CN206599989U - The formwork erecting structure of shear wall - Google Patents

The formwork erecting structure of shear wall Download PDF

Info

Publication number
CN206599989U
CN206599989U CN201720241549.9U CN201720241549U CN206599989U CN 206599989 U CN206599989 U CN 206599989U CN 201720241549 U CN201720241549 U CN 201720241549U CN 206599989 U CN206599989 U CN 206599989U
Authority
CN
China
Prior art keywords
template
purlin
hips
chest
waist
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720241549.9U
Other languages
Chinese (zh)
Inventor
李崇鹏
张立国
臧永久
樊怀亮
田飞龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Eighth Engineering Division Co Ltd
Original Assignee
China Construction Eighth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Eighth Engineering Division Co Ltd filed Critical China Construction Eighth Engineering Division Co Ltd
Priority to CN201720241549.9U priority Critical patent/CN206599989U/en
Application granted granted Critical
Publication of CN206599989U publication Critical patent/CN206599989U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Moulds, Cores, Or Mandrels (AREA)

Abstract

The utility model is related to a kind of formwork erecting structure of shear wall, using in the first template, second template, gear sets first and encloses purlin respectively on the outside of 3rd template, second encloses purlin, measurements of the chest, waist and hips purlin, purlin and measurements of the chest, waist and hips purlin are enclosed by the way that the oblique junction for being located at the first template and the 3rd template of the first oblique pull screw mandrel is fastenedly connected into first, purlin and measurements of the chest, waist and hips purlin are enclosed by the way that the oblique junction for being located at the second template and the 3rd template of the second oblique pull screw mandrel is fastenedly connected into second, so that vertically disposed first template and the 3rd template, the firm connection in the corner of second template and the 3rd template, this connected mode effectively prevents the mould that rises of die plate corners, ensure the Forming Quality for pouring finished product concrete shear force wall, so as to which the connection method for solving existing template is not firm enough for the connection of die plate corners, the mould that easily rises causes the problem of concrete shear force wall quality is not good.

Description

The formwork erecting structure of shear wall
Technical field
The utility model is related to building field, refers in particular to a kind of formwork erecting structure of shear wall.
Background technology
Building template is the important tool often used in construction, at present, with construction market new type formwork Pattern increases, and big multi-template constitutes by sheet material and located at the frame of sheet material surrounding, sheet material as concreting template face, The assembled connection that frame is used between sheet material, and the joining quality between frame is outstanding for the Forming Quality of concreting finished product For key.For two templates being mutually connected vertically, the frame of its angle two is vertical setting, general to be carried out using angle steel Connection, but to there is intensity weaker for such connected mode, it is easy to rise mould phenomenon, and then causes concrete shear force wall matter Amount is not good.
Utility model content
The purpose of this utility model is that the defect for overcoming prior art, there is provided a kind of formwork erecting structure of shear wall, is solved The connection method of existing template is not firm enough for the connection of die plate corners, and the mould that easily rises causes concrete shear force wall quality not Good the problem of.
Realizing the technical scheme of above-mentioned purpose is:
The utility model provides a kind of formwork erecting structure of shear wall, including:
First template, includes the aluminum dipping form Slab element of multiple splicing connections;
The second template being oppositely arranged with first template, includes the punching block Slab element of multiple splicing connections:
Gear is located at the 3rd template of first template and the second template end, the 3rd template and described first The casting space being formed with for pouring shear wall is enclosed inside template and second template;
Transverse gear first encloses purlin on the outside of first template;
Transverse gear second encloses purlin on the outside of second template;
Measurements of the chest, waist and hips purlin of the transverse gear on the outside of the 3rd template;
Through first template and second template to wire drawing bar, by it is described wire drawing bar is fastenedly connected it is described First template, second template, described first enclose purlin and described second enclose purlin;
Obliquely through the described first the first oblique pull screw mandrel for enclosing purlin and the measurements of the chest, waist and hips purlin, the first oblique pull screw mandrel is oblique Located at the junction of first template and the 3rd template, it is fastenedly connected described first by the first oblique pull screw mandrel and encloses Purlin and the measurements of the chest, waist and hips purlin;And
Obliquely through the described second the second oblique pull screw mandrel for enclosing purlin and the measurements of the chest, waist and hips purlin, the second oblique pull screw mandrel is oblique Located at the junction of second template and the 3rd template, it is fastenedly connected described second by the second oblique pull screw mandrel and encloses Purlin and the measurements of the chest, waist and hips purlin.
The structure use on the outside of the first template, the second template, the 3rd template respectively gear set first and enclose purlin, second enclose Purlin, measurements of the chest, waist and hips purlin, by the way that the oblique junction for being located at the first template and the 3rd template of the first oblique pull screw mandrel is fastenedly connected into first Purlin and measurements of the chest, waist and hips purlin are enclosed, by the way that the oblique junction for being located at the second template and the 3rd template of the second oblique pull screw mandrel is fastenedly connected into Two enclose purlin and measurements of the chest, waist and hips purlin, so that the corner of vertically disposed first template and the 3rd template, the second template and the 3rd template Firm connection, this connected mode effectively prevents the mould that rises of die plate corners, ensures the shaping matter for pouring finished product concrete shear force wall Amount.
The utility model shear wall formwork erecting structure further improvement is that,
Described first enclose purlin the first oblique pull screw mandrel corresponding with the lateral surface of the measurements of the chest, waist and hips purlin provided with the first dentation it is convex Platform, the end of the first oblique pull screw mandrel passes through corresponding first dentation boss, is arranged the first block piece and first spiral shell that is screwed together Mother, first block piece screws togather to push against to the first dentation boss so as to realize by first nut is fastenedly connected institute State first and enclose purlin and the measurements of the chest, waist and hips purlin;
Described second enclose purlin the second oblique pull screw mandrel corresponding with the lateral surface of the measurements of the chest, waist and hips purlin provided with the second dentation it is convex Platform, the end of the second oblique pull screw mandrel passes through corresponding second dentation boss, is arranged the second block piece and second spiral shell that is screwed together Mother, second block piece screws togather to push against to the second dentation boss so as to realize by second nut is fastenedly connected institute State second and enclose purlin and the measurements of the chest, waist and hips purlin.
The utility model shear wall formwork erecting structure further improvement is that,
The aluminium frame being surrounded by for connection of the aluminum dipping form Slab element;The confession that is surrounded by of the punching block Slab element connects The steel frame connect;The connection frame being surrounded by for connection of 3rd modular unit;
The formwork erecting structure also includes first jiao of the connection angle located at first template and the 3rd template Plate and the second gusset located at the connection angle of second template and the 3rd template, first gusset with it is corresponding The aluminium frame and the connection frame are fitted, and are connected by fixture, second gusset with it is corresponding The steel frame and the connection frame are fitted, and are connected by fixture.
The utility model shear wall formwork erecting structure further improvement is that,
First gusset is fixedly connected with the corresponding aluminium frame by pin, first gusset and corresponding institute Connection frame is stated to be bolted to connection;
Second gusset is fixedly connected with the corresponding steel frame by pin, second gusset and corresponding institute Connection frame is stated to be bolted to connection.
The utility model shear wall formwork erecting structure further improvement is that,
Provided with some groups laterally and the first vertical back cords, described first encloses purlin is fixedly arranged on described the to the aluminum dipping form Slab element One back cord;
Provided with some groups laterally and the second vertical back cords, described second encloses purlin is fixedly arranged on described the to the punching block Slab element Two back cords;
3rd template is fixedly arranged on the described 3rd provided with some groups of the 3rd horizontal and vertical back cords, the measurements of the chest, waist and hips purlin Back cord.
Brief description of the drawings
Fig. 1 is the structural representation of the formwork erecting structure of the utility model shear wall.
Fig. 2 is the front view of the formwork erecting structure of the utility model shear wall.
Fig. 3 is the side view of the formwork erecting structure of the utility model shear wall.
Embodiment
The utility model is described in further detail with specific embodiment below in conjunction with the accompanying drawings.
Refering to Fig. 1, the utility model provides a kind of formwork erecting structure of shear wall, using the first template, the second template, Gear sets first and encloses purlin, second encloses purlin, measurements of the chest, waist and hips purlin respectively on the outside of 3rd template, by being located at the by the first oblique pull screw mandrel is oblique The junction of one template and the 3rd template is fastenedly connected first and encloses purlin and measurements of the chest, waist and hips purlin, by being located at the second oblique pull screw mandrel is oblique The junction of second template and the 3rd template is fastenedly connected second and encloses purlin and measurements of the chest, waist and hips purlin, so that vertically disposed first template Connection is consolidated with the corner of the 3rd template, the second template and the 3rd template, the mould that rises of die plate corners is effectively prevented, guarantee, which is poured, to be built up The Forming Quality of product concrete shear force wall, the connection method for solving existing template is not firm enough for the connection of die plate corners, holds The mould that easily rises causes the problem of concrete shear force wall quality is not good.Below in conjunction with the accompanying drawings to the formwork erecting structure of the utility model shear wall Illustrate.
As shown in Figure 1 to Figure 3, the formwork erecting structure of the utility model shear wall includes:First template 110, the second template 210, the 3rd template 310, first encloses purlin 112, and second encloses purlin 212, measurements of the chest, waist and hips purlin 312, to wire drawing bar 321, the first oblique pull screw mandrel 121, the second oblique pull screw mandrel 221, the first gusset 130, the second gusset 230.
Wherein, the first template 110 includes the aluminum dipping form Slab element of multiple splicing connections, if the back of the aluminum dipping form Slab element is provided with The first horizontal and vertical back cord 111 of dry group, the aluminum dipping form Slab element is surrounded by aluminium frame 113 for connection.Aluminium frame 113 preferred thickness are 5mm.
Preferably, the first template 110 is calibrated bolck, splices aluminum dipping form Slab element using pin 131, pin when form removal 131 remove just dismountable first template 110, are connected using pin and install and remove to facilitate.
First encloses the transverse gear of purlin 112 located at the outside of the first template 110, and is fixedly arranged on the first back cord 111.
Second template 210 is oppositely arranged with the first template 110, and the second template 210 includes the steel form of multiple splicing connections Unit, punching block Slab element is surrounded by for connection provided with some groups of the second horizontal and vertical back cords 211, punching block Slab element Steel frame 213.The preferred thickness of steel frame 213 is 5mm.
Preferably, the second template 210 is integral hoisting, splices punching block Slab element using bolt 231, is not required to when form removal Fritter is splitted into, is connected with increasing fixed intensity.
Second encloses the transverse gear of purlin 212 located at the outside of the second template 210, and is fixedly arranged on the second back cord 211.
3rd template 310 gear is located at the first template 110 and the end of the second template 210, the 3rd template 310 and the first template 110 and second enclose the casting space being formed with for pouring shear wall inside template 210, and the 3rd template 310 is horizontal provided with some groups To with the 3rd vertical back cord 311, the 3rd template 310 is surrounded by connection frame 313 for connection.Connect frame 313 excellent It is 5mm to select thickness.
The transverse gear of measurements of the chest, waist and hips purlin 312 is fixedly arranged on the 3rd back cord 311 located at the outside of the 3rd template 310.
Aluminum dipping form Slab element is provided with some groups of the first horizontal and vertical back cords 111, and first, which encloses purlin 112, is fixedly arranged on the first back cord 111;Punching block Slab element is provided with some groups of the second horizontal and vertical back cords 211, and second, which encloses purlin 212, is fixedly arranged on the second back cord 211; 3rd template is fixedly arranged on the 3rd back cord 311 provided with some groups of the 3rd horizontal and vertical back cords 311, measurements of the chest, waist and hips purlin 312.
First template 110 and the second template 210 are run through to wire drawing bar 321, by being fastenedly connected the first mould to wire drawing bar 321 Plate 110, the second template 210, first enclose purlin 112 and second enclose purlin 212.It is preferably A20mm screw mandrels to wire drawing bar 321.
Purlin 112 and second is enclosed through corresponding first to the end of wire drawing bar 321 and encloses purlin 212, third gear part 322 is arranged simultaneously Be screwed together the 3rd nut, and third gear part 322 screws togather pushing and pressing by the 3rd nut and encloses purlin 112 or the second to first and enclose purlin 212 It is upper to enclose purlin 212 so as to realize to be fastenedly connected first and enclose purlin 112 and second.
First oblique pull screw mandrel 121 encloses purlin 112 and measurements of the chest, waist and hips purlin 312 obliquely through first, and the first oblique pull screw mandrel 121 is oblique to be set In the junction of the first template 110 and the 3rd template 310, it is fastenedly connected first by the first oblique pull screw mandrel 121 and encloses purlin 112 and Measurements of the chest, waist and hips purlin 312.First oblique pull screw mandrel 121 is preferably A20mm screw mandrels.
First encloses the first oblique pull screw mandrel 121 corresponding with the lateral surface of measurements of the chest, waist and hips purlin 312 of purlin 112 provided with the first dentation boss 1121, the end of the first oblique pull screw mandrel 121 passes through corresponding first dentation boss 1121, is arranged the first block piece 122 and the company of screwing togather The first nut is connect, the first block piece 122 screws togather pushing and pressing to the first dentation boss 1121 to realize fastening by first nut Purlin 112 and measurements of the chest, waist and hips purlin 312 are enclosed in connection first.
Second oblique pull screw mandrel 221 encloses purlin 212 and measurements of the chest, waist and hips purlin 312 obliquely through second, and the second oblique pull screw mandrel 221 is oblique to be set In the junction of the second template 210 and the 3rd template 310, it is fastenedly connected second by the second oblique pull screw mandrel 221 and encloses purlin 212 and Measurements of the chest, waist and hips purlin 312.Second oblique pull screw mandrel 221 is preferably A20mm screw mandrels.
Second encloses the second oblique pull screw mandrel 221 corresponding with the lateral surface of measurements of the chest, waist and hips purlin 312 of purlin 212 provided with the second dentation boss 2121, the end of the second oblique pull screw mandrel 221 passes through corresponding second dentation boss 2121, is arranged the second block piece 222 and the company of screwing togather The second nut is connect, the second block piece 222 screws togather pushing and pressing to the second dentation boss 2121 to realize fastening by second nut Purlin 212 and measurements of the chest, waist and hips purlin 312 are enclosed in connection second.
First gusset 130 is located at the connection angle of the first template 110 and the 3rd template 310, and the second gusset 230 is located at the The connection angle of two templates 210 and the 3rd template 310, the first gusset 130 and corresponding aluminium frame 113 and connection frame 313 It is fitted, and is connected by fixture, the second gusset 230 is affixed with corresponding steel frame 213 and connection frame 313 Close and set, and be connected by fixture.First gusset 130 and the second gusset 230 are preferably the aluminum corner brace that width is 10cm.
Offered on aluminium frame 113, steel frame 213, connection frame 313, the first gusset 130 and the second gusset 230 Connecting hole, a pair of corresponding connecting holes that fixture is arranged on the face of fitting, to realize the first gusset 130 and corresponding aluminium Frame 113 and connection frame 313 are fixedly connected and the second gusset 230 and corresponding steel frame 213 and connect consolidating for frame 313 Fixed connection.Connecting hole preferably a diameter of 2cm, spacing is 20cm.
First gusset 130 is fixedly connected with corresponding aluminium frame 113 by pin 131, the first gusset 130 and corresponding company Edge fit frame 313 is fixedly connected by bolt 231;Second gusset 230 is fixedly connected with corresponding steel frame 213 by pin 131, Second gusset 230 is fixedly connected with corresponding connection frame 313 by bolt 231.
Using the formwork erecting structure of the utility model shear wall, firstly, since multiple change can occur for shear wall, column section, Therefore before Deepen Design, the number of times of the size of change, change is taken into account, the master die of change interface dimensions is prefabricated into Plate, i.e. the 3rd template 310.This example is change 3 times, changes 10cm every time, therefore the 3rd template length is 10cm.Then, The template length and width needed according to construction, it is determined that the size of the second template 210 and the first template 110 the need for and The quantity of pin, bolt.Finally, installation form and attachment structure, start construction.When concrete shear force wall variable cross-section, then root According to need remove the template 310 of monolithic the 3rd.
The formwork erecting structure of the utility model shear wall is using beyond traditional frame template connected mode, also using the One template, the second template, on the outside of the 3rd template on respectively gear set first and enclose purlin, second enclose purlin, measurements of the chest, waist and hips purlin, by oblique by first Wire drawing bar is oblique to be located at the junction of the first template and the 3rd template and is fastenedly connected first and encloses purlin and measurements of the chest, waist and hips purlin by by second Oblique pull screw mandrel is oblique to be located at the junction of the second template and the 3rd template and is fastenedly connected second and encloses purlin and measurements of the chest, waist and hips purlin so that hanging down The firm connection of the first template directly set and the corner of the 3rd template, the second template and the 3rd template, this connected mode is effective The mould that rises of die plate corners is prevented, the Forming Quality for pouring finished product concrete shear force wall is ensured.Also, due to consideration that shearing wall column Multiple change can occur for section, and the master die plate of prefabricated change interface dimensions, i.e. the 3rd template 310 has template more preferable Flexibility.In addition, the bolt of enhancing fixing intensity is respectively suitable for the second template of integral hoisting with the pin for being easy to remove 210 and the first template of calibrated bolck 110, whole attachment structure is easily installed and is dismantled, simple to operate, time and labour saving, can do To punching block Slab element and aluminum dipping form Slab element is quick and be firmly attached, construction speed is improved, construction cost is reduced.
The utility model is described in detail above in association with accompanying drawing embodiment, those skilled in the art can root Many variations example is made to the utility model according to described above.Thus, some of embodiment details should not be constituted to this practicality New restriction, the utility model regard the scope defined using appended claims as protection domain of the present utility model.

Claims (5)

1. a kind of formwork erecting structure of shear wall, it is characterised in that including:
First template, includes the aluminum dipping form Slab element of multiple splicing connections;
The second template being oppositely arranged with first template, includes the punching block Slab element of multiple splicing connections;
Gear is located at first template and the 3rd template of the second template end, the 3rd template and first template The casting space that confession pours shear wall is formed with being enclosed inside second template;
Transverse gear first encloses purlin on the outside of first template;
Transverse gear second encloses purlin on the outside of second template;
Measurements of the chest, waist and hips purlin of the transverse gear on the outside of the 3rd template;
Through first template and second template to wire drawing bar, described first is fastenedly connected to wire drawing bar by described Template, second template, described first enclose purlin and described second enclose purlin;
Obliquely through the described first the first oblique pull screw mandrel for enclosing purlin and the measurements of the chest, waist and hips purlin, the first oblique pull screw mandrel is oblique to be located at The junction of first template and the 3rd template, by the first oblique pull screw mandrel be fastenedly connected described first enclose purlin and The measurements of the chest, waist and hips purlin;And
Obliquely through the described second the second oblique pull screw mandrel for enclosing purlin and the measurements of the chest, waist and hips purlin, the second oblique pull screw mandrel is oblique to be located at The junction of second template and the 3rd template, by the second oblique pull screw mandrel be fastenedly connected described second enclose purlin and The measurements of the chest, waist and hips purlin.
2. the formwork erecting structure of shear wall as claimed in claim 1, it is characterised in that
Described first encloses purlin the first oblique pull screw mandrel corresponding with the lateral surface of the measurements of the chest, waist and hips purlin provided with the first dentation boss, institute The end for stating the first oblique pull screw mandrel passes through corresponding first dentation boss, is arranged the first block piece and first nut that is screwed together, institute State the first block piece and pushing and pressing are screwed togather to being fastenedly connected described the so as to realize on the first dentation boss by first nut One encloses purlin and the measurements of the chest, waist and hips purlin;
Described second encloses purlin the second oblique pull screw mandrel corresponding with the lateral surface of the measurements of the chest, waist and hips purlin provided with the second dentation boss, institute The end for stating the second oblique pull screw mandrel passes through corresponding second dentation boss, is arranged the second block piece and second nut that is screwed together, institute State the second block piece and pushing and pressing are screwed togather to being fastenedly connected described the so as to realize on the second dentation boss by second nut Two enclose purlin and the measurements of the chest, waist and hips purlin.
3. the formwork erecting structure of shear wall as claimed in claim 1, it is characterised in that
The aluminium frame being surrounded by for connection of the aluminum dipping form Slab element;The punching block Slab element is surrounded by for connection Steel frame;The connection frame being surrounded by for connection of 3rd modular unit;
The formwork erecting structure also include located at the connection angle of first template and the 3rd template the first gusset and The second gusset located at the connection angle of second template and the 3rd template, first gusset with it is corresponding described Aluminium frame and the connection frame are fitted, and are connected by fixture, second gusset with it is corresponding described Steel frame and the connection frame are fitted, and are connected by fixture.
4. the formwork erecting structure of shear wall as claimed in claim 3, it is characterised in that
First gusset is fixedly connected with the corresponding aluminium frame by pin, first gusset and the corresponding company Edge fit frame is bolted to connection;
Second gusset is fixedly connected with the corresponding steel frame by pin, second gusset and the corresponding company Edge fit frame is bolted to connection.
5. the formwork erecting structure of shear wall as claimed in claim 1, it is characterised in that
The aluminum dipping form Slab element is provided with some groups of the first horizontal and vertical back cords, and described first, which encloses purlin, is fixedly arranged on first back of the body It is stupefied;
The punching block Slab element is provided with some groups of the second horizontal and vertical back cords, and described second, which encloses purlin, is fixedly arranged on second back of the body It is stupefied;
3rd template is fixedly arranged on the 3rd back of the body provided with some groups of the 3rd horizontal and vertical back cords, the measurements of the chest, waist and hips purlin It is stupefied.
CN201720241549.9U 2017-03-14 2017-03-14 The formwork erecting structure of shear wall Expired - Fee Related CN206599989U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720241549.9U CN206599989U (en) 2017-03-14 2017-03-14 The formwork erecting structure of shear wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720241549.9U CN206599989U (en) 2017-03-14 2017-03-14 The formwork erecting structure of shear wall

Publications (1)

Publication Number Publication Date
CN206599989U true CN206599989U (en) 2017-10-31

Family

ID=60148105

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720241549.9U Expired - Fee Related CN206599989U (en) 2017-03-14 2017-03-14 The formwork erecting structure of shear wall

Country Status (1)

Country Link
CN (1) CN206599989U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111926857A (en) * 2020-07-20 2020-11-13 鞍山三冶建筑工程有限公司 Template for construction joint of pipe gallery wall and construction method
CN112538967A (en) * 2020-12-17 2021-03-23 中国建筑第七工程局有限公司 Shear wall template is to drawing connecting piece and template reinforced structure thereof

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111926857A (en) * 2020-07-20 2020-11-13 鞍山三冶建筑工程有限公司 Template for construction joint of pipe gallery wall and construction method
CN111926857B (en) * 2020-07-20 2022-03-15 鞍山三冶建筑工程有限公司 Template for construction joint of pipe gallery wall and construction method
CN112538967A (en) * 2020-12-17 2021-03-23 中国建筑第七工程局有限公司 Shear wall template is to drawing connecting piece and template reinforced structure thereof
CN112538967B (en) * 2020-12-17 2022-05-17 中国建筑第七工程局有限公司 Shear wall template is to drawing connecting piece and template reinforced structure thereof

Similar Documents

Publication Publication Date Title
CN208023710U (en) A kind of connection structure of assembly concrete shear wall
CN108824676B (en) Bottom joint structure of double-sided superimposed shear wall and installation construction method thereof
CN207700438U (en) A kind of fabricated shear wall cross connected structure
CN102953546A (en) Construction method for mounting deformation joint template at double walls
CN206599989U (en) The formwork erecting structure of shear wall
CN105113790A (en) Bare-concrete corner floating window steel formwork structure body device
CN105113789A (en) Bare concrete bay window steel formwork structural body device
CN105113787A (en) Bare-concrete sawtooth-shaped closed type stair steel formwork device
CN208343121U (en) Prefabricated assembled steel structure concrete wallboard mould
CN206942138U (en) Cast template splices bridge plate
CN211647429U (en) Preformed plugging device for floor holes and construction structure for manufacturing plugging block by using preformed plugging device
CN203097290U (en) Assembled type split bolt
CN107419897B (en) Reinforcing die for windowsill coping template
CN216865604U (en) Integrated form-removal-free prefabricated hollow wall body with decorative structure
CN203129572U (en) Prefabricated concrete formwork and prefabricated building formed by same
CN205742988U (en) The explosion-proof membrane module of template one word piece
CN112609982A (en) Method for manufacturing wall with heat-insulation plate by adopting energy-saving bolt
CN109235709B (en) Full cast-in-place outer wall structure of building
CN207727982U (en) A kind of building wall corner Constructional Col-umn Construction template
CN207092546U (en) A kind of subsiding crack both sides shear wall formwork for placing frame being easily installed
CN207513153U (en) The beam column cast-in-place node dedicated aluminium alloy template of assembly concrete frame structure
CN112627504A (en) Method for manufacturing wall with heat insulation board
CN206503365U (en) A kind of shear wall and filling wall junction aluminum alloy pattern plate erecting device
CN205025087U (en) Closed stair steel form device of clear water concrete saw flute profile
CN214034755U (en) Template assembly and double-sided shear wall

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20171031

CF01 Termination of patent right due to non-payment of annual fee