CN107143335A - The guide hole construction method of ultra-deep shaft - Google Patents
The guide hole construction method of ultra-deep shaft Download PDFInfo
- Publication number
- CN107143335A CN107143335A CN201710450332.3A CN201710450332A CN107143335A CN 107143335 A CN107143335 A CN 107143335A CN 201710450332 A CN201710450332 A CN 201710450332A CN 107143335 A CN107143335 A CN 107143335A
- Authority
- CN
- China
- Prior art keywords
- drilling
- directional
- drill
- bha
- hole
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000010276 construction Methods 0.000 title claims abstract description 50
- 238000005553 drilling Methods 0.000 claims abstract description 100
- 239000011435 rock Substances 0.000 claims description 20
- 238000000034 method Methods 0.000 claims description 10
- 238000003780 insertion Methods 0.000 claims description 5
- 230000037431 insertion Effects 0.000 claims description 5
- 239000002689 soil Substances 0.000 claims description 3
- 230000003068 static effect Effects 0.000 claims description 3
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 5
- 238000010586 diagram Methods 0.000 description 4
- 241001074085 Scophthalmus aquosus Species 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 2
- 238000009434 installation Methods 0.000 description 2
- 101100194817 Caenorhabditis elegans rig-6 gene Proteins 0.000 description 1
- 241000923606 Schistes Species 0.000 description 1
- 230000015572 biosynthetic process Effects 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 206010016256 fatigue Diseases 0.000 description 1
- 239000003673 groundwater Substances 0.000 description 1
- 239000010445 mica Substances 0.000 description 1
- 229910052618 mica group Inorganic materials 0.000 description 1
- 230000035515 penetration Effects 0.000 description 1
- 238000004062 sedimentation Methods 0.000 description 1
- 239000010865 sewage Substances 0.000 description 1
- 239000002893 slag Substances 0.000 description 1
- 230000005641 tunneling Effects 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D1/00—Sinking shafts
- E21D1/03—Sinking shafts mechanically, e.g. by loading shovels or loading buckets, scraping devices, conveying screws
- E21D1/06—Sinking shafts mechanically, e.g. by loading shovels or loading buckets, scraping devices, conveying screws with shaft-boring cutters
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B10/00—Drill bits
- E21B10/26—Drill bits with leading portion, i.e. drill bits with a pilot cutter; Drill bits for enlarging the borehole, e.g. reamers
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B47/00—Survey of boreholes or wells
- E21B47/02—Determining slope or direction
- E21B47/022—Determining slope or direction of the borehole, e.g. using geomagnetism
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B7/00—Special methods or apparatus for drilling
- E21B7/04—Directional drilling
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B7/00—Special methods or apparatus for drilling
- E21B7/04—Directional drilling
- E21B7/10—Correction of deflected boreholes
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B7/00—Special methods or apparatus for drilling
- E21B7/28—Enlarging drilled holes, e.g. by counterboring
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D3/00—Raising shafts, i.e. working upwards from the bottom
Landscapes
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Life Sciences & Earth Sciences (AREA)
- Geology (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Physics & Mathematics (AREA)
- Environmental & Geological Engineering (AREA)
- Fluid Mechanics (AREA)
- Mechanical Engineering (AREA)
- Geophysics (AREA)
- Earth Drilling (AREA)
Abstract
The guide hole construction method of ultra-deep shaft of the present invention, including:(1)Preparation of construction;(2)Directional drilling machine is installed in place;(3)Perforate drilling tool combination drill enters;(4)Normal BHA drilling:(5)Deviational survey BHA is crept into:(6)Directional tool combination drilling:(7)Normal BHA drilling:(8)Directional drilling machine is removed:(9)Anti- well rig is installed in place.Ben Mingfa construction method energy accelerating construction progresses, improve construction precision, reduction construction cost, safety, accurately and fast.
Description
Technical field:
The present invention relates to a kind of ultra-deep for being particularly suitable for use in the outdoor ultra-deep shaft drilling construction such as water conservancy, water power, building, mine
(More than 300m)The guide hole construction method of vertical shaft,
Background technology:
In conventional vertical shaft guide hole construction, anti-well rig has operating efficiency height, Forming Quality is good, labor intensity is low, safety
The advantages of risk is small, is more and more applied in hydroelectric project Construction of Silo.But in advanced Construction of Silo, due to setting
Standby self performance, the influence for operating the factor such as hands-on background and geological conditions, anti-well rig guide hole construction precision is difficult to full
Foot is required, often produces larger deviation, and then causes later stage Construction of Silo difficult, causes substantial amounts of extra-fill of backbreaking, even
Disused well etc. is caused, substantial amounts of construction period and cost is wasted.
The content of the invention:
The invention aims to overcome anti-well rig precision in the construction of ultra-deep shaft guide hole not high, deflection is larger to be lacked
Point improves construction precision, reduces the safety of construction cost, ultra-deep shaft accurately and fast there is provided a kind of energy accelerating construction progress
Construction method.
The object of the present invention is achieved like this:
The guide hole construction method of ultra-deep shaft of the present invention, comprises the following steps:
(1)Preparation of construction;
(2)Directional drilling machine is installed in place;
(3)Perforate drilling tool combination drill enters;
Annular hole slot is reserved on the basis of concrete, and rig is subjected to conscientious centering, makes drill center, well head center and unit head master
Axle center superposition, it is ensured that 20m is crept into using perforate BHA before perforate perpendicularity, directional hole;
(4)Normal BHA drilling:
20~50m of directional hole is crept into using normal drilling BHA;
(5)Deviational survey BHA is crept into:
More than directional hole 50m is crept into using deviational survey BHA, and every 9~11m carries out 1 deviational survey, ensures rig during deviational survey
Static shape is in drilling rod;
(6)Directional tool combination drilling:
The deflection that the drift angle size that must be measured according to directional tool in directional hole drilling process is judged, passes through azimuth
Judge the position of deflection, once there is larger deflection in directional hole(More than 30cm), drilling should be stopped, deflection and deflection is determined
Directional tool combination is changed behind orientation to be rectified a deviation, and after the completion of correction, is crept into using directional tool combination, the pressure of the drill, drilling speed
With pump amount with normal BHA;
(7)Normal BHA drilling:
When directional hole is crept into last remaining 9~11m, normal drilling BHA is changed, to prevent from damaging deviational survey in open-work
Instrument, drill collar;
(8)Directional drilling machine is removed:
The smooth insertion of directional hole, meet after required precision, drilling tool is all proposed, to determining outside hole, directional drilling machine to be removed;
(9)Anti- well rig is installed in place;
Anti- well rig and its auxiliary equipment coordinate manually installed using truck crane, and anti-well rig basis and setting well rig are expanded
Hole, reaming uses special drill bit, prevents from glancing off in reaming procedure.
When above-mentioned directional tool combination is crept into, directional tool combination uses 190mm rock bit+165mm screw drills
Head+159mm non magnetic drill collar+NC46 hanging pup joint+89mm high-strength drill pipe+73mm high-strength drill pipes, directional hole was rectified a deviation
The pressure of the drill is to control based on tool face azimuth in journey, and drilling speed is 0r~10r/min, and pump amount is 990 L/min, cylinder sleeve 140mm.
When above-mentioned perforate drilling tool combination drill enters, 20m is crept into using perforate BHA before directional hole, and drilling tool is used
190mm rock bit+159mm non magnetic drill collar+73mm short drill pipes, drilling the pressure of the drill is 0.3~0.5 t, and drilling speed is 30~40r/
Min, pump amount is 990 L/min, cylinder sleeve 140mm.
When above-mentioned normal BHA is crept into, drilling tool uses 190mm rock bit+159mm non magnetic drill collars+89mm
High-strength drill pipe+73mm high-strength drill pipes, drilling the pressure of the drill is 1.5~3.5 t, and table soil, decomposed rock section drilling speed are 70~80 r/
Min, bottom hard rock section drilling speed is 50~60 r/min, and pump amount is 990 L/min, cylinder sleeve 140mm, and non magnetic drill collar is 2~4
Root.
When above-mentioned deviational survey BHA creeps into step:Deviational survey BHA using 190mm rock bit+159mm without
Magnetic drill collar+NC46 hanging pup joint+89mm high-strength drill pipe+73mm high-strength drill pipes, the pressure of the drill, drilling speed and pump amount and normal drilling tool
Combination drilling phase is same.
The inventive method is had with the function of boring deviational survey, automatic deviation correction using directional drilling machine.The top measured according to inclinometer
Angle size may determine that deflection, the position of deflection be may determine that by azimuth, it is determined that deflection and deflection side
After position, directional tool combination will be changed by applying brill personnel, and main frame engine stop provides torsion, only driven by mud pressure curved
The MTR rotation of screw rod bottom, drives rock bit broken rock, when drilling is repaired to normal hole position, recovers normal drilling
Pattern is crept into.
The guide hole construction method of ultra-deep shaft has the effect that compared with the single anti-well rig pore-forming of tradition:
(1)The construction that anti-well rig carries out high deep shaft guide hole is combined using directional drilling machine, vertical shaft deflection can be effectively prevented,
Ensure borehole accuracy, realize the disposable insertion success of vertical shaft guide hole;
(2)Special reaming bit is used in anti-well rig reaming procedure, can effectively prevent anti-well rig in reaming
The skew problems being likely to occur in journey;
(3)Anti- well rig is combined using directional drilling machine and carries out high deep shaft guide hole construction, can be reduced due to vertical shaft Rods Under Deviated Pilot Hole Conditions
Caused later stage pilot shaft, tunneling boring dig the problems such as construction period extension caused, construction cost increase;
(4)Anti- well rig is combined using directional drilling machine and carries out advanced Construction of Silo, is reduced to a certain extent to anti-well rig
The requirement of performance.
Brief description of the drawings:
Fig. 1 is directional drilling machine site layout project figure.
Fig. 2 is perforate drilling tool combination diagram.
Fig. 3 is normal BHA schematic diagram.
Fig. 4 is deviational survey BHA schematic diagram.
Fig. 5 is directional drilling BHA schematic diagram.
Embodiment:
Fig. 1 is directional drilling machine site layout project figure.Including 1# mud pits 1,2# mud pits 2, sedimentation basin 3, drilling rod laydown area 4, drilling
Center 5, rig 6, rig recession region 7.
Referring to Fig. 1~Fig. 5, the guide hole construction method of the present embodiment ultra-deep shaft comprises the following steps:
(1)Preparation of construction:
Preparation of construction includes water supply and sewage, power supply, levelling of the land, directional drilling machine and anti-well rig basis, circulating water pool, electrical equipment
The actions such as installation;
Drilling mud preparation must also be completed before construction, and mud is fully circulated;
(2)Directional drilling machine is installed in place:
Directional drilling machine derrick platform near well head is assembled, and using 25t and 50t truck crane integral hoistings, rig is then carried out again
And auxiliary equipment is installed;
(3)Perforate drilling tool combination drill enters:
Annular hole slot is reserved on the basis of concrete, and rig is subjected to conscientious centering, makes drill center, well head center and unit head master
Axle center superposition, it is ensured that perforate perpendicularity.20m is crept into using perforate BHA before directional hole.Drilling tool uses 190mm
Rock bit 8+ 159mm non magnetic drill collar 9+ 73mm short drill pipes 10(2m)(Referring to Fig. 2).Drilling the pressure of the drill is 0.3~0.5 t, is bored
Speed is 30~40r/min, and pump amount is 990 L/min(140mm cylinder sleeves);
(4)Normal BHA drilling:
20~50m of directional hole is crept into using normal drilling BHA, and drilling tool uses 190mm rock bit 8+ 159mm
Non magnetic drill collar 9(2~4)+ 89mm high-strength drill pipe 11+ 73mm high-strength drill pipes 10(Referring to Fig. 3).Creeping into the pressure of the drill is
1.5~3.5 t, table soil, decomposed rock section drilling speed are 70~80 r/min, and hard rock section drilling speed in bottom is 50~60 r/min, pump amount
For 990 L/min(140mm cylinder sleeves);
(5)Deviational survey BHA is crept into:
Crept into after directional hole 50m using deviational survey BHA, 1 deviational survey is carried out per 10m(More than 30cm), protected during deviational survey
Card rig and drilling rod remain static.Deviational survey BHA uses 190mm rock bit 8+ 159mm non magnetic drill collars 9+NC46
Hanging pup joint 12+ 89mm high-strength drill pipe 11+ 73mm high-strength drill pipes 10(Referring to Fig. 4).The pressure of the drill, drilling speed and pump amount with it is normal
BHA is identical when creeping into;
(6)Directional tool combination drilling:
According to the skew results that directional tool is drawn in directional hole drilling process, once larger deflection occurs in directional hole, it should stop
Only creep into, change directional tool combination and rectified a deviation.Directional tool combination uses 190mm rock bit 8+ 165mm screw drills
Head 13+ 159mm non magnetic drill collar 9+ NC46 hanging pup joint 12+ 89mm high-strength drill pipe 11+ 73mm high-strength drill pipes 10(Referring to
Fig. 5).The pressure of the drill is to control based on tool face azimuth during directional hole correction, and drilling speed is 0r~10r/min, and pump amount is 990 L/min
(140mm cylinder sleeves), after the completion of correction, to save the time for changing drilling tool, crept into using directional tool combination, the pressure of the drill, brill
Speed and pump amount are with normal BHA;
(7)Normal BHA drilling:
When directional hole is crept into last remaining 10m or so, normal drilling BHA is changed, to prevent from damaging deviational survey in open-work
Instrument, drill collar etc.;
(8)Directional drilling machine is removed:
The smooth insertion of directional hole, meet after required precision, drilling tool is all proposed outside holes, using 50t truck cranes by directional drilling machine
Remove;
(9)Anti- well rig is installed in place:
Anti- well rig and its auxiliary equipment coordinate manually installed using 50t truck cranes.Surveying party is to anti-well rig basis and equipment
Installation measures check.Anti- well rig base cross members are reinforced using foundation bolt, to prevent anti-well in drilling process
The shifting phenomena that rig may occur;
(10)Reaming:
Under the conditions of normal reaming, anti-well rig uses I type reaming bit.When there is directional hole stopping state, it is necessary to change II
Type reaming bit, carries out reaming in the form of recirculated water return slag;
After the completion of reaming, reverse drawing drill bit is installed and carries out follow-up vertical shaft construction of pilot shaft.
The applicant is once 374.32m in some hydropower station cable shaft depth, and diameter 7.3m is tested.Vertical shaft location
Domain top 50m is Quaternary Period outwash, is below quartz-schist, mica schist, and formation dip is 65~80 ° or so, and is developed
Have and easily occur deflection in multigroup joint fissure, rich groundwater, boring procedure, pore-forming condition is poor.
To solve the cable shaft duration tightly, complex geologic conditions, the problem of pore-forming condition difference is bored using directional drilling machine and anti-well
The form of machine combination carries out cable shaft guide hole construction.First, the directional hole for carrying out 190mm using directional drilling machine is constructed, then
Using the anti-well rig of BMC400 types by special reaming bit, 190mm directional hole is expanded as to 270mm guide hole.Adopt
Hole construction is oriented with directional drilling machine, the smooth insertion of directional hole, average penetration intensity is 22m/d;Carried out using anti-well rig
Directional hole reaming is constructed, and reaming construction is smoothly completed, and average reaming intensity is 23.4m/d.
Cable shaft guide hole construction is carried out using Directional Drilling and the combination of anti-well rig, total construction period is 33 days, average construction
Intensity is 11.34m/d.Guide hole construction is directly carried out using anti-well rig, average construction intensity is 7m/d, completes cable shaft guide hole
Construction about needs the duration 53 days.20 day time has been saved for the construction of cable shaft guide hole.The guide hole ultimately formed using this method is tired out
Meter deflection is 1.21m, and borehole accuracy is 0.32%.Much smaller than the required precision of anti-well drill hole of drilling machine 1%.
Above-described embodiment is that the above of the present invention is described further, but it is above-mentioned that this should not be interpreted as to the present invention
The scope of theme is only limitted to above-described embodiment.It is all that protection scope of the present invention is belonged to based on the technology that the above is realized.
Claims (5)
1. the guide hole construction method of ultra-deep shaft, comprises the following steps:
(1)Preparation of construction;
(2)Directional drilling machine is installed in place;
(3)Perforate drilling tool combination drill enters;
Annular hole slot is reserved on the basis of concrete, and rig is subjected to conscientious centering, makes drill center, well head center and unit head master
Axle center superposition, it is ensured that 20m is crept into using perforate BHA before perforate perpendicularity, directional hole;
(4)Normal BHA drilling:
20~50m of directional hole is crept into using normal drilling BHA;
(5)Deviational survey BHA is crept into:
More than directional hole 50m is crept into using deviational survey BHA, and every 9~11m carries out 1 deviational survey, ensures rig during deviational survey
Static shape is in drilling rod;
(6)Directional tool combination drilling:
The deflection that the drift angle size that must be measured according to directional tool in directional hole drilling process is judged, passes through azimuth
Judge the position of deflection, once larger deflection occurs in directional hole, drilling should be stopped, determining to change after deflection and skew direction
Directional tool combination is rectified a deviation, after the completion of correction, is crept into using directional tool combination, the pressure of the drill, drilling speed and pump amount are with just
Normal BHA;
(7)Normal BHA drilling:
When directional hole is crept into last remaining 9~11m, normal drilling BHA is changed, to prevent from damaging deviational survey in open-work
Instrument, drill collar;
(8)Directional drilling machine is removed:
The smooth insertion of directional hole, meet after required precision, drilling tool is all proposed, to determining outside hole, directional drilling machine to be removed;
(9)Anti- well rig is installed in place;
Anti- well rig and its auxiliary equipment coordinate manually installed using truck crane, and anti-well rig basis and setting well rig are expanded
Hole, reaming uses special drill bit, prevents from glancing off in reaming procedure.
2. the guide hole construction method of ultra-deep shaft as claimed in claim 1, it is characterised in that during directional tool combination drilling,
Directional tool combination use 190mm rock bit+165mm screw rod drill bit+159mm non magnetic drill collar+NC46 hanging pup joints+
89mm high-strength drill pipe+73mm high-strength drill pipes, the pressure of the drill is to control based on tool face azimuth during directional hole correction, and drilling speed is 0
~10 r/min, pump amount is 990 L/min, cylinder sleeve 140mm.
3. the guide hole construction method of ultra-deep shaft as claimed in claim 1 or 2, it is characterised in that perforate drilling tool combination drill enters
When, 20m is crept into using perforate BHA before directional hole, drilling tool using 190mm rock bit+159mm non magnetic drill collars+
73mm short drill pipes, drilling the pressure of the drill is 0.3~0.5 t, and drilling speed is 30~40r/min, and pump amount is 990 L/min, cylinder sleeve
140mm。
4. the guide hole construction method of ultra-deep shaft as claimed in claim 1 or 2, it is characterised in that normal BHA drilling
When, drilling tool uses 190mm rock bit+159mm non magnetic drill collar+89mm high-strength drill pipe+73mm high-strength drill pipes, drilling
The pressure of the drill is 1.5~3.5 t, and table soil, decomposed rock section drilling speed are 70~80 r/min, and hard rock section drilling speed in bottom is 50~60 r/
Min, pump amount is 990 L/min, cylinder sleeve 140mm, and non magnetic drill collar is 2~4.
5. the guide hole construction method of ultra-deep shaft as claimed in claim 1 or 2, it is characterised in that deviational survey BHA drilling step
Rapid deviational survey BHA using 190mm rock bit+159mm non magnetic drill collar+NC46 hanging pup joint+89mm high-strength drill pipes+
73mm high-strength drill pipes, the pressure of the drill, drilling speed and pump amount are identical when being crept into normal BHA.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201710450332.3A CN107143335A (en) | 2017-06-15 | 2017-06-15 | The guide hole construction method of ultra-deep shaft |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201710450332.3A CN107143335A (en) | 2017-06-15 | 2017-06-15 | The guide hole construction method of ultra-deep shaft |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN107143335A true CN107143335A (en) | 2017-09-08 |
Family
ID=59782427
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201710450332.3A Pending CN107143335A (en) | 2017-06-15 | 2017-06-15 | The guide hole construction method of ultra-deep shaft |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN107143335A (en) |
Cited By (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN111441718A (en) * | 2020-04-10 | 2020-07-24 | 中国水利水电第一工程局有限公司 | Construction method, system and application for high-precision pilot shaft excavation of large-section steep slope long inclined shaft |
| CN113445916A (en) * | 2021-08-11 | 2021-09-28 | 中冀建勘集团有限公司 | Construction method for correcting hole sweeping deviation of small-diameter deep well bedrock section |
| CN114575746A (en) * | 2022-03-10 | 2022-06-03 | 贵州天然气管网有限责任公司 | Construction method for natural gas pipeline reverse well drilling crossing |
Citations (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN201110127Y (en) * | 2007-12-18 | 2008-09-03 | 上海中曼石油天然气集团有限公司 | Drilling tool combination being suitable for quick welldrilling |
| CN201386509Y (en) * | 2009-04-30 | 2010-01-20 | 中国石油集团川庆钻探工程有限公司钻采工艺技术研究院 | Drilling tool combination for relay transmission measurement while drilling device |
| CN104847263A (en) * | 2015-04-30 | 2015-08-19 | 中煤科工集团西安研究院有限公司 | Coal bed methane far-end butt joint horizontal well drilling method |
| CN105888549A (en) * | 2015-06-26 | 2016-08-24 | 山东科技大学 | Kilometer-depth L-shaped ground pre-grouting drilling tool assembly applied to hole drilling and hole drilling process |
-
2017
- 2017-06-15 CN CN201710450332.3A patent/CN107143335A/en active Pending
Patent Citations (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN201110127Y (en) * | 2007-12-18 | 2008-09-03 | 上海中曼石油天然气集团有限公司 | Drilling tool combination being suitable for quick welldrilling |
| CN201386509Y (en) * | 2009-04-30 | 2010-01-20 | 中国石油集团川庆钻探工程有限公司钻采工艺技术研究院 | Drilling tool combination for relay transmission measurement while drilling device |
| CN104847263A (en) * | 2015-04-30 | 2015-08-19 | 中煤科工集团西安研究院有限公司 | Coal bed methane far-end butt joint horizontal well drilling method |
| CN105888549A (en) * | 2015-06-26 | 2016-08-24 | 山东科技大学 | Kilometer-depth L-shaped ground pre-grouting drilling tool assembly applied to hole drilling and hole drilling process |
Non-Patent Citations (1)
| Title |
|---|
| 王彬彬: "深竖井反井法先导孔快速施工技术研究", 《铁道建筑技术》 * |
Cited By (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN111441718A (en) * | 2020-04-10 | 2020-07-24 | 中国水利水电第一工程局有限公司 | Construction method, system and application for high-precision pilot shaft excavation of large-section steep slope long inclined shaft |
| CN113445916A (en) * | 2021-08-11 | 2021-09-28 | 中冀建勘集团有限公司 | Construction method for correcting hole sweeping deviation of small-diameter deep well bedrock section |
| CN114575746A (en) * | 2022-03-10 | 2022-06-03 | 贵州天然气管网有限责任公司 | Construction method for natural gas pipeline reverse well drilling crossing |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN105888551B (en) | Anti- well method is once drilled to long inclined shaft sinking shaft technique | |
| CN102392650B (en) | Non-explosive tunnel excavation construction method | |
| CN103643918B (en) | A kind of searching for Ordovician limestone mining area and the method preventing mine from seeping water | |
| CN110700293B (en) | Rotary excavating leading hole steel sheet pile cofferdam construction method under deep water sloping rock environment | |
| CN112360468B (en) | Excavation supporting method for vertical shaft slag sliding well | |
| CN109024719B (en) | A method of rectifying the inclination of buildings with pile side disturbance and resistance reduction | |
| CN106245626A (en) | A kind of hard formation churning driven enters method | |
| CN104832119A (en) | Window opening and sidetrack drilling short-radius horizontal well and reverse circulation well cementing and water plugging method | |
| CN109098661B (en) | Two-way paired cross-river large apex angle inclined hole drilling method in the valley of the hydropower station | |
| CN101818644A (en) | Well digging process of mining vertical shaft by adopting one-drilling well completion and well drilling method | |
| CN103266603A (en) | Construction method for pre-drilling hole-forming base-expanding and grouting of prestressed concrete special-shaped pile | |
| CN110984132B (en) | Construction method for grooving underground diaphragm wall under complex geological condition | |
| CN103134236A (en) | Construction method of tilted burying of underground heat exchanger of ground source heat pump | |
| CN105888549B (en) | A kind of boring BHA of km depth L-type pre grouting from the surface and bore process | |
| CN102562087B (en) | Hydraulic drill follow-up pipe-shed construction method | |
| CN110273413A (en) | A kind of efficient construction method of prefabricated pile | |
| CN103643674B (en) | Erect column pile construction method under geologic condition of pebble bed sandstone | |
| CN115419409B (en) | A method for reverse well construction of a large diameter shaft in deep surface soil | |
| CN108570982A (en) | The quiet brill of one kind taking root in energy stake and its construction method | |
| CN104453705A (en) | Secondary forming method for large-hole-diameter cast-in-place pile rotary drilling rig | |
| CN106836236A (en) | A kind of ultra-deep steel pipe concrete continuous underground wall structure and its construction method | |
| CN113738383A (en) | Shield end reinforcing method | |
| CN103452473A (en) | Method for performing small-diameter deep well construction by using full-face high-counterweight drill bit device | |
| CN206503149U (en) | A kind of ultra-deep steel pipe concrete continuous underground wall structure | |
| CN105401572A (en) | Construction technique for environment-friendly cast-in-situ bored pile provided with wall protecting tube |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PB01 | Publication | ||
| PB01 | Publication | ||
| SE01 | Entry into force of request for substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20170908 |
|
| WD01 | Invention patent application deemed withdrawn after publication |