CN206705418U - Coal bed gas water supply line quickly retracting device - Google Patents
Coal bed gas water supply line quickly retracting device Download PDFInfo
- Publication number
- CN206705418U CN206705418U CN201720450554.0U CN201720450554U CN206705418U CN 206705418 U CN206705418 U CN 206705418U CN 201720450554 U CN201720450554 U CN 201720450554U CN 206705418 U CN206705418 U CN 206705418U
- Authority
- CN
- China
- Prior art keywords
- pipeline
- folding
- power transmission
- unfolding
- water supply
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Supports For Pipes And Cables (AREA)
Abstract
It the utility model is related to a kind of line device, especially coal bed gas water supply line quickly retracting device.Technical problem to be solved in the utility model is to provide a kind of low coal bed gas water supply line quickly retracting device of labor intensity, including Operation Van and the pipeline jack installed in Operation Van both ends;The pipeline jack includes mounting bracket, pipeline folding and unfolding driving-shaft assembly, power transmission pair, pipeline storage rack, the pipeline folding and unfolding driving-shaft assembly both ends are mounted on pipeline storage rack, the pipeline folding and unfolding driving-shaft assembly, power transmission pair are installed on mounting bracket, and the pipeline folding and unfolding driving-shaft assembly is connected with power transmission pinion.The utility model compared with prior art the advantages of be:1st, quick laying, recovery of the pipeline in highway, notch, level land, simple mountain region and shoal environment are realized, folding and unfolding speed is the several times of artificial folding and unfolding;2nd, the hand labor intensity of water supply line folding and unfolding is greatly reduced, saves the labo r usage of pipeline folding and unfolding operation.
Description
Technical field
It the utility model is related to a kind of line device, especially coal bed gas water supply line quickly retracting device.
Background technology
In coal bed gas water supply or other large-scale water supply projects, the laying and recovery operation of the pipeline such as rubber hose rely primarily on
Manual operation, labor intensity is big, operating speed is slow.
Utility model content
It is quick that technical problem to be solved in the utility model is to provide a kind of low coal bed gas water supply line of labor intensity
Draw off gear.
Technical scheme is used by the utility model solves above-mentioned technical problem:Coal bed gas water supply line quickly retracting fills
Put, including Operation Van and the pipeline jack installed in Operation Van both ends;
The pipeline jack includes mounting bracket, pipeline folding and unfolding driving-shaft assembly, power transmission pair, pipeline storage rack,
The pipeline folding and unfolding driving-shaft assembly both ends are mounted on pipeline storage rack, the pipeline folding and unfolding driving-shaft assembly, power transmission
Pair is installed on mounting bracket, and the pipeline folding and unfolding driving-shaft assembly is connected with power transmission pinion.
It is further that the mounting bracket is provided with pipeline guiding trestle turning arm, pipeline guiding trestle, the mounting bracket
Upper connecting rod, middle brace rod, lower connecting rod are provided with, the upper connecting rod, middle brace rod, lower connecting rod are each perpendicular to pipe
Line folding and unfolding driving-shaft assembly, described pipeline guiding trestle turning arm one end are bolted middle brace rod, other end connection
Pipeline guiding trestle.
Be further, the pipeline folding and unfolding driving-shaft assembly include upper power transmission shaft, lower drive shaft, the upper power transmission shaft,
Lower drive shaft is equipped with gear, and the power transmission pair is provided with two drives, two transmissions in the power transmission pair
The gear respectively with upper power transmission shaft, lower drive shaft is taken turns to be connected.
It is further that power source is additionally provided with the mounting bracket, the power source is connected with power transmission pair.
It is further that the pipeline storage rack is detachably connected on pipeline folding and unfolding driving-shaft assembly.
The utility model compared with prior art the advantages of be:1st, realize pipeline in highway, notch, level land, simple
Mountain region and quick laying, the recovery of shoal environment, folding and unfolding speed are the several times of artificial folding and unfolding;2nd, water supply line folding and unfolding is greatly reduced
Hand labor intensity, save pipeline folding and unfolding operation labo r usage, reduce pipe laying, recovery operating cost.
Brief description of the drawings
Fig. 1 is structural representation of the present utility model.
Shown in figure:1- Operation Vans, 2- mounting brackets, 3- pipeline folding and unfolding driving-shaft assemblies, 4- power transmission pairs, 5- pipelines are deposited
Put frame, 6- pipeline guiding trestles, 7- upper connecting rods, 8- middle brace rods, 9- lower connecting rods, 10- pipeline guiding trestle turning arms.
Embodiment
Utility model is further described in detail with reference to the accompanying drawings and examples.
As shown in figure 1, coal bed gas water supply line quickly retracting device of the present utility model, including Operation Van 1 and it is arranged on
The pipeline jack at the both ends of Operation Van 1;The pipeline jack includes mounting bracket 2, pipeline folding and unfolding driving-shaft assembly 3, moved
Power transmission 4, pipeline storage rack 5, the both ends of pipeline folding and unfolding driving-shaft assembly 3 are mounted on pipeline storage rack 5, the pipeline
Folding and unfolding driving-shaft assembly 3, power transmission pair 4 are installed on mounting bracket 2, and the pipeline folding and unfolding driving-shaft assembly 3 passes with power
The 4 gears connection of dynamic pair.
Pipeline jack is installed on the front-end and back-end of Operation Van 1, and the battery carried by Operation Van 1 provides power electric
Source is that power transmission pair 4 provides power, so that power transmission pair 4 rotates, and then drives 3 turns of pipeline folding and unfolding driving-shaft assembly
It is dynamic, to reach the purpose of folding and unfolding pipeline.
During use, soft pipeline to be recycled is wound on pipeline storage rack 5, is driven by the motor of the power supply of Operation Van 1
Dynamic pipeline storage rack 5 is rotated with recovery line.After pipe string recovery terminates, the pipeline storage rack filled can be unloaded and loaded onto
New pipeline storage rack continues the pipeline that recovery does not harvest.
Pipeline has remnants liquid, in order to remove residul liquid-removing, preferred embodiment is, described in recovery pipeline
Mounting bracket 2 be provided with pipeline guiding trestle turning arm 10, pipeline guiding trestle 6, the mounting bracket 2 be provided with upper connecting rod 7, in
Between connecting rod 8, lower connecting rod 9, the upper connecting rod 7, middle brace rod 8, lower connecting rod 9 are each perpendicular to pipeline folding and unfolding power transmission shaft
Assembly 3, described one end of pipeline guiding trestle turning arm 5 are bolted middle brace rod 8, and other end connecting pipeline is oriented to branch
Frame 6.Wherein one end of pipeline guiding trestle 6 is movably connected on middle brace rod 8, and the other end is bolted on upper connecting rod
7 or lower connecting rod 9 on;When pipeline reclaims, rotate pipeline guiding trestle turning arm 10 and fixation makes pipeline guiding trestle 6 be placed in pipe
The front of line storage rack 5, pipeline guiding trestle 6 controls pipeline direction and extrudes the liquid remained in pipeline when pipeline reclaims.
For the ease of one side take-up, one side defence line, preferred embodiment is that the pipeline folding and unfolding driving-shaft assembly 3 wraps
Power transmission shaft, lower drive shaft are included, the upper power transmission shaft, lower drive shaft are equipped with gear, and the power transmission pair 4 is provided with two
Drive, gear of two drives respectively with upper power transmission shaft, lower drive shaft in the power transmission pair 4 are connected.On wherein
Power transmission shaft, lower drive shaft are equipped with anti-rotation pin, may be such that either lower drive shaft is rotated or stopped power transmission shaft.By upper and lower
Control device in rotary shaft, two pipeline storage racks 5 with one end unilateral can rotate, and the unilateral laying and recovery of pipeline are mutual not
Influence.
In order to cost-effective, preferred embodiment is that power source is additionally provided with the mounting bracket 2, the power source with
Power transmission pair 4 connects.So power source directly provides power, avoids Operation Van 1 from being started in folding and unfolding pipeline, can save combustion
Oil.
The pipeline storage rack 5 is detachably connected on pipeline folding and unfolding driving-shaft assembly 3.During pipe installation, with operation
The advance of car 1, pipeline storage rack 5, which is freely rotated along road, unloads underground pipelines.
The utility model the above embodiments have advantages below:1st, pipeline jack is installed in Operation Van 1 and assigned
The mobility of draw off gear Operation Van is given;2nd, pipeline folding and unfolding automates, and removal process substitutes manpower with machine power.3rd, pipeline
Storage bracket 5 is detachable, and pipeline guiding trestle 6 is rotatable, can continuously repeat use.
Preferred embodiment of the present utility model is the foregoing is only, not thereby limits the scope of the claims of the present utility model,
Every equivalent structure done using the utility model specification and accompanying drawing content or equivalent flow conversion, or directly or indirectly fortune
Used in other related technical areas, similarly it is included within scope of patent protection of the present utility model.
Claims (5)
1. coal bed gas water supply line quickly retracting device, it is characterised in that including Operation Van (1) and installed in Operation Van (1) two
The pipeline jack at end;
The pipeline jack includes mounting bracket (2), pipeline folding and unfolding driving-shaft assembly (3), power transmission secondary (4), pipeline is deposited
Frame (5) is put, pipeline folding and unfolding driving-shaft assembly (3) both ends are mounted on pipeline storage rack (5), the pipeline folding and unfolding power transmission shaft
Assembly (3), power transmission secondary (4) are installed on mounting bracket (2), the pipeline folding and unfolding driving-shaft assembly (3) and power transmission
Secondary (4) gear connection.
2. coal bed gas water supply line quickly retracting device according to claim 1, it is characterised in that the mounting bracket (2)
Be provided with pipeline guiding trestle turning arm (10), pipeline guiding trestle (6), the mounting bracket (2) be provided with upper connecting rod (7),
Middle brace rod (8), lower connecting rod (9), the upper connecting rod (7), middle brace rod (8), lower connecting rod (9) are each perpendicular to pipe
Line folding and unfolding driving-shaft assembly (3), described pipeline guiding trestle turning arm (10) one end are bolted middle brace rod (8),
Other end connecting pipeline guiding trestle (6).
3. coal bed gas water supply line quickly retracting device according to claim 1, it is characterised in that the pipeline folding and unfolding passes
Moving axis assembly (3) includes upper power transmission shaft, lower drive shaft, and the upper power transmission shaft, lower drive shaft are equipped with gear, the power transmission
Secondary (4) are provided with two drives, two drives on the power transmission pair (4) respectively with upper power transmission shaft, lower drive shaft
Gear connection.
4. coal bed gas water supply line quickly retracting device according to claim 1, it is characterised in that the mounting bracket (2)
On be additionally provided with power source, the power source is connected with power transmission secondary (4).
5. coal bed gas water supply line quickly retracting device according to claim 1, it is characterised in that the pipeline storage rack
(5) it is detachably connected on pipeline folding and unfolding driving-shaft assembly (3).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720450554.0U CN206705418U (en) | 2017-04-26 | 2017-04-26 | Coal bed gas water supply line quickly retracting device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720450554.0U CN206705418U (en) | 2017-04-26 | 2017-04-26 | Coal bed gas water supply line quickly retracting device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206705418U true CN206705418U (en) | 2017-12-05 |
Family
ID=60457385
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720450554.0U Expired - Fee Related CN206705418U (en) | 2017-04-26 | 2017-04-26 | Coal bed gas water supply line quickly retracting device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206705418U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107458936A (en) * | 2017-04-26 | 2017-12-12 | 汤树林 | Coal bed gas water supply line quickly retracting device |
-
2017
- 2017-04-26 CN CN201720450554.0U patent/CN206705418U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107458936A (en) * | 2017-04-26 | 2017-12-12 | 汤树林 | Coal bed gas water supply line quickly retracting device |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104259165B (en) | Cleaning machine | |
CN107755172A (en) | A kind of outer surface of steel tube application device that can add derusting oil automatically | |
CN103470910A (en) | On-line winding machine for pipeline | |
CN206254017U (en) | Pipeline outer wall derusting device | |
CN204035149U (en) | Cleaning machine | |
CN206705418U (en) | Coal bed gas water supply line quickly retracting device | |
CN115522955A (en) | Rail traffic tunnel lining leakage diagnosis and treatment integrated device | |
CN208976458U (en) | A kind of bucket tool cleaning device for building | |
CN208631746U (en) | A kind of small-sized rotary type tower double-station automatic deploying and retracting winding apparatus | |
CN108298431A (en) | A kind of natural gas line placement hanging device | |
CN112554905B (en) | Slurry pipe extending device and construction method thereof | |
CN107458936A (en) | Coal bed gas water supply line quickly retracting device | |
CN107178325B (en) | A kind of automation oil pipe means of locomotion | |
CN209651387U (en) | A kind of automatic charging workpiece gripper device | |
CN205103054U (en) | Full -automatic sample machine | |
CN203477757U (en) | Pipe on-line winding machine | |
CN208645554U (en) | A kind of accurate perforating device of glass reinforced plastic screen casing | |
CN207930246U (en) | It is a kind of to combine the engineering fork truck for having distribution ring main unit fixture | |
CN114101233B (en) | Power pipeline inner wall cleaning device | |
CN103774539B (en) | Rigid pavement combined maintenance truck | |
CN106476668A (en) | Vehicle-mounted automatic loading and unloading oil pipe device | |
CN106078442B (en) | A kind of pipe is interior to be ground cutter device | |
CN206091870U (en) | High -efficient drilling equipment is used in industry exploitation | |
CN207844762U (en) | A kind of novel hose exhibition is returned the vehicle to the garage and knock off | |
CN201634346U (en) | Telescopic arm for underground mine explosive loading truck |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right | ||
TR01 | Transfer of patent right |
Effective date of registration: 20220425 Address after: Room 902, floor 9, unit 1, building 4, No. 333, Yuying Road, Xindu District, Chengdu, Sichuan 610500 Patentee after: Tang Zhixiang Address before: 610500 Ma Chao, East Road, Xindu Xiangcheng Avenue, Xindu District, Chengdu, Sichuan, No. 1, 1, unit 1, No. 5, building No. 2. Patentee before: Tang Shulin |
|
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20171205 |