- Publication number
- CN206427941U CN206427941U CN201720020167.3U CN201720020167U CN206427941U CN 206427941 U CN206427941 U CN 206427941U CN 201720020167 U CN201720020167 U CN 201720020167U CN 206427941 U CN206427941 U CN 206427941U
- Authority
- CN
- China
- Prior art keywords
- anchoring ring
- tower body
- pedestal
- tower crane
- attachment
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Abstract
The utility model is related to a kind of construction tower crane and builds attachment temporarily, including tower crane tower body, also include at least two attachment pedestals for being located at tower crane tower body homonymy, pedestal anchoring ring is fixed with described attachment pedestal, tower body anchoring ring I is fixed with the position being generally aligned in the same plane on described tower crane tower body with described pedestal anchoring ring, described tower crane tower body is further fixed on tower body anchoring ring II above or below tower body anchoring ring I, two horizontal Anchored Bars are at least hinged between wherein tower body anchoring ring I and each pedestal anchoring ring, fix bar is fixed between horizontal Anchored Bar in adjacent pedestal anchoring ring, oblique Anchored Bar is hinged between described fix bar and described tower body anchoring ring II.The utility model is set up firmly, can be set up for deep basal pit and foundation ditch periphery narrow and small place, be efficiently solved the problem of tower crane is reinforced.
Description
Technical field
The utility model is related to construction engineering technical field, and in particular to a kind of construction safety device, particularly one kind is applied
Work tower crane builds attachment temporarily.
Background technology
In Building Construction, the use of tower crane is indispensable, and with the construction of architectural engineering, the height of tower crane is not
Disconnected increase, risk is also increased therewith, and this is accomplished by setting up rock-steady structure, referred to as tower crane attachment in tower crane relevant position.When need
How tower crane attachment is set to add tower crane when deep basal pit is installed and has non-demolition of buildings around tower crane and closing foundation ditch
Admittedly being a great problem, adhere to for deep-excavation tower crane, a kind of construction tower crane of design builds attachment temporarily, can well solve
The reinforcing problem of tower crane in deep basal pit.
Utility model content
The utility model builds attachment, this attachment temporarily there is provided one kind construction tower crane in view of the shortcomings of the prior art
Put and set up firmly, can be set up for deep basal pit and foundation ditch periphery narrow and small place, efficiently solve the problem of tower crane is reinforced.
The utility model is achieved by the following technical solution:
A kind of construction tower crane is provided and builds attachment, including tower crane tower body temporarily, in addition at least two are located at tower crane tower body
It is fixed with the attachment pedestal of homonymy, described attachment pedestal on pedestal anchoring ring, described tower crane tower body and described pedestal
Tower body anchoring ring I is fixed with the position that anchoring ring is generally aligned in the same plane, described tower crane tower body is in tower body anchoring ring I top
Or lower section is further fixed on tower body anchoring ring II, and two are at least hinged between wherein tower body anchoring ring I and each pedestal anchoring ring
Be fixed with fix bar between horizontal Anchored Bar in horizontal Anchored Bar, adjacent pedestal anchoring ring, described fix bar with it is described
Tower body anchoring ring II between be hinged with oblique Anchored Bar.
Adhere to and connected between the stand anchoring ring of pedestal and the tower body anchoring ring I of tower crane tower body by horizontal Anchored Bar, filled
Divide the stability using triangle, strengthen the stability of tower crane attachment, be hinged between horizontal Anchored Bar in fixed fix bar
The other end of one oblique Anchored Bar and oblique Anchored Bar is hinged with the tower body anchoring ring II on tower crane tower body, constitutes vertical plane triangle
Structure, further increases the stability of tower crane attachment.
Preferably, described pedestal anchoring ring, tower body anchoring ring I and tower body anchoring ring II are logical by two adhesion frames
Connecting bolt is crossed to be spliced.
Pedestal anchoring ring, tower body anchoring ring I and tower body anchoring ring II are set to the splicing of two adhesion frames, convenient dismounting with
Install, and may be reused.
Preferably, be hinged between described tower body anchoring ring I and each pedestal anchoring ring two horizontal Anchored Bars and
Strengthening support is fixed between horizontal Anchored Bar.
Preferably, being fixed with girt between described attachment pedestal.
