CN206707348U - A kind of intelligent integration fast-assembling operating room - Google Patents
A kind of intelligent integration fast-assembling operating room Download PDFInfo
- Publication number
- CN206707348U CN206707348U CN201720595068.8U CN201720595068U CN206707348U CN 206707348 U CN206707348 U CN 206707348U CN 201720595068 U CN201720595068 U CN 201720595068U CN 206707348 U CN206707348 U CN 206707348U
- Authority
- CN
- China
- Prior art keywords
- operating room
- keel
- group
- intelligent integration
- assembling
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 230000010354 integration Effects 0.000 title claims abstract description 35
- 239000000758 substrate Substances 0.000 claims description 10
- 238000009413 insulation Methods 0.000 claims description 9
- 230000015572 biosynthetic process Effects 0.000 claims description 2
- 210000000988 bone and bone Anatomy 0.000 claims description 2
- 241000361919 Metaphire sieboldi Species 0.000 claims 1
- 238000010276 construction Methods 0.000 abstract description 8
- 230000002787 reinforcement Effects 0.000 abstract description 4
- 210000003739 neck Anatomy 0.000 description 11
- 238000009434 installation Methods 0.000 description 10
- 210000002105 tongue Anatomy 0.000 description 9
- 210000002683 foot Anatomy 0.000 description 8
- 239000012530 fluid Substances 0.000 description 4
- 238000000034 method Methods 0.000 description 4
- 239000000565 sealant Substances 0.000 description 4
- 238000007789 sealing Methods 0.000 description 4
- 229910000831 Steel Inorganic materials 0.000 description 3
- 238000010586 diagram Methods 0.000 description 3
- 238000005516 engineering process Methods 0.000 description 3
- 239000010959 steel Substances 0.000 description 3
- 238000003466 welding Methods 0.000 description 3
- 230000003749 cleanliness Effects 0.000 description 2
- 230000005611 electricity Effects 0.000 description 2
- 239000003292 glue Substances 0.000 description 2
- 241000894006 Bacteria Species 0.000 description 1
- 230000000712 assembly Effects 0.000 description 1
- 238000000429 assembly Methods 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 239000000356 contaminant Substances 0.000 description 1
- 230000003247 decreasing effect Effects 0.000 description 1
- 230000007717 exclusion Effects 0.000 description 1
- 238000005286 illumination Methods 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 239000000203 mixture Substances 0.000 description 1
- 238000000746 purification Methods 0.000 description 1
- 238000004064 recycling Methods 0.000 description 1
- 230000003014 reinforcing effect Effects 0.000 description 1
- 230000007704 transition Effects 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04H—BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
- E04H3/00—Buildings or groups of buildings for public or similar purposes; Institutions, e.g. infirmaries or prisons
- E04H3/08—Hospitals, infirmaries, or the like; Schools; Prisons
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/38—Connections for building structures in general
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/62—Insulation or other protection; Elements or use of specified material therefor
- E04B1/66—Sealings
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04F—FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
- E04F19/00—Other details of constructional parts for finishing work on buildings
- E04F19/02—Borders; Finishing strips, e.g. beadings; Light coves
- E04F19/04—Borders; Finishing strips, e.g. beadings; Light coves for use between floor or ceiling and wall, e.g. skirtings
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- Health & Medical Sciences (AREA)
- Public Health (AREA)
- Floor Finish (AREA)
Abstract
Purified operation room technical field is the utility model is related to, more particularly to a kind of intelligent integration fast-assembling operating room, including:If the support frame being spliced by some keel, drywall panel and some top plates, support frame includes ground joist group, top keel group and the centre keel group for being fixedly connected with ground joist group and top keel group, wallboard is fixed to form operating room metope with centre keel group, top plate is fixed to form operating room top surface with top keel group, supporting frame is also surrounded on the outside of the support frame, the top keel group is fixedly connected with supporting frame.The utility model provides a kind of intelligent integration fast-assembling operating room, also surrounded on the outside of support frame and be provided with supporting frame, top keel group is set to be fixedly connected with supporting frame, make operating room that there is independent load bearing system structure, shadowless lamp can be easily installed thereon, laminar flow case and all size tower crane, operating room whole system has independent firm and stable construction, without again to building reinforcement by connection itself.
Description
Technical field
Purified operation room technical field is the utility model is related to, particularly a kind of intelligent integration fast-assembling operating room.
Background technology
Clean operating room is to utilize purification of air treatment technology by the particulate in air in the range of particular space, You Haikong
The contaminant exclusions such as gas, bacterium, and by indoor temperature, cleanliness factor, room pressure, air velocity and air flow method, noise vibration
And illumination, Electrostatic Control give specially designed room in a certain range of needs.No matter external air conditionses
Change, can all there is the characteristic of the performances such as cleanliness factor, humiture and the pressure for maintaining original set provisioning request in clean operation room.
