CN109853956A - Residential building construction method - Google Patents

Residential building construction method Download PDF

Info

Publication number
CN109853956A
CN109853956A CN201910284697.2A CN201910284697A CN109853956A CN 109853956 A CN109853956 A CN 109853956A CN 201910284697 A CN201910284697 A CN 201910284697A CN 109853956 A CN109853956 A CN 109853956A
Authority
CN
China
Prior art keywords
panel
prefabricated
filled
prefabricated filled
wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910284697.2A
Other languages
Chinese (zh)
Inventor
徐礼赞
吴建功
吴善艳
张中明
孙斌
郑淮华
吴坤
张涛
李翔
吴万强
桂诗凯
姚伟
唐苏豫
陈德龙
乐祥锋
张宏春
杨鑫
刘洋洋
夏河山
李恒阳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
HENAN WUJIAN SECOND CONSTRUCTION CO Ltd
Original Assignee
HENAN WUJIAN SECOND CONSTRUCTION CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HENAN WUJIAN SECOND CONSTRUCTION CO Ltd filed Critical HENAN WUJIAN SECOND CONSTRUCTION CO Ltd
Priority to CN201910284697.2A priority Critical patent/CN109853956A/en
Publication of CN109853956A publication Critical patent/CN109853956A/en
Pending legal-status Critical Current

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The invention discloses a kind of residential building construction method, each layer of construction of residential building includes reinforcing bar binding, the lifting of prefabricated filled-in panel, branch aluminum alloy mould plate, casting concrete step;Reinforcing bar step of ligation are as follows: bind shear force wall reinforcing steel bar and constructional column reinforcing bar according to design drawing;Prefabricated filled-in panel lifts step are as follows: lifts the prefabricated filled-in panel prepared according to design drawing to installation site;Prefabricated one face wall of filled-in panel is an entirety, and the upper and lower side of prefabricated filled-in panel is straight line, and the left and right stile of prefabricated filled-in panel reserves anchor lacing wire;The stile that prefabricated filled-in panel is connected with shear wall is straight line;The stile that prefabricated filled-in panel is connected with constructional column is the fold-line edge to match with constructional column side wall;Branch aluminum alloy mould plate step are as follows: main body site concrete and constructional column aluminum alloy mould plate synchronously complete;Casting concrete step are as follows: main body site concrete and constructional column one-pass molding.The invention has the advantages that eliminating plastering process, the duration is shortened.

Description

Residential building construction method
Technical field
The present invention relates to architecture construction methods, more particularly, to residential building construction method.
Background technique
Currently, high residential building mostly uses greatly shear wall structure, wall is divided to two kinds, and one is shear walls, plays load-bearing effect, Another kind is filling wall, mainly plays compartmentation.Currently, the construction technology process of high residential building routine is: reinforcing bar binding → Template → casting concrete → demoulding → secondary structure construction;It first constructs load-carrying members (including shear wall, stair, floor, beam Deng), then non bearing structure of constructing, non bearing structure include constructional column, collar tie beam, filling wall etc., also known as secondary structure.Secondary knot Structure need to construct after the completion of main structure (load-carrying members), and working procedure is complicated.Secondary structure building wall is needed block The construction materials such as block, mortar are carried upstairs by vertical transportation machinery, and when masonry needs to set up inner wall scaffold, secondary structure structure It makes column and still needs to formwork, assembling reinforcement, sealing anti-bank in toilet needs cast-in-place in advance, and water power set aside pre-embedded need to follow that build process same Step construction, excessively beam prefabricated or cast-in-place etc., time-consuming, and process is more.Meanwhile it being needed after the completion of main structure and secondary structure construction Plastering, plastering engineering is the thing of a labor intensive and resource in house building course, and main function is levelling.Cause There are relatively large deviation, the requirement of finishing is not achieved in degree of plainness for wall surface, verticality, needs to use sand for main structure and secondary structure construction Slurry progress is levelling, there is the saying of " homogeneous is mud ";Plastering engineering belongs to wet construction, and construction environment is poor, " goes all the time Plastering ", " subtracting plastering " are the directions of construction industry technology development.
Existing aluminum alloy mould plate technology is the technology that main structure exempts from plastering, and the template precision is high, shear wall mould Plate uses aluminum alloy mould plate, its wall leveling degree and verticality can reach the standard of finishes after demoulding, to exempt plastering.But It is, because the house type of every house is different, to cause aluminum alloy mould plate model used in every house different.According to statistics, one The completion of aluminum alloy mould plate used by residence building moves back in another building in use, there is 30% or so sketch plate Block needs reconfigure, and versatility is not strong, causes to waste.
Secondary structure is substituted with prefabricated partition board, secondary structure may be implemented and exempt to plaster, and working procedure greatly reduces; But existing deficiency is, prefabricated partition board height is mostly story height (removing deck-molding and slab thickness), and width 1000mm is left The right side, so that there are pieces for wall, piece position is often the place for being easy cracking, and deals with more troublesome, customer complaint It is more.Meanwhile prefabricated partition board is still to install after the completion of main structure construction, under present circumstances, is bound with main body to divide The duration of boundary line, basis plus major project accounts for about 50%, and the duration of decoration stage accounts for about 50%, and the duration is longer.
Summary of the invention
It is an object of that present invention to provide a kind of residential building construction methods.
To achieve the above object, the present invention takes following technical proposals:
Residential building construction method of the present invention, each layer of residential building construction include reinforcing bar binding, Prefabricated filled-in panel lifting, branch aluminum alloy mould plate, casting concrete step;
The reinforcing bar step of ligation are as follows: bind shear force wall reinforcing steel bar and constructional column reinforcing bar according to design drawing;
The prefabricated filled-in panel lifts step are as follows: lifts the prefabricated filled-in panel prepared according to design drawing to installation position It sets;Prefabricated one face wall of filled-in panel is an entirety, and the upper and lower side of prefabricated filled-in panel is straight line, prefabricated filled-in panel Left and right stile reserves anchor lacing wire;The stile that prefabricated filled-in panel is connected with shear wall is straight line;Prefabricated filled-in panel and construction The stile of column linking is the fold-line edge to match with constructional column side wall, i.e., the facade that prefabricated filled-in panel is connected with constructional column is horse Tooth raft structure;Prefabricated filled-in panel requires when prefabricated according to design drawing, by hydroelectric line, jack connector, distribution box, Network distribution case etc. is embedded in wallboard;When design drawing has door-window opening, door-window opening is reserved on prefabricated filled-in panel;In advance The plate face of filled-in panel processed, which requires to reach, exempts from precision of plastering, the wall bulk density and wall of aerated concrete block of prefabricated filled-in panel Bulk density it is suitable, or lower than the bulk density of wall of aerated concrete block;If the building is prefabrication, fill Wallboard lifting synchronous with prefabricated construction wallboard is completed;
The branch aluminum alloy mould plate step are as follows: main body site concrete and constructional column aluminum alloy mould plate synchronously complete;
The casting concrete step are as follows: main body site concrete and constructional column one-pass molding.
In the prefabricated filled-in panel lifting step, after the installation of prefabricated filled-in panel is in place, prefabricated filled-in panel with A strata benzene plate or other flexible materials are placed between the contact surface of lintel, for discharging deformation, then bind beam steel.
The invention has the advantages that the lifting of prefabricated filled-in panel is assembled architecture construction method, can industrialized production, remove from Plastering process saves material and artificial, substantially reduces the duration.Meanwhile equipment leasing expense, administration fee greatly reduce, Decrease aluminum alloy mould plate sketch plate number of blocks.
Detailed description of the invention
Fig. 1 is the schematic diagram of binding shear force wall reinforcing steel bar and constructional column reinforcing bar of the present invention.
Fig. 2 is the scheme of installation of prefabricated filled-in panel of the present invention.
Fig. 3 is the prefabricated filled-in panel schematic diagram that left and right stile of the present invention is reserved with anchor lacing wire.
Fig. 4 .1 is prefabricated filled-in panel schematic diagram (figure when left and right stile of the present invention is mutually connected with shear wall respectively In conceal anchor lacing wire).
Fig. 4 .2 is prefabricated filling wall when left stile of the present invention is connected with shear wall, right stile is connected with constructional column Plate schematic diagram (conceals anchor lacing wire) in figure.
Fig. 4 .3 is prefabricated filled-in panel schematic diagram (figure when left and right stile of the present invention is mutually connected with constructional column respectively In conceal anchor lacing wire).
Fig. 5 is the schematic diagram that a strata benzene plate is placed between prefabricated filled-in panel and lintel contact surface of the present invention.
Fig. 6 is the schematic diagram of branch aluminum alloy mould plate of the present invention.
Specific embodiment
It elaborates with reference to the accompanying drawing to the embodiment of the present invention, the present embodiment before being with technical solution of the present invention It puts and is implemented, the detailed implementation method and specific operation process are given, but protection scope of the present invention is not limited to down State embodiment.
Residential building construction method of the present invention, each layer of residential building construction include reinforcing bar binding, Prefabricated filled-in panel lifting, branch aluminum alloy mould plate, casting concrete step.
As shown in Figure 1, the reinforcing bar step of ligation are as follows: require binding shear force wall reinforcing steel bar 1 and constructional column according to design drawing Reinforcing bar 2.
As shown in Fig. 2, the prefabricated filled-in panel lifts step are as follows: the prefabricated filled-in panel that will be prepared according to design drawing 3 lift to installation site;Prefabricated filled-in panel 3 is overall structure;As shown in figure 3, the upper and lower Bian Weizhi of prefabricated filled-in panel 3 The left and right stile on line side, prefabricated filled-in panel 3 reserves anchor lacing wire 4.
The left and right stile of prefabricated filled-in panel 3 has 3 kinds of structures:
When the left and right stile of prefabricated filled-in panel 3 is mutually connected with shear wall respectively, as shown in Fig. 4 .1, prefabricated filled-in panel 3 Left and right stile is straight line;
When a left side (or right) stile of prefabricated filled-in panel 3 is connected with shear wall, right (or left) stile is connected with constructional column, such as scheme Shown in 4.2, the left side of prefabricated filled-in panel 3 (or right) stile is straight line, and the right side (or left) stile of prefabricated filled-in panel 3 is and structure The fold-line edge that column side wall matches is made, i.e., the facade that prefabricated filled-in panel 3 is connected with constructional column is 5 structure of horse tooth trough;
When the left and right stile of prefabricated filled-in panel 3 is mutually connected with constructional column respectively, as shown in Fig. 4 .3, prefabricated filled-in panel 3 Left and right stile is the fold-line edge to match with constructional column side wall, i.e., the left and right facade that prefabricated filled-in panel 3 is connected with constructional column It is 5 structure of horse tooth trough.
Prefabricated filled-in panel 3 requires when prefabricated according to design drawing, by hydroelectric line, jack connector, distribution box, Network distribution case is embedded in wallboard;When design drawing has door-window opening, door-window opening is reserved on prefabricated filled-in panel 3;In advance The plate face of filled-in panel 3 processed, which requires to reach, exempts from precision of plastering, the wall bulk density and aerated concrete block work of prefabricated filled-in panel 3 The bulk density of body is suitable, or lower than the bulk density of wall of aerated concrete block.
After prefabricated filled-in panel 3 is installed in place, a strata benzene plate is placed between prefabricated filled-in panel 3 and the contact surface of beam 6 or other flexible materials, then release deformation binds beam steel 7, as shown in Figure 5.
As shown in fig. 6, the branch aluminum alloy mould plate step are as follows: supported shear wall aluminum alloy mould plate 8.1, beam aluminum alloy mould plate 8.2, floor aluminum alloy mould plate 8.3, constructional column aluminum alloy mould plate 8.4 synchronously complete.
The casting concrete step are as follows: shear wall, beam, floor, stair and the cast-in-place main structure one-pass molding of constructional column.
Engineering method of the present invention only remains roofing, exterior wall, toilet warterproof, Gong Qu when blank after house main body binds hands over room The construction operations such as hard-cover can reach requirements for completion in 30-50 days after main body binds.With conventional construction method ratio, i.e., according to house base Plinth adds main body and decoration stage respectively to account for 50% calculating time claimed, and the duration shortens nearly 40%.
Engineering method of the present invention is mainly prefabricated filling wall assembly, and therefore, main body load-carrying members still can be cast-in-place, shock resistance Do not weaken;The prefabricated filled-in panel is equally applicable to assembled architecture, also, according to existing cast-in-place residential structure drawing, leads to A design alteration notification sheet is crossed, filling wall can be changed to prefabricated filled wall, cast-in-place house becomes assembled architecture, nothing It needs to redesign.
Engineering method of the present invention is used if from the beginning a house designs, structural computational model, calculation method have no to change, if Meter personnel can design without relearning new knowledge.
Engineering method of the present invention uses aluminum alloy mould plate, and aluminum alloy mould plate overlap is changeable, therefore versatility is stronger, subtracts Non-standard piece of quantity is lacked.
It is provided according to specification, filled wall length, which is greater than 5 meters, need to be arranged constructional column, and maximum wall is 5 meters long, and house fills wall Highly 2.5 ~ 2.7 meters.Therefore, the bulk density of the prefabricated filled-in panel of the present invention is controlled in 500kg/m3When left and right, i.e., 5 meters × 2.7 Rice × 0.2 meter × 500kg/m3=1350kg, common 5013 tower crane can lift.
Engineering method of the present invention eliminates plastering process, equal to resource input is reduced, has saved valuable river sand and cement money Source, while reducing artificial.If the prefabricated filled-in panel in the present invention is using industrialization batch-order production, working efficiency and use Work amount can be reduced, and mechanization degree is high, and labor intensity mitigates significantly.

Claims (2)

1. a kind of residential building construction method, it is characterised in that: each layer of construction of the residential building includes reinforcing bar Binding, the lifting of prefabricated filled-in panel, branch aluminum alloy mould plate, casting concrete step;
The reinforcing bar step of ligation are as follows: bind shear force wall reinforcing steel bar and constructional column reinforcing bar according to design drawing;
The prefabricated filled-in panel lifts step are as follows: lifts the prefabricated filled-in panel prepared according to design drawing to installation position It sets;Prefabricated one face wall of filled-in panel is an entirety, and the upper and lower side of prefabricated filled-in panel is straight line, prefabricated filled-in panel Left and right stile reserves anchor lacing wire;The stile that prefabricated filled-in panel is connected with shear wall is straight line;Prefabricated filled-in panel and construction The stile of column linking is the fold-line edge to match with constructional column side wall, i.e., the facade that prefabricated filled-in panel is connected with constructional column is horse Tooth raft structure;Prefabricated filled-in panel requires when prefabricated according to design drawing, by hydroelectric line, jack connector, distribution box, Network distribution case is embedded in wallboard;When design drawing has door-window opening, door-window opening is reserved on prefabricated filled-in panel;It is prefabricated The plate face of filled-in panel, which requires to reach, exempts from precision of plastering, the wall bulk density of prefabricated filled-in panel and wall of aerated concrete block Bulk density is suitable, or lower than the bulk density of wall of aerated concrete block;If the building is prefabrication, prefabricated to fill out Wallboard lifting synchronous with the prefabricated construction wallboard is filled to complete;
The branch aluminum alloy mould plate step are as follows: main body site concrete and constructional column aluminum alloy mould plate synchronously complete;
The casting concrete step are as follows: main body site concrete and constructional column one-pass molding.
2. residential building construction method according to claim 1, it is characterised in that: the prefabricated filled-in panel lifting step In rapid, after the installation of prefabricated filled-in panel is in place, a strata benzene plate is placed between prefabricated filled-in panel and the contact surface of lintel Or then other flexible materials bind beam steel for discharging deformation.
CN201910284697.2A 2019-04-10 2019-04-10 Residential building construction method Pending CN109853956A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910284697.2A CN109853956A (en) 2019-04-10 2019-04-10 Residential building construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910284697.2A CN109853956A (en) 2019-04-10 2019-04-10 Residential building construction method

Publications (1)

Publication Number Publication Date
CN109853956A true CN109853956A (en) 2019-06-07

Family

ID=66903578

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910284697.2A Pending CN109853956A (en) 2019-04-10 2019-04-10 Residential building construction method

Country Status (1)

Country Link
CN (1) CN109853956A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110259126A (en) * 2019-06-28 2019-09-20 深圳市科羿科技有限公司 A kind of assembled architecture construction method
CN110512831A (en) * 2019-09-02 2019-11-29 李良发 A kind of construction method of the public ventilation shaft of civil building
CN112878665A (en) * 2021-01-19 2021-06-01 中天建设集团有限公司 ALC (autoclaved lightweight concrete) plate and main body synchronous construction structure and construction method
CN113427628A (en) * 2021-06-30 2021-09-24 江苏华伟佳建材科技有限公司 Light self-insulation concrete wallboard and processing and construction method thereof
CN113719137A (en) * 2021-09-29 2021-11-30 徐红伟 Construction engineering secondary structure and masonry engineering and main body engineering synchronous construction method

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN206693451U (en) * 2017-04-24 2017-12-01 烟台金田科技有限公司 A kind of modularization lift-on/lift-off type fills wall
CN108457469A (en) * 2017-02-21 2018-08-28 黄靓 A kind of concrete structure construction method with assembled masonry filler wall

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108457469A (en) * 2017-02-21 2018-08-28 黄靓 A kind of concrete structure construction method with assembled masonry filler wall
CN206693451U (en) * 2017-04-24 2017-12-01 烟台金田科技有限公司 A kind of modularization lift-on/lift-off type fills wall

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
张栓成: "《建筑工程施工细部做法》", 31 January 2010 *
编委会: "《建筑施工常用条文速查与解析》", 31 March 2015 *

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110259126A (en) * 2019-06-28 2019-09-20 深圳市科羿科技有限公司 A kind of assembled architecture construction method
CN110512831A (en) * 2019-09-02 2019-11-29 李良发 A kind of construction method of the public ventilation shaft of civil building
CN110512831B (en) * 2019-09-02 2021-03-23 李良发 Construction method of public ventilation pipeline of civil building
CN112878665A (en) * 2021-01-19 2021-06-01 中天建设集团有限公司 ALC (autoclaved lightweight concrete) plate and main body synchronous construction structure and construction method
CN113427628A (en) * 2021-06-30 2021-09-24 江苏华伟佳建材科技有限公司 Light self-insulation concrete wallboard and processing and construction method thereof
CN113719137A (en) * 2021-09-29 2021-11-30 徐红伟 Construction engineering secondary structure and masonry engineering and main body engineering synchronous construction method

Similar Documents

Publication Publication Date Title
CN109853956A (en) Residential building construction method
CN102116061B (en) Masonry construction method for filling wall core pillar, core girder and building blocks into framework structure
CN107313517B (en) Connecting node for laminated wall and laminated floor slab in middle layer
CN201217898Y (en) Concrete prefabricated stairs
CN106854873A (en) A kind of engineering method and garage parking in precast spliced sinking type garage parking
US20020059763A1 (en) Pre-fabricated bathroom
CN103615053B (en) Monolithic reinforced concrete structure post empiricism engineering method
CN103410317A (en) Construction method for site assembly and casting integral wall body by adopting wall body prefabricated part
CN107558626A (en) A kind of prefabricated assembled wall structure and the method using this structure building house
CN107059920B (en) Loess formation piping lane construction technology
CN105089178B (en) A kind of pre-splicing Standard formula building of prefabricated steel reinforced concrete shear walls
CN106638940A (en) Fabricated high-rise residence precast concrete component construction method
CN206016309U (en) A kind of overall assembled building system
CN106193292A (en) A kind of steel frame assembled integral reinforced concrete shear wall structure system
CN206545215U (en) A kind of precast spliced sinking type garage parking
CN111335490A (en) Crack-resistant structure at joint of filler wall and shear wall under full-concrete outer wall window and construction method of crack-resistant structure
CN104790675A (en) Reinforced concrete block masonry structure assemblage construction method
CN106894538A (en) Filling wall and agent structure concrete integral shaping method
CN112575886A (en) Low-level and multi-level fully-prefabricated assembled concrete structure and design, production and installation method
CN110439291A (en) A kind of assembled production and construction method suitable for low-rise building
CN103306497A (en) Shock prevention and strengthening construction method for existing brickwork dwelling house fabricated structure
CN103061508A (en) Triangular slip form device and construction method for the same triangular slip form
CN205224332U (en) Prefabricated wall body and prefabricated wallboard
CN110886311A (en) Large-volume assembly type ground tire mold
CN219527957U (en) Concrete module box

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20190607

WD01 Invention patent application deemed withdrawn after publication