CN206769237U - A kind of more siphon rain pipes installation screens device - Google Patents

A kind of more siphon rain pipes installation screens device Download PDF

Info

Publication number
CN206769237U
CN206769237U CN201720498557.1U CN201720498557U CN206769237U CN 206769237 U CN206769237 U CN 206769237U CN 201720498557 U CN201720498557 U CN 201720498557U CN 206769237 U CN206769237 U CN 206769237U
Authority
CN
China
Prior art keywords
steel pipe
pipe column
limiting plate
siphon rain
siphon
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720498557.1U
Other languages
Chinese (zh)
Inventor
贾海涛
徐士杰
王传坤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiedi Design Group Co ltd
Original Assignee
Qingdao Gad Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Qingdao Gad Co Ltd filed Critical Qingdao Gad Co Ltd
Priority to CN201720498557.1U priority Critical patent/CN206769237U/en
Application granted granted Critical
Publication of CN206769237U publication Critical patent/CN206769237U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model discloses a kind of more siphon rain pipes installation screens device.During construction, lift and fix bottom steel pipe column.Limiting plate is placed in the upper end tube nozzle of top steel pipe column.And the buckle around limiting plate is caused to tangle the upper end tube nozzle of top steel pipe column.Top steel pipe column is lifted into the top of bottom steel pipe column, and causes a distance therebetween be present.By some double flute steel, top steel pipe column and the otic placode of bottom steel pipe column surrounding are connected.Rotation adjustment limiting plate so that the hole on limiting plate corresponds to the siphon rain pipe in the steel pipe column of bottom.Siphon rain pipe is penetrated above each hole on limiting plate so that these siphon rain pipes turn into the siphon rain pipe inside the steel pipe column of top.Siphon rain pipe inside top steel pipe column and bottom steel pipe column is docking together.Top steel pipe column is fixed by hanging device.Double flute steel is removed, completes the docking of top steel pipe column and bottom steel pipe column.

Description

A kind of more siphon rain pipes installation screens device
Technical field
It the utility model is related to the installation instrument of high-building construction equipment, specifically siphon rain pipe.
Background technology
At the construction field (site), the use of a complete siphon rain pipe is not from roofing to ground because building is higher Reality, typically to siphon rain pipe merogenesis installation.Not only to be solved in installation process between siphon rain pipe Overhead welding operational issue, and it is more when need to complete the lifting together of steel pipe column and siphon rain pipe, at this moment rain Positioning of the water pipe in lifting and abutting joint is all very cumbersome lengthy and jumbled always, and precision is not high, docking deviation often occurs Situation about can not weld, these problems annoying always construction one line personnel, there is presently no it is a kind of it is relatively good, simply have The solution method of effect.
Referring to accompanying drawing 5, in existing construction, siphon pipe poling and temporary weld are fixed on ground first, generally use 250T crawler cranes sling the steel pipe column of stationary siphon, complete the installation between first segment steel pipe column and basis.Then on ground Rain pipe poling and temporary weld are fixed in the second section steel pipe column on face, reusing crane, that steel pipe column is transported to scene is complete Assembly between the sections of Cheng Yijie and two.Because having substantial amounts of stiffener and ribbed stiffener in steel pipe column, operating space very little and be envelope Space is closed, siphon rain pipe erecting and welding requirement can not be met.And after rain pipe completes docking, it is also necessary to be cut and disassembled Fixing device (angle steel or reinforcing bar 8 in Fig. 6).This series of work progress is required for completing high aerial, before this Kind construction method seriously hinders erection schedule, have impact on construction speed.
In summary, it is the shortcomings that prior art:
(1) precise positioning of rain pipe can not be realized, fixed by angle steel due to support of the rain pipe in steel pipe column or Person's reinforcing bar, angle steel and reinforcing bar easily produce site error when being welded on steel pipe column, so as to influence later stage rain pipe Positioning.
(2) because rain pipe is longer, typically phase will not occur with steel pipe column because upper end is fixed in hoisting process To displacement, but its lower end would generally produce relative movement in hoisting process, can be equipped with deviation with initial sprocket bit, cause Docking inconvenience.
(3) after rain pipe completes docking, fixed angle steel or reinforcing bar need to be removed, otherwise can cause the steel in outside Tubing string is difficult to close.
Utility model content
The purpose of this utility model is that solve the siphon rain pipe construction problem in skyscraper.
To realize that the technical scheme that the utility model purpose uses is a kind of such, more siphon rain pipe installation cards Position device, it is characterised in that:The more siphon rain pipes installation screens device includes limiting plate and some buckles.
There is several holes for supplying siphon rain pipe to pass through on the limiting plate.The buckle is " several " font.It is some Individual buckle is distributed in the surrounding of limiting plate.One branch of each buckle is fixed on the upper surface of limiting plate.
The limiting plate is placed in the upper end tube nozzle of top steel pipe column.Buckle around limiting plate tangles top steel pipe column Upper end tube nozzle, the lower end of the top steel pipe column are docked with bottom steel pipe column.
Further, the limiting plate is wooden.
Further, the top steel pipe column is hollow cylinder.The limiting plate is circle.
Further, the diameter of described hole is bigger 4mm than the diameter of siphon rain pipe.
Further, the buckle quantity on each limiting plate is eight.
The advantages of the utility model, is as follows:
(1) it can ensure that the fixation of rain pipe is effective, relative offset not occur in hoisting process.
(2) operation is simplified, it is not necessary to by the way of being welded and fixed, avoid secondary dismounting, enable in particular to reduce high-altitude Operation is possible to the injury brought.
(3) mobile, convenient disassembly, measure input is reduced, the positioner can reuse, and reduce construction cost.
(4) adjustable is strong, even if there occurs relative deviation in hoisting process, can be easily real in docking Now adjust again, avoid rain pipe and fixed stuck situation.
The utility model has successfully been used in the construction of the siphon rain pipe in certain newly-built terminal and steel pipe column, So that the lifting docking of siphon rain pipe is achieved with steel pipe column crossed construction.
Brief description of the drawings
Fig. 1 is limiting plate and its buckle structure schematic diagram;
Fig. 2 is structure chart of the present utility model;
Fig. 3 is Fig. 2 elevation;
The elevation (removing double flute steel 5) that Fig. 4 is Fig. 2;
Fig. 5 is the schematic diagram of prior art;
Fig. 6 is Fig. 5 top view.
In figure:Limiting plate 1, hole 101, buckle 2, siphon rain pipe 3, top steel pipe column 4, double flute steel 5, bottom steel pipe column 6th, otic placode 7, angle steel or reinforcing bar 8.
Embodiment
With reference to embodiment, the utility model is described in further detail, but should not be construed the above-mentioned master of the utility model Topic scope is only limitted to following embodiments.It is common according to this area in the case where not departing from the above-mentioned technological thought of the utility model Technological know-how and customary means, various replacements and change are made, all should be included in the scope of protection of the utility model.
A kind of more siphon rain pipes installation screens device:
The more siphon rain pipes installation screens device includes limiting plate 1 and some buckles 2.The limiting plate 1 is wooden. The steel pipe column coordinated with limiting plate 1 is hollow cylinder, and therefore, the limiting plate 1 is circle.I.e. according to the diameter of live steel pipe column Size makes the limiting plate 1 shown in Fig. 1, and the size of the limiting plate 1 is can just put into preferably in steel pipe column.
There is several holes 101 for supplying siphon rain pipe 3 to pass through on the limiting plate 1.The diameter ratio of described hole 101 The big 4mm of diameter of siphon rain pipe 3.
The buckle 2 is " several " font.Several buckles 2 are distributed in the surrounding of limiting plate 1.One of each buckle 2 Branch is fixed on the upper surface of limiting plate 1.In embodiment, the quantity of buckle 2 on each limiting plate 1 is eight.The buckle 2 A branch, i.e. one pin of " several " word is fixed on limiting plate 1, is preferably embedded inside limiting plate 1, can be firm with limiting plate Be combined together.Necessary situation can use suitable glue bonding, or be anchored using rivet, ensure limiting plate 1 The situation of the loosening of buckle 2 will not occur in use.
The use process for the device that the present embodiment refers to is as follows, and the lower end of the bottom steel pipe column 6 is fixed, the bottom Some siphon rain pipes 3 have been secured in steel pipe column 6.The upper end of these siphon rain pipes 3 is higher than the upper end of bottom steel pipe column 6 The mouth of pipe.
The limiting plate 1 is placed in the upper end tube nozzle of top steel pipe column 4.Buckle 2 around limiting plate 1 tangles top steel pipe The upper end tube nozzle of post 4.
During construction, top steel pipe column 4 is lifted into the top of bottom steel pipe column 6, and causes a distance therebetween be present. By some double flute steel 5, top steel pipe column 4 and the otic placode 7 of the surrounding of bottom steel pipe column 6 are connected.
If bottom steel pipe column 6 is the undermost steel pipe column of whole building (first segment steel pipe column), fixation is directly lifted On the basis of, on the basis of internal some siphon rain pipes 3 are fixed on, it can also be fixed in undermost steel pipe column On the ribbed stiffener in portion.
The limiting plate 1 is placed in the upper end tube nozzle of top steel pipe column 4.And the buckle 2 around limiting plate 1 is tangled The upper end tube nozzle of portion's steel pipe column 4.
Top steel pipe column 4 is lifted into the top of bottom steel pipe column 6, and causes a distance therebetween be present.If by Dry double flute steel 5, top steel pipe column 4 and the otic placode 7 of the surrounding of bottom steel pipe column 6 are connected, that is, cause upper steel tubing string 4 and bottom steel pipe Post 6 is fixed together.In embodiment, double flute steel 5 has several bolts hole, is bolted double flute steel 5 and otic placode 7.
Rotation adjustment limiting plate 1 so that the siphon rain pipe 3 in the corresponding bottom steel pipe column 6 of hole 101 on limiting plate 1. I.e. as shown in Fig. 2 preferably before screens, the position of the good rain pipe of surveying and locating in advance, the hole on limiting plate 1 be adjusted to The position of siphon rain pipe 3 to be mounted is corresponding, and after the completion of being lifted so as to steel pipe column, siphon rain pipe 3 can perforate simultaneously Docked with the siphon rain pipe 3 of lower section.
Penetrate siphon rain pipe 3 from the top of each hole 101 on limiting plate 1 so that these siphon rain pipes 3 into For the siphon rain pipe 3 inside top steel pipe column 4.
Siphon rain pipe 3 inside top steel pipe column 4 and bottom steel pipe column 6 is docking together.
Top steel pipe column 4 is fixed by hanging device.Double flute steel 5 is removed, completes top steel pipe column 4 and bottom steel pipe column 6 docking.
Top steel pipe column 4 is considered as bottom steel pipe column 6, said process is repeated, until steel pipe column integrally docks completion.

Claims (5)

  1. A kind of 1. more siphon rain pipes installation screens device, it is characterised in that:
    The more siphon rain pipes installation screens device includes limiting plate (1) and some buckles (2);
    There is several holes (101) for supplying siphon rain pipe (3) to pass through on the limiting plate (1);The buckle (2) is " several " Font;Several buckles (2) are distributed in the surrounding of limiting plate (1);One branch of each buckle (2) is fixed on limiting plate (1) upper surface;
    The limiting plate (1) is placed in the upper end tube nozzle of top steel pipe column (4);Buckle (2) around limiting plate (1) tangles top The upper end tube nozzle of steel pipe column (4), the lower end of the top steel pipe column (4) are docked with bottom steel pipe column (6).
  2. 2. more siphon rain pipe installation screens devices of one kind according to claim 1, it is characterised in that:The limiting plate (1) to be wooden.
  3. 3. more siphon rain pipe installation screens devices of one kind according to claim 1, it is characterised in that:The top steel pipe Post (4) is hollow cylinder;The limiting plate (1) is circle.
  4. 4. more siphon rain pipe installation screens devices of one kind according to claim 1, it is characterised in that:Described hole (101) diameter is bigger 4mm than the diameter of siphon rain pipe (3).
  5. 5. more siphon rain pipe installation screens devices of one kind according to claim 1, it is characterised in that:Each limiting plate (1) buckle (2) quantity on is eight.
CN201720498557.1U 2017-05-08 2017-05-08 A kind of more siphon rain pipes installation screens device Active CN206769237U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720498557.1U CN206769237U (en) 2017-05-08 2017-05-08 A kind of more siphon rain pipes installation screens device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720498557.1U CN206769237U (en) 2017-05-08 2017-05-08 A kind of more siphon rain pipes installation screens device

Publications (1)

Publication Number Publication Date
CN206769237U true CN206769237U (en) 2017-12-19

Family

ID=60650199

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720498557.1U Active CN206769237U (en) 2017-05-08 2017-05-08 A kind of more siphon rain pipes installation screens device

Country Status (1)

Country Link
CN (1) CN206769237U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109208820A (en) * 2018-09-28 2019-01-15 北京市第五建筑工程集团有限公司 Pipe mounting structure and its construction method are drained in flower umbrella steel pipe column

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109208820A (en) * 2018-09-28 2019-01-15 北京市第五建筑工程集团有限公司 Pipe mounting structure and its construction method are drained in flower umbrella steel pipe column
CN109208820B (en) * 2018-09-28 2021-07-20 北京市第五建筑工程集团有限公司 Mounting structure of drainage pipe in steel pipe column with flower umbrella and construction method thereof

Similar Documents

Publication Publication Date Title
CN104389268B (en) A kind of steel tower column with location structure and construction method for hanging thereof
CN204098463U (en) Builder's jack
US20160084220A1 (en) Arrangement to align a part of a wind turbine
CN103123016B (en) Construction method for laying gas pipelines along bridge
CN108104832B (en) underground engineering assembled confined concrete arch center and mechanized construction method
CN105780995A (en) Curved surface space pipe truss structure and mounting method thereof
JP6681148B2 (en) Bridge construction method, pillars and guide means used in the bridge construction method
CN108756441A (en) A kind of hydraulic lifting flipped device and its hanging method for reducing tower
CN109680619A (en) A kind of steel truss beam sling Arch Bridge Construction method big suitable for environmental restrictions
CN107700479A (en) A kind of construction method of large diameter drill hole pile
CN107720575B (en) A kind of towing type construction method for hanging of tower crane support system
CN206769237U (en) A kind of more siphon rain pipes installation screens device
CN108119165A (en) Underground engineering normalized assembled confined concrete bow member Intelligent Installation method
CN108560895A (en) A kind of adjustable type elevator shaft operating platform and its erection method
CN210370522U (en) Drilling pile machine provided with double guide rails and double drilling machines
CN208649894U (en) A kind of steel anchor beam and steel corbel unit spelling moulding bed
CN106403996A (en) Production method of forced centering observation mark stake for precision engineering measurement
CN206941596U (en) A kind of shoulder pole boom device for lifting steel reinforcement cage
CN203834809U (en) Steel pipe column structure for steel pipe column concrete side pouring method
CN205975613U (en) Steel trestle steel -pipe pile construction leading truck
CN108374350A (en) A kind of the spelling moulding bed and installation method of steel anchor beam and steel corbel unit
CN112211384B (en) Scaffold for building site
CN107938841A (en) A kind of positioning adjusting of steel column pairing and method of temporarily fixing
CN207004548U (en) A kind of anchor bolt construction positioner
CN206956726U (en) Dual-purpose type fastening type Pile feeder

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder

Address after: 266071 19th Floor, G1 Floor, South Software Park, 288 Ningxia Road, Qingdao City, Shandong Province

Patentee after: QINGDAO GAD BUILDING DESIGN Co.,Ltd.

Address before: 266071 19th Floor, G1 Floor, South Software Park, 288 Ningxia Road, Qingdao City, Shandong Province

Patentee before: QINGDAO GAD Co.,Ltd.

CP01 Change in the name or title of a patent holder
TR01 Transfer of patent right

Effective date of registration: 20230118

Address after: 409-419, Floor 4, Martial Arts Museum Building, No. 168 Yugu Road, Xihu District, Hangzhou, Zhejiang, 310007 (singular)

Patentee after: Jiedi Design Group Co.,Ltd.

Address before: 266071 19th Floor, G1 Floor, South Software Park, 288 Ningxia Road, Qingdao City, Shandong Province

Patentee before: QINGDAO GAD BUILDING DESIGN Co.,Ltd.

TR01 Transfer of patent right