CN206668313U - The gas drainage system and tunnel structure in a kind of tunnel - Google Patents

The gas drainage system and tunnel structure in a kind of tunnel Download PDF

Info

Publication number
CN206668313U
CN206668313U CN201720411257.5U CN201720411257U CN206668313U CN 206668313 U CN206668313 U CN 206668313U CN 201720411257 U CN201720411257 U CN 201720411257U CN 206668313 U CN206668313 U CN 206668313U
Authority
CN
China
Prior art keywords
gas
tunnel
gas drainage
drainage system
under suction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720411257.5U
Other languages
Chinese (zh)
Inventor
高世强
肖向荣
杨立新
檀兴华
刘敦文
刘怀刚
刘伟
葛纪平
张铮
褚夫蛟
谭力海
赵升辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Road and Bridge International Co Ltd
Road and Bridge South China Engineering Co Ltd
Original Assignee
Road and Bridge International Co Ltd
Road and Bridge South China Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Road and Bridge International Co Ltd, Road and Bridge South China Engineering Co Ltd filed Critical Road and Bridge International Co Ltd
Priority to CN201720411257.5U priority Critical patent/CN206668313U/en
Application granted granted Critical
Publication of CN206668313U publication Critical patent/CN206668313U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

The utility model discloses a kind of gas drainage system in tunnel, it includes conductance tunnels and tunnels terminal anterior position and extraneous gas drainage under suction duct, the air extractor for being arranged on outside tunnel and being connected with the gas drainage under suction duct and the sealing device for sealing in the gas drainage under suction duct and air extractor in junction realization.Terminal anterior position and the external world are tunneled by conductance tunnels, gas is extracted out and discharged before tunnel piercing to gas accumulation region, the security incident that effectively can be prevented and treated gas accumulation and occur.

Description

The gas drainage system and tunnel structure in a kind of tunnel
【Technical field】
It the utility model is related to the gas drainage system and tunnel structure in constructing tunnel field, more particularly to gas tunnel.
【Background technology】
Gas refers to the general name of the various pernicious gases overflowed out of coal (rock) layer, and its main component is methane, titanium dioxide Carbon, the sometimes gas such as also a small amount of sulfur dioxide, hydrogen sulfide, carbon monoxide.Gas is a kind of odorless gas of colorless and odorless, But sometimes due to hydrocarbon and trace hydrogen sulfide in association, the fragrant special odor of similar apple, its relative density can be sent For 0.554, gas is slightly soluble in water, there is very strong diffusivity and permeability, and gas has flammability and explosivity.According to《Railway Gas tunnel technical specification》Regulation, gas tunnel are divided into three kinds of present low gas tunnel, high methane tunnel and Gas Outburst tunnel, watt The type in this tunnel is determined by the highest level in gas work area in tunnel.Gas tunnel work area is divided into non-gas work area, present low gas Work area, high methane work area, Gas Outburst work area supply four classes.Present low gas work area and high methane work area can be by the absolute Gas amounts of going Judged.When the gas emission in full work area is less than 0.5m3It is present low gas work area, more than or equal to 0.5m during/min3/min When, it is high methane work area.As long as gas tunnel has outburst danger at one, the place work area be Gas Outburst work area.
At present, the preventing and treating of gas is main in gas tunnel is carried out by the way of being divulged information in closure integrating tunnel, and its is main Measure includes:First, tunnel-liner is using the coiled material loopfuls such as waterproof layer closing sealing, gas;2nd, it is impervious to improve lining concrete Energy;3rd, forced ventilation is implemented according to gas density in tunnel.Prevent because existing tunnel mainly carries out gas by the way of stifled Control, the methane gas of lining cutting behind, only extremely micro part is drawn by the discharge structure of infiltration and existing tunnel, and Substantial amounts of gas actually gathers behind in lining cutting, causes lining cutting behind hydraulic pressure and gas pressure to be gone up, invades tunnel normal operation Space produces potential safety hazard even accident.And the gas drawn by existing tunnel discharge structure, aqueous vapor is mixed in discharge structure Close, longitudinally circulated entirely in tunnel bottom, although only micro, also actually add the risk of gas effusion.
【Utility model content】
The purpose of this utility model be to provide a kind of gas tunnel reclaimed water, qi leel from remove gas in gas work area Gas drainage system, to solve the problems, such as the gas preventing and control after tunnel piercing and operation.
A further object of the present utility model is in the tunnel structure in a kind of massif applied to gas accumulation is provided.
To realize the purpose, the utility model adopts the following technical scheme that:
A kind of gas drainage system in tunnel, it includes conductance tunnels driving terminal anterior position and extraneous gas drainage under suction Duct, the air extractor for being arranged on outside tunnel and being connected with the gas drainage under suction duct and by the gas drainage under suction duct with taking out Device of air realizes the sealing device of sealing in junction.
Further, the tunnel port in the gas drainage under suction duct is located at the front of the tunnel piercing terminal, mountain table end Mouth is located at the mountain table nearest apart from the tunnel piercing terminal.
Specifically, the air extractor connects at the mountain table port in the gas drainage under suction duct.
Optionally, the sealing device is by least one of cement mortar, cushion rubber hole packer or polyurethane sealing of hole material It is made.
Further, gas drainage under suction duct tetrad, the tunneling direction for defining tunnel is longitudinal direction, described in same group Gas extraction hole is in the same cross section relative to tunnel.
Optionally, it is parallel to each other between the gas drainage under suction duct of same group of gas drainage system.
Optionally, the gas drainage under suction duct of same group of gas drainage system be in from tunnel piercing terminal anterior position to The fan-shaped laying of mountain table diverging.
Specifically, the air extractor includes gas suction pump, the mountain table port in the insertion gas drainage under suction duct is taken out Put steel pipe and connect the extraction pipeline of the extraction steel pipe and the gas suction pump.
Optionally, the tunnel port in the gas drainage under suction duct is located in front of the tunnel piercing terminal 3 meters -5 meters.
A kind of tunnel structure, it uses gas drainage system in above-mentioned technical proposal.
Further, in addition to be laid in the tunnel inverted arch both sides drainage pipeline.
Specifically, also including the ring french drain of array arrangement, the both ends of the ring french drain connect with the drainage pipeline.
Referring now to prior art, the beneficial effects of the utility model are:In gas accumulation region, by from apart from tunnel digging Enter the nearest mountain epitope of terminal and put to drill through the gas drainage under suction duct that tunnel port is located in front of the tunnel piercing terminal, and utilize Air extractor carries out extraction to the gas in gas accumulation region, and before tunnel piercing to gas accumulation region, gas is arranged in advance Go out, effectively this caused security incident of preventing and treating invar.
Meanwhile gas drainage under suction duct is put from mountain epitope and drilled through, the gas of its extraction can be directly discharged to the ring of tunnel outer In border, job site will not be impacted.
In addition, by preliminary bracing, secondary lining and the gas drainage system positioned at tunnel piercing terminal, tunnel is realized Gas drainage under suction problem and ponding emission problem in tunneling process, realize the separating treatment of aqueous vapor.Accordingly, it is capable to effectively avoid gas And underground water gathering in lining cutting behind, avoid caused by lining cutting behind hydraulic pressure and gas pressure are gone up potential safety hazard very To accident;Secondly, gas is discharged through drawing-off gas pipe, can effectively be reduced the gas density of lining cutting behind, be avoided methane gas from entering Enter discharge structure, effectively reduce the effusion risk of gas, thus, it is possible to which tunnel piercing and the gas built up after operation is effectively ensured Preventing and treating.
【Brief description of the drawings】
Fig. 1 is gas drainage system provided by the utility model and the cross-sectional view of tunnel structure;
Fig. 2 is the schematic perspective view of the tunnel structure in tunneling construction provided by the utility model;
Fig. 3 is longitudinal schematic cross-sectional view of tunnel structure provided by the utility model.
【Embodiment】
The utility model is further described with exemplary embodiment below in conjunction with the accompanying drawings, wherein identical in accompanying drawing Label all refers to identical part.In addition, if it is known that the detailed description of technology is for showing feature of the present utility model It is unnecessary, then is omitted.
As shown in figure 1, the one of which embodiment of tunnel structure provided by the utility model, including:Gas drainage system, Drainage pipeline 4, ring french drain 5, preliminary bracing 6, secondary lining 7, inverted arch 9 and tunnel cavity 10;The gas drainage system bag Include air extractor 1, gas drainage under suction duct 2 and sealing device 3;The preliminary bracing 6 is steelframe supporting, positioned at tunnel outer layer;Institute The concreting that secondary lining 7 is air-tightness is stated, positioned at the inner side of the preliminary bracing 6;The inverted arch 9 and the secondary lining 7 relative layings are built, and the tunnel cavity 10 is crossed jointly with the secondary lining 7;The tunneling direction in tunnel is relative to level Face has 5/1000ths degree of inclination angle.The drainage pipeline 4 is laid in the both sides of the inverted arch 9 in tunnel, and along tunnel piercing direction Through whole piece tunnel;The boundary for being laid in the secondary lining 7 and the preliminary bracing 6 of the array of ring french drain 5 arrangement Side, its both ends connect with the drainage pipeline 4.During tunneling construction and tunnel are runed, the ponding in massif 8 passes through described Ring french drain 5 converges in the drainage pipeline 4, and discharges tunnel.
Refering to Fig. 1 and Fig. 2, in the one of which embodiment of gas drainage system provided by the utility model, it includes taking out Device of air 1, gas drainage under suction duct 2 and sealing device 3, the air extractor 1 include gas suction pump 11, extraction pipeline 12 and taken out Steel pipe 13 is put, the gas drainage under suction duct 2 includes hole body, mountain table port 21 and tunnel port 22, and the gas extraction hole The tunnel port 22 in road 2 is located at the front of tunnel piercing terminal, and the mountain table port 11 is located at apart from the tunnel piercing terminal Nearest mountain table 81.The sealing device 3 is made by least one of cement mortar, cushion rubber hole packer and polyurethane sealing Porous materials Into.Wherein, the tunnel piercing terminal be the progress with tunneling construction and dynamic change.
In tunnel excavating process, when detecting gas emission or running into Gas Outburst work area domain, stop tunneling construction, enter Row gas drainage under suction is constructed;In the nearest mountain table drilling of distance driving terminal, gas drainage under suction duct 2 is drilled out, the gas drilled out The tunnel port 22 in extraction duct 2 is located at about 3 meters to 5 meters of the front of the tunnel piercing terminal, and quantity is generally 4;Connect The hole body enlarged-diameter that will be close to mountain table port 11 to 100-120mm, insertion diameter 70-80mm extraction steel pipe 13, use is close The sealing of hole of seal apparatus 3, the sealing device 3 can use cement mortar to use cushion rubber hole packer or polyurethane sealing of hole, and sealing is deeply Degree is depending on the table near ports rock property of mountain, 2-3m when country rock is firm, 6-7m when country rock is soft, or even 10m or so, sealing of hole Afterwards, it is necessary to the composition such as bend pipe, automatic water drainage device, flowmeter, armored hose (or anti-static plastic flexible pipe), gate before extraction Extraction pipeline 12 the gas drainage under suction duct 2 and the gas suction pump 11 are connected;Finally, according to the pipe laid Road calculates and selects suitable gas suction pump 11.The extraction work of gas is carried out, once institute's extraction watt was detected every 10 minutes This concentration, extraction can be stopped after concentration continues 20 minutes to be less than 1.0%, and continue tunneling construction.
During using gas in the extraction massif 8 of gas drainage under suction duct 2, the aperture in gas drainage under suction duct 2, the depth in hole Degree, extraction pipeline length, the frictional resistance of extraction pipeline, gas flow etc. can influence the extraction resistance of gas drainage system in hole Power, and then influence drainage efficient and effect.Therefore, in gas drainage system, the depth and hole interior diameter one in gas drainage under suction duct As need combine specifically used environment, demand and by calculate obtain.Generally, the depth in the gas drainage under suction duct is not It should be greater than 60m.Therefore it is primarily adapted for use in the less shallow tunnel of Shangfang Mountain body thickness.The accumulation rule of gas and mountain in massif The factors such as body structure, geology are related, and the factor that the structure of same massif, geology etc. influence gas accumulation regional location is constant, because The gas accumulation region run into this tunnel excavating process, by the region that gas is easily assembled during being still tunnel operation.
Fig. 3 shows the longitudinal sectional view of the tunnel structure.The gas drainage under suction duct 2 that gas accumulation region drills through Continue to tunnel with tunnel, and be changed into from the duct that mountain table is extended on the outside of Tunnel, and remain in massif In., can also be right again by the gas drainage under suction duct 2 if gas is assembled in bore position again during tunnel operation The gas in these regions carries out extraction, is assembled with the gas during preventing tunnel operation in massif on the outside of tunnel.
Although having been illustrated with some exemplary embodiments of the present utility model above, those skilled in the art will Understand, in the case where not departing from principle or spirit of the present utility model, these exemplary embodiments can be made a change, this The scope of utility model is limited by claim and its equivalent.

Claims (12)

1. a kind of gas drainage system in tunnel, it is characterised in that it includes conductance tunnels driving terminal anterior position and the external world Gas drainage under suction duct, the air extractor for being arranged on outside tunnel and being connected with the gas drainage under suction duct and the gas is taken out The sealing device of sealing is realized in junction in discharge hole road with air extractor.
2. gas drainage system according to claim 1, it is characterised in that the tunnel port position in the gas drainage under suction duct In the front of the tunnel piercing terminal, mountain table port is located at the mountain table nearest apart from the tunnel piercing terminal.
3. gas drainage system according to claim 2, it is characterised in that the air extractor is in the gas extraction hole Connected at the mountain table port in road.
4. gas drainage system according to claim 3, it is characterised in that the sealing device is by cement mortar, cushion rubber At least one of hole packer or polyurethane sealing of hole material are made.
5. gas drainage system according to claim 2, it is characterised in that gas drainage under suction duct tetrad, it is fixed The tunneling direction in adopted tunnel is longitudinal direction, and gas extraction hole is in the same cross section relative to tunnel described in same group.
6. gas drainage system according to claim 5, it is characterised in that the gas of same group of gas drainage system Extraction is parallel to each other between duct.
7. gas drainage system according to claim 5, it is characterised in that the gas of same group of gas drainage system Extraction duct is in the fan-shaped laying dissipated from tunnel piercing terminal anterior position to mountain table.
8. gas drainage system according to claim 1, it is characterised in that the air extractor include gas suction pump, Insert the extraction steel pipe of the mountain table port in the gas drainage under suction duct and connect the extraction steel pipe and the gas suction pump Extraction pipeline.
9. gas drainage system according to claim 1, it is characterised in that the tunnel port position in the gas drainage under suction duct 3 meters -5 meters in front of the tunnel piercing terminal.
10. a kind of tunnel structure, it is characterised in that it uses the gas drainage system as described in claim 1-9 is any.
11. tunnel structure according to claim 10, it is characterised in that also include the inverted arch both sides for being laid in the tunnel Drainage pipeline.
12. tunnel structure according to claim 11, it is characterised in that also include the ring french drain of array arrangement, it is described The both ends of ring french drain connect with the drainage pipeline.
CN201720411257.5U 2017-04-18 2017-04-18 The gas drainage system and tunnel structure in a kind of tunnel Active CN206668313U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720411257.5U CN206668313U (en) 2017-04-18 2017-04-18 The gas drainage system and tunnel structure in a kind of tunnel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720411257.5U CN206668313U (en) 2017-04-18 2017-04-18 The gas drainage system and tunnel structure in a kind of tunnel

Publications (1)

Publication Number Publication Date
CN206668313U true CN206668313U (en) 2017-11-24

Family

ID=60375093

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720411257.5U Active CN206668313U (en) 2017-04-18 2017-04-18 The gas drainage system and tunnel structure in a kind of tunnel

Country Status (1)

Country Link
CN (1) CN206668313U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106979031A (en) * 2017-04-18 2017-07-25 中交路桥华南工程有限公司 The gas drainage system and tunnel structure in a kind of tunnel
CN109869189A (en) * 2019-03-22 2019-06-11 云南建投基础工程有限责任公司 A kind of tunnel pernicious gas and underground moisture are from exhaust system device
CN111396049A (en) * 2020-03-23 2020-07-10 中国矿业大学(北京) Safe and environment-friendly rock blasting device and method
CN112943349A (en) * 2021-04-15 2021-06-11 中铁九局集团第七工程有限公司 Comprehensive management construction method for gas of high-gas tunnel

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106979031A (en) * 2017-04-18 2017-07-25 中交路桥华南工程有限公司 The gas drainage system and tunnel structure in a kind of tunnel
CN109869189A (en) * 2019-03-22 2019-06-11 云南建投基础工程有限责任公司 A kind of tunnel pernicious gas and underground moisture are from exhaust system device
CN111396049A (en) * 2020-03-23 2020-07-10 中国矿业大学(北京) Safe and environment-friendly rock blasting device and method
CN112943349A (en) * 2021-04-15 2021-06-11 中铁九局集团第七工程有限公司 Comprehensive management construction method for gas of high-gas tunnel

Similar Documents

Publication Publication Date Title
CN206668313U (en) The gas drainage system and tunnel structure in a kind of tunnel
CN106979031A (en) The gas drainage system and tunnel structure in a kind of tunnel
CN103899323B (en) A kind of construction method of shield crossing rail yard
CN206386134U (en) A kind of Underground Subway Station guarded drainage construction
CN105178285B (en) A kind of method for expanding ground grouting and reinforcing and antiseepage extent of congestion
CN206386150U (en) A kind of Underground Subway Station draining and examination and repair system
CN109322699A (en) Pollution isolation blocking technology under a kind of mine
CN106320354A (en) Anti-seepage construction method for karst cave development stratum under overburden
CN110080789A (en) A kind of shield sky, which pushes away, spells section of jurisdiction construction
CN102536250A (en) Construction method for tunnels with karst and gas simultaneously
CN108825247B (en) External inclination side wall horizontal bottom-making basin-shaped freezing water stop construction method for 8 pilot tunnel PBA construction method
CN106050302A (en) Constructing system and method for coal mine permanent sealing wall
CN103382850B (en) A kind of roof fracture water let-off gear(stand) and method
CN113775345A (en) Method for improving full-section muck in silt layer in construction of connecting channel pipe jacking machine
KR101851959B1 (en) Grout same time injection apparatus and a method of construction using the same
CN109973115B (en) Construction method for drainage of vault of tunnel in karst area
CN205445634U (en) Be used for constructing built -in toward peripheral stratum slip casting reinforcing apparatus from shield
CN107013225A (en) The anti-collapse tunneling shield method of churning water shutoff
CN104612714B (en) Tunneling by mining method construction method and structure under the conditions of the poor geology of country rock is passed through
CN207934932U (en) One kind being used for rich water or easy crystallization water location tunnel auxiliary type replaceable drainage system
CN203499698U (en) Advanced curtain grouting system applied to underground engineering construction
CN109578058A (en) A method of extraction borehole gas extraction concentration is improved by auxiliary bore hole
CN203239355U (en) Jacking type cable sleeve channel structure
CN103244073B (en) The method for sealing of the closed firedamp taking-out discharging drilling in weak seam region
CN205477518U (en) Boring press seal hole device in colliery

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant