heavy damage presence.
This utility model uses wire mesh orifice plate, conveniently carries out installing wiring training, is conducive to promoting standardized connections;Having abandoned the conventional way separately setting wiring pile, this utility model directly utilizes the binding post of the real equipment such as electric energy meter, acquisition terminal, rosette to carry out installing wiring simultaneously.The shortcoming separately setting wiring pile way: increase trouble point;Increase cost;Destory the scene sense.
This utility model is designed as three operating surfaces, meets on-the-spot different metering scene requirement;Cabinet door design simultaneously is consistent with situ metrology chamber door, strengthens presence;And in cabinet, inner side is designed with extension type test instrunment shelf and illumination ceiling light, facilitates tester to use.
This utility model produces and provides the benefit that: this utility model, compared with existing apparatus, has the advantage that
1. this utility model is " split type ": cabinet imitates on-the-spot " electrical energy metering tank " or " electric energy metering box " above;Cabinet imitates on-the-spot " transformer cabinet " or " transformer chest " below;Upper wardrobe body is connected by " data wire ", " data wire " should imitate on-the-spot " secondary cable ".
And electrical energy metering tank or ammeter box are divided into three kinds of typical metering methods by scene: single-phase electric energy metering, three-phase and four-line low-voltage electric energy metering, high-voltage electric energy measurement are the most independently, the most convenient and reliable, completely the same with scene, allow user such as face scene.
The whole table apparatus of this utility model one makes three kinds of different typical metering methods, can share 1 set power source and 1 set common apparatus;And traditional station (the most identical 3 stations) that a whole table apparatus is made 3 identical metering units, clearly traditional method cost is the highest, because: by tradition Normal practice, three kinds of different typical metering methods, at least to make 3 different analog platforms, user needs to buy 3 analog could meet the repertoire of 1 actual training device of the present utility model.
2. using not open type current transformer design, will not produce high voltage, performance safety is reliable.(utility model patent number: 201420213989.X)
3. achieve output off current HIGH and reach a real current of 100A, employ real current transformer, ensure that the safety of gauger and the safety of equipment simultaneously;The no-load voltage ratio of transformer is variable;The heating of equipment is relatively low, and energy consumption is relatively low.
4. the no-load voltage ratio of convenient actual measurement current transform er;Achieve the actual field verification of current transformer error, the use of on-site calibrator can be trained easily;Achieve once the measurement of (greatly) electric current, the use of clamp on amperemeter can be trained easily.The current all products of this function are the most unrealized, but training and teaching needs " the field-checking function of transformer " in a hurry with qualification work about test.
5. rosette is external, and the mains side of rosette is completely the same with scene with the wiring of load side;Due to major part, manufacturer uses test harness post, and the design of this stage body avoids and frequently uses the rear binding post easily de-disconnected security risk causing open circuit and electric shock.
6. the wiring of transformer secondary side is all consistent with scene, and uses standard connection;The wire that connects used all leaves surplus when installing wiring, but is not connected into spiral shape, electric energy will not be lost, facilitate user rewiring.
The pocket watch backboard of conventional belt electrical analogue platform uses solid iron plate, does not has " wire mesh orifice plate ", it is impossible to carry out installing wiring exercise;This utility model can carry out repeatedly the installation wiring exercise of electric energy meter and acquisition terminal easily.Be conducive to promoting the correct mode of connection simultaneously.
7. in operating table surface, conceal the element and pile crown not used in field electric energy measurement device dexterously, allow only on all four with the scene electric energy measuring equipment and element that user conveniently sees.
8. devise the duty utilizing software to change acquisition terminal in real time, it is achieved that the actual working state that simulated field acquisition terminal is different, increase training of the present utility model and examination function.
9. devise and utilize software real-time operation once or the function such as break-make of secondary voltage, functions such as " in real time stop power transmission " is fully achieved, and stage body power supply need not be closed, not only increase grade of difficulty and the discrimination of examination, and be more nearly on-the-spot real work.
Accompanying drawing explanation
Below in conjunction with drawings and Examples, the utility model is described in further detail, in accompanying drawing:
Fig. 1 is the structural representation of this utility model embodiment;
Fig. 2 is that exemplary power batch meter inner member arranges Pictorial examples.
Detailed description of the invention
In order to make the purpose of this utility model, technical scheme and advantage clearer, below in conjunction with embodiment, this utility model is further elaborated.Should be appreciated that specific embodiment described herein, only in order to explain this utility model, is not used to limit this utility model.
As it is shown in figure 1, a kind of electric energy measuring equipment and terminal install wiring actual training device, including: with field electric energy measurement bin cabinet in specie, and electric power meter, transformer device, data wire and the power supply being arranged in cabinet;It is characterized in that, described cabinet is split type cabinet, and including upper wardrobe body and lower cabinet body, described upper wardrobe body is used for laying electric energy measuring equipment, power information acquisition terminal and test connecting box;Described lower cabinet body is used for laying transformer device;Electric power meter and transformer device in upper wardrobe body and lower cabinet body are connected by secondary circuit wire, and upper wardrobe body all uses grafting cassette joint with two junctions of lower cabinet body;
Fig. 2 is that exemplary power batch meter inner member arranges Pictorial examples, and electric power meter includes through type electric power meter, three-phase and four-line low voltage electric energy measure device and high-voltage electric-energy meter;Described cabinet includes left surface, front and three operating surfaces of right flank, and described three operating surfaces lay through type electric power meter, three-phase and four-line low voltage electric energy measure device and high-voltage electric-energy meter respectively;
Described transformer device includes that voltage transformer summation current transformer, described current transformer are not open type current transformer.
This utility model device has following characteristics: electrical energy metering tank casing in specie is commonly used at (1) and scene, and be arranged in casing energy measurement instruments, power information acquisition terminal, the equipment such as test connecting box, these equipment are completely the same with the equipment of onsite application;(2) transformer cabinet, and the current transformer that is arranged in cabinet and voltage transformer, the transformer wherein used is emulation transformer, also has some to control equipment;(3) emulation secondary circuit wire, this wire is to connect transformer cabinet and the data wire of electrical energy metering tank or order wire in fact, and junction, two all uses grafting cassette joint.
This utility model is designed as three operating surfaces, meets on-the-spot different metering scene requirement;Cabinet door design simultaneously is consistent with situ metrology chamber door, strengthens presence;And in cabinet, inner side is designed with extension type test instrunment shelf and overhead lighting, facilitates tester to use.
Cabinet envisaged underneath has air vent, has good ventilation and heat moisture effect.
At bottom of cabinet bulk, universal caster wheel and fixing lower margin are installed, are moved easily and fix.
On the basis of this electric energy measuring equipment and terminal install wiring actual training device, need to incorporate a set of single-phase, low voltage three-phase four line, high pressure phase three-wire three, high pressure three-phase and four-line, the mathematical model of the various wiring of TA and TV and logical operations software for training and examination, make the on-the-spot various wiring condition being likely to occur, all can pass through computer program simulation the Realization of Simulation.
By this comprehensive training instructional device and the use of software kit thereof, following functions can be realized:
(1) mode of connection contains wide, A wide selection of colours and designs, can realize tens thousand of kinds of wiring, include:
1. three-phase three-wire system (through TV, TA wiring, TA four-wire system)
2. three-phase four-wire system (through TV, TA wiring, TA six line system)
3. three-phase four-wire system (through TA without TV wiring, TA six line system)
4. three-phase four-wire system (direct access)
5. three-phase five-wire mode (direct access)
6. single-phase-two-wire system (direct access)
7. single-phase three wire system (direct access)
(2) it is provided with the basic fast wiring key of common phase three-wire three 48 kinds, quick and convenient can inquire about, emulate, it is simple to practice-training teaching.
(3) " test item bank " of the newly-increased different grade of difficulty having circle of good definition to index, can select wiring key element combination in any examination question by computer interface, and any one examination question in test item bank can be carried out emulating wiring by computer simulation system software.
(4) to being provided with TV open circuit, TA short circuit and the false wiring of open circuit, native system is provided with special " recovery button ", carries out charged recovery the most in real time, in order to user carries out wiring judgement and corrects wiring.
(5) it is provided with voltage circuit short-circuit protection warning function, when A, B, C tri-operate simultaneously, occurs that the protection of the station of violation operation is reported to the police and do not interfere with the operation process of other station.
(6) being provided with current loop open-circuit-protection warning function, this function has a unique design, and when the false wiring of system software sets is current loop open circuit, system is not reported to the police;When systems soft ware does not set current loop open circuit, but when being caused current loop open circuit by operator's maloperation, system will be reported to the police.
(7) TV, TA can carry out ground connection with earth-free with simulated field.
(8) field-checking record, examination question, phasor diagram, wiring diagram, more positive coefficient can be printed and move back benefit electricity.
(9) aiming at metering field personnel user to be provided with " Watt-hour meter's field test charting ", computer can automatic printing output services form.
(10) false wiring of TV can be emulated, and can the various modes of connection of combination in any transformer.
(11) newly-increased " electricity moves back benefit intelligence computation function ", the data input tested working site controls computer, computer can judge physical cabling mode according to the data of input, and automatically draw out phasor diagram, wiring diagram, calculate more positive coefficient, and automatically calculate average power factor according to meritorious, capacity of idle power record and move back benefit electricity.
It should be appreciated that for those of ordinary skills, can be improved according to the above description or be converted, and all these modifications and variations all should be belonged to the protection domain of this utility model claims.

Claims (4)

1. split type electric energy measuring equipment and terminal install a wiring actual training device, including with field electric energy measurement bin cabinet in specie Body, and be arranged in cabinet electric power meter, transformer device, for emulating the data wire of secondary circuit wire, use Electrical information acquisition terminal and power supply;It is characterized in that, described cabinet is split type cabinet, including upper wardrobe body and lower cabinet body, Described upper wardrobe body is used for laying electric energy measuring equipment, power information acquisition terminal and test connecting box;Described lower cabinet body is used for laying Transformer device;Electric power meter and transformer device in upper wardrobe body and lower cabinet body are connected by data wire, and data wire is with upper Junction between cabinet and lower cabinet body uses grafting cassette joint;
Described actual training device includes through type electric power meter, three-phase and four-line low voltage electric energy measure device and high-voltage electric-energy meter; Described cabinet includes left surface, front and three operating surfaces of right flank, and described three operating surfaces lay through type electric energy metrical respectively Device, three-phase and four-line low voltage electric energy measure device and high-voltage electric-energy meter;
Described transformer device includes that voltage transformer summation current transformer, described current transformer are not open type current transformer.
Split type electric energy measuring equipment the most according to claim 1 and terminal install wiring actual training device, it is characterised in that described Through type electric power meter includes carrying earth leakage protective low-voltage air switch and single-phase or three-phase intelligent table;Described three-phase and four-line is low Pressure electric power meter includes three-phase and four-line low pressure active electric energy meter and three-phase and four-line low-voltage acquisition terminal;Described high-voltage electric energy measurement Device includes three-phase and four-line high pressure active electric energy meter and three-phase and four-line high-voltage acquisition terminal, or phase three-wire three high pressure active electric energy meter and Phase three-wire three high-voltage acquisition terminal.
Split type electric energy measuring equipment the most according to claim 1 and terminal install wiring actual training device, it is characterised in that described Built-in scalable, Concealable measuring instrument shelf in upper wardrobe body cabinet;Built-in scalable, the Concealable measurement of described upper wardrobe body Use overhead lighting shelf.
Split type electric energy measuring equipment the most according to claim 1 and terminal install wiring actual training device, it is characterised in that described Rosette is external, China's electrical network electric energy metrical special actual experimental rosette.
CN201620204001.2U 2016-03-16 2016-03-16 Real device of instructing of split type energy metering equipment and terminal installation wiring Expired - Fee Related CN205594947U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620204001.2U CN205594947U (en) 2016-03-16 2016-03-16 Real device of instructing of split type energy metering equipment and terminal installation wiring

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620204001.2U CN205594947U (en) 2016-03-16 2016-03-16 Real device of instructing of split type energy metering equipment and terminal installation wiring

Publications (1)

Publication Number Publication Date
CN205594947U true CN205594947U (en) 2016-09-21

Family

ID=56929515

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620204001.2U Expired - Fee Related CN205594947U (en) 2016-03-16 2016-03-16 Real device of instructing of split type energy metering equipment and terminal installation wiring

Country Status (1)

Country Link
CN (1) CN205594947U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105608949A (en) * 2016-03-16 2016-05-25 国家电网公司 Split type electric energy metering device and terminal installation wiring practical training apparatus
CN111103448A (en) * 2019-11-15 2020-05-05 国网浙江省电力有限公司衢州供电公司 Wiring module for high-voltage electric energy metering new-installation user

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105608949A (en) * 2016-03-16 2016-05-25 国家电网公司 Split type electric energy metering device and terminal installation wiring practical training apparatus
CN111103448A (en) * 2019-11-15 2020-05-05 国网浙江省电力有限公司衢州供电公司 Wiring module for high-voltage electric energy metering new-installation user

Similar Documents

Publication Publication Date Title
CN105608949A (en) Split type electric energy metering device and terminal installation wiring practical training apparatus
CN202102624U (en) Integral experiment system for preventing electricity fraudulent use
CN105068022B (en) For the simulated failure intelligent electric meter of three phase mains and electrical test simulator
CN106970291B (en) A kind of method of automatic test high voltage device of transformer station current loop secondary load
CN104835396A (en) Simulation system based on anti-electric-larceny skill training
CN205594947U (en) Real device of instructing of split type energy metering equipment and terminal installation wiring
CN105608966A (en) Electric power metering device simulated field multifunctional training working table
CN108198477A (en) Electrical test of transformer simulation teaching system
CN108597291B (en) Distribution network line loss simulation training system
CN104851343A (en) Demonstration and training device for electric equipment
CN107356830B (en) Simulation transformer training device
CN204576923U (en) Investigation of visiting one house after another program-controlled analog device
CN211124488U (en) Low-voltage centralized meter reading intelligent simulation device
CN107219492B (en) Medium voltage network electrical energy measurement high pressure integration semi-physical simulation device
CN205665872U (en) Resident smart electric meter copies nuclear and receives simulation teching device
CN107527541A (en) A kind of cable fault emulation centralized control system and emulation training method
CN204650853U (en) A kind of simulation system based on skills training of opposing electricity-stealing
CN112396906A (en) Comprehensive simulation system for professional post skills and examination of electricity inspection for actual operation
CN103064054A (en) Electric energy measure device simulation system and wiring matrix control method thereof
CN202285151U (en) Double-path working power supply of integrative experimental device with electricity-theft prevention for simulating working condition of metering of electric energy
CN204856200U (en) Flexible automatic test system of servo controller
CN209641125U (en) Power cable simulation test device
CN204496748U (en) A kind of energy storage monitoring experiment and development platform
CN215007142U (en) Electricity stealing simulator based on effect comparison of two current transformers
CN204166720U (en) Single-phase intelligent expense control electric energy meter is installed concentratedly and training set

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160921

CF01 Termination of patent right due to non-payment of annual fee