CN206539052U - A kind of both balconied strengthening reconstruction structure - Google Patents
A kind of both balconied strengthening reconstruction structure Download PDFInfo
- Publication number
- CN206539052U CN206539052U CN201621367079.2U CN201621367079U CN206539052U CN 206539052 U CN206539052 U CN 206539052U CN 201621367079 U CN201621367079 U CN 201621367079U CN 206539052 U CN206539052 U CN 206539052U
- Authority
- CN
- China
- Prior art keywords
- balcony
- reinforces
- balconied
- skeleton
- embedded
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Steps, Ramps, And Handrails (AREA)
Abstract
A kind of both balconied strengthening reconstruction structure, the structure is connected between balcony slab and exterior wall, including balcony reinforces skeleton and balcony reinforces breast board;Balcony reinforces breast board upper end, and by connecting, top frame and balcony reinforcing skeleton are connected, lower end reinforces skeleton by spacing underframe and balcony and is connected;Balcony is reinforced skeleton and is distributed along balcony slab outward flange, and the both ends that balcony reinforces skeleton are connected with exterior wall.The utility model is simple in construction, component is easy to make, is easily adjusted, and the destruction of original structure is preferably minimized, fabrication cycle is short, it is ensured that construction speed requirement;Meanwhile, prefabricated board is stress quantity to the neglect of quality, be easily installed, and low cost significantly reduces construction cost, reaches energy-conservation green construction;The characteristics of balcony structure after construction is maximum load is reduced, and outer surface perception is good, good integrity.Relatively low to balcony fence concrete strength suitable for old cell, the existing balcony that crack phenomenon and breast board concrete loosely come off serious carries out strengthening reconstruction construction.
Description
Technical field
The utility model is related to a kind of construction, the strengthening reconstruction structure of particularly a kind of existing building.
Background technology
With the continuous progress of science and technology, social civilization is continued to develop, and it is large quantities of that country's reform and opening-up early stage is built
City exist aging disadvantage highlighted, auxiliary facility imperfection, impersonality, high energy consumption, potential safety hazard etc. not only into
For livelihood issues, the stumbling-block of restriction urban development is also become.
At present, the balcony fence of old cell is generally that precast concrete is spliced to form, part balcony fence concrete strength
Relatively low, exterior plaster, which is wiped one's face, to be pasted not strongly, has the phenomenons such as hollowing, crack, cause rainwater to pour into, steel bar corrosion, breast board concrete pine
Dissipate and come off, in order to ensure the safety of resident, eliminate safe hidden trouble, it is necessary to carry out strengthening reconstruction to existing balcony, but balcony adds
Gu facing some problems in work progress, such as working time is limited by the time of having a rest of resident, sooner or later can not be by capital construction commission of city
Defined time construction, it is impossible to organize night to apply, construction production efficiency reduction, can have an impact to project progress.
Utility model content
The purpose of this utility model is to provide a kind of both balconied strengthening reconstruction structure, on existing balcony structure basis
Upper, progress strengthening reconstruction, solves the problem of existing balcony structure is long neglected and in disrepair.
To achieve the above object, the utility model is adopted the following technical scheme that:
A kind of both balconied strengthening reconstruction structure, is connected between balcony slab and exterior wall, including balcony reinforce skeleton and
Balcony reinforces breast board;The balcony reinforce breast board upper end be connected by connecting top frame with balcony reinforcing skeleton, lower end pass through it is spacing
Underframe is reinforced skeleton with balcony and is connected;The balcony is reinforced skeleton and is distributed along balcony slab outward flange, and balcony reinforces the two of skeleton
End is connected with exterior wall.
Strengthening reconstruction structure also includes the embedded board for being embedded in the anti-platform upper surface of balcony slab;The embedded board is along anti-platform
It is elongated to set, it is vertically connected with embedded ribs between balcony slab horizontal bar;Correspondence is provided with through balcony slab and erects muscle on the embedded board
With the perforation of embedded ribs, and embedded board erects muscle and embedded ribs with balcony slab respectively and is welded and fixed.
The balcony is reinforced skeleton and is connected on the anti-platform of balcony slab, including parallel to anti-platform, the horizontally disposed steel that bears down on one
Manage and be vertically connected on the column beared down on one between steel pipe and anti-platform.
The end of the steel pipe that bears down on one is welded with connecting plate and is connected by fastener with exterior wall.
The bottom of the column is welded with column bottom plate and is connected by column bottom plate with embedded board;The column bottom plate
Upper correspondence is provided with the perforation that muscle and embedded ribs are erected through balcony slab, and column bottom plate erects muscle with balcony slab respectively and embedded ribs are welded
It is fixed.
The cross section of the connection top frame is L-shaped, and one limb, which is fixed on balcony, to be reinforced skeleton and bear down on one on steel pipe, another limb
The outward flange that balcony reinforces breast board top is connected to by connector.
The connector is gib headed bolt, and its gib head hook joint adds in lateral surface, the horizontal screw bolt of connection top frame through balcony
Gu breast board is simultaneously fastened by nut.
The spacing underframe is connected between column, and the cross section of spacing underframe is U-shaped, and its bottom plate is welded on embedded board
Upper, biside plate correspondence is connected to the bottom both sides that balcony reinforces breast board.
There is screed on the bottom plate of the balcony slab.
The balcony is reinforced inside and outside breast board covered with steel wire and scribbles coat of plaster, the thickness of coat of plaster for 4~
6mm。
In work progress, the framework of steel reinforcement corrosion in the balcony slab of some old cells is unfavorable for column and pre-buried
The connection of plate, now, does not include embedded board and embedded ribs, the column bottom plate of the column is directly by swollen in strengthening reconstruction structure
Swollen to be bolted on the anti-platform of balcony slab, spacing underframe is then directly welded between column.
The utility model has the characteristics that and beneficial effect compared with prior art:
The utility model carries out strengthening reconstruction on both balconied architecture basics, by the structure newly constructed and existing structure
It is rationally unified, it is improvement citizen's living environment on the basis of not destroying original structure, while realizing the construction of new construction
People's livelihood engineering:Balcony reinforcing skeleton is connected by connecting plate, fastener with direct exterior wall, simple and convenient, efficiency high;Balcony adds
Gu breast board is reinforced skeleton by connecting top frame and spacing underframe and balcony and is connected, install convenient, workable;Balcony reinforces bone
Frame bottom is connected by column bottom plate, embedded board and balcony slab, original structure is retained as far as possible, it is only necessary to by the vertical of former fence
Reinforcing bar cutting is removed, balcony slab erect muscle and embedded ribs directly wear connect embedded board and column bottom plate with both be connected, realize new and old knot
The combination of structure, it is ensured that the globality of structure after connection.
The utility model can be widely applied to both balconied strengthening reconstruction constructions, and the destruction of original structure is dropped to most
It is low, while reinforcing effective cooperation that skeleton, balcony are reinforced between breast board, connection top frame and spacing underframe by embedded board, balcony
And the combination with existing structure, realize globality, the stability of structure, it is ensured that structural strength after construction;This practicality
New structure is simple, component is easy to make, is easily adjusted, and workman can process as needed by simple training, fabrication cycle
It is short, it is ensured that construction speed requirement;Meanwhile, prefabricated board is stress quantity to the neglect of quality, be easily installed, and low cost is significantly reduced and is constructed into
This, reaches energy-conservation green construction;The characteristics of balcony structure after construction is maximum load is reduced, and outer surface perception is good, good integrity.
The utility model is relatively low to balcony fence concrete strength suitable for old cell, crack phenomenon and breast board
The existing balcony that concrete loosely comes off serious carries out strengthening reconstruction construction.
Brief description of the drawings
The utility model is described in more detail below in conjunction with the accompanying drawings.
Fig. 1 is the structural representation of the utility model embodiment one.
Fig. 2 is the main structure diagram of the utility model embodiment one.
Fig. 3 is the side structure schematic view of the utility model embodiment one.
Fig. 4 is the cross-sectional view of the utility model embodiment one.
Fig. 5 is the connecting joint structure schematic diagram of bear down on one steel pipe and the exterior wall of the utility model embodiment one.
Fig. 6 is the structural representation of the connecting plate of the utility model embodiment one.
Fig. 7 is the column bottom plate of the utility model embodiment one and the connecting joint structure schematic diagram of balcony slab.
Fig. 8 is the structural representation of the column bottom plate of the utility model embodiment one.
Fig. 9 is hanging basket safeguard structure schematic diagram when the utility model embodiment one is constructed.
Figure 10 is the column bottom plate of the utility model embodiment two and the connecting joint structure schematic diagram of balcony slab.
Figure 11 is the structural representation of the column bottom plate of the utility model embodiment two.
Reference:1- balconies reinforce skeleton, 2- balconies and reinforce breast board, 3- connections top frame, the spacing underframes of 4-, 5-
Connector, 6- fasteners, 7- connecting plates, 8- balcony slabs, 9- exterior walls, 10- columns bottom plate, 11- embedded boards, 12- balcony slabs
Horizontal bar, 13- balcony slabs erect muscle, 14- embedded ribs, 15- hanging baskets, the existing balconies of 16-.
Embodiment
Embodiment is shown in Figure 1, this both balconied strengthening reconstruction structure, be connected to balcony slab 8 and exterior wall 9 it
Between, including balcony reinforces skeleton 1 and balcony reinforces breast board 2;The balcony is reinforced skeleton 1 and is distributed along the outward flange of balcony slab 8, sun
The both ends that platform reinforces skeleton 1 are connected with exterior wall 9, and the plan structure that balcony reinforces skeleton 1 can be in-line, U-shaped or L
Shape, depending on balcony structure, in this example, by taking U-shaped as an example.
Referring to shown in Fig. 2, Fig. 3, the balcony is reinforced skeleton 1 and is connected on the anti-platform of balcony slab 8, including parallel to anti-
Platform, horizontally disposed bear down on one and are vertically welded in the column beared down on one between steel pipe and anti-platform at steel pipe, and weld seam is not less than 4mm, component
Depending on size is according to balcony size, in this example, the steel pipe that bears down on one is that 50 × 100 × 4mm square tube, column are 50 × 75 × 4mm's
Steel pipe.
The balcony reinforces the upper end of breast board 2, and by connecting top frame 3, skeleton 1 is connected, lower end passes through spacing bottom with balcony reinforcing
Frame 4 is reinforced skeleton 1 with balcony and is connected;It is aerating plate that balcony, which reinforces breast board 2, from autoclaved lightweight concrete board, plate and plate
Between gap should be not more than 2mm.
The balcony reinforces mesh plaster inside and outside breast board 2, and thickness control is in 4~6mm, only to cover steel wire,
It is micro- to see that steel wire profile is advisable, motar match ratio to ensure accurately, make that finish plaster is uniform in material, cement preferably uses 325#,
Rough sand, clay content meet code requirement during sand is preferably used.There is screed on the bottom plate of the balcony slab.
Shown in Figure 4, the connection top frame 3 is angle steel, and its cross section is L-shaped, and one limb is welded on balcony and reinforces bone
Frame bears down on one on steel pipe, and weld seam is not less than 4mm, and another limb is connected to the outside that balcony reinforces the top of breast board 2 by connector 5
Edge;The connector 5 is gib headed bolt, and its gib head hook joint passes through balcony to reinforce column in lateral surface, the horizontal screw bolt of connection top frame 3
Plate is simultaneously fastened by nut.
The spacing underframe 4 is 10# channel-section steels, is connected between column, and the cross section of spacing underframe 4 is U-shaped, the weldering of its bottom plate
It is connected on embedded board 11, weld seam is not less than 4mm, biside plate correspondence is connected to the bottom both sides that balcony reinforces breast board.
Referring to shown in Fig. 5, Fig. 6, the end of the steel pipe that bears down on one is welded with connecting plate 7 and connected by fastener with exterior wall 9
Connect, the connecting plate 7 is 340 × 290 × 10mm steel plate, fastener is on 4 diameter 12mm crab-bolt, the connecting plate 7
Anchor hole positional distance edge 80mm, distance bears down on one steel pipe 40mm.
Shown in Figure 7, strengthening reconstruction structure also includes the embedded board 11 for being embedded in the anti-platform upper surface of balcony slab 8;Institute
State embedded board 11 to set along anti-platform is elongated, embedded ribs 14 are vertically connected between balcony slab horizontal bar 12;On the embedded board
Correspondence is provided with the perforation that muscle 13 and embedded ribs 14 are erected through balcony slab, and embedded board erects muscle 13 and embedded ribs 14 with balcony slab respectively
It is welded and fixed;Embedded board is long 100mm, thickness 4mm steel plate, and the embedded ribs are diameter 16mm one-level reinforcing bar.
The bottom of the column is welded with column bottom plate 10 and is connected by column bottom plate with embedded board 11;Referring to Fig. 8 institutes
Show, the column bottom plate 10 is that corresponding be provided with through balcony slab is erected on 290 × 150 × 10mm steel plate, the column bottom plate 10
The perforation of muscle 13 and embedded ribs 14, and column bottom plate 10 erects muscle 13 with balcony slab respectively and the plug welding of embedded ribs 14 is welded and fixed, institute
State and be perforated with two, be symmetrically distributed in column both sides, perforate apart from column bottom plate left and right edges 80mm, above and below column bottom plate
Edge 75mm, apart from column 40mm.
A kind of both construction method of balconied strengthening reconstruction structure as mentioned, is comprised the following steps that:
Step one, before construction, connection hanging basket 15 is used as construction protection on the outside of existing balcony:It is shown in Figure 9, it is described to hang
The main body of basket 15 is located on the downside of both balconied fronts, is vertically connected with main body and prevents shedding baffle plate, main body and existing balcony weight
The size of conjunction is no more than the half of existing balcony width, also no more than the half of body width;The anti-baffle plate of shedding is located at both
Balconied front, its height is not less than existing balcony top edge, and the one of hanging basket width is not less than with both balconied spacing
Halfth, it is not more than 3/4ths of hanging basket width.
Step 2, both balconied entrance door opening will have been closed using protective door.
Step 3, removes the breast board of existing balcony 16, and the breast board collection of dismounting is uniformly cleared:Pass through piecemeal patterning method
The breast board of existing balcony 16 is split:During segmentation, erect the distributing position of muscle 13 according to both balconied balcony slabs and split,
Ensure that no more than 1 balcony slab erects muscle 13 in the breast board plate after every piece of segmentation.
Step 4, rejects residual concrete on balcony slab 8, exposes balcony slab horizontal bar 12:After rejecting is finished, cleaning residue and
Dirt, reinforcing bar is thoroughly derusted.
Step 5, the vertical welding embedded ribs 14 on balcony slab horizontal bar 12, remaining dregs during cleaning welding.
Step 6, if balcony slab finds structure no significant defect with polymer by the bottom plate of balcony slab 8 and anti-platform again
It is floating:The space that balcony slab bottom joins position with balcony slab is blocked with C20 concrete, drainage is to avoid.
Step 7, the elongated connection embedded board 11 above floating place:The embedded ribs and balcony slab erect muscle 13 correspondence through
The perforation of embedded board 11, and be connected using plug welding, wherein balcony slab erects muscle 13 and cuts off concordant with embedded ribs.
Step 8, the interval connection column bottom plate 10 on embedded board 11:The embedded ribs and balcony slab erect the correspondence of muscle 13 and worn
The perforation of column bottom plate 10 is crossed, and is connected using plug welding.
Step 9, spacing underframe 4 correspondence is welded to connect on embedded board 11, and balcony is reinforced to the column correspondence of skeleton 1
It is welded to connect on column bottom plate 10:Weld seam is not less than 4mm.
The steel pipe that bears down on one that balcony reinforces skeleton 1, is connected by step 10 by connecting plate 7 and fastener with exterior wall:Installing
Before, component should derust thoroughly, and steel surface need to spray the red primer of vinyl chloride firefly at least three times after the completion of derusting, be applied after spraying
It is 100 μm to expect thickness, and the steel pipe that bears down on one is welded with connecting plate 7 using butt welding, and connecting plate 7 is by four anchor bolts on exterior wall.
Step 11, top frame 3 is welded to connect in steel pipe bottom of bearing down on one:Weld seam is not less than 4mm:During structure steel fabrication, surface
Should thoroughly it derust, but using during centrifugal blast cleaning, derusting grade should be met after injection《Steel surface rusting grade and removed before application
Rust grade》GB/T8923 Sa2.5 levels;The red finish paint of vinyl chloride firefly is sprayed at least three times in surface again after the completion of steel construction, is applied after spraying
It is 100 μm to expect thickness.
Step 12, the connection corresponding with connection top frame 3 and spacing underframe 4 of breast board 2 is reinforced by balcony:Balcony reinforces breast board 2
Top gib headed bolt is attached fixation with being connected top frame 3, and balcony reinforces the bottom of breast board 2 and is correspondingly placed at spacing underframe 4
Between biside plate;Gap is not more than 2mm between the plate of adjacent balcony reinforcing breast board 2.
Step 13, the both sides mesh plaster of breast board 2 is reinforced in balcony:Balcony is reinforced inside and outside breast board 2 and covers steel
Silk screen, micro- to see that steel wire profile is advisable, motar match ratio will ensure accurately, to make that finish plaster is uniform in material, cement is preferably used
325#, rough sand during sand is preferably used, clay content meets code requirement, and the thickness control of mesh plaster layer is between 4~6mm.
Step 14, removes protective door, installs balcony window.
Step 15, carries out decoration construction:External metope, the ground of balcony, breast board, ceiling carry out decoration construction.
Embodiment two is shown in Figure 10, and unlike embodiment one, in work progress, the balcony of some old cells
Framework of steel reinforcement corrosion in plate, is unfavorable for the connection of column and embedded board, now, does not include in strengthening reconstruction structure pre-buried
Plate and embedded ribs, the column bottom plate of the column are directly connected on the anti-platform of balcony slab by 4 diameter 12mm expansion bolts,
Spacing underframe is then directly welded between column.
Shown in Figure 11, the column bottom plate 10 is 290 × 150 × 10mm steel plate, and correspondence is provided with through swollen above
Punch position on the perforation of swollen bolt, the column bottom plate 10 is apart from column bottom plate left and right edges 80mm, apart from column bottom plate
Lower edges 40mm, apart from column 40mm.
Claims (10)
1. a kind of both balconied strengthening reconstruction structure, is connected to balcony slab(8)And exterior wall(9)Between, it is characterised in that:Including
Balcony reinforces skeleton(1)Breast board is reinforced with balcony(2);
The balcony reinforces breast board(2)Upper end is by connecting top frame(3)Skeleton is reinforced with balcony(1)Connection, lower end pass through spacing
Underframe(4)Skeleton is reinforced with balcony(1)Connection;
The balcony reinforces skeleton(1)Along balcony slab(8)Outward flange is distributed, and balcony reinforces skeleton(1)Both ends and exterior wall
(9)Connection.
2. according to claim 1 both balconied strengthening reconstruction structure, it is characterised in that:Strengthening reconstruction structure also includes
It is embedded in balcony slab(8)Anti- platform upper surface embedded board(11);
The embedded board(11)Set along anti-platform is elongated, with balcony slab horizontal bar(12)Between be vertically connected with embedded ribs(14);
Correspondence is provided with through balcony slab and erects muscle on the embedded board(13)And embedded ribs(14)Perforation, and embedded board respectively with sun
Platen erects muscle(13)And embedded ribs(14)It is welded and fixed.
3. according to claim 2 both balconied strengthening reconstruction structure, it is characterised in that:The balcony reinforces skeleton
(1)It is connected to balcony slab(8)Anti- platform on, including bear down on one parallel to anti-platform, the horizontally disposed steel pipe and being vertically connected on of bearing down on one
Column between steel pipe and anti-platform;
The end of the steel pipe that bears down on one is welded with connecting plate(7)And pass through fastener and exterior wall(9)Connection.
4. according to claim 3 both balconied strengthening reconstruction structure, it is characterised in that:The bottom welding of the column
There is column bottom plate(10)And pass through column bottom plate and embedded board(11)Connection;
The column bottom plate(10)Upper correspondence is provided with through balcony slab and erects muscle(13)And embedded ribs(14)Perforation, and column bottom plate
(10)Respectively muscle is erected with balcony slab(13)And embedded ribs(14)It is welded and fixed.
5. according to claim 4 both balconied strengthening reconstruction structure, it is characterised in that:The spacing underframe(4)Even
It is connected between column, spacing underframe(4)Cross section be U-shaped, its bottom plate is welded on embedded board(11)Upper, biside plate correspondence clamping
The bottom both sides of breast board are reinforced in balcony.
6. according to claim 3 both balconied strengthening reconstruction structure, it is characterised in that:The bottom welding of the column
There is column bottom plate(10)And be connected to by expansion bolt on the anti-platform of balcony slab, spacing underframe is welded between column.
7. the both balconied strengthening reconstruction structure according to claim 1 to 6 any one, it is characterised in that:The company
Connect top frame(3)Cross section be L-shaped, one limb, which is fixed on balcony, to be reinforced skeleton and bears down on one on steel pipe, and another limb passes through connector
(5)It is connected to balcony and reinforces breast board(2)The outward flange on top.
8. according to claim 7 both balconied strengthening reconstruction structure, it is characterised in that:The connector(5)For hook
Hook bolt, its gib head hook joint is in connection top frame(3)Lateral surface, horizontal screw bolt reinforce breast board and tight by nut through balcony
Gu.
9. according to claim 8 both balconied strengthening reconstruction structure, it is characterised in that:On the bottom plate of the balcony slab
There is screed.
10. according to claim 9 both balconied strengthening reconstruction structure, it is characterised in that:The balcony reinforces breast board
Inside and outside covered with steel wire and scribble coat of plaster, the thickness of coat of plaster is 4~6mm.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621367079.2U CN206539052U (en) | 2016-12-14 | 2016-12-14 | A kind of both balconied strengthening reconstruction structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621367079.2U CN206539052U (en) | 2016-12-14 | 2016-12-14 | A kind of both balconied strengthening reconstruction structure |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206539052U true CN206539052U (en) | 2017-10-03 |
Family
ID=59938474
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201621367079.2U Active CN206539052U (en) | 2016-12-14 | 2016-12-14 | A kind of both balconied strengthening reconstruction structure |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206539052U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106437195A (en) * | 2016-12-14 | 2017-02-22 | 泛华建设集团有限公司 | Reinforcing reconstructing structure for existing balcony and construction method thereof |
-
2016
- 2016-12-14 CN CN201621367079.2U patent/CN206539052U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106437195A (en) * | 2016-12-14 | 2017-02-22 | 泛华建设集团有限公司 | Reinforcing reconstructing structure for existing balcony and construction method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106801517B (en) | External reinforcing and reinforcing method for school shed with prefabricated porous plate brick mixed structure | |
CN109837992A (en) | A kind of assembly light steel frame building system | |
CN203856202U (en) | Simple pullable sizing device of reserved holes | |
CN206571130U (en) | A kind of outside the pale of civilization protective frame of sizing for Fabricated balcony | |
CN103526929A (en) | Super high-rise steel pipe column interior concrete pouring construction method | |
CN206616862U (en) | Formwork root bracing means | |
CN106760502A (en) | Shear wall end cylinder construction method | |
CN108661202A (en) | A kind of large area hollow out lattice brick curtain wall construction modelled after an antique and construction method | |
CN106245821A (en) | A kind of lightweight steel construction lightweight concrete prefabrication and assembly construction body of wall and construction method thereof | |
CN104295109B (en) | Do not register one's residence balcony rapid reinforcement structure and construction method thereof in old community | |
CN204209803U (en) | A kind of prefabricated box girder inner formwork aluminum alloy mould plate | |
CN206539052U (en) | A kind of both balconied strengthening reconstruction structure | |
CN106437190A (en) | Industrial architectural heritage planning and designing method | |
CN109488037A (en) | A kind of environmental protection construction method that private residence is quickly rebuild | |
CN205712565U (en) | A kind of prefabricated two-sided wall | |
CN205329703U (en) | A foundation structure and full aluminium building frame structure for making perfect aluminium building | |
CN205475877U (en) | Compound outer thermal insulation walling system of assembled self preservation temperature wallboard | |
CN106437195A (en) | Reinforcing reconstructing structure for existing balcony and construction method thereof | |
CN204690801U (en) | Formwork erecting structure is hung in basement roof ater-casting | |
CN201649686U (en) | Novel anti-seismic reinforced constructional column | |
CN115324249B (en) | Full-prefabricated kitchen and bathroom floor slab and inverse sill integral pouring construction method | |
CN110158762A (en) | Prefabricated steel structure frame supports room | |
CN106320662B (en) | Decorating outer wall of building ultra-wide concrete wire construction method | |
CN106193578B (en) | It is a kind of that modular system and construction technology are matched somebody with somebody based on groove type quarter bend | |
CN107882243B (en) | A kind of cassette ceiling and construction method of concrete-filled rectangular steel tube waffle beam structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |