CN206655471U - 一种梁柱节点核心区混凝土施工缝留槎模具 - Google Patents
一种梁柱节点核心区混凝土施工缝留槎模具 Download PDFInfo
- Publication number
- CN206655471U CN206655471U CN201720199326.0U CN201720199326U CN206655471U CN 206655471 U CN206655471 U CN 206655471U CN 201720199326 U CN201720199326 U CN 201720199326U CN 206655471 U CN206655471 U CN 206655471U
- Authority
- CN
- China
- Prior art keywords
- mobile jib
- mounting ring
- mould
- vertical rod
- support bar
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)
Abstract
本实用新型公开了一种梁柱节点核心区混凝土施工缝留槎模具,包括有主杆(1),在所述的主杆(1)上活动设置有与主杆(1)垂直的横杆(2),在所述的横杆(2)上套设有一组立杆(3),所述的主杆(1)和立杆(3)均包括有安装环(4),所述的安装环(4)套设在所述的横杆(2)上,在所述的安装环(4)上均设有长度相等支撑杆(5),在所述的支撑杆(5)远离安装环(4)一端设有支撑面(6),所述的支撑面(6)与各支撑杆(5)所在平面呈45°夹角,在所述主杆(1)的安装环(4)上还设置有提手(7),混凝土浇筑完成后通过提手将置于两种等级混凝土界面之间的模具取出,可重复周转使用,节约了成本。
Description
【技术领域】
本实用新型属于建筑工程施工领域,具体涉及梁柱节点核心区混凝土浇筑施工缝留槎的模具。
【背景技术】
目前在钢筋混凝土结构中,梁柱节点不同强度等级混凝土结构件施工比较常见,从施工方面讲,由于此节点构造复杂,钢筋绑扎密集,混凝土浇筑难度较大,通常采用的方法是:梁柱节点处主梁钢筋绑扎时,在梁柱节点附近沿45°斜面从梁顶面到梁底面用2㎜网眼的密目钢丝网分隔做为高低等级砼的分界,施工时,混凝土实行“先高后低”的浇捣原则,严格控混凝土浇筑顺序,在混凝土初凝前,尽快浇筑楼面梁板的混凝土。若施工稍有疏忽质量就难以保证,且高低强度等级混凝土交界附近容易产生裂缝,这种传统施工方法的缺陷是:混凝土一次浇筑完成后密目钢丝网会留置在施工缝处梁柱混凝土内,不能周转重复使用,且成本高。
【实用新型内容】
为了解决现有技术中的不足,提供一种能够重复周转使用,且能根据不同梁断面规格尺寸变换的梁柱节点核心区混凝土施工缝留槎模具,本实用新型所采用的技术方案是:
一种梁柱节点核心区混凝土施工缝留槎模具,包括有主杆,在所述的主杆上活动设置有与主杆垂直的横杆,在所述的横杆上套设有一组立杆,所述的主杆和立杆均包括有安装环,所述的安装环套设在所述的横杆上,在所述的安装环上均设有长度相等支撑杆,在所述的支撑杆远离安装环一端设有支撑面,所述的支撑面与各支撑杆所在平面呈45°夹角,在所述主杆的安装环上还设置有提手。
各所述的立杆对称设置在主杆两侧等距排列。
采用上面结构的模具,可以根据梁柱尺寸变换更换主杆和立杆尺寸,立杆可以根据实际情况增减数量设定密度,确保浇筑节点面的混凝土不流失,混凝土浇筑完成后通过提手将置于两种等级混凝土界面之间的模具取出,可重复周转使用,节约了成本,而且在支撑杆端部设置45°支撑面方便模具根据施工要求定位,安装拆除便捷、周转率高、费用低、速度快、安全稳定性高等性能。
【附图说明】
图1为本实用新结构示意图。
图2为本实用新型爆炸图。
图3为本实用新型主杆结构示意图。
图4为本实用新型立杆结构示意图。
图5为本实用新型使用状态示意图。
【具体实施方式】
如图1图2所示,该模具包括主杆1、立杆3和横杆2,如图3和图4所示主杆1和立杆3均包括有安装环4,安装环4上均设有支撑杆5,立杆3和主杆1通过安装环4套设安装到横杆2上,在主杆1的安装环4上还设有提手7,提手呈T型设置,安装中主杆1设置在横杆2中心位置,立杆3根据实际情况设置若干个且对称设置在主杆1两侧等距排列。其中主杆1和立杆3上的支撑杆5的长度相同。为了满足梁柱分隔面45°的施工要求,在支撑杆5远离安装环4一端设置支撑面6,支撑面6与主杆1的支撑杆5和立杆3的支撑杆5所在平面呈45°夹角。使用中立杆3和主杆1可根据梁柱尺寸选择支撑杆5长度,立杆3可以根据规格要求增减数量已达到密度要求,避免混凝土从缝隙流失。
如图5所示在使用中支撑面6支撑在模板C上使主杆1和立杆3形成45°的斜面依靠在钢筋框架上,首先浇筑立柱A部分高等级的混凝土,然后浇筑横梁B部位低等级的混凝土,之后通过提手7将模具从混凝土中抽出。
Claims (2)
1.一种梁柱节点核心区混凝土施工缝留槎模具,其特征在于:包括有主杆(1),在所述的主杆(1)上活动设置有与主杆(1)垂直的横杆(2),在所述的横杆(2)上套设有一组立杆(3),所述的主杆(1)和立杆(3)均包括有安装环(4),所述的安装环(4)套设在所述的横杆(2)上,在所述的安装环(4)上均设有长度相等支撑杆(5),在所述的支撑杆(5)远离安装环(4)一端设有支撑面(6),所述的支撑面(6)与各支撑杆(5)所在平面呈45°夹角,在所述主杆(1)的安装环(4)上还设置有提手(7)。
2.根据权利要求1所述的一种梁柱节点核心区混凝土施工缝留槎模具,其特征在于:各所述的立杆(3)对称设置在主杆(1)两侧等距排列。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720199326.0U CN206655471U (zh) | 2017-03-01 | 2017-03-01 | 一种梁柱节点核心区混凝土施工缝留槎模具 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720199326.0U CN206655471U (zh) | 2017-03-01 | 2017-03-01 | 一种梁柱节点核心区混凝土施工缝留槎模具 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206655471U true CN206655471U (zh) | 2017-11-21 |
Family
ID=60313484
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720199326.0U Expired - Fee Related CN206655471U (zh) | 2017-03-01 | 2017-03-01 | 一种梁柱节点核心区混凝土施工缝留槎模具 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206655471U (zh) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110295751A (zh) * | 2019-07-12 | 2019-10-01 | 中国一冶集团有限公司 | 一种不同强度等级混凝土拦截结构及拦截方法 |
-
2017
- 2017-03-01 CN CN201720199326.0U patent/CN206655471U/zh not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110295751A (zh) * | 2019-07-12 | 2019-10-01 | 中国一冶集团有限公司 | 一种不同强度等级混凝土拦截结构及拦截方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103290967B (zh) | 一种密肋空腹复合楼板及制作方法 | |
CN103981803B (zh) | 预制拼装组合型门型墩及其施工方法 | |
CN104695337A (zh) | 自提升滑翻施工系统及施工方法 | |
CN101781878A (zh) | 独塔无背索斜拉桥主塔整体提升模板及其提升施工方法 | |
CN104405123A (zh) | 现浇钢筋砼薄壁矩形小截面空心柱用模板组件及其施工方法 | |
CN107806019A (zh) | 大跨度悬索桥门型索塔施工方法 | |
CN110644371A (zh) | 预制盖梁安装方法及系统 | |
CN103452350B (zh) | 装配式电子厂房及其施工方法 | |
CN103485574B (zh) | 一种造粒塔塔顶钢筋混凝土结构施工方法 | |
CN106012851A (zh) | 钢箱梁与混凝土墩柱同步施工方法 | |
CN201099989Y (zh) | 高空大悬挑钢筋混凝土结构高支模模架 | |
CN109338894A (zh) | 移动模架浇筑宽窄箱梁施工方法 | |
CN115302614A (zh) | 一种海洋工程建设用段梁预制模板设备 | |
CN206655471U (zh) | 一种梁柱节点核心区混凝土施工缝留槎模具 | |
CN102561193A (zh) | 一种跨电气化铁路转体连续梁合拢段施工工艺及其挂篮 | |
CN207775938U (zh) | 一种检查井的整体式井圈施工用支模拆模装置 | |
CN104213728B (zh) | 体育馆看台斜梁及其施工工艺 | |
CN202000265U (zh) | 桥梁高墩混凝土施工模板 | |
CN203200664U (zh) | 变截面空心高墩滑模施工装置 | |
CN206844444U (zh) | 一种基于免拆模板的钢筋桁架混凝土空心楼盖 | |
CN105064500A (zh) | 一种阳台梁板内侧填充墙体与主体结构整体浇筑施工方法 | |
CN110043035B (zh) | 一种后浇带施工支撑方法 | |
CN110230414B (zh) | 一种装配式站台雨棚及其安装方法 | |
CN104746434B (zh) | 一种不拆除外模的合龙段模板系统 | |
CN204299179U (zh) | 现浇钢筋砼薄壁矩形小截面空心柱用模板组件 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20171121 |
|
CF01 | Termination of patent right due to non-payment of annual fee |