CN206693451U - A kind of modularization lift-on/lift-off type fills wall - Google Patents
A kind of modularization lift-on/lift-off type fills wall Download PDFInfo
- Publication number
- CN206693451U CN206693451U CN201720428869.5U CN201720428869U CN206693451U CN 206693451 U CN206693451 U CN 206693451U CN 201720428869 U CN201720428869 U CN 201720428869U CN 206693451 U CN206693451 U CN 206693451U
- Authority
- CN
- China
- Prior art keywords
- lift
- wall
- pieces
- modularization
- stalk
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02A—TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
- Y02A30/00—Adapting or protecting infrastructure or their operation
- Y02A30/24—Structural elements or technologies for improving thermal insulation
- Y02A30/244—Structural elements or technologies for improving thermal insulation using natural or recycled building materials, e.g. straw, wool, clay or used tires
Abstract
The utility model is a kind of modularization lift-on/lift-off type filling wall, this wall can be used as load bearing wall and non-load bearing wall, each one piece of stalk board in left and right including being disposed in parallel relation to one another, interconnected between two pieces of stalk boards by connector, the lateral surface of two pieces of stalk boards has been respectively fixedly connected with one layer of reinforced mesh, and the lateral surface of two pieces of stalk boards is also respectively provided with one layer of carbon ash being combined with homonymy reinforced mesh(The product of biological power plant)Screed;The reinforced mesh has the upper, external part of left and right three.Exterior wall and interior wall are disposably molded with agent structure, secondary wet trade is not needed, there is the reinforced mesh for reserving and the left and right ends and upper end of module, it can be connected with the pillar of agent structure, beam with shear wall, cast in situs after colligation, the module belongs to insulation construction integration, it is incubated after not needing secondary constructed, designed door and window and water power pipe is all embedded in wall while making, only need to be connected with connector to scene.
Description
Technical field
It the utility model is related to a kind of filled wall, and in particular to a kind of modularization lift-on/lift-off type fills wall, and this wall can be made
For load bearing wall and non-load bearing wall.
Background technology
Existing frame structure building filling wall is typically constructed in building site to be completed, and Specific construction mode is:Treat main body
After the completion of frame structure, secondary masonry panel in the frame, bar planting and masonry panel in agent structure are needed in building process
Connection, process is more, time length, also needs to plaster after the completion of building by laying bricks or stones, exterior wall also needs to do heat preservation construction.Have bad luck and build at the construction field (site)
Build various types of materials not only lost labor, occupied ground, and wet trade time to grow, also influenceed by weather, process trouble;Exterior wall
Do insulation and also have potential safety hazard, it is difficult to ensure heat-insulation layer and wall same life-span;After wall of having constructed, water power work carries out wall again
Body is slotted, and carries out water power arrangement, is wasted the plenty of time and is produced substantial amounts of building waste.
Utility model content
Technical problem to be solved in the utility model is to provide a kind of modularization lift-on/lift-off type filling wall, whole wall(Very
Extremely include door and window)It is fully completed in the stage in factory and realizes modularization, wall and main body is constructed simultaneously, avoid Secondary Transport, water
Fulgurite is embedded in wall, and structural thermal insulation integration, whole face wall is installed by lifting mode in scene.
The technical solution of the utility model is as follows:
A kind of modularization lift-on/lift-off type fills wall, including each one piece of stalk board in left and right being disposed in parallel relation to one another, two pieces of stalks
Interconnected between plate by connector, it is characterised in that:The lateral surface of two pieces of stalk boards has been respectively fixedly connected with one layer
Reinforced mesh, the lateral surface of two pieces of stalk boards are also respectively provided with one layer of carbon lime and brick being combined with homonymy reinforced mesh
Layer;The reinforced mesh has the upper, external part of left and right three.
There is stalk grieshoch between two pieces of stalk boards.
Connector carries small opening.
Erection of doors and windows space is offered among filling wall and door or window are installed within this space.
Connector is C-type steel either wooden specification section bar.
Water power line pipe is embedded with the carbon sand-lime pulp layer of inner side, and electrical socket or water pipe are provided with water power line pipe
Joint.
Economic effect of the present utility model is:
Exterior wall and interior wall are disposably molded with agent structure, it is not necessary to secondary wet trade, the left and right ends and upper end of module
There is the reinforced mesh for reserving and, can be connected with the pillar of agent structure, beam with shear wall, cast in situs after colligation, should
Module belong to insulation construction integration, exterior wall can be with one-shot forming, it is not necessary to it is secondary construct after be incubated, making while
Designed door and window and water power pipe are all embedded in wall, only need to be connected with connector to scene.
The utility model make use of natural waste straw material to do stalk board raw material, and make use of carbon grey(Biological electricity
The product of factory)Mortar and straw ash(The product of biological power plant)Insulation material is done, arrives modularization by these insulation materials are prefabricated
In wall, allow the insulation of wall and structure same life-span, accomplish modularization wall, will not produce building waste, during installation not
It can be influenceed by weather, preferably serve fire prevention and waterproof thermal-insulated effect.
The utility model also has cost cheap, can largely utilize the carbon ash discarded, reduce pollution, easy for construction, to people
The characteristics of body is harmless.
Brief description of the drawings
Fig. 1 is the structural representation of the utility model embodiment one.
Fig. 2 is Fig. 1 section structure diagram.
Fig. 3 is the structural representation of the utility model embodiment two.
Embodiment
The utility model is described further with reference to the accompanying drawings and examples.
Embodiment one
Such as Fig. 1 and Fig. 2, it is mutually equal that the present embodiment includes size identical or so each one piece of stalk board 2, two pieces of stalk boards
Row is set
Put and interconnected between two pieces of stalk boards by connector 3.The lateral surface of two pieces of stalk boards is solid respectively
Surely one layer of reinforced mesh 4 is connected with, the lateral surface of two pieces of stalk boards is also respectively provided with one layer and the phase knot of homonymy reinforced mesh 4
The carbon sand-lime pulp layer 1 of conjunction.The reinforced mesh 4 has the upper, external part of left and right three, wherein upper external part is built for connection
The beam of thing is built, the external part of left and right two is respectively used to the column of connecting building thing.
Described connector 3 can be the cold bending thin wall of the C-type steel form shown in Fig. 2 or wooden specification section bar.
The utility model is applied to cold district(Such as the northern area of China)When, due to needing more preferable heat-insulating property,
Need to fill straw ash between two pieces of stalk boards, now then need connector 3 to be used for material leakage with small opening(Straw ash).
In order that hydroelectric line is more hidden and clean and tidy in building, it is pre-buried in filling within the walls side carbon sand-lime pulp layer 1
There is water power line pipe 5, and electrical socket or water pipe head 6 are provided with water power line pipe 5.
When preparing the utility model, each one piece of stalk board 2 in left and right is connected by connector 3 first, then outside stalk board 2
Side, which connects reinforced mesh 4 and smears carbon lime and brick, forms carbon sand-lime pulp layer 1.If it is necessary, left and right between closing stalk board 2
And bottom, straw ash is filled from top to bottom between two pieces of stalk boards, is finished product after straw ash dries solidification.
Embodiment two
Erection of doors and windows space is offered among filling wall and door or window are installed within this space, and the present embodiment is window 7, such as
Shown in Fig. 3.
Claims (6)
1. a kind of modularization lift-on/lift-off type fills wall, including each one piece of stalk board in left and right being disposed in parallel relation to one another(2), two pieces of stalks
Pass through connector between plate(3)Interconnect, it is characterised in that:The lateral surface of two pieces of stalk boards has been respectively fixedly connected with one
Layer reinforced mesh(4), the lateral surface of two pieces of stalk boards is also respectively provided with one layer and homonymy reinforced mesh(4)The carbon being combined
Plain sand-lime pulp layer(1);The reinforced mesh(4)With the upper, external part of left and right three.
2. modularization lift-on/lift-off type as claimed in claim 1 fills wall, it is characterised in that:There is straw ash between two pieces of stalk boards
Layer.
3. modularization lift-on/lift-off type as claimed in claim 2 fills wall, it is characterised in that:Connector(3)With small opening.
4. the modularization lift-on/lift-off type filling wall as described in claim 1 or 2 or 3, it is characterised in that:Door is offered among filling wall
Window installing space is simultaneously provided with door or window within this space.
5. the modularization lift-on/lift-off type filling wall as described in claim 1 or 2 or 3, it is characterised in that:Connector(3)Be C-type steel or
Person is wooden specification section bar.
6. the modularization lift-on/lift-off type filling wall as described in claim 1 or 2 or 3, it is characterised in that:In inner side carbon sand-lime pulp layer
(1)In be embedded with water power line pipe(5), and in water power line pipe(5)It is provided with electrical socket or water pipe head(6).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720428869.5U CN206693451U (en) | 2017-04-24 | 2017-04-24 | A kind of modularization lift-on/lift-off type fills wall |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720428869.5U CN206693451U (en) | 2017-04-24 | 2017-04-24 | A kind of modularization lift-on/lift-off type fills wall |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206693451U true CN206693451U (en) | 2017-12-01 |
Family
ID=60445814
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720428869.5U Active CN206693451U (en) | 2017-04-24 | 2017-04-24 | A kind of modularization lift-on/lift-off type fills wall |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206693451U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109853956A (en) * | 2019-04-10 | 2019-06-07 | 河南五建第二建筑安装有限公司 | Residential building construction method |
-
2017
- 2017-04-24 CN CN201720428869.5U patent/CN206693451U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109853956A (en) * | 2019-04-10 | 2019-06-07 | 河南五建第二建筑安装有限公司 | Residential building construction method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101168977B (en) | Plastering composite wall | |
CN104358341B (en) | Building brickwork and masonry construction method of building brickwork | |
US20100218446A1 (en) | Structure system of concrete building for self-heat insulation | |
CN105804292A (en) | Environment-friendly and energy-saving integrated cast-in-situ lightweight concrete wall and construction method thereof | |
CN209277334U (en) | A kind of prefabricated combined assembled insulation construction integrated wallboard | |
CN103266685B (en) | Multifunctional interlocking, anti-seismic and anti-breaking combined building block and combined structure thereof | |
CN107989233A (en) | The prefabricated curtain wall structure and its construction method of lightgage steel joist sand aerating plate | |
CN205653934U (en) | Cast -in -place lightweight concrete wall body of green energy -conserving integration | |
CN106522359A (en) | Total-prefabricated rural residential class composite wall structure system and construction method thereof | |
CN203174810U (en) | Bearing-and-leaning type installed assembly wall body | |
CN206418663U (en) | A kind of prefabricated combined wall board of novel fabricated H types | |
CN103243857A (en) | Self-heat-preservation building block and self-heat-preservation wall body consisting of self-heat-preservation building blocks | |
CN105003020A (en) | Ceramsite concrete metal net rack light wallboard and splicing structure thereof | |
CN1888344B (en) | Composite thermal insulation concrete load-bearing wall | |
CN206189685U (en) | Integrated floor of modularization and house | |
CN201620465U (en) | New light steel-weed tile energy saving residential structure for villages | |
CN206693451U (en) | A kind of modularization lift-on/lift-off type fills wall | |
CN108316546A (en) | Assembled integrated heat-insulation wall plate | |
CN104389360A (en) | Externally suspended insulation board type reinforcement brickwork shear wall system and construction method thereof | |
CN208830530U (en) | A kind of industrialization light gauge cold-formed steel shape combined wall | |
CN208039610U (en) | Assembled integrated heat-insulation wall plate | |
CN103758256B (en) | A kind of decorative heat preservation composite wall and preparation method thereof | |
CN107724596B (en) | Partially prefabricated sandwich wallboard, wall structure thereof and building | |
CN207296087U (en) | A kind of Prefabricated outer wall non-load bearing wall standard component | |
CN1526894A (en) | Composite antiseismic heat-insulating wall with support layer and outer protective reinforced concrete layer |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |