CN206768804U - Precast concrete pile attachment structure - Google Patents
Precast concrete pile attachment structure Download PDFInfo
- Publication number
- CN206768804U CN206768804U CN201720593363.XU CN201720593363U CN206768804U CN 206768804 U CN206768804 U CN 206768804U CN 201720593363 U CN201720593363 U CN 201720593363U CN 206768804 U CN206768804 U CN 206768804U
- Authority
- CN
- China
- Prior art keywords
- steel pipe
- attachment structure
- pile
- concrete
- precast concrete
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Piles And Underground Anchors (AREA)
Abstract
The utility model provides a kind of precast concrete pile attachment structure, and concrete-pile is elongated hollow structure, and the termination of concrete-pile is provided with ring flange.Wherein, the end sleeve of concrete-pile is provided with steel pipe, and WELDING STUDS is provided with the inside of the steel pipe;The ring flange weld of two concrete-piles is provided with connecting plate, the steel pipe of two concrete-piles and ring flange are connected as an entirety by connecting plate.Attachment structure of the present utility model, its joint have horizontal bearing capacity is high, make it is simple efficiently, the advantages of splicing is convenient, economical and efficient, can efficiently solve cast in situs cast-in-place concrete pile and existing attachment structure existing for technical problem.
Description
Technical field
It the utility model is related to building pile foundation technical field, more particularly to precast concrete pile attachment structure.
Background technology
Stake currently used for foundation pit supporting project mainly has the bored concrete pile and prefabricated pile of cast in situs, the coagulation of cast in situs
Native bored concrete pile directly enters Concrete Filled in prefabricated reinforcing bar, and majority uses solid section form, is molded through natural curing,
Its concrete strength is generally below C40.The cast-in-place concrete pile that this technique makes is had a great influence by weather, and the rainy day is difficult to can not
Construction, construction period can not ensure, there is that fabrication of reinforcing cage efficiency is low, pile concrete resistance to compression and impermeability are poor, exists
Durability is poor, easily the problems such as crack occurs, and quality cannot be guaranteed, and the materials such as concrete, steel are consumed when pouring making
Material is excessive and wastes national resources.Cast in situs construction period is longer simultaneously, and certain destruction can be also produced to the environment of surrounding.And
When being used for pattern foundation pit supporting structure using prefabricated pile, deficiency existing for bored concrete pile can be made up, especially only with the base of single-unit prefabricated pile
Support engineering is cheated, there is preferable economic benefit.But when foundation ditch is deeper, need to be spliced using prefabricated pile of multi-segments, often this
When prefabricated pile joint turn into the weak link of whole pile, especially for the prefabricated pile of the high ratio of reinforcement, the welding of existing end plate
Connection is difficult to meet the requirement with pile body uniform strength design, once joint can not meet design requirement, the safety of foundation ditch is caused
Hidden danger.
Utility model content
To overcome problem above, the utility model provides a kind of joint horizontal bearing capacity height, makes simple efficient, splicing side
Just, the precast concrete pile attachment structure of economical and efficient, to solve the cast-in-place concrete pile of cast in situs and existing attachment structure
The problem of existing.
To solve technical problem, the utility model adopts the following technical scheme that:
Precast concrete pile attachment structure, concrete-pile are elongated hollow structure, and the termination of concrete-pile is provided with flange
Disk, it is characterised in that the end sleeve of the concrete-pile is provided with steel pipe, and WELDING STUDS is provided with the inside of the steel pipe;In two coagulations
The ring flange weld of native stake is provided with connecting plate, and the steel pipe of two concrete-piles and ring flange are connected as one by the connecting plate
Individual entirety.
Preferably, the WELDING STUDS is circumferentially disposed along steel pipe inner side and perpendicular to steel pipe inner wall.
Preferably, a diameter of 10mm~28mm of the WELDING STUDS, it is highly 30mm~80mm;The spacing of two adjacent WELDING STUDSs
For 50mm~200mm.
Preferably, the connecting plate welds with steel pipe and ring flange.
Preferably, the connecting plate width is 50mm~150mm, and length is 100mm~600mm, thickness be 5mm~
30mm。
Preferably, one end of the steel pipe is connected with ring flange.
Preferably, the thickness of the steel pipe is 4mm~20mm.
Preferably, the side wall of the steel pipe is provided with through hole.
Preferably, anchor rib is provided with the concrete-pile, anchor hole is provided with the ring flange;The anchor hole is
Threaded through hole is to be provided with the through hole of chuck or to be provided with the through hole that chuck combines with screw thread.
Preferably, the anchor rib uses prestressed steel bar or regular reinforcement.
The beneficial effects of the utility model are:
1st, due to being connected jointly using connecting plate and steel pipe, ring flange, the bending resistance of pile body joint can be increased substantially
Performance, the anti-bending strength and pile body equal strength of joint are realized, live manpower and construction cost can be greatly lowered, shortens construction week
Phase, the problem of bored concrete pile of cast in situs can be avoided to exist.
2nd, the WELDING STUDS set can improve the cohesive force of steel pipe and pile concrete, avoid joint by it is curved when, concrete
There is break-off with ring flange, effectively improve the anti-bending strength of joint.
3rd, the setting of steel pipe can efficiently reduce the stress concentration phenomenon at end plate, can improve the anti-bending strength of joint.Steel
The side wall of pipe sets radial direction through hole to improve the cohesive force of steel pipe and concrete, prevent joint during by horizontal bearing capacity with
Flange disk detachment.
4th, compared with existing anchor rib set-up mode, the utility model on ring flange by setting special anchoring
Hole, while be arranged on high-strength prestressed steel bar as anchor rib on ring flange, it can be achieved when cage bar uses prestressed steel bar
When, anchor rib can share the stress of a part of original cage bar heading, improve the anti-bending strength of joint.
Brief description of the drawings
Fig. 1 is the schematic diagram of precast concrete pile attachment structure in the utility model embodiment;
Fig. 2 is the schematic cross-section of precast concrete pile attachment structure in the utility model embodiment;
Fig. 3 is (a) schematic cross-section of ring flange in the utility model embodiment, and (b) anchor hole connects with anchor rib to be shown
It is intended to;
Fig. 4 is the side schematic view of steel pipe in the utility model embodiment;
In figure, 1, concrete-pile;2nd, connecting plate;3rd, steel pipe;4th, steel reinforcement framework cage;5th, ring flange;6th, WELDING STUDS;7th, in advance should
Power reinforcing bar;8th, nonprestressed reinforcement;9th, anchor hole;10th, anchor rib;11st, chuck;12nd, through hole.
Embodiment
It should be noted that in the case where not conflicting, the feature in the utility model embodiment can be mutually combined.Under
Face describes the utility model in detail by refer to the attached drawing and in conjunction with the embodiments.
As shown in figure 1, a kind of precast concrete pile attachment structure of the present embodiment, including concrete-pile 1, connecting plate 2, steel
Pipe 3.Wherein, concrete-pile 1 is elongated hollow structure, is internally provided with steel reinforcement framework cage 4, and concrete-pile 1 is provided at both ends with
Ring flange 5, steel pipe 3 is set in the end of pile crown, and one end of steel pipe 3 can be connected with ring flange 5 so as to increase intensity.Steel
The inner side of pipe 3 is provided with WELDING STUDS 6.After the pile crown of two concrete-piles is welded by ring flange 5, using connecting plate 2 by two concrete
Steel pipe 3, the ring flange 5 of stake are connected as an entirety, so as to realize the connection of the high-level bearing capacity of two concrete-piles.
Preferably, the thickness of steel pipe 3 is 4mm~20mm, and the side wall of steel pipe 3 is provided with radial direction through hole 12.WELDING STUDS 6 along
Circumferentially disposed and perpendicular to steel pipe 3 the inwall (see Fig. 2) in the inner side of steel pipe 3, the spacing of two adjacent WELDING STUDSs is 50mm~200mm,
A diameter of 10mm~the 28mm of WELDING STUDS, it is highly 30mm~80mm.Wherein, the position of WELDING STUDS 6 is according to deformed bar 7 and non-
The location-appropriate adjustment of deformed bar 8, avoids WELDING STUDS 6 from influenceing the installation of steel reinforcement framework cage 4 and ring flange 5, WELDING STUDS 6
The number of plies could be arranged to multilayer, in the present embodiment, set two layers of WELDING STUDS 6 in the inner side of steel pipe 3 of every concrete-pile one end, often
The quantity of layer is six.
Connecting plate 2 uses steel plate, is welded on the outside of steel plate with steel pipe 3, ring flange 5.Preferably, the width of connecting plate 2 is
50mm~150mm, length are 100mm~600mm, and thickness is 5mm~30mm.
As shown in Fig. 3 (a), tensioning hole, muscle groove, heavy muscle hole, anchor hole 9 are may be provided with ring flange 5, anchor hole 9 is
Threaded through hole is provided with the through hole of chuck or is provided with the through hole that chuck combines with screw thread.Anchor rib 10 can use mixed
Native prestressed steel bar is coagulated, as shown in Fig. 3 (b), rod iron is stuck in chuck 11 after passing through anchor hole 9.
Above-described is only preferred embodiment of the present utility model, it is noted that for the ordinary skill of this area
For personnel, on the premise of not departing from the utility model and creating design, various modifications and improvements can be made, these all belong to
In the scope of protection of the utility model.
Claims (10)
1. precast concrete pile attachment structure, concrete-pile is elongated hollow structure, and the termination of concrete-pile is provided with ring flange,
Characterized in that, the end sleeve of the concrete-pile is provided with steel pipe, WELDING STUDS is provided with the inside of the steel pipe;In two concrete-piles
Ring flange weld be provided with connecting plate, the connecting plate by the steel pipe of two concrete-piles and ring flange be connected as one it is whole
Body.
2. precast concrete pile attachment structure according to claim 1, it is characterised in that the WELDING STUDS is along in steel pipe
Side is circumferentially disposed and perpendicular to steel pipe inner wall.
3. precast concrete pile attachment structure according to claim 1 or 2, it is characterised in that the WELDING STUDS is a diameter of
10mm~28mm, it is highly 30mm~80mm;The spacing of two adjacent WELDING STUDSs is 50mm~200mm.
4. precast concrete pile attachment structure according to claim 1, it is characterised in that the connecting plate and steel pipe and
Ring flange welds.
5. the precast concrete pile attachment structure according to claim 1 or 4, it is characterised in that the connecting plate width is
50mm~150mm, length are 100mm~600mm, and thickness is 5mm~30mm.
6. precast concrete pile attachment structure according to claim 1, it is characterised in that one end of the steel pipe and flange
Disk connects.
7. precast concrete pile attachment structure according to claim 1, it is characterised in that the thickness of the steel pipe is 4mm
~20mm.
8. precast concrete pile attachment structure according to claim 1, it is characterised in that the side wall of the steel pipe is provided with
Through hole.
9. precast concrete pile attachment structure according to claim 1, it is characterised in that be provided with anchor in the concrete-pile
Gu muscle, anchor hole is provided with the ring flange;The anchor hole be threaded through hole or be provided with chuck through hole or
To be provided with the through hole that chuck combines with screw thread.
10. precast concrete pile attachment structure according to claim 9, it is characterised in that the anchor rib is answered using pre-
Power rod iron or regular reinforcement.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720593363.XU CN206768804U (en) | 2017-05-25 | 2017-05-25 | Precast concrete pile attachment structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720593363.XU CN206768804U (en) | 2017-05-25 | 2017-05-25 | Precast concrete pile attachment structure |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206768804U true CN206768804U (en) | 2017-12-19 |
Family
ID=60638306
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720593363.XU Active CN206768804U (en) | 2017-05-25 | 2017-05-25 | Precast concrete pile attachment structure |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206768804U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113585240A (en) * | 2021-09-03 | 2021-11-02 | 辽宁科技大学 | Concrete filled steel tube pile integrated structure and construction method |
-
2017
- 2017-05-25 CN CN201720593363.XU patent/CN206768804U/en active Active
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113585240A (en) * | 2021-09-03 | 2021-11-02 | 辽宁科技大学 | Concrete filled steel tube pile integrated structure and construction method |
NL2032920A (en) * | 2021-09-03 | 2023-03-10 | Univ Science & Technology Liaoning | Concrete filled steel tubular pile-column integrated structure and construction method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203569582U (en) | Connecting structure of concrete pipe pile and bearing platform | |
CN108149844B (en) | A kind of self-positioning assembly concrete-filled steel tube intercolumniation node and its construction method | |
CN204753844U (en) | Circular steel tube concrete column sleeve connected node | |
CN103590414B (en) | A kind of attachment structure of concrete tubular pile and cushion cap | |
CN111576403B (en) | Pile splicing structure and bearing platform anchoring structure using PHC tubular pile | |
CN108301561A (en) | A kind of connection structure of assembly concrete-filled steel tube shaft | |
CN105971827B (en) | The conversion ring beam and its construction method of pylon are combined with steel cylinder for concrete tube | |
CN106760054B (en) | Prefabricated reinforced concrete shear wall | |
CN108560544A (en) | A kind of sleeve connection assembled pile foundation and its construction method | |
CN201649078U (en) | Prestressed concrete heading hollow square pile with pyramid pile tip | |
CN2883468Y (en) | Steel pipe segaments splicing joints of steel pipe concrete arches | |
CN208844417U (en) | A kind of outer precast construction for pier column and its outer prefabricated interior cast-in-place pier column | |
CN208533868U (en) | A kind of novel arrangement of reinforcement hollow steel pipe high-strength concrete column | |
CN108978667A (en) | A kind of positioning connection structure and its construction method of steel-pipe pile and bored concrete pile | |
CN206768804U (en) | Precast concrete pile attachment structure | |
CN104594343B (en) | A kind of assembled stake and its construction method | |
CN204456670U (en) | Fabricated construction straight screw sleeve connection joint | |
CN204435368U (en) | Prestressed concrete pile | |
CN208933973U (en) | A kind of positioning connection structure of steel-pipe pile and bored concrete pile | |
CN209798807U (en) | Railway bridge tubular pile and bearing platform connecting structure and railway bridge foundation structure | |
CN109778894A (en) | A kind of railroad bridge tubular pole and cushion cap connection structure, foundation structure and construction method | |
CN216041287U (en) | Assembled spiral anchor foundation | |
CN208455613U (en) | A kind of sleeve connection assembled pile foundation | |
CN210917329U (en) | Movable connection anchor disc of prefabricated single tubular pile of overhead transmission line shaft tower | |
CN114263093A (en) | Fully-prefabricated assembled bridge and construction method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CP01 | Change in the name or title of a patent holder |
Address after: 212413 the development zone along the Yangtze River in Xia Shu Town, Jurong City, Zhenjiang, Jiangsu Patentee after: Jianhua building materials (China) Co., Ltd. Address before: 212413 the development zone along the Yangtze River in Xia Shu Town, Jurong City, Zhenjiang, Jiangsu Patentee before: Jianhua building materials (Jiangsu) Co., Ltd. |
|
CP01 | Change in the name or title of a patent holder |