The modularized design of integrated fast-assembling operating room so that the disassembled resettlement refitting of operating room or recycling.It can expire
Sufficient situation of all-level hospitals is newly-built, enlarging, reconstruction, the demand of resettlement clean operating room, can also meet hospital operating room quick assembling and
Resettlement demand.
The A of Chinese patent CN 103031964 disclose a kind of Modular clean operating room and its mounting process, and specific public
Open:Including Modular keel, wallboard, top plate and various electricity, gas class pipe fitting;Multiple Modular keels are fixedly connected to form hand
The basic forming framework of art room;The upper and lower part of basic forming framework is fixed with building ground and construction ceiling respectively;It is multiple
Modular keel is built into the overall keel structure of operating room;Various electricity, gas class pipe fitting are fixed in overall keel structure;Wallboard
Modular keel is fixed to form operating room metope;Top plate is fixed to form operating room top surface with Modular keel.The operating room does not have
There is independent load bearing system, the installation of shadowless lamp thereon, the installation of laminar flow case and all size tower crane is, it is necessary to building
Reinforcement by connection itself, its own weight capacity are poor;And the fixation between the orthogonal keel of the operating room is connected by L-shaped
Fitting is fixed, and two sheets of L-shaped connector are bolted with keel respectively, erector's duration of the fixed form, is adjusted
Try time length.
Utility model content
Technical problem to be solved in the utility model is:Held to solve existing fast-assembling operating room without independent
Weight system, the installation of shadowless lamp thereon, the installation of laminar flow case and all size tower crane add, it is necessary to be connected in itself to building
Gu the problem of its own weight capacity difference, the utility model provides a kind of intelligent integration fast-assembling operating room, in support frame
Outside is also surrounded there is provided supporting frame, top keel group is fixedly connected with supporting frame, operating room is had independent hold
Weight system architecture, can easily install shadowless lamp, laminar flow case and all size tower crane, operating room whole system has thereon
Independent firm and stable construction, without again to building reinforcement by connection itself.
Technical scheme is used by the utility model solves its technical problem:A kind of intelligent integration fast-assembling operating room,
Including:If the support frame being spliced by some keel, drywall panel and some top plates, support frame includes ground joist group, top
Portion's keel group and the centre keel group for being fixedly connected with ground joist group and top keel group, wallboard are fixed to form operating room with centre keel group
Metope, top plate are fixed to form operating room top surface with top keel group, and supporting frame, the top are also surrounded on the outside of the support frame
Portion's keel group is fixedly connected with supporting frame.
Specifically, sealed between above-mentioned wallboard and wallboard by seal.
Specifically, sealed between above-mentioned top plate and top plate by seal.
Specifically, above-mentioned seal be rubber weather strip, fluid sealant or other can meet medical environment seal.
Specifically, the centre keel in above-mentioned centre keel group is fixed with the ground joist in ground joist group by bolt and connector
Connect, the centre keel in the centre keel group is fixedly connected with the top keel in the keel group of top by bolt and connector.
Specifically, above-mentioned connector includes L-shaped transverse slat and riser, side of the riser away from transverse slat is fixedly installed
Face is provided with least one L-shaped clamp, formed with the bayonet socket towards transverse slat between the L-shaped clamp and riser, on the transverse slat
Provided with fixing hole, the centre keel close end at least side side wall offers and L-shaped clamp number identical neck, the L-shaped card
When board is located in neck, bolt may pass through fixing hole and be fixed with ground joist or top keel.
Specifically, one side both sides of the above-mentioned riser away from transverse slat are respectively provided with a L-shaped clamp.
Specifically, above-mentioned wallboard is snapped onto by bayonet unit on the centre keel of centre keel group.
Specifically, above-mentioned bayonet unit includes the opening being opened on centre keel and the fastener being arranged on wallboard, described
The position of fastener is corresponding with the position of opening and is interlockingly connected with opening.
Specifically, above-mentioned fastener includes being easy to the substrate and L-shaped block tongue fixed with wallboard, and the L-shaped block tongue hangs down with substrate
Straight to set, one end of L-shaped block tongue is fixedly connected with substrate, and the other end is fastened in the opening of centre keel.
Specifically, the tip that above-mentioned L-shaped block tongue is fastened on one end in the opening of centre keel to be caught in opening.
Specifically, above-mentioned top plate is fixed with top keel by fastener.
Specifically, above-mentioned fastener is to buckle code greatly.
Specifically, power supply box is installed on above-mentioned operating room metope.
