CN206511664U - A kind of T-rail steel stacking double suction device - Google Patents
A kind of T-rail steel stacking double suction device Download PDFInfo
- Publication number
- CN206511664U CN206511664U CN201720014983.3U CN201720014983U CN206511664U CN 206511664 U CN206511664 U CN 206511664U CN 201720014983 U CN201720014983 U CN 201720014983U CN 206511664 U CN206511664 U CN 206511664U
- Authority
- CN
- China
- Prior art keywords
- stacking
- row
- electromagnetic disc
- rail steel
- steel
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Abstract
The utility model discloses a kind of T-rail steel stacking double suction device and technique.The device includes:Support, is portal frame construction;The removable electromagnetic disc being placed on support;The piling platform being placed in below electromagnetic disc;Stacking conveyer chain, positioned at the front of removable electromagnetic disc and less than the lower surface of removable electromagnetic disc;Collection row's retainer plate, is placed in the underface of stacking conveyer chain, and by Driven by Hydraulic Cylinder.The T-rail steel in a row folded in stacking conveyer chain of the present utility model is all the time in same position, collection row's retainer plate, which rises disk after support steel a to high position and holds the bottom of steel, connects T-rail steel, it is to avoid the head bias that traditional single suction odd row suction nozzle portion is brought;After collection row's retainer plate declines, original place overturns 180 ° of occiputs and waited down for positive left-hand thread for electromagnetic disc position, and even rows, which are risen by collecting row's retainer plate, to be inserted directly into, it is to avoid electromagnetic disc long distance running stop position is difficult to control to the error brought.
Description
Technical field
The utility model is related to the production T-rail steel automatic stacking technical field of metallurgy industry, more particularly to a kind of T-shaped
Guide rail steel stacking double suction device.
Background technology
For a long time, positive left-hand thread after either traditional hand stowage or new-type automatic stacking, T-rail steel folded steel
All it is rail head gap very little, especially small dimension after a problem, T-rail steel folded steel, as long as the glacing flatness of steel is slightly not
Foot, will carry out difficulty, or even can not buckle into positive and negative cingulum.In traditional stacking and stacking technology, positive left-hand thread is in stacking lifting platform
Upper to be completed in layer by disk single suction, disk first holds the head of row's guide rail steel on collection row's retainer, is moved to code
On pile lifting platform, afterwards disk return to collection row retainer at hold row's guide rail steel bottom and overturn 180 ° by its head to
Under, move to the row's guide rail steel of the lifting platform head portion to be palletized such as stacking lifting platform top upward again afterwards and rise insertion disk
On row's steel head gap in.
But the positive and negative Flip-chip of traditional stacking has many problems, occur two rows during positive left-hand thread in production often
Steel is to the situation on not, because to not upper top bad equipment, specific head clearance error producing cause is as follows when serious:1) first row
Steel is since collection row's retainer positioning, and disk holds head, and because the suction of disk produces head clearance skew, it is error one;
2) first row steel is since disk holds head, and disk translation drops down onto steel on stacking lifting platform, because electromagnetic disc magnetic field is not complete
Lose entirely, steel in a row produces clearance offsets during falling, it is error two;3) second row steel passes through magnetic at collection row's retainer
Disk upset head down, afterwards disk move to stacking lifting platform top position stop wait, disk walking stop position without
Method is accurately controlled, and it is error three;4) between the second row steel head that first row steel rising insertion is being waited on stacking lifting platform
In gap, because the magnetic field of electromagnetic disc influences, when close to second row steel head head occurs again for first row steel on stacking lifting platform
Portion is offset, and it is error four;5) assume not considering these errors, first row steel with second row steel is positive and negative buckle well after, second row steel
Bottom surface be in washboard tabular, and restraining force is small suffered by the steel of its edge, may cave at any time, then the 3rd row's steel fall on
Face will produce bigger head clearance skew, and it is error five;6) the 4th row's steel is run to the stacking lifting of existing three row's steel
Above platform, first-order error one is accumulated again to all errors of error four, the very difficult action for completing positive left-hand thread.
In summary, traditional single suction technique at most can only four layers of T-rail steel of code, and actual production fault rate very
Height, how by spacing of the T steel after stacked between accurate control rail head be one must solve the problem of.
Utility model content
In order to overcome the defect of prior art, the purpose of this utility model is to provide a kind of T-rail steel stacking double suction dress
Put, it is simple in construction, it is possible to achieve to pile up at least four layers T-rail steel.
A kind of T-rail steel stacking double suction device, is characterized in including:Support, is portal frame construction;It is placed on support
Removable electromagnetic disc;The piling platform being placed in below electromagnetic disc;Stacking conveyer chain, positioned at the front of removable electromagnetic disc and low
In the lower surface of removable electromagnetic disc;Collection row's retainer plate, is placed in the underface of stacking conveyer chain, and by Driven by Hydraulic Cylinder.
In above-mentioned T-rail steel stacking double suction device, optionally, the removable electromagnetic disc includes being arranged on support
On guide rail, swivel mount and disk body, swivel mount and guide rail coordinate, and disk body is fixed on swivel mount by rotating shaft, it is possible to achieve
360 ° of rotations.
In above-mentioned T-rail steel stacking double suction device, optionally, the stacking conveyer chain includes some tensioning chains
Wheel, tightener sprocket is fixed on the framework of stacking conveyer chain, by the effect of tightener sprocket, realizes the elastic tune of stacking conveyer chain
Section.
In above-mentioned T-rail steel stacking double suction device, optionally, the piling platform includes motor, base, transport
Roller and flat surface, motor, transport roller are installed on base, and what flat surface can be moved up and down is fixed on base, T-rail
Steel is fallen on transport roller by flat surface, and motor driving transport roller advances, so as to drive T-rail steel to advance.
In above-mentioned T-rail steel stacking double suction device, optionally, the collection row retainer plate includes plate face and and plate face
Integrally formed push rod, plate face upper surface is smooth and with certain roughness;The framework of stacking conveyer chain is provided with guide ring,
Push rod is arranged in guide ring, and the expansion link of hydraulic cylinder is connected with push rod, by the flexible up and down of hydraulic cylinder, realizes collection row's retainer
The splicing of plate.
T-rail steel stacking double suction technique of the present utility model, comprises the following steps:Step S1, first row T-rail steel
In place, it is parked in stacking transport chain end;Step S2, collection row's retainer plate rise support steel;Step S3, electromagnetic disc are connect after T-rail steel
Original place overturns 180 °;Step S4, second row T-rail steel in place, are parked in stacking transport chain end;Step S5, collection row's retainer plate
Rise support steel and realize positive left-hand thread;Step S6, electromagnetic disc translation;In place, piling platform rises and connects steel for step S7, electromagnetic disc translation;
Step S8, piling platform, which are connected to after T-rail steel, to be declined;Step S9, repetition stacking, second of double suction;Step S10, third time
Fallen on after double suction on transport roller.
Compared with prior art, advantage is:
1) the T-rail steel in a row folded in stacking conveyer chain is all the time in same position, and collection row's retainer plate rises support steel extremely
After a high position disk holds the bottom of steel and connects T-rail steel, it is to avoid the head bias that traditional single suction odd row suction nozzle portion is brought;
2) after collection row retainer plate declines, for positive left-hand thread, original place 180 ° of occiputs of upset are waited down for electromagnetic disc position,
Even rows, which are risen by collecting row's retainer plate, to be inserted directly into, it is to avoid electromagnetic disc long distance running stop position is difficult to control to the mistake brought
Difference;
3) using after double suction technique, the flatness for the plane that its even rows bottom to traditional single suction technique is formed has not had
Require;The double-deck positive and negative T-rail steel buckled well only needs to directly to put by piling platform, and so change leads T-shaped
Rail steel can bring up to 6 layers with stacking from 4 layers, and reliable and stable.
Brief description of the drawings
To the utility model, further row is described in detail below in conjunction with the accompanying drawings.
Fig. 1 is the structural representation of the utility model T-rail steel stacking double suction device.
In figure:1- supports, 2- may move electromagnetic disc, 21- guide rails, 22- swivel mounts, 23- disk bodies, 3- piling platforms, 31- electricity
Machine, 32- bases, 33- transport rollers, 34- flat surfaces, 4- stackings conveyer chain, 41- frameworks, 42- tightener sprockets, 5- collection row retainer plate,
51- plate faces, 52- push rods, 53- hydraulic cylinders, 6-T shape guide rail steel.
Embodiment
With reference to embodiment, to the utility model, further row is described in detail.
As shown in figure 1, a kind of T-rail steel stacking double suction device includes:Support 1, is portal frame construction;It is placed in support
On removable electromagnetic disc 2;The piling platform 3 being placed in below electromagnetic disc;Stacking conveyer chain 4, before removable electromagnetic disc 2
Side and the lower surface for being less than removable electromagnetic disc 2;Collection row's retainer plate 5, is placed in the underface of stacking conveyer chain 4, and by hydraulic cylinder
Driving.
Further, the removable electromagnetic disc 2 includes rack-mount guide rail 21, swivel mount 22 and disk body 23,
Swivel mount coordinates with guide rail, and disk body is fixed on swivel mount by rotating shaft, it is possible to achieve 360 ° of rotations.
Further, the stacking conveyer chain 4 includes some tightener sprockets 42, and tightener sprocket is fixed on stacking conveyer chain 4
Framework 41 on, by the effect of tightener sprocket, realize the elastic regulation of stacking conveyer chain.
Further, the piling platform 3 includes motor 31, base 32, transport roller 33 and flat surface 34, motor, transport
Roller is installed on base, and what flat surface can be moved up and down is fixed on base, and T-rail steel falls on transport roller by flat surface
On, motor driving transport roller advances, so as to drive T-rail steel to advance.
Further, it is described collection row retainer plate 5 include plate face 51 and with the integrally formed push rod of plate face 52, plate face upper surface
It is smooth and with certain roughness;The framework 41 of stacking conveyer chain 4 is provided with guide ring (not marked in figure), and push rod is arranged in
In guide ring, the expansion link of hydraulic cylinder 53 is connected with push rod, by the flexible up and down of hydraulic cylinder, realizes connecing for collection row's retainer plate
Material.
The benefit of above-mentioned device is:1) the T-rail steel in a row folded in stacking conveyer chain is all the time in same position, collection
Row's retainer plate rises disk after support steel a to high position and holds the bottom of steel connects T-rail steel, it is to avoid traditional single suction odd row suction nozzle
The head bias that portion is brought;2) after collection row retainer plate declines, for positive left-hand thread, original place overturns 180 ° of occiputs for electromagnetic disc position
Wait down, even rows, which are risen by collecting row's retainer plate, to be inserted directly into, it is to avoid electromagnetic disc long distance running stop position is difficult to control
Make the error brought.
In addition, the utility model also provides a kind of T-rail steel stacking double suction technique, comprise the following steps:Step S1,
One row's T-rail steel 6 in place, is parked in stacking transport chain end;Step S2, collection row's retainer plate rise support steel;Step S3, electromagnetic disc
Connect original place after T-rail steel and overturn 180 °;Step S4, second row T-rail steel in place, are parked in stacking transport chain end;Step
S5, collection row's retainer plate, which rise support steel, realizes positive left-hand thread;Step S6, electromagnetic disc translation;Step S7, electromagnetic disc are translated in place, stacking
Platform rises and connects steel;Step S8, piling platform, which are connected to after T-rail steel, to be declined;Step S9, repetition stacking, second of double suction;Step
Fallen on after rapid S10, third time double suction on transport roller.After double suction technique, its even rows bottom shape to traditional single suction technique
Into the flatness of plane do not required;The double-deck positive and negative T-rail steel buckled well only needs to directly to put by piling platform
Upper, so changing makes T-rail steel to bring up to 6 layers from 4 layers with stacking, and reliable and stable.
By taking T75 guide rails as an example, during production, row's T75T shape guide rails steel is 9, and overall width is 480mm, detection after folded steel
To after signal, collection row's retainer rises support steel to highest point, and electromagnetic disc delay comes from bottom Jie Ganghou original places, then the upset that is delayed
180 ° of occiputs are waited down, and even rows are inserted directly into by collecting row's retainer plate rising, and clad steel is integrally translated to code afterwards
On pile lifting platform, it is to meet to require that such process, which circulates 3 direct 3 layer of 6 rows of stacking,.T-rail steel code of the present utility model
The course of work of pile double suction technique is:After this 10 steps are completed, a complete double suction technical process action cycle declaration
Complete.
Claims (5)
1. a kind of T-rail steel stacking double suction device, it is characterised in that including:Support (1), is portal frame construction;It is placed in branch
Removable electromagnetic disc (2) on frame;The piling platform (3) being placed in below electromagnetic disc;Stacking conveyer chain (4), positioned at removable electricity
The front of disk (2) and the lower surface for being less than removable electromagnetic disc (2);Collection row's retainer plate (5), is placed in stacking conveyer chain (4)
Underface, and by Driven by Hydraulic Cylinder.
2. T-rail steel stacking double suction device according to claim 1, it is characterised in that the removable electromagnetic disc (2)
Including rack-mount guide rail (21), swivel mount (22) and disk body (23), swivel mount coordinates with guide rail, and disk body passes through rotating shaft
It is fixed on swivel mount.
3. T-rail steel stacking double suction device according to claim 1, it is characterised in that stacking conveyer chain (4) bag
Some tightener sprockets (42) are included, tightener sprocket is fixed on the framework of stacking conveyer chain (4) (41).
4. T-rail steel stacking double suction device according to claim 1, it is characterised in that the piling platform (3) includes
Motor (31), base (32), transport roller (33) and flat surface (34), motor, transport roller are installed on base, and flat surface can be with
What is moved up and down is fixed on base, and T-rail steel is fallen on transport roller by flat surface.
5. T-rail steel stacking double suction device according to claim 3, it is characterised in that collection row's retainer plate (5) bag
Rubbing board face (51) and with the integrally formed push rod of plate face (52), plate face upper surface is smooth and with certain roughness;Stacking is transported
The framework (41) of defeated chain (4) is provided with guide ring, and push rod is arranged in guide ring, and expansion link and the push rod of hydraulic cylinder (53) connect
Connect.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720014983.3U CN206511664U (en) | 2017-01-06 | 2017-01-06 | A kind of T-rail steel stacking double suction device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720014983.3U CN206511664U (en) | 2017-01-06 | 2017-01-06 | A kind of T-rail steel stacking double suction device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206511664U true CN206511664U (en) | 2017-09-22 |
Family
ID=59865485
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720014983.3U Active CN206511664U (en) | 2017-01-06 | 2017-01-06 | A kind of T-rail steel stacking double suction device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206511664U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106516778A (en) * | 2017-01-06 | 2017-03-22 | 中冶华天南京工程技术有限公司 | T-shaped guide rail steel stacking dual-suction device and process |
CN109384025A (en) * | 2018-09-18 | 2019-02-26 | 安徽伟宏钢结构集团股份有限公司 | A kind of T-steel automatic turning system |
-
2017
- 2017-01-06 CN CN201720014983.3U patent/CN206511664U/en active Active
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106516778A (en) * | 2017-01-06 | 2017-03-22 | 中冶华天南京工程技术有限公司 | T-shaped guide rail steel stacking dual-suction device and process |
CN109384025A (en) * | 2018-09-18 | 2019-02-26 | 安徽伟宏钢结构集团股份有限公司 | A kind of T-steel automatic turning system |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN202924393U (en) | Automatic tray conveyer | |
CN106516778A (en) | T-shaped guide rail steel stacking dual-suction device and process | |
CN109513578A (en) | A kind of full-automatic single track dispenser and its gluing process | |
CN206511664U (en) | A kind of T-rail steel stacking double suction device | |
CN103159055B (en) | A kind of sheet metal automatic shift device | |
CN104986686A (en) | Material transfer machine | |
CN104973425A (en) | Double-tray conveying mechanism of IC optical inspection and sorting system | |
CN207434493U (en) | A kind of integrated transverse moves conveyer | |
CN107813080A (en) | A kind of vehicle beam automation circulation location equipment | |
CN106706652A (en) | Workpiece inspection device | |
CN107902126A (en) | Magnetic shoe boxing apparatus | |
CN111037104A (en) | Automatic marking device for valve body speed-multiplying chain conveying line | |
CN210084502U (en) | Intelligent cargo handling system | |
CN209383326U (en) | A kind of lift brick machine lifting guide mechanism | |
CN208071212U (en) | A kind of lifting device | |
CN207508554U (en) | A kind of vehicle beam automation cycle positioning device | |
CN207596043U (en) | A kind of panel detection device | |
CN207242977U (en) | Stacking pallet dispensing mechanism | |
CN210762955U (en) | Bar type substrate conveying device | |
CN203187149U (en) | Automatic transferring equipment for metal plates | |
CN105329675A (en) | Stacked board machine | |
CN204714454U (en) | Material transfer | |
CN212196094U (en) | Building block quantitative stable conveying device | |
CN219238559U (en) | Conveying device with jacking structure | |
CN207390926U (en) | A kind of new energy battery restrains disk cross-line truss and promotes transfer machine |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |