CN206503149U - A kind of ultra-deep steel pipe concrete continuous underground wall structure - Google Patents

A kind of ultra-deep steel pipe concrete continuous underground wall structure Download PDF

Info

Publication number
CN206503149U
CN206503149U CN201720174265.2U CN201720174265U CN206503149U CN 206503149 U CN206503149 U CN 206503149U CN 201720174265 U CN201720174265 U CN 201720174265U CN 206503149 U CN206503149 U CN 206503149U
Authority
CN
China
Prior art keywords
steel
construction
ultra
pipe pile
concrete
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720174265.2U
Other languages
Chinese (zh)
Inventor
张继红
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Solid Earth Rock Engineering Co Ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201720174265.2U priority Critical patent/CN206503149U/en
Application granted granted Critical
Publication of CN206503149U publication Critical patent/CN206503149U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bulkheads Adapted To Foundation Construction (AREA)
  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)

Abstract

The utility model is related to a kind of ultra-deep steel pipe concrete continuous underground wall structure and its construction method in the underground engineering field in field of civil engineering, the ultra-deep steel pipe concrete continuous underground wall structure includes steel-pipe pile (1), guide frame between stake, fill concrete (10), the part of inclination measurement device (8) four, in work progress, pass through construction steel pile tube (1) control construction perpendicularity, and ensure adjacent pile driving construction perfect parallelism not jag, continuous steel pipe (shaped steel) concrete diaphram wall body is formed in steel-pipe pile and adjacent stake seam crossing perfusion concrete, perpendicularity of constructing can be in work progress timely monitor and processing with perfect parallelism problem, construction depth is unrestricted, steady quality is reliable, it is particularly suitable for use in construction and the Foundation Pit Support Engineering of ultra-deep underground structure.

Description

A kind of ultra-deep steel pipe concrete continuous underground wall structure
Technical field
The utility model is related to the underground engineering field in field of civil engineering.
Background technology
Gone along with sb. to guard him for ultra-deep foundation pit, substantially gone along with sb. to guard him, when depth chin-deep, can be adopted using diaphram wall at present Slotter grooving, or use is used to grab milling combination grooving, mud off, descending reinforcing cage after grooving, Reperfu- sion concrete, the ground commonly used at present The lower general depth of diaphragm wall is up to 40~60 meters, for deeper foundation ditch, and reinforced concrete construction of diaphragm wall technique suffers from huge Big challenge, is primarily due to construct for ultra-deep underground continuous wall, whether grabs native grooving or slotter grooving, grooving it is vertical Straight degree high-precision control is world today's level problem, for the diaphram wall of nearly hundred meters of depths, even millesimal vertical Degree error may also cause bottom 20cm jag, so as to not reach the purpose of earth-retaining sealing, even if using most advanced in the world Equipment, it is also difficult to ensure reliable construction quality.Therefore, for Retaining Structure of Extra-deep Excavation, it is necessary to change prior art structure Direction is thought, using reliable, measurable technical measures and technological means, it is ensured that perfectly safe.The utility model people proposes before this From continuous piling wall construction technology is crept into, solving adjacent steel tube pile construction ensures not jag problem, is that ultra-deep foundation pit goes along with sb. to guard him form Appearance specify direction.
The content of the invention
The purpose of this utility model is to provide a kind of ultra-deep steel pipe concrete continuous underground wall structure, and the ultra-deep steel pipe concrete underground connects Continuous wall construction reliable construction quality, particularly can ensure that the parallel not jag of adjacent stake, and degree control precision is high, there is concrete filling between adjacent stake Note, can form continuous shaped steel (steel pipe) concrete wall, construction depth is unrestricted, is particularly suitable for use in ultra-deep foundation pit and goes along with sb. to guard him and underground The construction of structure.
Guide frame, filling concrete, inclination measurement device four between ultra-deep steel pipe concrete continuous underground wall structure Baogang pile tube, the stake Part, wherein, guide frame includes the guider being connected respectively with adjacent steel-pipe pile and guider two parts between stake, is oriented to Device is the sub-buckle or box that are mutually socketed with guider, and filling concrete is located between steel-pipe pile or stake in connection gap, deviational survey Guide frame is connected between device and steel-pipe pile or stake.
In above-mentioned ultra-deep steel pipe concrete continuous underground wall structure, it can be set at above-mentioned adjacent steel-pipe pile seaming position Put water stopping trough and water sealing structure.
The underground of depth is continuous needed for ultra-deep steel pipe concrete continuous underground wall structure of the present utility model can realize any engineering Wall construction, and the parallel not jag of adjacent stake of successively construction can be accurately controlled, can the timely monitor control construction in work progress The perpendicularity of wall, reliable construction quality, speed is fast, low cost.
Brief description of the drawings
Fig. 1 is a kind of ultra-deep steel pipe concrete continuous underground wall structure construction signal used in one embodiment of the present utility model Figure.
Embodiment
As one embodiment of the present utility model as shown in Figure 1, introduced mainly in conjunction with Fig. 1 of the present utility model super The construction procedure of deep steel pipe concrete diaphram wall and the steel pipe concrete continuous underground wall structure formed after the completion of construction method and construction Construction.As shown in figure 1, the construction of the present utility model ultra-deep steel pipe concrete diaphram wall to be completed is included between steel-pipe pile (1), stake Guide frame, filling concrete (10), the part of inclination measurement device (8) four, wherein, guide frame is connected with steel-pipe pile (1) between stake, is filled Fill out concrete (10) to be located between steel-pipe pile (1) or stake in connection gap, knot is oriented between inclination measurement device (8) and steel-pipe pile (1) or stake Structure is connected.In the present embodiment, guide frame may be designed as the guider (4) being connected respectively with adjacent stake and guider between stake (5) two parts, guider (4) and guider (5) can be connected by H profile steel (2) as shown in Figure 1 with steel-pipe pile (1), work as H , can be using connecting plate (6) as shown in Figure 1 even when shaped steel (2) size is unable to good match with steel-pipe pile (1) and its connector Connect.In the present embodiment, in order to improve the water-stagnating effect that adjacent staking is stitched, it can be set at adjacent steel-pipe pile (1) seaming position Water stopping trough (7) as shown in Figure 1 and water sealing structure (9), water sealing structure (9) can be water-swellable body or fill The sealing bag of water, main purpose is the adjacent staking seam of closure.In the present embodiment, the web (3) of H profile steel (2) and steel-pipe pile (1) it Between space can also using filling concrete (10) filling.This reality is introduced mainly in conjunction with Fig. 1 in the following part of the present embodiment With the construction procedure and method of new ultra-deep steel pipe concrete underground continuous structure.The ultra-deep steel pipe concrete construction method of underground continuous wall Comprise the following steps:The first step, is fixedly mounted leading truck, and the effect of leading truck is mainly first steel-pipe pile (1) of control and applied Perpendicularity during work, because steel-pipe pile (1) lateral stiffness is big, by controlling the vertical control of steel-pipe pile (1) in work progress The perpendicularity of steel pipe concrete diaphram wall after the completion of system construction.The first step of the present utility model is completed, into second step.In this step In rapid, the steel-pipe pile (1) with guider (5) is positioned in leading truck, drill bit is installed in steel-pipe pile (1) bottom so that Drilling rod is located in steel-pipe pile (1), and installs inclination measurement device (8) in steel-pipe pile (1) side wall, and the diameter of drill bit can compare steel-pipe pile (1) external diameter is big, and so, after the completion of construction, drill bit can be placed in soil, and a dismounting drilling rod is recycled.Main purpose is so that The bore diameter got out is more than the diameter of steel-pipe pile (1), is easy to steel-pipe pile (1) to adjust perpendicularity in work progress.Can also The diameter of drill bit is slightly less than the diameter of steel-pipe pile (1), the brill of larger diameter is got out by drill bit rocking in drilling process Hole.When the rated capacity of the calibrator (-ter) unit of use is higher, bore diameter can also be made to be less than the external diameter of steel-pipe pile (1), so Benefit be that need not handle the hole on the outside of pile body after the completion of steel-pipe pile (1) piling construction.Otherwise, needed after pile sinking to steel-pipe pile (1) space on periphery is handled.The all spaces of stake can be blocked by connecting Grouting Pipe slip casting in the outside of steel-pipe pile (1), The space on steel-pipe pile (1) periphery can be blocked using the method for high-pressure rotary-spray, it is contemplated that steel-pipe pile (1) belongs to ultra-deep underground structure, can The drilling rod of high-pressure rotary jet grouting pile or the guiding of drill bit are pre-set in the side wall of steel-pipe pile (1), to prevent rotary churning pile inclined at far-reaching place From steel-pipe pile (1).So as to complete the second step of the present embodiment, into the 3rd step.In this step, drill bit is driven to bore by drilling rod Enter the soil body, the soil body of steel-pipe pile (1) bottom is drilled loose or be drilled to mud, steel-pipe pile (1) is sunk into the soil body, steel-pipe pile (1) is sunk to The casing of drilled pile can be doubled as after the soil body, protects hole wall not cave in, during steel-pipe pile (1) sinks to drilling, is measured simultaneously The perpendicularity of steel-pipe pile is adjusted, steel-pipe pile (1) is remained vertical, while drilling can be ensured by the constraint of steel-pipe pile (1) All the time it is vertical, and make drilling all the time with adjacent stake perfect parallelism.The 3rd step is completed, into the 4th step.This step is mainly lasting brill Hole is to desired depth, while steel-pipe pile (1) is sunk down into expected absolute altitude.After the piling construction of steel-pipe pile (1) is completed, it will can put Take out and recycle in the drilling rod in steel-pipe pile (1).The 4th step of the present embodiment is completed, into the 5th step.In this step, it will treat In the guider (5) for the steel-pipe pile (1) that guider (4) insertion on the steel-pipe pile (1) of construction is formerly constructed, and to construct Steel-pipe pile (1) bottom install drill bit so that drilling rod be located at steel pipe in, and steel-pipe pile (1) side wall install inclinometer pipe, repeat 3rd step to the 4th step, completes the piling construction of next steel-pipe pile (1).In the present embodiment, guider (4) and guider (5) it can be sub-buckle or box in double buckle, the 5th step of the present embodiment be completed, into the 6th step.In this step, pass through Whether the perpendicularity that inclination measurement device (8) determines construction steel pile tube (1) meets design requirement, and determine adjacent stake whether jag, such as Be unsatisfactory for design requirement, then can on pull out steel-pipe pile (1) and construct again, if meeting design requirement, steel-pipe pile, adjacent stake can be connected The space perfusion concrete at place, and next pile construction can be continued, so as to complete ultra-deep steel pipe concrete diaphram wall of the present utility model Construction method.In the present embodiment, in the 3rd above-mentioned step, vibratory drilling method or static pressure method can be aided with by steel-pipe pile (1) and its connected Fitting sinks to the soil body.In addition, in the present embodiment, in the 3rd above-mentioned step, using slotter drill bit can be replaced to complete square The construction of steel pipe concrete stake diaphram wall.
This patent includes but is not limited to alternative other construction methods used of professional person in the art.

Claims (2)

1. a kind of ultra-deep steel pipe concrete continuous underground wall structure, it is characterized in that mixed including guide frame, filling between steel-pipe pile (1), stake Solidifying soil (10), the part of inclination measurement device (8) four, wherein, between stake guide frame include respectively with leading that adjacent steel-pipe pile (1) is connected To device (4) and guider (5) two parts, guider (4) is the sub-buckle or box that are mutually socketed, filling with guider (5) Concrete (10) is located between steel-pipe pile (1) or stake in connection gap, guide frame between inclination measurement device (8) and steel-pipe pile (1) or stake Connection.
2. ultra-deep steel pipe concrete continuous underground wall structure according to claim 1, it is characterized in that in above-mentioned adjacent steel pipe Water stopping trough (7) and water sealing structure (9) are set at stake (1) seaming position.
CN201720174265.2U 2017-02-24 2017-02-24 A kind of ultra-deep steel pipe concrete continuous underground wall structure Active CN206503149U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720174265.2U CN206503149U (en) 2017-02-24 2017-02-24 A kind of ultra-deep steel pipe concrete continuous underground wall structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720174265.2U CN206503149U (en) 2017-02-24 2017-02-24 A kind of ultra-deep steel pipe concrete continuous underground wall structure

Publications (1)

Publication Number Publication Date
CN206503149U true CN206503149U (en) 2017-09-19

Family

ID=59842058

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720174265.2U Active CN206503149U (en) 2017-02-24 2017-02-24 A kind of ultra-deep steel pipe concrete continuous underground wall structure

Country Status (1)

Country Link
CN (1) CN206503149U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106836236A (en) * 2017-02-24 2017-06-13 张继红 A kind of ultra-deep steel pipe concrete continuous underground wall structure and its construction method
CN114657998A (en) * 2022-02-09 2022-06-24 中国建筑第八工程局有限公司 Subway station deep foundation pit support structure and construction method thereof

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106836236A (en) * 2017-02-24 2017-06-13 张继红 A kind of ultra-deep steel pipe concrete continuous underground wall structure and its construction method
CN114657998A (en) * 2022-02-09 2022-06-24 中国建筑第八工程局有限公司 Subway station deep foundation pit support structure and construction method thereof
CN114657998B (en) * 2022-02-09 2024-03-12 中国建筑第八工程局有限公司 Subway station deep foundation pit retaining structure and construction method thereof

Similar Documents

Publication Publication Date Title
CN106245626A (en) A kind of hard formation churning driven enters method
CN104153352B (en) Karst geology rotary-drilling bored concrete pile hole forming process
CN104563098B (en) A kind of super-large diameter all steel casing does operation pore-creating filling pile construction method
CN105275381B (en) Impact drill drilling construction method in rich water pebble layer
CN105951747B (en) A kind of construction method of the pre-buried lattice column of contrary sequence method
CN107130592B (en) construction method for long spiral drill and impact drill double-machine composite hole-forming cast-in-place pile
CN106836206A (en) Casing rotary digging bore forming method
JP6342126B2 (en) Ground injection method
CN103774690A (en) Grabbing, drilling and punching combined underground continuous wall grooving construction method
CN102628266A (en) Construction method of long spiral cast-in-situ bored pile
CN106193042A (en) Next-door neighbour's underground structure sandy soil layer is gone along with sb. to guard him obstacle pile sweep-out method at ground wall
CN101586340A (en) Preconditioning process of continuous wall for weak weathering terrane grooving construction
CN112196494B (en) Construction process and construction equipment for geological pipeline jointed between rock and soil layer
CN111691397A (en) Karst tunnel bottom filling bead string type karst cave steel pipe pile grouting hole forming method
CN110306531A (en) High water level erratic boulder stratum construction of diaphragm wall technique
CN107084648A (en) One kind uses pilot hole guide-localization and Smooth Blasting Construction method
CN105064381A (en) High-low cutting edge double-wall steel cofferdam reinforced concrete once bottom sealing construction method
CN206503149U (en) A kind of ultra-deep steel pipe concrete continuous underground wall structure
CN115369860A (en) Construction method of super-long isolation pile close to subway
CN106836236A (en) A kind of ultra-deep steel pipe concrete continuous underground wall structure and its construction method
CN105200994A (en) Construction method for reserved shield crossing composite foundation pit support device
CN211500533U (en) Hole guiding device for geological static pressure pile in rich thick sand layer
CN107964940A (en) A kind of construction method of continuous wall trench underground
CN103806444A (en) Soft soil layer rotary excavating pile construction method
CN107143335A (en) The guide hole construction method of ultra-deep shaft

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20181102

Address after: 200086 502, room 4, Lane 306, Helen Road, Hongkou District, Shanghai.

Patentee after: Shanghai Solid Earth Rock Engineering Co., Ltd.

Address before: 200086 502, room 4, Lane 306, Helen Road, Hongkou District, Shanghai.

Patentee before: Zhang Jihong