Specifically, above-mentioned operating room top surface is provided with laminar flow case, the laminar flow case and the load-bearing frame on operating room top surface top
Frame is fixed, and air return system is provided with the operating room, and return air inlet is arranged on operating room metope.
Specifically, above-mentioned operating room top surface is fixed with light bar.
Specifically, above-mentioned operating room top surface is provided with tower crane and/or shadowless lamp, the tower crane and operating room top surface top
Supporting frame is fixed, and the shadowless lamp and the supporting frame on operating room top surface top are fixed.Specifically, on above-mentioned operating room metope
It is fixed with some cabinets.
Specifically, above-mentioned cabinet is instrument cabine and/or medical cupboard and/or thermal insulation cabinet and/or cold insulation cabinet and/or read tablet lamp cabinet
And/or air source box.
Specifically, above-mentioned operating room metope bottom is provided with skirting board.
Specifically, above-mentioned floor of operating room is equipped with rubber or PVC ground cushions.
Specifically, the skirt plate thickness is less than wallboard thickness, and skirting board and wallboard junction are described formed with a step
Ground cushion has flanging, and the flanging is covered in skirt plate surface, and is against at the step that skirting board is formed with wallboard.
The beneficial effects of the utility model are:
A kind of intelligent integration fast-assembling operating room provided by the utility model, also surround to be provided with the outside of support frame and hold
Weight framework, top keel group is fixedly connected with supporting frame, make operating room that there is independent load bearing system structure, thereon can be with
Convenient installation shadowless lamp, laminar flow case and all size tower crane, operating room whole system have independent firm and stable structure
Make, without again to building reinforcement by connection itself.
A kind of intelligent integration fast-assembling operating room provided by the utility model, carried out using bolt and connector between keel
It is connected, protection wallboard protection wallboard is snapped onto on the keel of support frame by bayonet unit, and it has thoroughly broken away from welding
Assembling mode so that the flexibility of construction and security are greatly improved, can easily group with screw driver spanner and electric drill
Dress up work(.
For traditional operating room in build process, centre keel typically selects square duct keel or C-shaped keel, from square
During duct keel, it is fixed between general centre keel and ground joist or top surface keel by the way of welding, is selecting C-shaped keel
When, either it is fixed by the way of welding, or fixed using L-shaped connector, in centre keel with being used on ground joist
Bolt is fixed, it is necessary to will first be bolted in the neck of C-shaped keel, and construction is relatively difficult, and provided by the utility model one
Kind intelligent integration fast-assembling operating room, connector can be caught in the neck of centre keel by L-shaped clamp, and the transverse slat of connector leads to
Bolt is crossed to fix with ground joist or top surface keel, it is easy for installation, installation work-hour and debug time is greatly decreased, it is entirely avoided pass
The bolt that the operating room of system runs into build process fixes the problem of difficult.
A kind of intelligent integration fast-assembling operating room provided by the utility model, wallboard pass through fastener and centre keel clamping, peace
Dress is convenient, and construction is flexible.
A kind of intelligent integration fast-assembling operating room provided by the utility model, after operating room is scrapped, it can be repeated with 100%
Utilize, strange land is rebuild, and has higher construction flexibility and repeatable usability.
A kind of intelligent integration fast-assembling operating room provided by the utility model, rubber floor mat is laid in floor of operating room, its
The size of middle rubber floor mat is more than the actual size of floor of operating room, in laying, retrousse flanging can be formed, due to skirt
Plate thickness is less than wallboard thickness, and skirting board is covered in skirt plate surface with wallboard junction formed with a step, the flanging of ground cushion,
And it is against at the step that skirting board is formed with wallboard, it is not necessary to which extra fixing device is fixed, and can be effectively ensured
Floor of operating room is without corner or spot as yet untouched by a clean-up campaign.
Brief description of the drawings
The utility model is further illustrated with reference to the accompanying drawings and examples.
Fig. 1 is a kind of intelligent integration fast-assembling operating room support frame of the present utility model and supporting frame structural representation
Figure;
Fig. 2 is the preferred structure schematic diagram of connector of the present utility model;
Fig. 3 is Fig. 2 top view;
Fig. 4 connectors of the present utility model fix the structural representation of ground joist and centre keel;
Fig. 5 is the structural representation of centre keel of the present utility model;
Fig. 6 is Fig. 5 right view;
Fig. 7 is the structural representation of fastener of the present utility model;
Fig. 8 is Fig. 7 right view;
Fig. 9 is a kind of partial sectional view of intelligent integration fast-assembling operating room of the present utility model;
Figure 10 is a kind of top view of intelligent integration fast-assembling operating room of the present utility model;
Figure 11 is a kind of upward view of intelligent integration fast-assembling operating room of the present utility model;
Figure 12 is A directions view in Figure 10;
Figure 13 is B directions view in Figure 10;
Figure 14 is C directions view in Figure 10;
Figure 15 is D directions view in Figure 10;
Figure 16 is E, F, G and H direction view in Figure 10;
In figure:1. support frame, 2. wallboards, 3. top plates, 4. supporting frames, 5. centre keels, 6. ground joists, 7. top dragons
Bone, 8. bolts, 9. connectors, 10. fasteners, 11. fasteners, 12. power supply boxs, 13. laminar flow casees, 14. air return systems, 15. return air
Mouthful, 16. light bar, 17. tower cranes, 18. instrument cabines, 19. medical cupboards, 20. thermal insulation cabinets, 21. cold insulation cabinets, 22. read tablet lamp cabinets, 23. kick
Sole, 24. ground cushions, 25. flanging, 26. chamfering plates, 27. support feets, 28. seals, 29. automatically-controlled doors, 30. air source boxes, 31.
Shadowless lamp, 101. substrates, 102.L shape block tongues, 501. necks, 502. openings, 901. transverse slats, 902. risers, 903.L shape clamps,
904. bayonet sockets, 905. fixing holes.
Embodiment
The utility model is described in further detail presently in connection with accompanying drawing.These accompanying drawings are simplified schematic diagram,
Only illustrate basic structure of the present utility model in a schematic way, therefore it only shows the composition relevant with the utility model.
As shown in figure 1, a kind of intelligent integration fast-assembling operating room, including:The support frame being spliced by some keel
If the 1, drywall panel 2 and some top plates 3, support frame 1 includes ground joist group, top keel group and is fixedly connected with ground joist group and top
The centre keel group of portion's keel group, wallboard 2 are fixed to form operating room metope with centre keel group, and top plate 3 fixes shape with top keel group
Into operating room top surface, the outside of support frame 1 also surrounds supporting frame 4, and top keel group is fixedly connected with supporting frame 4.
In this specific embodiment, the adjacent ground joist 6 in ground joist group passes through straight type connecting plate, L-type connecting plate or different
Shape connecting plate is fixedly connected(It can certainly be any connecting plate that other are easy to fix ground joist 6), then ground joist 6 is led to
Cross expansion bolt and be fixed on building ground;Ground joist 6 directly can certainly be fixed on building ground.
In this specific embodiment, the adjacent top keel 7 in the keel group of top pass through straight type connecting plate, L-type connecting plate
Or special-shaped connecting plate is fixedly connected(It can certainly be any connecting plate that other are easy to fix ground joist 6), then by top
Keel 7 are fixedly connected with centre keel 5.
In this specific embodiment, fast-assembling Operating Room Design is into tetrahedroid, and its four corners all have transition
Chamfering plate 26, wherein supporting frame 4 have four support feets 27, and four support feets 27 are located at four of fast-assembling operating room respectively
Corner, the top keel 7 in the keel group of top are fixedly connected with four support feets 27.Wherein support feet 27 can also be by swollen
It is swollen to be bolted to building ground.
In this specific embodiment, supporting frame 4 can select I-steel or channel-section steel in selection, or other have compared with
The steel construction of strong weight capacity.
In a kind of embodiment, the centre keel 5 in centre keel group passes through bolt with the ground joist 6 in ground joist group
8 are fixedly connected with connector 9, and the centre keel 5 in centre keel group by bolt 8 and connects with the top keel 7 in the keel group of top
Fitting 9 is fixedly connected.
In a kind of embodiment, as shown in figures 2-6, connector 9 includes the L-shaped He of transverse slat 901 is fixedly installed
Riser 902, one side of the riser 902 away from transverse slat 901 are provided with least one L-shaped clamp 903, L-shaped clamp 903 and riser
Between 902 fixing hole 905, the close end of centre keel 5 at least one are provided with formed with the bayonet socket 904 towards transverse slat 901, transverse slat 901
Side side wall offers counts identical neck 501 with L-shaped clamp 903, and when L-shaped clamp 903 is fastened in neck 501, bolt 8 can be worn
Fixing hole 905 is crossed to fix with ground joist 6 or top keel 7.
Centre keel 5 and ground joist 6 are being fixed using connector 9(Top keel 7)When, the L-shaped clamp 903 on connector 9
The neck 501 opened is penetrated on centre keel 5, and downwards(On)Motion, makes the plate body of centre keel 5 be caught in bayonet socket 904, then passes through spiral shell
Bolt 8 is penetrated in fixing hole 905, so with ground joist 6(Top keel 7)It is fixedly connected.In actual production process, L-shaped clamp
903 is unsuitable excessive with the distance between riser 902, optimal preferred scheme be the distance between L-shaped clamp 903 and riser 902 with
The thickness of the plate of centre keel 5 is equal, naturally it is also possible to is that the distance between L-shaped clamp 903 and riser 902 are slightly larger than the plate of centre keel 5
Thickness.
In this embodiment, neck 501 preferably vertically on flat port, the shape of L-shaped clamp 903 with
The shape of neck 501 matches.
In a kind of embodiment, one side both sides of the riser 902 away from transverse slat 901 are respectively provided with a L-shaped clamp
903.The fixation uniform force between centre keel 5 and ground joist 6 can be ensured.
In a kind of embodiment, the close end both sides side wall of centre keel 5 offer counted with L-shaped clamp 903 it is identical
Neck 501, centre keel 5 and ground joist 6 or top keel 7 fixed simultaneously by both sides.
In a kind of embodiment, wallboard 2 is snapped onto on the centre keel 5 of centre keel group by bayonet unit.
Specifically, as Figure 7-8, bayonet unit includes the opening 502 being opened on centre keel 5 and is arranged on wallboard 2
On fastener 10, the position of fastener 10 is corresponding with the position of opening 502 and is interlockingly connected with opening 502.
Preferably, fastener 10 include be easy to wallboard 2 fix substrate 101 and L-shaped block tongue 102, L-shaped block tongue 102 with
Substrate 101 is vertically arranged, and one end of L-shaped block tongue 102 is fixedly connected with substrate 101, and the other end is fastened on the opening of centre keel 5
In 502.
The tip that wherein L-shaped block tongue 102 is fastened on one end in the opening 502 of centre keel 5 to be caught in opening 502.
As shown in figure 9, in a kind of embodiment, in order to ensure the sealing of operating room, wallboard 2 and wallboard 2 it
Between sealed by seal 28;Certainly, seal 28 can be rubber weather strip, fluid sealant or other can meet medical environment use
Seal 28.
In a kind of embodiment, as shown in figure 9, top plate 3 is fixed with top keel 7 by fastener 11.At this
In embodiment, fastener 11 is preferably to buckle code greatly.
In a kind of embodiment, in order to ensure the sealing of operating room, pass through sealing between top plate 3 and top plate 3
Part 28 seals;Certainly, seal 28 can be rubber weather strip, fluid sealant or other can meet medical environment seal 28.
As shown in Figure 10-16, in a kind of embodiment, power supply box 12 is installed on operating room metope.
In a kind of embodiment, operating room top surface is provided with laminar flow case 13, laminar flow case 13 with operating room top surface
The supporting frame 4 in portion is fixed, and air return system 14 is provided with operating room, and return air inlet 15 is arranged on operating room metope.
In a kind of embodiment, operating room top surface is fixed with light bar 16.
In a kind of embodiment, operating room top surface is provided with tower crane 17, tower crane 17 and operating room top surface top
Supporting frame 4 is fixed.
In a kind of embodiment, operating room top surface is provided with shadowless lamp 31, shadowless lamp 31 with operating room top surface
The supporting frame 4 in portion is fixed.In this embodiment, shadowless lamp 31 is fixedly installed on the crossbeam at the top of supporting frame 4,
The position of shadowless lamp 31 is arranged on the middle part of laminar flow case 13;Certainly, shadowless lamp 31 can also be mounted in other positions, and a use can expire
Foot operation requires.
In a kind of embodiment, some cabinets are fixed with operating room metope.
Specifically, cabinet is instrument cabine 18 and/or medical cupboard 19 and/or thermal insulation cabinet 20 and/or cold insulation cabinet 21 and/or read tablet
Lamp cabinet 22 and/or air source box 30.In this specific embodiment, instrument cabine 18, medical cupboard 19 are fixed with operating room metope, is protected
Warm cabinet 20, cold insulation cabinet 21 and read tablet lamp cabinet 22.
In a kind of embodiment, operating room metope bottom is provided with skirting board 23.
In a kind of embodiment, floor of operating room is equipped with rubber or PVC ground cushions 24.
In a kind of embodiment, the thickness of skirting board 23 is less than the thickness of wallboard 2, skirting board 23 and the junction of wallboard 2
Formed with a step, ground cushion 24 has flanging 25, and flanging 25 is covered in the surface of skirting board 23, and is against skirting board 23 and wallboard 2
At the step of formation.
In a kind of embodiment, complete prefabricated ready-package purified operation room is necessarily required to include door, and wherein door uses
Be automatically-controlled door 29(Push the door open), naturally it is also possible to it is sliding door.
Specifically installation steps are:
1. ground levelling, laying ground joist 6, the level of ground joist 6 can be used in 6 times cushion materials of ground joist to ensure,
The expansion bolt of ground joist 6 is fixed on building ground;
2. installing centre keel 5 on ground joist 6, the perpendicularity of centre keel 5 is calibrated using laser leveler, then using company
Fitting 9 fixes centre keel 5 and ground joist 6;
It is 3. adjacent top keel 7 are whole with being fixedly connected into by straight type connecting plate, L-type connecting plate or special-shaped connecting plate
Section, and connected together it with centre keel 5 using connector 9;
4. building supporting frame 4 in the periphery of support frame 1, first four positions of support feet 27 of supporting frame 4 are fixed, and
Ground is fixed on by expansion bolt, then the top of supporting frame 4 built according to the actual requirements, finally by top keel
7 fix with the support feet 27 of supporting frame 4, for reinforcing brace frame frame 1;
5. mounting wallboard 2 successively by diagram, the wallboard 2 that bottom is first mounted when hanging equipped position mounts again
Between equipment, notice that writing counter first overleaf will be fixed on wall 22 with rivet and mounted again by small-sized writing counter etc, arrange
The wallboard 2 of power supply box 12 and air source box 30 can directly first wallboard 2, then to be mounted directly inside operating room power supply box 12 gentle
Source case 30;
6. installing top plate 3 after having mounted wallboard, the top keel 7 of top plate 3 are fixed using big button code, and it is pre- on top plate 3
Reserve the installation site of the top assemblies such as tower crane 17, laminar flow case 13;
7. the gap between top plate 3 and top plate 3, between wallboard 2 and wallboard 2 between wallboard 2 and top plate 3 passes through seal
28 are filled, seal 28 typically can be rubber weather strip, fluid sealant or other can meet medical environment seal 28,
It can certainly be weather-resistant glue;
8. laminar flow case 13 is lifted into the reserved installation site among top plate 3 again after having assembled laminar flow case 13 on the ground
It is interior, and be fixed on supporting frame 4, pay attention to laminar flow case with being directly lifted on supporting frame 4, not with operating room wall body keel
It is rigidly connected, i.e., operating room keel are not subject to the weight of laminar flow case.
9. mounting light bar 16, light bar 16 is internally with rivet interlacement to keel.
10. last break a weather-resistant glue or filling sealing strip again(Depend on the circumstances).
11. laying rubber floor mat 24 in floor of operating room, the wherein size of rubber floor mat 24 is more than the reality of floor of operating room
Border size, in laying, retrousse flanging 25 can be formed, because the thickness of skirting board 23 is less than the thickness of wallboard 2, skirting board 23 and
For the junction of wallboard 2 formed with a step, the flanging 25 of ground cushion 24 is covered in the surface of skirting board 23, and is against skirting board 23 and wallboard
At 2 steps formed.
Using it is above-mentioned according to desirable embodiment of the present utility model as enlightenment, pass through above-mentioned description, related work people
Member can carry out various changes and amendments in the range of without departing from this item utility model technological thought completely.This item is real
The content being not limited to new technical scope on specification, it is necessary to which its technology is determined according to right
Property scope.
Claims (17)
- A kind of 1. intelligent integration fast-assembling operating room, it is characterised in that including:The support frame being spliced by some keel (1)If, drywall panel(2)With some top plates(3), support frame(1)Including ground joist group, top keel group and it is fixedly connected with earthworm The centre keel group of bone group and top keel group, wallboard(2)Fix to form operating room metope, top plate with centre keel group(3)With top Keel group fixes to form operating room top surface, the support frame(1)Outside also surrounds supporting frame(4), the top keel group With supporting frame(4)It is fixedly connected.
- A kind of 2. intelligent integration fast-assembling operating room according to claim 1, it is characterised in that:In the centre keel group Centre keel(5)With the ground joist in ground joist group(6)Pass through bolt(8)And connector(9)It is fixedly connected, the centre keel group In centre keel(5)With the top keel in the keel group of top(7)Pass through bolt(8)And connector(9)It is fixedly connected.
- A kind of 3. intelligent integration fast-assembling operating room according to claim 2, it is characterised in that:The connector(9)Bag Include and L-shaped transverse slat is fixedly installed(901)And riser(902), the riser(902)Away from transverse slat(901)One side on set There is at least one L-shaped clamp(903), the L-shaped clamp(903)With riser(902)Between formed with towards transverse slat(901)Card Mouthful(904), the transverse slat(901)It is provided with fixing hole(905), the centre keel(5)Close end at least side side wall offers With L-shaped clamp(903)Number identical neck(501), the L-shaped clamp(903)It is fastened on neck(501)When interior, bolt(8)Can Through fixing hole(905)With ground joist(6)Or top keel(7)It is fixed.
- A kind of 4. intelligent integration fast-assembling operating room according to claim 3, it is characterised in that:The riser(902)Far From transverse slat(901)One side both sides be respectively provided with a L-shaped clamp(903).
- A kind of 5. intelligent integration fast-assembling operating room according to claim 1, it is characterised in that:The wallboard(2)Pass through Bayonet unit snaps onto the centre keel of centre keel group(5)On.
- A kind of 6. intelligent integration fast-assembling operating room according to claim 5, it is characterised in that:The bayonet unit includes It is opened in centre keel(5)On opening(502)Be arranged on wallboard(2)On fastener(10), the fastener(10)Position with Opening(502)Position it is corresponding and with opening(502)It is interlockingly connected.
- A kind of 7. intelligent integration fast-assembling operating room according to claim 6, it is characterised in that:The fastener(10)Including It is easy to and wallboard(2)Fixed substrate(101)With L-shaped block tongue(102), the L-shaped block tongue(102)With substrate(101)Vertically set Put, L-shaped block tongue(102)One end and substrate(101)It is fixedly connected, the other end is fastened on centre keel(5)Opening(502)It is interior.
- A kind of 8. intelligent integration fast-assembling operating room according to claim 1, it is characterised in that:The top plate(3)With top Portion's keel(7)Pass through fastener(11)It is fixed.
- A kind of 9. intelligent integration fast-assembling operating room according to claim 1, it is characterised in that:On the operating room metope Power supply box is installed(12).
- A kind of 10. intelligent integration fast-assembling operating room according to claim 1, it is characterised in that:The operating room top surface It is provided with laminar flow case(13), the laminar flow case(13)With the supporting frame on operating room top surface top(4)It is fixed, in the operating room Air return system is installed(14), return air inlet(15)It is arranged on operating room metope.
- A kind of 11. intelligent integration fast-assembling operating room according to claim 1, it is characterised in that:The operating room top surface It is fixed with light bar(16).
- A kind of 12. intelligent integration fast-assembling operating room according to claim 1, it is characterised in that:The operating room top surface It is provided with tower crane(17)And/or shadowless lamp(31), the tower crane(17)With the supporting frame on operating room top surface top(4)It is fixed, The shadowless lamp(31)With the supporting frame on operating room top surface top(4)It is fixed.
- A kind of 13. intelligent integration fast-assembling operating room according to claim 1, it is characterised in that:The operating room metope On be fixed with some cabinets.
- A kind of 14. intelligent integration fast-assembling operating room according to claim 13, it is characterised in that:The cabinet is apparatus Cabinet(18)And/or medical cupboard(19)And/or thermal insulation cabinet(20)And/or cold insulation cabinet(21)And/or read tablet lamp cabinet(22)And/or source of the gas Case(30).
- A kind of 15. intelligent integration fast-assembling operating room according to claim 1, it is characterised in that:The operating room metope Bottom is provided with skirting board(23).
- A kind of 16. intelligent integration fast-assembling operating room according to claim 15, it is characterised in that:The floor of operating room It is equipped with rubber or PVC ground cushions(24).
- A kind of 17. intelligent integration fast-assembling operating room according to claim 16, it is characterised in that:The skirting board(23) Thickness is less than wallboard(2)Thickness, skirting board(23)With wallboard(2)Junction is formed with a step, the ground cushion(24)With pressure Side(25), the flanging(25)It is covered in skirting board(23)Surface, and it is against skirting board(23)With wallboard(2)The step of formation Place.
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710296955 | 2017-04-28 | ||
CN201710296955X | 2017-04-28 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206707348U true CN206707348U (en) | 2017-12-05 |
Family
ID=59419830
Family Applications (2)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710379303.2A Pending CN106988563A (en) | 2017-04-28 | 2017-05-25 | A kind of intelligent integration fast-assembling operating room |
CN201720595068.8U Expired - Fee Related CN206707348U (en) | 2017-04-28 | 2017-05-25 | A kind of intelligent integration fast-assembling operating room |
Family Applications Before (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710379303.2A Pending CN106988563A (en) | 2017-04-28 | 2017-05-25 | A kind of intelligent integration fast-assembling operating room |
Country Status (1)
Country | Link |
---|---|
CN (2) | CN106988563A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106988563A (en) * | 2017-04-28 | 2017-07-28 | 王博 | A kind of intelligent integration fast-assembling operating room |
Families Citing this family (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108867878A (en) * | 2018-08-31 | 2018-11-23 | 江苏达实久信医疗科技有限公司 | Modular surgical room |
CN108797848A (en) * | 2018-08-31 | 2018-11-13 | 江苏达实久信医疗科技有限公司 | The grid system of modular surgical room |
CN110200422B (en) * | 2019-07-01 | 2024-06-11 | 常州市浩东净化设备科技有限公司 | Built-in cabinet mounting structure of buckle formula operating room |
CN110185366A (en) * | 2019-07-01 | 2019-08-30 | 常州市浩东净化设备科技有限公司 | Plug-in automatic door of operating room mounting structure |
Family Cites Families (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2220848Y (en) * | 1995-03-10 | 1996-02-28 | 东莞羚亚医护用品制造厂有限公司 | Prefabricated combination steel structure octagon operating room |
CN2721779Y (en) * | 2004-06-30 | 2005-08-31 | 江苏久信医用净化工程有限公司 | Main body structure of assembled purified operation room |
DE202012003176U1 (en) * | 2011-03-30 | 2012-05-16 | Ht Labor + Hospitaltechnik Ag | Modular space in scaffolding construction, especially an operating room in the medical sector and control module |
CN103031964B (en) * | 2011-10-08 | 2015-05-06 | 江苏久信医用净化工程有限公司 | Modularized clean operating room and installation technology thereof |
CN104533109A (en) * | 2014-11-27 | 2015-04-22 | 浙江盛源医用工程有限公司 | Sand aerated concrete block operation room and building and constructing method thereof |
CN205100597U (en) * | 2015-09-28 | 2016-03-23 | 天津龙川精工洁净技术发展有限公司 | Clean operating room |
CN205502225U (en) * | 2016-04-15 | 2016-08-24 | 昆山市德信致远环境科技有限公司 | Frame construction of toilet |
CN205913226U (en) * | 2016-05-31 | 2017-02-01 | 中建七局建筑装饰工程有限公司 | Pelmet light gauge steel framework |
CN106988563A (en) * | 2017-04-28 | 2017-07-28 | 王博 | A kind of intelligent integration fast-assembling operating room |
-
2017
- 2017-05-25 CN CN201710379303.2A patent/CN106988563A/en active Pending
- 2017-05-25 CN CN201720595068.8U patent/CN206707348U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106988563A (en) * | 2017-04-28 | 2017-07-28 | 王博 | A kind of intelligent integration fast-assembling operating room |
Also Published As
Publication number | Publication date |
---|---|
CN106988563A (en) | 2017-07-28 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN206707348U (en) | A kind of intelligent integration fast-assembling operating room | |
RU2628352C2 (en) | Prefabricated module for building | |
CN103031964B (en) | Modularized clean operating room and installation technology thereof | |
CN207739480U (en) | A kind of sustainable full module-assembled building system of green | |
CA2847594A1 (en) | Modular building system | |
CN207776110U (en) | A kind of dismountable steel house | |
CN109162355A (en) | A kind of assembling type steel structure modularization campsite building construction system | |
GB2442606A (en) | Modular buildings | |
CN207597814U (en) | A kind of assembling type steel structure elevator device for existing apartment | |
CN207905205U (en) | A kind of prefabricated floor construction and its structural system | |
CN209145000U (en) | A kind of assembling type steel structure modularization campsite building construction system | |
US20040154245A1 (en) | Structure of a combinative interlocking board enclosing vertical and horizontal pipes | |
CN112900682B (en) | Assembly type medical wall and medical unit assembly method | |
CN110056104A (en) | A kind of component, wall and the construction method of modularization indoor partition | |
CN206015894U (en) | A kind of modular surgical room | |
CN103850374B (en) | Element type curtain wall system | |
CN1187505C (en) | Assembled division wall system | |
CN202202580U (en) | Precast modular building capable of being subjected to overlapping combination | |
CN205839980U (en) | Novel modularized house | |
CN211114236U (en) | Glass wall and wisdom building | |
CN201276755Y (en) | Major structure of combined house | |
CN215949071U (en) | Steel construction building medical ward module | |
ITVR20100214A1 (en) | PROFESSIONAL CABIN FOR WELL-BEING TREATMENTS, SUCH AS TURKISH, SAUNA AND SIMILAR BATHROOMS AS WELL AS METHOD TO REALIZE SUCH CABINS | |
CN206174256U (en) | Corridor passageway furred ceiling | |
CN206328873U (en) | A kind of modularization case room with Stilt layer |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right | ||
TR01 | Transfer of patent right |
Effective date of registration: 20190103 Address after: 650000 Room 807, 5 Wanhong International Building, Panlong District, Kunming City, Yunnan Province Patentee after: YUNNAN DIANLING MEDICAL PURIFYING ENGINEERING Co.,Ltd. Address before: 650000 Crystal Palace Apartment, No. 1 Crystal Palace, Wuhua District, Kunming City, Yunnan Province, Room 12, Renxuan F Block Patentee before: Wang Bo |
|
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20171205 |