CN104612714B - Tunneling by mining method construction method and structure under the conditions of the poor geology of country rock is passed through - Google Patents

Tunneling by mining method construction method and structure under the conditions of the poor geology of country rock is passed through Download PDF

Info

Publication number
CN104612714B
CN104612714B CN201410852490.8A CN201410852490A CN104612714B CN 104612714 B CN104612714 B CN 104612714B CN 201410852490 A CN201410852490 A CN 201410852490A CN 104612714 B CN104612714 B CN 104612714B
Authority
CN
China
Prior art keywords
country rock
steel pipe
type funnel
tunneling
funnel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201410852490.8A
Other languages
Chinese (zh)
Other versions
CN104612714A (en
Inventor
郭争辉
葛德明
黄瑜
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Mechanized Construction Group Co Ltd
Original Assignee
Shanghai Mechanized Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Mechanized Construction Group Co Ltd filed Critical Shanghai Mechanized Construction Group Co Ltd
Priority to CN201410852490.8A priority Critical patent/CN104612714B/en
Publication of CN104612714A publication Critical patent/CN104612714A/en
Application granted granted Critical
Publication of CN104612714B publication Critical patent/CN104612714B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/04Lining with building materials
    • E21D11/10Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/14Lining predominantly with metal
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • E21D9/001Improving soil or rock, e.g. by freezing; Injections
    • E21D9/002Injection methods characterised by the chemical composition used

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Geology (AREA)
  • Structural Engineering (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Chemical & Material Sciences (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • General Chemical & Material Sciences (AREA)
  • Soil Sciences (AREA)
  • Environmental & Geological Engineering (AREA)
  • Excavating Of Shafts Or Tunnels (AREA)
  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)

Abstract

The invention discloses a kind of Tunneling by mining method construction method and structure under the conditions of the poor geology of country rock is passed through, country rock has a Long-Span V-Shape funnel, the structure includes a pipe canopy, the pipe canopy is set using outer 5 15 ° of the limb of some steel pipes in the range of 120 150 ° of the arch in proposed tunnel, the 350mm of ring spacing 250, every steel pipe 6 18m long, the flange that every steel pipe stays 1 m to expose and prevent slurries from outflowing after the bottom exposed installs one for being finished in slip casting, the every upper end of steel pipe through V-type funnel side country rock, the country rock of V-type funnel opposite side is stretched into behind V-type funnel space, the pipeline section being located in V-type funnel space and V-type funnel both sides country rock on every steel pipe is uniformly distributed slurry outlet.The present invention can play good advance support effect, it is ensured that safely pass through geology section, construction safety and construction quality is effectively ensured.

Description

Tunneling by mining method construction method and structure under the conditions of the poor geology of country rock is passed through
Technical field
The invention belongs to technical field of tunnel construction, relate generally to a kind of under the conditions of the poor geology of country rock is passed through Tunneling by mining method construction method and structure.
Background technology
Tunneling by mining method construction is underground project dug underground, main to use drilling and blasting method tunneling, due to country rock shape Condition is more complicated, might have hidden solution cavity and crack, therefore needed before excavation to face (face It is a term in tunnel construction, that is, excavates the working face that tunnel is constantly pushed ahead, is not a fixation Face) front carry out forward probe, geological state is grasped in advance, at the same implement advanced tubule supporting measure.
But (funnel inner stuffing is generally the stronger limestone of rate of decay to run into the larger V-type funnel of span With the broken and scattered property rock such as diabase and artificial backfill material) when, advanced tubule method for protecting support is used at present. But (filler is generally the stronger limestone of rate of decay and diabase etc. to run into the larger V-type funnel of span Broken and scattered property rock and artificial backfill material) when, ductule advance support effect is poor, it is impossible to ensure construction Safety.
Therefore, how to provide a kind of advance support effect it is good, ensure tunnel safety construction pass through country rock compared with The poorly Tunneling by mining method construction method and structure under the conditions of matter, it has also become construction circle needs further perfect The technical problem of optimization.
The content of the invention
It is an object of the invention to provide a kind of Tunneling by mining method construction party under the conditions of the poor geology of country rock is passed through Method and structure, with good advance support effect, it is ensured that safely pass through geology section, be effectively ensured and apply Work safety and construction quality.
In order to solve the above technical problems, the present invention provides following technical scheme:
A kind of Tunneling by mining method constructing structure under the conditions of the poor geology of country rock is passed through, the country rock has one Individual Long-Span V-Shape funnel, including a pipe canopy, the pipe canopy is using outer 5-15 ° of the limb of some steel pipes in plan Set in the range of 120-150 ° of the arch of built tunnel, ring spacing 250-350mm, every steel pipe is long 6-18m, every steel pipe stays 1m to expose and prevented after the bottom exposed installs one for being finished in slip casting The flange of slurries outflow, the every upper end of steel pipe is behind country rock, the V-type funnel space of V-type funnel side The country rock of V-type funnel opposite side is stretched into, V-type funnel space and V-type funnel two are located on every steel pipe Pipeline section in gusset rock is uniformly distributed slurry outlet.
Preferably, above-mentioned in the Tunneling by mining method constructing structure under the conditions of passing through the poor geology of country rock, Using slip casting machine by noting dual slurry, the dual slurry in the steel pipe forwards country rock and V-type funnel By cement mortar and waterglass example 1 by volume:0.5 mixing, wherein, the ratio of mud of the cement mortar is 1:1, The concentration of sodium silicate is 35 Baume degrees, and modulus of water glass is 2.4, and slip casting first pressing 0.5MPa~1MPa, Final pressure 2MPa, holds pressure and stops after 15 minutes.
Preferably, above-mentioned in the Tunneling by mining method constructing structure under the conditions of passing through the poor geology of country rock, The pipe canopy is set using outer 15 ° of the limb of φ 50mm steel pipes in the range of 120 ° of the arch in proposed tunnel, Ring spacing 300mm, every steel pipe 6m long.
Preferably, above-mentioned in the Tunneling by mining method constructing structure under the conditions of passing through the poor geology of country rock, Accomplished fluently in advance in the V-type funnel both sides country rock for inserting correspondence steel tube drilling.
Preferably, above-mentioned in the Tunneling by mining method constructing structure under the conditions of passing through the poor geology of country rock, The quantity of the steel pipe is 20-25 roots.
The invention also discloses a kind of Tunneling by mining method construction method under the conditions of the poor geology of country rock is passed through, Comprise the following steps:
The first step, during when constructing tunnel to the country rock near Long-Span V-Shape funnel, from tunneling to V The both sides country rock of type funnel accomplishes fluently the drilling for inserting follow-up steel pipe;
Second step, using outer 5-15 ° of the limb of some steel pipes in the range of 120-150 ° of the arch in proposed tunnel Set, ring spacing 250-350mm, every steel pipe 6-18m long, every steel pipe stay 1m expose and The bottom exposed is installed by one flange for being used to prevent slurries from outflowing after slip casting is finished, the every upper end of steel pipe The country rock of V-type funnel opposite side, every are stretched into behind the country rock of V-type funnel side, V-type funnel space The pipeline section being located in V-type funnel space and V-type funnel both sides country rock on steel pipe is uniformly distributed slurry outlet;
3rd step, using slip casting machine by noting dual slurry in the steel pipe forwards country rock and V-type funnel, The dual slurry is by cement mortar and waterglass example 1 by volume:0.5 mixing, wherein, the water of the cement mortar Gray scale is 1:1, the concentration of sodium silicate is 35 Baume degrees, and modulus of water glass is 2.4, and slip casting first pressing 0.5MPa~1MPa, final pressure 2MPa, hold pressure and stop after 15 minutes.
From techniques disclosed above scheme, compared with prior art, beneficial effects of the present invention are as follows:
Tunneling by mining method constructing structure under the conditions of the poor geology of country rock is passed through of the invention, if by using Outer 5-15 ° of the limb of dry steel pipe is set in the range of 120-150 ° of the arch in proposed tunnel, ring spacing 250-350mm, every steel pipe 6-18m long, every steel pipe stays 1m to expose and installed in the bottom exposed One flange for being used to be prevented after slip casting is finished slurries outflow, the every upper end of steel pipe is through V-type funnel side Country rock, V-type funnel space after stretch into the country rock of V-type funnel opposite side, V-type is located on every steel pipe Pipeline section in funnel space and V-type funnel both sides country rock is uniformly distributed slurry outlet, on the one hand, by upper The steel pipe for stating structure is injected grout into the country rock of V-type funnel both sides and in V-type funnel space, So that the granular type filler in V-type funnel space in the presence of slurries with the country rock of V-type funnel both sides An entirety is reinforced into, on the other hand, the pipe canopy that these steel pipes are formed can also play certain supporting effect, So as to these two aspects can play good advance support effect altogether, it is ensured that safely pass through the geology Section, is effectively ensured construction safety and construction quality.
Tunneling by mining method construction method under the conditions of the poor geology of country rock is passed through of the invention, using as above institute The Tunneling by mining method constructing structure under the conditions of the poor geology of country rock is passed through stated so that V-type funnel space Interior granular type filler in the presence of slurries with the surrounding rock consolidation of V-type funnel both sides into an entirety, Good advance support effect can be played, it is ensured that safely pass through geology section, construction safety is effectively ensured And construction quality.Also, using slip casting machine by being noted in the steel pipe forwards country rock and V-type funnel Dual slurry, the dual slurry is by cement mortar and waterglass example 1 by volume:0.5 mixing, wherein, the water The ratio of mud of mud is 1:1, the concentration of sodium silicate is 35 Baume degrees, and modulus of water glass is 2.4, and note Slurry first pressing 0.5MPa~1MPa, final pressure 2MPa, holds pressure and stops after 15 minutes, the injection above method with it is upper Stating composition dual slurry carries out grouting and reinforcing, and the granular type filler in V-type funnel space can be caused in slurry It is more prone to the country rock of V-type funnel both sides reinforce into an entirety in the presence of liquid, further improves super Preceding supporting effect, it is ensured that safely pass through geology section, construction safety and construction quality is effectively ensured.
Brief description of the drawings
Fig. 1 is the construction of the Tunneling by mining method under the conditions of the poor geology of country rock is passed through of one embodiment of the invention Structure transverse face schematic diagram;
Fig. 2 is the construction of the Tunneling by mining method under the conditions of the poor geology of country rock is passed through of one embodiment of the invention Structure schematic longitudinal section.
In figure:1- country rocks, 2-V types funnel, 3- steel pipes, the proposed tunnels of 4-, 5- tunnelings.
Specific embodiment
Passed through under the conditions of the poor geology of country rock to proposed by the present invention below in conjunction with the drawings and specific embodiments Tunneling by mining method constructing structure be described in further detail.It should be noted that, accompanying drawing is using very simplified Form and use non-accurately ratio, be only used to conveniently, lucidly aid in illustrating the embodiment of the present invention Purpose.
With reference to Fig. 1 to Fig. 2, present embodiment discloses a kind of mine under the conditions of the poor geology of country rock is passed through Method constructing tunnel structure, the country rock 1 has a Long-Span V-Shape funnel 2, including a pipe canopy, described Pipe canopy is set using 5-15 ° of the outer limb of some steel pipes 3 in the range of 120-150 ° of the arch in proposed tunnel 4, Ring spacing 250-350mm, every steel pipe 3 6-18m long, every steel pipe 3 stay 1m to expose and outside The bottom of dew is installed by one flange for being used to prevent slurries from outflowing after slip casting is finished, the every upper end of steel pipe 3 Through the country rock 1 of the side of V-type funnel 2, V-type funnel 2 enclosing for the opposite side of V-type funnel 2 is stretched into behind space Rock 1, is located at the pipe in the space of V-type funnel 2 and the both sides country rock 1 of V-type funnel 2 on every steel pipe 3 Section is uniformly distributed slurry outlet.On the one hand, V-type funnel 2 is injected grout into by the steel pipe 3 of said structure In the country rock 1 of both sides and in the space of V-type funnel 2 so that the granular type filling in V-type funnel space Thing reinforces into an entirety in the presence of slurries with the country rock 1 of the both sides of V-type funnel 2;On the other hand, The pipe canopy that these steel pipes are formed can also play certain supporting effect, and these two aspects can play good altogether Good advance support effect, it is ensured that pass through to safety for tunnel engineering geology section, be effectively ensured construction safety with Construction quality.
Wherein, the outer limb is exactly the angle between the steel pipe 3 of pipe canopy and tunnel longitudinal direction.Because pipe canopy one As length it is more long, during drilling construction drill bit because Action of Gravity Field can be sagging and easily invades tunnel clearance, in order to This problem is avoided, will be to having individual angle outside tunnel contour (rather than completely along tunnel during construction steel pipe 3 Longitudinally construct in road), with offset it is final cause because tunnel drill bit is sagging invade limit problem.
Preferably, above-mentioned in the Tunneling by mining method constructing structure under the conditions of passing through the poor geology of country rock, Using slip casting machine by noting dual slurry, the dual slurry in the steel pipe forwards country rock and V-type funnel By cement mortar and waterglass example 1 by volume:0.5 mixing, wherein, the ratio of mud of the cement mortar is 1:1, The concentration of sodium silicate is 35 Baume degrees, and modulus of water glass is 2.4, and slip casting first pressing 0.5MPa~1MPa, Final pressure 2MPa, holds pressure and stops after 15 minutes.Using dual slurry as described above, coordinate slip casting first pressing 0.5MPa~1MPa, final pressure 2MPa, hold the grouting process that pressure stops after 15 minutes, can cause V-type Granular type filler in the space of funnel 2 in the presence of slurries with the country rock 1 of the both sides of V-type funnel 2 more Plus an entirety easily is reinforced into, further improve advance support effect, it is ensured that safely pass through geology section, Construction safety and construction quality is effectively ensured.
Preferably, above-mentioned in the Tunneling by mining method constructing structure under the conditions of passing through the poor geology of country rock, The pipe canopy can use 50mm, 89mm or 100mm steel pipe.
In the present embodiment, in the construction of the Tunneling by mining method under the conditions of the poor geology of country rock is passed through of the present embodiment In structure, the pipe canopy uses 3 outer limb of φ 50mm steel pipes, 15 ° of 120 ° of arch in proposed tunnel 4 In the range of set, ring spacing 300mm, the every 6m long of steel pipe 3.Using steel pipe as described above 3, With more stable supporting effect.
Preferably, above-mentioned in the Tunneling by mining method constructing structure under the conditions of passing through the poor geology of country rock, The quantity of the steel pipe 3 is 20-25 roots.In the present embodiment, using 23 steel pipes 3.
Preferably, above-mentioned in the Tunneling by mining method constructing structure under the conditions of passing through the poor geology of country rock, Accomplished fluently in advance in the both sides country rock 1 of the V-type funnel 2 and drilled for inserting correspondence steel pipe 3.Such that it is able to More facilitate smoothly to squeeze into and form pipe canopy for the steel pipe 3.
The invention also discloses a kind of Tunneling by mining method construction method under the conditions of the poor geology of country rock is passed through, Comprise the following steps:
The first step, during when constructing tunnel to the country rock 1 near Long-Span V-Shape funnel 2, from tunneling 5 accomplish fluently the drilling for inserting follow-up steel pipe 3 to the both sides country rock 1 of V-type funnel 2.
Second step, using 5-15 ° of 120-150 ° of the arch model in proposed tunnel 4 of the outer limb of some steel pipes 3 Interior setting is enclosed, ring spacing 250-350mm, the every 6-18m long of steel pipe 3, every steel pipe 3 stays 1m Expose and prevented after the bottom exposed installs one for being finished in slip casting the flange that slurries outflow, every steel V-type funnel 2 is stretched into behind space in the upper end of pipe 3 through the country rock 1 of the side of V-type funnel 2, V-type funnel 2 The country rock 1 of opposite side, is located at the space of V-type funnel 2 and V-type funnel both sides country rock 1 on every steel pipe 3 Interior pipeline section is uniformly distributed slurry outlet.In the present embodiment, the poor geology bar of country rock is being passed through in the present embodiment In Tunneling by mining method constructing structure under part, the pipe canopy is using 15 ° of 3 outer limb of φ 50mm steel pipes in plan Set in the range of 120 ° of the arch of built tunnel 4, ring spacing 300mm, the every 6m long of steel pipe 3.Adopt With steel pipe as described above 3, with more stable supporting effect.
3rd step, using slip casting machine by note in the steel pipe 3 forwards country rock and V-type funnel 1 Dual slurry, the dual slurry is by cement mortar and waterglass example 1 by volume:0.5 mixing, wherein, the water The ratio of mud of mud is 1:1, the concentration of sodium silicate is 35 Baume degrees, and modulus of water glass is 2.4, and note Slurry first pressing 0.5MPa~1MPa, final pressure 2MPa, holds pressure and stops after 15 minutes.It is follow-up to wait grout cures strong After change, can continue using drilling and blasting method tunneling, the country rock 1 of the smooth approach Long-Span V-Shape funnel 2. On the one hand, by the steel pipe 3 of said structure inject grout into the both sides of V-type funnel 2 country rock 1 and In the space of V-type funnel 2 so that the granular type filler in the space of V-type funnel 2 is in the presence of slurries Reinforce into an entirety with the country rock 1 of V-type funnel both sides, the country rock 1 of Long-Span V-Shape funnel 2 it is whole Body intensity.On the other hand, the pipe canopy that these steel pipes 3 are formed can also play certain supporting effect.Further Aspect, the injection above method carries out grouting and reinforcing with mentioned component dual slurry, can cause V-type funnel 2 The country rock 1 of granular type filler in space with the both sides of V-type funnel 2 in the presence of slurries is more prone to An entirety is reinforced into, advance support effect is further improved, it is ensured that geology section is safely passed through, effectively Ensure construction safety and construction quality.
Foregoing description is only the description to present pre-ferred embodiments, not to any limit of the scope of the invention Calmly, the those of ordinary skill in field of the present invention does according to the disclosure above content any change, modification, belong to In the protection domain of claims.

Claims (6)

1. a kind of Tunneling by mining method constructing structure under the conditions of the poor geology of country rock is passed through, the country rock tool There is a Long-Span V-Shape funnel, it is characterised in that including a pipe canopy, the pipe canopy is using outside some steel pipes 5-15 ° of limb is set in the range of 120-150 ° of the arch in proposed tunnel, ring spacing 250-350mm, Every steel pipe 6-18m long, every steel pipe stays 1m to expose and install one in the bottom exposed to be used in slip casting The flange for preventing slurries from outflowing after finishing, country rock, V-type leakage of the every upper end of steel pipe through V-type funnel side The country rock of V-type funnel opposite side is stretched into behind bucket space, V-type funnel space and V are located on every steel pipe Pipeline section in the country rock of type funnel both sides is uniformly distributed slurry outlet, is enclosed forwards by the steel pipe using slip casting machine Note dual slurry in rock and V-type funnel, the dual slurry is by cement mortar and waterglass example 1 by volume:0.5 Mixing, wherein, the ratio of mud of the cement mortar is 1:1, the concentration of sodium silicate is 35 Baume degrees, water Glass modulus is 2.4, and slip casting first pressing 0.5MPa~1MPa, final pressure 2MPa, holds pressure and stops after 15 minutes.
2. the Tunneling by mining method construction under the conditions of the poor geology of country rock is passed through as claimed in claim 1 is tied Structure, it is characterised in that the pipe canopy is using the outer 15 ° of arch in proposed tunnel of limb of φ 50mm steel pipes Set in the range of 120 °, ring spacing 300mm, every steel pipe 6m long.
3. the Tunneling by mining method construction under the conditions of the poor geology of country rock is passed through as claimed in claim 1 is tied Structure, it is characterised in that accomplish fluently the drilling for inserting correspondence steel pipe in the V-type funnel both sides country rock in advance.
4. the Tunneling by mining method construction under the conditions of the poor geology of country rock is passed through as claimed in claim 1 is tied Structure, it is characterised in that the pipe canopy uses 50mm, 89mm or 100mm steel pipe.
5. the Tunneling by mining method construction under the conditions of the poor geology of country rock is passed through as claimed in claim 1 is tied Structure, it is characterised in that the quantity of the steel pipe is 20-25 roots.
6. a kind of Tunneling by mining method construction method under the conditions of the poor geology of country rock is passed through, its feature exists In comprising the following steps:
The first step, during when constructing tunnel to the country rock near Long-Span V-Shape funnel, from tunneling to V The both sides country rock of type funnel accomplishes fluently the drilling for inserting follow-up steel pipe;
Second step, using outer 5-15 ° of the limb of some steel pipes in the range of 120-150 ° of the arch in proposed tunnel Set, ring spacing 250-350mm, every steel pipe 6-18m long, every steel pipe stay 1m expose and The bottom exposed is installed by one flange for being used to prevent slurries from outflowing after slip casting is finished, the every upper end of steel pipe The country rock of V-type funnel opposite side, every are stretched into behind the country rock of V-type funnel side, V-type funnel space The pipeline section being located in V-type funnel space and V-type funnel both sides country rock on steel pipe is uniformly distributed slurry outlet;
3rd step, using slip casting machine by noting dual slurry in the steel pipe forwards country rock and V-type funnel, The dual slurry is by cement mortar and waterglass example 1 by volume:0.5 mixing, wherein, the water of the cement mortar Gray scale is 1:1, the concentration of sodium silicate is 35 Baume degrees, and modulus of water glass is 2.4, and slip casting first pressing 0.5MPa~1MPa, final pressure 2MPa, hold pressure and stop after 15 minutes.
CN201410852490.8A 2014-12-31 2014-12-31 Tunneling by mining method construction method and structure under the conditions of the poor geology of country rock is passed through Active CN104612714B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410852490.8A CN104612714B (en) 2014-12-31 2014-12-31 Tunneling by mining method construction method and structure under the conditions of the poor geology of country rock is passed through

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410852490.8A CN104612714B (en) 2014-12-31 2014-12-31 Tunneling by mining method construction method and structure under the conditions of the poor geology of country rock is passed through

Publications (2)

Publication Number Publication Date
CN104612714A CN104612714A (en) 2015-05-13
CN104612714B true CN104612714B (en) 2017-06-13

Family

ID=53147339

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410852490.8A Active CN104612714B (en) 2014-12-31 2014-12-31 Tunneling by mining method construction method and structure under the conditions of the poor geology of country rock is passed through

Country Status (1)

Country Link
CN (1) CN104612714B (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106014424B (en) * 2016-06-27 2019-03-05 中交一公局第三工程有限公司 A kind of blasting digging method for shallow overlying strata shallow-depth-excavation tunnel
CN106968677A (en) * 2017-03-28 2017-07-21 中国五冶集团有限公司 Method for tunnel construction based on pipe shed support
CN108487918B (en) * 2018-03-06 2019-04-02 山东科技大学 Tunneling and underground engineering wall-rock crack water grouting treatment design method
CN109340458B (en) * 2018-11-16 2020-07-14 杭州江润科技有限公司 Cross-rock section pipeline structure and installation method thereof

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101196118A (en) * 2008-01-07 2008-06-11 北京市政建设集团有限责任公司 Advanced double rows slip casting ductule construction technique
CN101387202B (en) * 2008-10-29 2010-06-23 中铁四局集团有限公司 Method for expanding and digging pipe shed working chamber in tunnel in section of soft surrounding rock with primary support
CN101614125B (en) * 2009-07-23 2011-04-27 中铁九局集团有限公司 Construction method of V-level surrounding rock tunnel
CN102174894A (en) * 2011-03-15 2011-09-07 中铁十二局集团第一工程有限公司 Follow-up pipe shed construction method
CN102322027A (en) * 2011-06-28 2012-01-18 广州轨道交通建设监理有限公司 A kind of method that adopts the Mine Method expansion to dig shield tunnel construction subway station
CN102383806B (en) * 2011-07-18 2013-09-18 广东华盟路桥工程有限公司 Construction technology for allowing tunnel to pass through ultra-large karst cave

Also Published As

Publication number Publication date
CN104612714A (en) 2015-05-13

Similar Documents

Publication Publication Date Title
CN103334770B (en) One is grown up reverse-slope tunnel ultra high water pressure rich water zone of fracture construction method
CN101994513B (en) Method for constructing tunnel by finishing full section curtain grouting from upper-half section
CN205013011U (en) Pyroclastic flow stratum tunnel advance support structure
CN202866826U (en) Shield tunnel working well outer end socket stratum reinforced structure
CN103899323B (en) A kind of construction method of shield crossing rail yard
CN107060834A (en) Grout injection control technique is oozed in drainage slowly under back rich water broken condition
CN108915736A (en) The water damage control method of digging laneway under the strong weak cementing water-bearing layer of rich water
CN104612714B (en) Tunneling by mining method construction method and structure under the conditions of the poor geology of country rock is passed through
CN107605498A (en) Rich water sand-pebble layer shield tunnel termination horizontal grouting ruggedized construction construction method
CN104612698A (en) Method for constructing upper step middle partition wall of shallow-buried excavation tunnel
CN110735653A (en) deep-hole retreating type grouting water plugging construction method for igneous rock water-rich fault
CN105888673B (en) The operating method of deep hole modeling pipe high-pressure slip-casting explosion-protection equipment in soft rich water country rock
CN105443143B (en) A kind of coal mine gob roadway support device and its construction method
CN102278130A (en) Process method for reinforcing and grouting of high-pressure water-rich solution cavity of tunnel
CN105715296A (en) Blowing sand backfill and grouting construction method of tunnel crossing coal mine goaf
CN103835729A (en) Ground pre-grouting strengthening technology for deep long-distance roadway surrounding rock
CN106121722A (en) A kind of method quickly constructing fire dam
CN208965598U (en) The Anti-seeping technology structure of grout curtain and underground chamber intersection area
CN106194204A (en) A kind of drift cobble tunnel advanced support structure and method for protecting support
CN101793154A (en) Method for grouting for stopping up water by using geological parameters of tunnel surrounding rocks and setting relief holes
CN103993902B (en) A kind of mash gas pumping drilling two step slip-casting hole-sealing method
CN107165661A (en) A kind of high-ground stress weak surrounding rock large deformation tunnel overlength enlarged footing anchor cable construction method
CN103089276A (en) Deep-shallow hole and high-low pressure coupling grouting technology
CN104533451A (en) Tunnel advance pre-supporting technology used in discrete gravelly soil and broken surrounding rock
CN103498697A (en) Filling and construction method for goaf below tunnel

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant