CN206654575U - To inland river bulk freighter unload the job platform of direct Stuff (to) - Google Patents

To inland river bulk freighter unload the job platform of direct Stuff (to) Download PDF

Info

Publication number
CN206654575U
CN206654575U CN201720395006.2U CN201720395006U CN206654575U CN 206654575 U CN206654575 U CN 206654575U CN 201720395006 U CN201720395006 U CN 201720395006U CN 206654575 U CN206654575 U CN 206654575U
Authority
CN
China
Prior art keywords
platform
stuff
direct
inland river
bulk freighter
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720395006.2U
Other languages
Chinese (zh)
Inventor
蔡健珊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201720395006.2U priority Critical patent/CN206654575U/en
Application granted granted Critical
Publication of CN206654575U publication Critical patent/CN206654575U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Ship Loading And Unloading (AREA)

Abstract

The utility model discloses a kind of job platform for the direct Stuff (to) that to inland river bulk freighter unload, it is included in harbour water conservancy project platform, the container Special crane being arranged on harbour water conservancy project platform of bank foundation, the carrying ship for also including stopping at container Special crane, the materials-taking machine and turning device that are arranged on carrying ship, the carrying ship are connected with harbour water conservancy project platform.The utility model can be reduced environmental pollution and loss of goods, improve operating efficiency, reduce cost, increase economic efficiency.

Description

To inland river bulk freighter unload the job platform of direct Stuff (to)
Technical field
Handling art is the utility model is related to, more particularly to a kind of direct Stuff (to) of unloading is carried out to inland river bulk freighter Job platform.
Background technology
At present, inland river bulk cargo terminals at home, traditional bulk goods unloading technique have:Grab type, belt-type, Pneumatic type, Screw machine formula etc., grab type operation technique flow are:Bulk freighter berthing is on harbour, the harbour side bank with grab bucket provided for oneself Loop wheel machine starts to unload bulk goods disembarkation:Operation is grabbed bucket onto bulk goods heap, is opened grab bucket, is utilized the weight or hydraulic mechanism of itself of grabbing bucket Catch goods;Then closure grab bucket, lifting, luffing and the slew gear of loop wheel machine are manipulated, the goods for the inside of grabbing bucket is placed on bulk goods Che Shang, pier storage yard is transported to by hopper car and unloaded.Bulk goods is so completed to unload to a continuous action in stockyard.Wherein, also may be used To replace hopper car with belt conveyor, that is, grabbing bucket is placed on bulk goods on the charging aperture of belt conveyor, utilizes the continuous of belt Transmission, stockyard is discharged to by bulk goods.
But this traditional bulk goods unloading technique, there are many natural critical defects, due to being open operation, grab Bucket is from cabin is left to disembarkation, to car is loaded onto, until transporting to stockyard, all has that inevitable goods is unrestrained or leakage is asked Topic, this operating environment to harbour cause serious influence so that and many such harbours are black everywhere, meanwhile, Also the loss i.e. goods damage of goods is caused, such harbour damage rate of goods generally reaches 3/1000ths, and serious even up to percent One.If this damage rate of goods is in the claimed range of client, the owner of cargo has no problem, but if damage rate of goods has exceeded client's Claimed range, then often harbour side wants the liable for compensation owner of cargo.
The also container terminal in some inland rivers, because business needs, also carry out bulk goods unloading business, and will toward contact Bulk goods puts into container, i.e., so-called " dissipate and change collection ", its technique is:Grab bucket coordinates with hopper car or belt conveyor, will dissipate Goods is discharged to stockyard, then, is equipped with the equipment such as belt conveyor, tipper, hopper car or forklift in stockyard, bulk goods is put into and collected Vanning, install and transport or be transported to Container Yard after closing case and temporarily put, wait trailer to be transported to factory.Some container terminals do not exist Stockyard Stuff (to), but directly cased in wharf apron.
This " dissipate and change collection " although realizing the process for unloading bulk goods Stuff (to) in harbour, its operation technique dissipates with tradition Cargo pier is the same, all unavoidably causes the unrestrained of bulk goods and leakage, thus all inevitably lead to port environment pollution and Goods damage, therefore, the technique of this " dissipate and change collection " are not preferably " to dissipate and change collection " technique.Other as belt conveyor, screw machine, Different degrees of environmental pollution and goods damage all be present in the unloading such as strength machine mode.
Utility model content
The purpose of this utility model is to provide a kind of directly Stuff (to) operation horizontal that to inland river bulk freighter unload simultaneously Platform, environmental pollution and loss of goods can be reduced, improve operating efficiency, cost is reduced, increase economic efficiency.
To realize the purpose, there is provided a kind of water surface job platform for the direct Stuff (to) that to bulk freighter unload, bag The harbour water conservancy project platform established on bank, the container Special crane being arranged on harbour water conservancy project platform are included, in addition to close to collection The carrying ship stopped at vanning Special crane, the materials-taking machine and turning device that are arranged on carrying ship, the carrying ship and harbour Water conservancy project platform connects.
Preferably, the platform also includes being used for the support for supporting turning device, and the support includes being arranged at support upper table The netted steel construction in face, the back taper funnel being arranged under netted steel construction, it is arranged at the discharging opening of back taper funnel lower end, institute State discharge outlet be provided with a switch valve be used for goods concentration it is filling.
Preferably, the materials-taking machine is arranged in the middle part of the cabin of carrying ship and the parallel bank both sides of materials-taking machine are set respectively There are two turning devices.
Preferably, the carrying ship is Freighter, Small or landing stage.
Preferably, grab bucket running orbit during materials-taking machine material grasping is provided with splicing dress between the carrying ship and bulk freighter Put.
Preferably, the platform is additionally provided with the transporting equipment for transferring containers.
Compared with prior art, its advantage is the utility model:
The utility model is realized on Freighter, Small to bulk goods by setting turning device and materials-taking machine on Freighter, Small Ship carries out bulk goods unloading and direct Stuff (to), then directly hangs away, can be reduced environmental pollution and loss of goods, improve work Efficiency, cost is reduced, increased economic efficiency.In the utility model, the turning device and material grasping of the parallel bank both sides of materials-taking machine After the loading of side container is completed, materials-taking machine just goes to opposite side and empty container is continued to freight machine, realizes material grasping Machine is worked continuously, and can be improved operating efficiency.In the utility model, by setting two per side delivery location in materials-taking machine Turning device so that container Special crane is by can be first by an empty container before transporting equipment on the container crane for having filled goods The delivery location of the same side is hung in, so as to avoid loop wheel machine from flogging a dead horse, the operating efficiency of motor can be effectively improved.
Brief description of the drawings
Fig. 1 is the structural representation of the utility model platform;
Fig. 2 is the side structure schematic view of the utility model platform;
Fig. 3 is the utility model supporting structure schematic diagram.
Embodiment
With reference to embodiment, the utility model will be further described, but does not form to of the present utility model any Limitation, the modification of any limited number of time made in the utility model claims scope, still in claim of the present utility model In the range of.
As shown in 1 to Fig. 3, the utility model provides a kind of water surface for the direct Stuff (to) that to bulk freighter unload and made Industry platform, be included in bank foundation harbour water conservancy project platform 5, be arranged on harbour water conservancy project platform 5 container Special crane 1, For the transporting equipment 6 of transferring containers, in addition to stopped at container Special crane 1 carrying ship 2, be arranged at carrying Materials-taking machine 4 and turning device 3 on ship 2, carrying ship 2 are connected with harbour water conservancy project platform 5.Carrying ship 2 is Freighter, Small.Materials-taking machine 4 are arranged in the middle part of carrying ship 2 cabin and the parallel bank both sides of materials-taking machine 4 are respectively arranged with two turning devices 3.Carry ship 2 Grab bucket running orbit during 4 material grasping of materials-taking machine is provided with material-receiving device between bulk freighter.
In the present embodiment, the surface platform that ship 2 is an operation is carried, can be transformed with Conventional Ship, in design, Only need to consider that it disclosure satisfy that enough space mounting equipment, is easy to human users, consider further that ship in work shape in addition Stability can under state so that the low cost of complete equipment.Because carrying ship 2, which is Freighter, Small, causes its movable property It is good, it can open to scattered other harbours for changing collection operation of development and work on after the operation of harbour where completion, so as to have The utilization equipment of effect, it is cost-effective.
In addition, carrying ship 2 or landing stage, relatively stablize in big harbour carrying ship 2 job site of volume of goods flow and use landing stage Can be effectively cost-effective, its berthing in a harbour can be changed by artificial or power set in case there is a need Position, it can also be opened when needed with power set to development and dissipate other harbours for changing collection operation.
In the present embodiment, material-receiving device is canvas, can effectively catch the goods that materials-taking machine 4 drops at work, Avoid polluting environment while carrying out recovery saving cost.Two turning devices 3 of the parallel bank side of materials-taking machine 4 are parallel to bank Place.
In the present embodiment, at work, carry and all connected between ship 2 and harbour water conservancy project platform 5 and bulk freighter by hawser, So that carrying ship 2 and bulk freighter are stable, make Discharging Process is stable to carry out.Transporting equipment 6 is lorry.
The platform also includes being used for the support 7 for supporting turning device 3, and support 7 includes being arranged at the netted of the upper surface of support 7 Steel construction 71, the back taper funnel 72 being arranged under netted steel construction 71, the discharging opening 73 of the lower end of back taper funnel 72 is arranged at, The concentration that a switch valve 74 is provided with discharging opening 73 for goods is filling.
In the present embodiment, discharging opening 73 and switch valve 74 can be arranged on carrying ship 2 deck or inside cabin.Pass through Set support 7 and back taper funnel 72 effectively can be recycled to the goods being scattered in the course of work, and reclaimed Journey is convenient, succinct, and cleaning is succinct, can effectively avoid polluting.
In the present embodiment, the platform can apply to the related or similar bulk goods work such as coal, corn, ore, river sand Industry.The platform from efficiency for, 6-8 hour completes the unloading of 3000 tons of bulk freighter, and inland terminal depot is most at present High operating efficiency.The platform, per hour can be with the cooperation of 4 two equipment relays of container Special crane 1 and materials-taking machine The action for unloading bulk goods and directly casing and hanging on bank of about 20 containers is completed, if by taking coal as an example, a 20 chi packaging box installeds 30 tons can completely be reached, then can completes the direct Stuff (to) of unloading of 600 tons of coal and hangs on the action of bank per hour.Press This is calculated, one 3000 tons of coal riverboat, can complete unloading at 6 hours, if it is considered that the time brought down stocks, then can be small 8 When interior completion, then by this calculating, " dissipate and change collection " operation of about 10,000 tons of coal can be completed daily.
The course of work of the present embodiment:Bulk freighter is connected with carrying ship 2 by hawser, container Special crane 1 is by one Empty container is placed on the turning device 3 of parallel bank side, and container tipping is caused door side court for 90 degree by turning device 3 On, after the door opening and closing mechanism of turning device opens chamber door, materials-taking machine 4, which starts to pick up the goods on bulk freighter, is put into container In, meanwhile, container Special crane 1 is placed an empty container on the turning device 3 of the opposite side on parallel bank;Treat container Goods is installed, materials-taking machine 4 rotates 180 degree and the container of the opening chamber door on the turning device 3 of the opposite side on parallel bank is entered Luggage goods, meanwhile, staff will install the container customs door locking of goods, and container tipping is caused collection for 90 degree by turning device 3 Vanning is laid flat, and container Special crane 1 will after an empty container is hung down on turning device 3 by the container for being put into and installing goods The container lock for installing goods is hung oneself disembarkation, is put on transporting equipment 6, is transported.In materials-taking machine 4 by the collection of the opposite side on parallel bank After installing material, materials-taking machine 4 rotates 180 degree go back the to fight each other container of unpacking door and freighted again, meanwhile, staff will Container tipping is caused container to be laid flat for 90 degree by the container customs door locking of charged, turning device 3, container Special crane 1 an empty container is hung down on turning device 3 by the container for being put into charged after will be hung on the container lock of charged Bank, put on transporting equipment 6, transport.Circulation work is carried out, until freighter goods is unsnatched.In harbour idle, also ship can will be carried 2 open to other harbours progress ship-discharging operation.
Environmental pollution and loss of goods can be reduced by the present invention, improve operating efficiency, cost is reduced, improve economic effect Benefit.
It the above is only preferred embodiment of the present utility model, it should be pointed out that for those skilled in the art, On the premise of not departing from the utility model structure, several modifications and improvements can also be made, these are new all without this practicality is influenceed The effect and practical applicability that type is implemented.

Claims (6)

1. a kind of job platform for the direct Stuff (to) that to inland river bulk freighter unload, is included in the harbour water conservancy project of bank foundation Platform (5), the container Special crane (1) being arranged on harbour water conservancy project platform (5), it is characterised in that:Also include close to packaging The carrying ship (2) of case Special crane (1) place stop, the materials-taking machine (4) and turning device (3) being arranged on carrying ship (2), it is described Carrying ship (2) is connected with harbour water conservancy project platform (5).
2. a kind of job platform of direct Stuff (to) that to inland river bulk freighter unload according to claim 1, it is special Sign is:The platform also includes being used for the support (7) for supporting turning device (3), and the support (7) includes being arranged at support (7) The netted steel construction (71) of upper surface, the back taper funnel (72) being arranged under netted steel construction (71), it is arranged at back taper leakage The discharging opening (73) of bucket (72) lower end, it is filling for the concentration of goods that discharging opening (73) place is provided with a switch valve (74).
3. a kind of job platform of direct Stuff (to) that to inland river bulk freighter unload according to claim 1, it is special Sign is:The materials-taking machine (4) is arranged in the middle part of the cabin of carrying ship (2) and the parallel bank both sides of materials-taking machine (4) are set respectively It is equipped with two turning devices (3).
4. a kind of job platform of direct Stuff (to) that to inland river bulk freighter unload according to claim 1 or 3, its It is characterised by:The carrying ship (2) is Freighter, Small or landing stage.
5. a kind of job platform of direct Stuff (to) that to inland river bulk freighter unload according to claim 4, it is special Sign is:The carrying ship (2) is provided with splicing dress between bulk freighter along grab bucket running orbit during materials-taking machine (4) material grasping Put.
6. a kind of job platform of direct Stuff (to) that to inland river bulk freighter unload according to claim 1, it is special Sign is:The platform is additionally provided with the transporting equipment (6) for transferring containers.
CN201720395006.2U 2017-04-14 2017-04-14 To inland river bulk freighter unload the job platform of direct Stuff (to) Expired - Fee Related CN206654575U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720395006.2U CN206654575U (en) 2017-04-14 2017-04-14 To inland river bulk freighter unload the job platform of direct Stuff (to)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720395006.2U CN206654575U (en) 2017-04-14 2017-04-14 To inland river bulk freighter unload the job platform of direct Stuff (to)

Publications (1)

Publication Number Publication Date
CN206654575U true CN206654575U (en) 2017-11-21

Family

ID=60317879

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720395006.2U Expired - Fee Related CN206654575U (en) 2017-04-14 2017-04-14 To inland river bulk freighter unload the job platform of direct Stuff (to)

Country Status (1)

Country Link
CN (1) CN206654575U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115246571A (en) * 2021-04-27 2022-10-28 宝钢物流(江苏)有限公司 Automatic transport and transfer device and method for goods arriving at port

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115246571A (en) * 2021-04-27 2022-10-28 宝钢物流(江苏)有限公司 Automatic transport and transfer device and method for goods arriving at port

Similar Documents

Publication Publication Date Title
CN103449204B (en) A kind of bucket continuous ship unloader
CN102114985A (en) Bulk loading and unloading method
CN101823630A (en) Containerized transport method of a large quantity of solid bulk cargos as well as solid bulk cargo container and decrater thereof
CN107089528A (en) A kind of side formula cantilever tire mobile ship loader
CN106882612A (en) To inland river bulk freighter unload the operational method and platform of direct Stuff (to)
CN109665340A (en) Large-scale bulk goods wheel cabin material method for cleaning
CN209009669U (en) A kind of Container Transport bulk material system
CN206654575U (en) To inland river bulk freighter unload the job platform of direct Stuff (to)
US6390006B1 (en) Sea bulk transfer vessel
CN203079346U (en) Overside loading and unloading transportation self-propelled ship
CN101654191B (en) Method and device for bulk freight of containers
CN204078016U (en) One is transferred and is loaded and unloaded transport bulge carrier
CN102923491A (en) Container wharf operation and management method
CN203845492U (en) Efficient hopper-provided portal crane of suspension type structural discharging system
CN205972509U (en) Single track hangs container
CN205524851U (en) Full -automatic compression subtracts holds rubbish transport ship
CN205916808U (en) Standdle carrier railway carriage or compartment doffer on loading funnel
Zamorano Surface ore movement, storage, and recovery systems
CN204056248U (en) A kind of transfer system loading and unloading carrier and carrier with this system of transferring
CN208022398U (en) Container-type raw coal storing and transporting system
CN108147146B (en) Closed transfer facility suitable for bridge type grab ship unloader operation
CN105775793A (en) Bulk grain container loading machine
CN111994772A (en) Container turning hanger system and application method thereof
CN2644301Y (en) Assistant easing gear for hold of bulk/general cargo vessel
CN204057318U (en) One is transferred handling carrier

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20171121

Termination date: 20200414