Girt is fixed pedestal is adhered to, and further enhances the triangular structure stability of pedestal and tower crane tower body.
Preferably, described attachment pedestal is provided with two and symmetrical centered on tower crane tower body.
Two attachment pedestals are set to meet the requirement of firm tower crane tower body, it is symmetrical so that structure is attractive in appearance, more
Aesthetic feeling.
Preferably, described horizontal Anchored Bar and oblique Anchored Bar be respectively adjustable length horizontal Anchored Bar and can
The oblique Anchored Bar of adjustment length.
Set adjustable length horizontal Anchored Bar and adjustable length oblique Anchored Bar, can according to attachment pedestal with
The distance of tower crane tower body adjusts appropriate length, may apply to more job sites, with good general applicability.
Preferably, described horizontal Anchored Bar two ends pass through bearing pin between attachment pedestal and tower body anchoring ring I respectively
It is hinged.
Preferably, described oblique Anchored Bar two ends are cut with scissors between fix bar and tower body anchoring ring II by bearing pin respectively
Connect.
The two ends of horizontal Anchored Bar are respectively equipped with pin shaft hole, match somebody with somebody with the pin shaft hole in pedestal anchoring ring and tower body anchoring ring I
Close, and be hinged by inserting bearing pin realization;The two ends of oblique Anchored Bar are respectively equipped with pin shaft hole, with being anchored in fix bar with tower body
Pin shaft hole on ring II coordinates, and is hinged by inserting bearing pin realization, convenient dismounting.
The beneficial effects of the utility model:
First, by being hinged horizontal Anchored Bar and oblique attachment in tower body anchoring ring I, tower body anchoring ring II and pedestal anchoring ring
Bar, makes full use of the stability of triangle, substantially increases the security and stability of tower crane;
2nd, the adjustable in length of horizontal Anchored Bar and oblique Anchored Bar, disclosure satisfy that the use of different condition, applicability
Extensively;
3rd, set up firmly, can be set up for deep basal pit and foundation ditch periphery narrow and small place, and it is reusable, effectively solve
The problem of tower crane of having determined is reinforced.
Brief description of the drawings
Fig. 1 is top view of the present utility model;
Fig. 2 is front view of the present utility model;
Shown in figure:
1st, adhere to pedestal, 2, pedestal anchoring ring, 3, connecting bolt, 4, horizontal Anchored Bar and pedestal anchor interannular bearing pin, 5,
Horizontal Anchored Bar, 6, strengthening support, 7, fix bar, 8, oblique Anchored Bar, bearing pin between 9, tower body anchoring ring II and oblique Anchored Bar,
10th, tower crane tower body, 11, tower body anchoring ring II, 12, girt, 13, tower body anchoring ring I.
Embodiment
For the technical characterstic for illustrating this programme can be understood, below by embodiment, this programme is illustrated.
A kind of construction tower crane is provided and builds attachment, including tower crane tower body 10 temporarily, in addition at least two are located at tower crane tower
Girt 12 is fixed between the attachment pedestal 1 of the homonymy of body 10, attachment pedestal 1, attachment pedestal 1 can set two, three
It is even more many, as a kind of embodiment of the present utility model, as shown in figure 1, provided with two attachment pedestals 1 and with tower crane tower body
It is symmetrical centered on 10;
It is fixed with pedestal anchoring ring 2, described tower crane tower body 10 and is anchored with described pedestal on described attachment pedestal 1
Tower body anchoring ring I13 is fixed with the position that ring 2 is generally aligned in the same plane, described tower crane tower body 10 is tower body anchoring ring I13's
Above or below be further fixed on tower body anchoring ring II11, as a kind of embodiment of the present utility model, as shown in Fig. 2 tower body
Anchoring ring II11 is located at tower body anchoring ring I13 top, described pedestal anchoring ring 1, tower body anchoring ring I13 and tower body anchoring ring
II11 is spliced by two adhesion frames by connecting bolt 3, and tower crane tower body 10 and attachment pedestal 1 are square structure,
It is also square that pedestal anchoring ring 2, tower body anchoring ring I13 and tower body anchoring ring II11 match therewith, so adhesion frame is en
Shape structure and by connecting bolt 3 fixed bit, one square structure, certain pedestal anchoring ring 2 can also be other shapes, such as
The shapes such as cylinder, triangular prism, adhesion frame matches with the shape of pedestal anchoring ring 2;
Two horizontal Anchored Bars 5 are at least hinged between wherein tower body anchoring ring I13 and each pedestal anchoring ring 2, it is adjacent
Pedestal anchoring ring 2 on horizontal Anchored Bar 5 between be fixed with fix bar 7, described fix bar 7 and described tower body anchoring ring
Oblique Anchored Bar 8 is hinged between II11.
Two horizontal Anchored Bars 5 are hinged between described tower body anchoring ring I13 and each pedestal anchoring ring 2 and level is attached
And be fixed with strengthening support 6 between bar 5.
Described horizontal Anchored Bar 5 and oblique Anchored Bar 8 are respectively the horizontal Anchored Bar and adjustable length of adjustable length
The oblique Anchored Bar of degree.
Cut with scissors respectively between pedestal anchoring ring 2 and tower body anchoring ring I13 by bearing pin 4 at the described two ends of horizontal Anchored Bar 5
Connect.
The described two ends of oblique Anchored Bar 8 are hinged between fix bar 7 and tower body anchoring ring II11 by bearing pin 9 respectively.
The utility model can manufacture adhering member according to design drawing, and structure manufacture, which is finished, to be started to install, installation procedure
It is as follows:
The position that attached wall frame is filled on tower crane tower body 10 adds provisional mounting platform, performs installation and prepares.Tower crane is installed
During tower body anchoring ring I13 and tower body anchoring ring II11, first the adhesion frame of the side of tower body 10 is hung at the attachment point of tower body(Should
Sling adhesion frame level), it is fixed on tower crane tower body 10, then slings second half adhesion frame just with iron wire
Position, it is determined that the tower body anchoring ring I13 or tower body anchoring ring II11 that two adhesion frames are spliced into be horizontal after enter again
Row is fixed;It is fixed after should appropriately adjusting if being not in horizontal level, two lateral frames are linked together with connecting bolt 2
It is spliced into tower body anchoring ring I13 or tower body anchoring ring II11.It is when horizontal Anchored Bar 5 and oblique Anchored Bar 8 are lifted, level is attached
Bar 5 and oblique Anchored Bar 8 be assembled on the ground needed for be hung at attachment point after length, the bearing pin in alignment adhesion frame
Hole, squeezes into connection bearing pin 4 and bearing pin 9, then adjusts again to attachment point adhesion frame, completes to install.
Certainly, described above is also not limited to the example above, and technical characteristic of the utility model without description can lead to
Cross or realized using prior art, be will not be repeated here;Above example and accompanying drawing are merely to illustrate technology of the present utility model
Scheme is not to limitation of the present utility model, with reference to preferred embodiment the utility model is described in detail, originally
Field it is to be appreciated by one skilled in the art that those skilled in the art institute in essential scope of the present utility model
The variations, modifications, additions or substitutions made are without departure from objective of the present utility model, and should also belong to right of the present utility model will
Seek protection domain.
Claims (8)
1. one kind construction tower crane builds attachment, including tower crane tower body temporarily, it is characterised in that:Also include at least two and be located at tower crane
Be fixed with the attachment pedestal of tower body homonymy, described attachment pedestal on pedestal anchoring ring, described tower crane tower body with it is described
Tower body anchoring ring I is fixed with the position that pedestal anchoring ring is generally aligned in the same plane, described tower crane tower body is tower body anchoring ring I's
Above or below be further fixed on tower body anchoring ring II, be at least hinged between wherein tower body anchoring ring I and each pedestal anchoring ring
Be fixed with fix bar between horizontal Anchored Bar in two horizontal Anchored Bars, adjacent pedestal anchoring ring, described fix bar with
Oblique Anchored Bar is hinged between described tower body anchoring ring II.
2. construction tower crane according to claim 1 builds attachment temporarily, it is characterised in that:Described pedestal anchoring ring, tower
Body anchoring ring I and tower body anchoring ring II is spliced by two adhesion frames by connecting bolt.
3. construction tower crane according to claim 1 builds attachment temporarily, it is characterised in that:Described tower body anchoring ring I with
It is hinged between each pedestal anchoring ring between two horizontal Anchored Bars and horizontal Anchored Bar and is fixed with strengthening support.
4. construction tower crane according to claim 1 builds attachment temporarily, it is characterised in that:It is solid between described attachment pedestal
Surely there is girt.
5. construction tower crane according to claim 1 builds attachment temporarily, it is characterised in that:Described attachment pedestal is provided with two
It is individual and symmetrical centered on tower crane tower body.
6. construction tower crane according to claim 1 builds attachment temporarily, it is characterised in that:Described horizontal Anchored Bar and tiltedly
It is respectively the horizontal Anchored Bar of adjustable length and the oblique Anchored Bar of adjustable length to Anchored Bar.
7. the construction tower crane according to claim 1 or 6 builds attachment temporarily, it is characterised in that:Described horizontal Anchored Bar
Two ends pass through hinge between pedestal anchoring ring and tower body anchoring ring I respectively.
8. the construction tower crane according to claim 1 or 6 builds attachment temporarily, it is characterised in that:Described oblique Anchored Bar
Two ends pass through hinge between fix bar and tower body anchoring ring II respectively.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720020167.3U CN206427941U (en) | 2017-01-09 | 2017-01-09 | Construction tower crane builds attachment temporarily |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720020167.3U CN206427941U (en) | 2017-01-09 | 2017-01-09 | Construction tower crane builds attachment temporarily |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206427941U true CN206427941U (en) | 2017-08-22 |
Family
ID=59584724
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720020167.3U Expired - Fee Related CN206427941U (en) | 2017-01-09 | 2017-01-09 | Construction tower crane builds attachment temporarily |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206427941U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106495026A (en) * | 2017-01-09 | 2017-03-15 | 山东华邦建设集团有限公司 | Attachment built temporarily by construction tower crane |
CN107522112A (en) * | 2017-09-04 | 2017-12-29 | 储昭汉 | A kind of multifunctional safe tower crane |
-
2017
- 2017-01-09 CN CN201720020167.3U patent/CN206427941U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106495026A (en) * | 2017-01-09 | 2017-03-15 | 山东华邦建设集团有限公司 | Attachment built temporarily by construction tower crane |
CN107522112A (en) * | 2017-09-04 | 2017-12-29 | 储昭汉 | A kind of multifunctional safe tower crane |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN206769354U (en) | A kind of steel structure hoisting platform | |
CN104895335B (en) | Method for mounting hanging pillar | |
CN105908761A (en) | Construction technology of hanging basket moving platform for high slope | |
CN206427941U (en) | Construction tower crane builds attachment temporarily | |
CN205777600U (en) | Batter post installs auxiliary support apparatus | |
CN211689943U (en) | Assembled pier stud template upset buffer | |
CN105464456A (en) | Method and lifting sling for assembling extra-high voltage transmission iron tower through helicopter | |
CN109826082B (en) | Construction method for installing decorative structure in multi-tower combined space of cable-stayed bridge | |
CN106495026B (en) | Construction tower crane temporarily builds attachment | |
CN205953378U (en) | Tower crane counter weight is put from dismouting | |
CN104563515B (en) | The formwork erection structure of superelevation shear wall and construction method | |
CN204252083U (en) | Arch dam bracket hangs plate device by the feet entirely | |
CN206607903U (en) | A kind of pre-assembled elevator hard protection pipe support | |
CN107143198B (en) | A method of UHV transmission steel tower is found suitable for mountain area sternness location group | |
CN205875168U (en) | A prevent structure of falling for foundation ditch steel shotcrete | |
CN211920714U (en) | Support system of pull-up and pull-down type external hanging self-climbing tower crane | |
CN209011132U (en) | A kind of fixed foundation pit berm structure of assembled two point | |
CN210947661U (en) | Installation device of socket type overhanging scaffold | |
CN108518119B (en) | Portable power transmission pole maintenance tool and construction method | |
CN203101704U (en) | Transmission line protection device | |
CN106245530A (en) | A kind of universal rod body CABLEWAY ERECTION SYSTEM removes engineering method | |
CN208309937U (en) | The support construction of artistic stone curtain wall is installed | |
CN111764623A (en) | Lower hanging construction platform module of high-altitude large-cantilever steel roof truss and construction method | |
CN206580444U (en) | A kind of urban construction building prefabricated components hanging apparatus | |
CN205476507U (en) | Inside pump line fixing device of jacking platform |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||