CN206495107U - The earth's surface osmotic layer configurations of the sponge urban rainwater circulatory system - Google Patents

The earth's surface osmotic layer configurations of the sponge urban rainwater circulatory system Download PDF

Info

Publication number
CN206495107U
CN206495107U CN201720131710.7U CN201720131710U CN206495107U CN 206495107 U CN206495107 U CN 206495107U CN 201720131710 U CN201720131710 U CN 201720131710U CN 206495107 U CN206495107 U CN 206495107U
Authority
CN
China
Prior art keywords
earth
pervious bed
basic unit
layer
buffer layer
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720131710.7U
Other languages
Chinese (zh)
Inventor
王泽芳
杨尚坤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Deyang Huali New Type Building Material Co Ltd
Deyang Shun Hui Building Materials Co Ltd
Original Assignee
Deyang Huali New Type Building Material Co Ltd
Deyang Shun Hui Building Materials Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Deyang Huali New Type Building Material Co Ltd, Deyang Shun Hui Building Materials Co Ltd filed Critical Deyang Huali New Type Building Material Co Ltd
Priority to CN201720131710.7U priority Critical patent/CN206495107U/en
Application granted granted Critical
Publication of CN206495107U publication Critical patent/CN206495107U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Road Paving Structures (AREA)

Abstract

The utility model discloses a kind of design of the earth's surface osmotic layer configurations of sponge urban rainwater circulatory system, belong to urban water supply system technical field;The earth's surface permeable formation from top to bottom includes successively:First pervious bed, first buffer layer, the second pervious bed, second buffer layer, basic unit and geotechnological layer of cloth, first pervious bed and the second pervious bed are built into using mechanism water-permeable brick, first buffer layer and second buffer layer are formed using sand or sand and rubble mixing laying, and basic unit is formed using rubble or rubble and sand mixing compacting;The earth's surface permeable formation has preferably infiltration and filter effect using the structure design of multilayer, on the other hand the storage and holding for also causing the earth's surface permeable formation that there is larger volume to carry out rainwater, while there is the earth's surface permeable formation under the structure preferable intensity disclosure satisfy that the demand that urban pavement is laid.

Description

The earth's surface osmotic layer configurations of the sponge urban rainwater circulatory system
Technical field
The utility model is related to a kind of sponge city conceptual design, particularly a kind of ground of the sponge urban rainwater circulatory system Table osmotic layer configurations are designed, and belong to urban water supply system technical field.
Background technology
Traditional road construction, lays, brick body and concrete do not absorb water and oozed when raining by common brick body or concrete Water, road surface slippery situation, the discharge of rainwater is carried out by urban discharging pipeline.Often because heavy rain, heavy rain, displacement be big, draining Pond blocks and causes road ponding, or even the phenomenons such as waterlogging occurs.Rainwater is directly entered urban discharging pipeline and discharged simultaneously, makes The rainwater of urban pavement(Freshwater resources)Utilization rate is low.
The problems such as in order to solve rainy city Route for pedestrians draining and water storage, it is proposed that the concept in sponge city.Sponge city City is exactly urban construction to be become as cavernous body is the same, can have water suction, retaining, infiltration and the effect of water purification, neutralizing rainwater The natural calamity brought, makes the elastic city of the water acted freely.It is not to make a new start to build sponge city, and substitution is passed The drainage system of system, but a kind of of conventional drainage systems is lightened the burden and supplemented, farthest play urban water supply and sewerage pipe network The effect of itself.
Therefore a kind of sponge urban rainwater circulatory system is designed, can efficiently carries out the collection, purification, storage of urban rainwater And infiltration, and can be merged with urban drainage pipe network, it is target and the requirement of city sponge system Construction, is also the reason Read the key factor promoted.
Pervious concrete is also known as celluar concrete, non-fine concrete, permeable terrace.Be by aggregate, cement, reinforcing agent and A kind of porous light concrete of water mixing, it is free of fine aggregate, mutual by coarse aggregate Surface coating a thin layer cement mortar Bond and form the equally distributed alveolate texture in hole, therefore with ventilative, permeable and lightweight feature.Water-permeable brick, can divide For common water-permeable brick, polymer fiber concrete permeable brick, colored stone composite concrete permeable brick, colored stone epoxy entire body water-permeable brick, Concrete permeable brick and ecological sand base water-permeable brick etc..
The content of the invention
Goal of the invention of the present utility model is:Circulated for above-mentioned problem there is provided a kind of sponge urban rainwater The earth's surface osmotic layer configurations of system, make it have good infiltration and water storage function, and with good intensity and durability.
The technical solution adopted in the utility model is as follows:
A kind of earth's surface osmotic layer configurations of the sponge urban rainwater circulatory system, the earth's surface permeable formation is from top to bottom wrapped successively Include:First pervious bed, first buffer layer, the second pervious bed, second buffer layer, basic unit and geotechnological layer of cloth, first pervious bed and Second pervious bed is built into using water-permeable brick, and first buffer layer and second buffer layer are using sand or sand and rubble mixing laying Into basic unit is formed using rubble or rubble and sand mixing compacting.Using the structure of multilayer, on the one hand cause the earth's surface permeable formation The storage of rainwater is carried out with larger volume, while the earth's surface permeable formation under the structure has preferable filter effect, and With preferable intensity with meet urban pavement laying demand.
Further, the thickness of second pervious bed is more than the thickness of the first pervious bed.
Further, first pervious bed is divided into two layers, respectively different permeable of two layers of density of upper layer and cutting optimal Concrete is made, and pervious concrete density of the pervious concrete density more than cutting optimal of upper layer.
Further, the basic unit is divided into two layers, respectively upper basic unit and goes to a grassroots level, and upper basic unit gravel particle be less than under The gravel particle of basic unit.
Further, the thickness of first pervious bed is 60-70mm, and the thickness of first buffer layer is 20-30mm, and second is saturating The thickness of water layer is 100-140mm, and its thickness of second buffer layer is 20-30mm, and the thickness of basic unit is 100-200mm.
Further, the earth's surface permeable formation is layed in pavement.
In summary, by adopting the above-described technical solution, the beneficial effects of the utility model are:The earth's surface permeable formation is adopted There is preferably infiltration and filter effect with the structure design of multilayer, on the other hand also cause the earth's surface permeable formation has larger Volume carries out the storage and holding of rainwater, while there is the earth's surface permeable formation under the structure preferable intensity disclosure satisfy that city road The demand of face laying.
Brief description of the drawings
Fig. 1 is the section structure signal of the earth's surface osmotic layer configurations of the sponge urban rainwater circulatory system of the present utility model Figure.
Marked in figure:The pervious beds of 1- first, 11- upper layers, 12- cutting optimals, 2- first buffer layers, the pervious beds of 3- second, 4- second buffer layers, 5- basic units, the upper basic units of 51-, 52- are gone to a grassroots level, the geotechnological layer of cloths of 6-.
Embodiment
Below in conjunction with the accompanying drawings, the utility model is described in detail.
In order that the purpose of this utility model, technical scheme and advantage are more clearly understood, below in conjunction with accompanying drawing and implementation Example, the utility model is further elaborated.It should be appreciated that specific embodiment described herein is only to explain The utility model, is not used to limit the utility model.
Embodiment
A kind of earth's surface osmotic layer configurations of sponge urban rainwater circulatory system of the present utility model, its section structure such as Fig. 1 Shown, the earth's surface permeable formation from top to bottom includes successively:First pervious bed 1, first buffer layer 2, the second pervious bed 3, second delay Layer 4, basic unit 5 and geotechnological layer of cloth 6 are rushed, the pervious bed 3 of the first pervious bed 1 and second is built into using water-permeable brick, the He of first buffer layer 2 Second buffer layer 4 is formed using sand or sand and rubble mixing laying, and basic unit 5 is formed using rubble compacting.Pervious concrete It is used as a kind of prior art, also known as celluar concrete, non-fine concrete, permeable terrace.It is by aggregate, cement, reinforcing agent, He Shui A kind of porous light concrete of mixing, it is free of fine aggregate, is mutually glued by coarse aggregate Surface coating a thin layer cement mortar Tie and form the equally distributed alveolate texture in hole, therefore be a kind of good ground with ventilative, permeable and lightweight feature The material of table permeable formation 1.Earth's surface permeable formation under the structure has good permeance property and strainability, and with higher water Storage capacity, while the Mechanical Structure Strength of earth's surface permeable formation under the structure is good, stably, disclosure satisfy that urban pavement is mated formation The need for.First pervious bed 1 ensures the intensity of mating formation on ground, and plays a part of seeping water and filter.Second pervious bed 3, which is played, to be added The effect of strong ground pavement intensity, also acts as infiltration, the effect of water conservation.First buffer layer 2 and second buffer layer 4 play buffering and made With while playing a part of infiltration and water conservation, to the second pervious bed 3 in basic unit 5, the first pervious bed 1 on the second pervious bed 3 For also act as the effect of levelling support.The well-grounded effect of whole earth's surface permeable formation is played by basic unit 5.Geotechnological layer of cloth 6 is carried out Soil(Such as the roadbed on pavement)The cut-off of interlayer is permeated with earth's surface, it is ensured that the superperformance of earth's surface permeable formation.
In an embodiment of first buffer layer 2 and second buffer layer 4, it is to be formed using coarse sand laying, has Have the advantages that water penetration is high.Or a small amount of cement is further added in coarse sand, the ratio of specific coarse sand and cement is matter Amount compares 3:1 forms the structure with space, to ensure the further stabilization of the cushion, and does not influence its water permeability.In tool In body implementation process, in order to ensure to be filled with sand in the stability of basic unit 5, basic unit 5, or it is further in basic unit 5 add cement further to stablize its structure.
In structure based on the earth's surface permeable formation, the first pervious bed 1, the second pervious bed 3 can be using live one-piece castings Laying.As another improvement and optimization, the pervious bed 3 of the first pervious bed 1 or/and second uses saturating in another embodiment Water coagulation soil be made it is brick into so that its convenient-laying and maintenance.
In structure based on the earth's surface permeable formation, as another improvement and optimization, in another embodiment this second The thickness of pervious bed 3 is more than the thickness of the first pervious bed 1.Such design causes second pervious bed 3 playing intensity increase In the presence of, also act the effect for improving moisture storage capacity.
In structure based on the earth's surface permeable formation, as another improvement and optimization, in another embodiment this first 1 point of pervious bed is two layers, as shown in figure 1, the respectively different pervious concrete system of two layers of density of upper layer 11 and cutting optimal 12 Into, and pervious concrete density of the pervious concrete density more than cutting optimal 12 of upper layer 11.The density of upper layer 11 is larger, energy Enough improve top layer strainability, enable long-time use protect the first pervious bed 1 and under permeance property.It is specific real Shi Zhong, the thickness of upper layer 11 is about the 1/4 of the thickness of the first pervious bed 1, makes it have good permeability and filterability.
In structure based on the earth's surface permeable formation, as improving and optimizing, 5 points of the basic unit is in another embodiment Two layers, respectively upper basic unit 51 and go to a grassroots level 52, and upper basic unit 51 gravel particle be less than go to a grassroots level 52 gravel particle.This is The optimization done to basic unit 5 in structural strength and functionally, two layers of design forms the basic unit 5, Yi Jibao with density gradient Card basic unit 5 seamlessly transits with second buffer layer 4, it is ensured that the support strength of basic unit 5 and the stabilization for ensureing second buffer layer 4 thereon Property.
In the structure of the various embodiments described above based on the earth's surface permeable formation, each layer is made improvements and optimized, this is first permeable The thickness of layer 1 is 60-70mm, and the thickness of first buffer layer 2 is 20-30mm, and the thickness of the second pervious bed 3 is 100-140mm, the Its thickness of two cushions 4 is 20-30mm, and the thickness of basic unit 5 is 100-200mm., can be more preferably under the thickness design of each layer Guarantee earth's surface permeable formation infiltration, filtering and the effect of water storage realization, while have more preferable structural stability, and engineering Cost in zone of reasonableness, enough meet the need for urban pavement mats formation.
In the concrete application of earth's surface permeable formation, the earth's surface permeable formation can be layed in pavement.
Earth's surface permeable formation of the present utility model uses the structure design of multilayer, is permeated and filter effect with preferable, separately On the one hand the storage and holding for also causing the earth's surface permeable formation that there is larger volume to carry out rainwater, while the earth's surface under the structure There is permeable formation preferable intensity disclosure satisfy that the demand that urban pavement is laid.Show by the practical result of test section, should Earth's surface permeable formation penetrating power is good, disclosure satisfy that city torrential rain and extra torrential rain permeate demand and road surface simultaneously should without ponding The storage capacity of earth's surface permeable formation is good, and the water evaporation of summer earth's surface permeable formation causes the temperature of earth's surface significantly to reduce, effectively It has adjusted the miniclimate in city.Preferably, its construction costs is substantially suitable with traditional paved road for the durability of the earth's surface permeable formation, With very strong practicality.
Preferred embodiment of the present utility model is the foregoing is only, it is all at this not to limit the utility model Any modifications, equivalent substitutions and improvements made within the spirit and principle of utility model etc., should be included in the utility model Protection domain within.

Claims (6)

1. a kind of earth's surface osmotic layer configurations of the sponge urban rainwater circulatory system, it is characterised in that:The earth's surface permeable formation is by up to Under include successively:First pervious bed(1), first buffer layer(2), the second pervious bed(3), second buffer layer(4), basic unit(5)With Geotechnological layer of cloth(6), first pervious bed(1)With the second pervious bed(3)It is built into using water-permeable brick, first buffer layer(2)With second Cushion(4)Formed using sand or sand and rubble mixing laying, basic unit(5)Using rubble or the mixing compacting of rubble and sand Form.
2. the earth's surface osmotic layer configurations of the sponge urban rainwater circulatory system as claimed in claim 1, it is characterised in that:This second Pervious bed(3)Thickness be more than the first pervious bed(1)Thickness.
3. the earth's surface osmotic layer configurations of the sponge urban rainwater circulatory system as claimed in claim 1, it is characterised in that:This first Pervious bed(1)It is divided into two layers, respectively upper layer(11)And cutting optimal(12)The different pervious concrete of two layers of density is made, and Upper layer(11)Pervious concrete density be more than cutting optimal(12)Pervious concrete density.
4. the earth's surface osmotic layer configurations of the sponge urban rainwater circulatory system as claimed in claim 1, it is characterised in that:The basic unit (5)It is divided into two layers, respectively upper basic unit(51)With go to a grassroots level(52), and upper basic unit(51)Gravel particle be less than go to a grassroots level(52) Gravel particle.
5. the earth's surface osmotic layer configurations of the sponge urban rainwater circulatory system as claimed in claim 1, it is characterised in that:This first Pervious bed(1)Thickness be 60-70mm, first buffer layer(2)Thickness be 20-30mm, the second pervious bed(3)Thickness be 100-140mm, second buffer layer(4)Its thickness be 20-30mm, basic unit(5)Thickness be 100-200mm.
6. the earth's surface osmotic layer configurations of the sponge urban rainwater circulatory system as claimed in claim 1, it is characterised in that:The earth's surface Permeable formation is layed in pavement.
CN201720131710.7U 2017-02-14 2017-02-14 The earth's surface osmotic layer configurations of the sponge urban rainwater circulatory system Active CN206495107U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720131710.7U CN206495107U (en) 2017-02-14 2017-02-14 The earth's surface osmotic layer configurations of the sponge urban rainwater circulatory system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720131710.7U CN206495107U (en) 2017-02-14 2017-02-14 The earth's surface osmotic layer configurations of the sponge urban rainwater circulatory system

Publications (1)

Publication Number Publication Date
CN206495107U true CN206495107U (en) 2017-09-15

Family

ID=59804596

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720131710.7U Active CN206495107U (en) 2017-02-14 2017-02-14 The earth's surface osmotic layer configurations of the sponge urban rainwater circulatory system

Country Status (1)

Country Link
CN (1) CN206495107U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107642017A (en) * 2017-09-17 2018-01-30 刘庆芳 A kind of rain return-seepage device for water collecting access way
CN108642993A (en) * 2018-06-26 2018-10-12 长春玛莎建材有限公司 A kind of permeable unit, porous base course, porous pavement and construction method
CN112666058A (en) * 2020-11-10 2021-04-16 宁波大学 Experimental device and method suitable for optimizing performance of coastal sponge city permeable pavement system
CN114525708A (en) * 2022-02-28 2022-05-24 上海占弘水性高分子材料有限公司 Colored anti-skidding terrace suitable for sponge city and construction process thereof

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107642017A (en) * 2017-09-17 2018-01-30 刘庆芳 A kind of rain return-seepage device for water collecting access way
CN108642993A (en) * 2018-06-26 2018-10-12 长春玛莎建材有限公司 A kind of permeable unit, porous base course, porous pavement and construction method
CN112666058A (en) * 2020-11-10 2021-04-16 宁波大学 Experimental device and method suitable for optimizing performance of coastal sponge city permeable pavement system
CN112666058B (en) * 2020-11-10 2023-04-07 宁波大学 Experimental device and method suitable for optimizing performance of coastal sponge city permeable pavement system
CN114525708A (en) * 2022-02-28 2022-05-24 上海占弘水性高分子材料有限公司 Colored anti-skidding terrace suitable for sponge city and construction process thereof

Similar Documents

Publication Publication Date Title
CN206495107U (en) The earth's surface osmotic layer configurations of the sponge urban rainwater circulatory system
CN206495262U (en) The sponge urban rainwater circulatory system
CN106638918A (en) Construction method for sponge city rainwater collection system
CN107326774A (en) Multi-functional ink storage draining and the urban ecology road surface for conserving lawn
CN104878678A (en) Construction method for water-permeable and water-retaining water-permeable pavement structure
CN105735082A (en) Water-permeable planting formwork frame and multifunctional water-permeable pavement structure system and pavement method thereof
CN206256334U (en) A kind of novel environment friendly paving structure
CN107386048A (en) Underground heat snow melt, noise reduction suitable for the north cut dirty rainwater-collecting ecological pavement
CN107386054A (en) A kind of urban road filtration, purification and collection drainage systems
CN107503263A (en) A kind of multimode rainwater-collecting purification and the urban road of self-restraint greenbelt
CN206591382U (en) Assembled sponge walkway system
CN204803703U (en) Concrete road surface water collect structures permeates water
CN207143633U (en) A kind of pervious concrete grass planting land earth construction
CN214089283U (en) Permeable pavement structure with preformed groove
CN208685390U (en) Sponge city paved road structure
CN110607727B (en) Garden road structure capable of draining water quickly and construction method
JP4147154B2 (en) Water-retaining pavement and its construction method
CN204608544U (en) A kind of water conservation layer of water permeable pavement
CN105484125A (en) Step capable of collecting and utilizing rainwater
CN214089284U (en) Permeable pavement structure
CN203049399U (en) Water filter brick
CN105421647A (en) Step building block for collecting and utilizing rainwater
CN212582322U (en) Polyurethane-based permeable ecological road
CN206090204U (en) Height ecological road surface structure of permeating water
CN211256536U (en) Composite semi-permeable waterway surface structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant