CN205777600U - Batter post installs auxiliary support apparatus - Google Patents

Batter post installs auxiliary support apparatus Download PDF

Info

Publication number
CN205777600U
CN205777600U CN201620603505.1U CN201620603505U CN205777600U CN 205777600 U CN205777600 U CN 205777600U CN 201620603505 U CN201620603505 U CN 201620603505U CN 205777600 U CN205777600 U CN 205777600U
Authority
CN
China
Prior art keywords
batter post
stay cord
anchor ear
support column
fixedly connected
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201620603505.1U
Other languages
Chinese (zh)
Inventor
刘金芳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Metallurgical Construction Engineering Group Co Ltd
Original Assignee
China Metallurgical Construction Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Metallurgical Construction Engineering Group Co Ltd filed Critical China Metallurgical Construction Engineering Group Co Ltd
Priority to CN201620603505.1U priority Critical patent/CN205777600U/en
Application granted granted Critical
Publication of CN205777600U publication Critical patent/CN205777600U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Abstract

The utility model discloses a kind of batter post and auxiliary support apparatus is installed, including being separately positioned on the support means on batter post top and being arranged on the stabilising arrangement of batter post bottom, described support means includes can banding anchor ear I on described batter post, the lower section being positioned at anchor ear I is provided with support column, the top of described support column is articulated and connected with described anchor ear I, and the bottom of described support column can abut on the ground;Described stabilising arrangement include can banding anchor ear II on described batter post, the left and right sides being positioned at anchor ear II is respectively arranged with stay cord, and one end of stay cord is fixedly connected on described anchor ear II, the other end of stay cord can fix connection ground on.This utility model simple in construction, easy to use, make batter post during installing, be no longer influenced by the restriction of support means, accomplish the controllability at angle of inclination, shorten construction period, improve efficiency of construction.

Description

Batter post installs auxiliary support apparatus
Technical field
This utility model relates to construction support means, is specifically related to a kind of batter post and installs auxiliary support apparatus.
Background technology
At present, the configuration design of the public buildings such as large stadium is more and more unique, different modeling, its total figure modelling generally in Existing " V " shape shape, outer loop pillar is being not to be vertically arranged simultaneously, but presents outward-dipping state, and outer dip angle is relatively big, this Batter post structure construction and installation when, formed local overall time solid memder self often cannot be relied on to realize self-supporting Weight, but needing, temporary support is set and has assisted.Each batter post is generally required for bracing frame and individually supports, and props up Support was accomplished by installation before batter post lifts often and puts in place.But during bracing frame makes and sets up, be to tiltedly The angle of inclination of post pre-sets, and is lifted on bracing frame by batter post and is supported, the finally two ends to batter post Install.But bracing frame is in the angle of inclination of default batter post, deviation somewhat occurs, then batter post is lifted on bracing frame After, may result in batter post two ends cannot install, it is necessary to is again adjusted the predetermined angle of batter post on bracing frame, and regulated Journey is complicated, wastes time and energy, reduces efficiency of construction, it is impossible to meets duration demand.
Utility model content
For above-mentioned the deficiencies in the prior art, technical problem to be solved in the utility model is: how to provide the one can Being adjusted with the angle of inclination to batter post, shorten construction period, the batter post improving efficiency of construction installs auxiliary support apparatus.
In order to solve above-mentioned technical problem, this utility model have employed following technical scheme:
A kind of batter post installs auxiliary support apparatus, it is characterised in that: include the support means being separately positioned on batter post top Be arranged on the stabilising arrangement of batter post bottom, described support means include can banding anchor ear I on described batter post, be positioned at and embrace The lower section of hoop I is provided with support column, and the top of described support column is articulated and connected with described anchor ear I, and the bottom of described support column can Abut on the ground;Described stabilising arrangement include can banding anchor ear II on described batter post, be positioned at the left and right two of anchor ear II Side is respectively arranged with stay cord, and one end of stay cord is fixedly connected on described anchor ear II, and the other end of stay cord can be fixedly connected on On ground.
In this utility model, support means and stabilising arrangement, before lifting, are the most first arranged on tiltedly by batter post On post, it is utilized respectively anchor ear I and anchor ear II banding on batter post.Then with crane by batter post, support means and stabilising arrangement Together slinging, utilize crane, first vertical so pass through the hinge on anchor ear I on the ground by vertical for support column, batter post can be The top of support column relatively rotates, and makes support column while supporting batter post, additionally it is possible to adjust the angle of inclination of batter post Joint, meets the angle of inclination of batter post.Additionally the left and right directions of batter post can be carried out by two stay cords in stabilising arrangement respectively It is strained and fixed, enables the two ends of batter post to be directed at corresponding installation position, finally install.Thus it is no longer influenced by supporting The restriction of device, can be adjusted the angle of inclination of batter post, shorten construction period, improve efficiency of construction.
As optimization, the bottom thread of described support column is combined with length adjustment device, and described length adjustment device includes Base, the top of base is provided with threaded post along its axial direction, and the left and right sides of base is respectively fixedly connected with is easy to gripping Handle, the bottom of described support column is provided with along its axis direction can be with the screwed hole of described threaded post threaded engagement.Because Support arrangement is before batter post lifts, and is fixed on the ground on batter post, then get up with support means handling at batter post After, it is possible to occurring that support column length is too short, batter post cannot turn to the situation at corresponding angle of inclination, if again by batter post and Support means is placed and is readjusted installation site on ground, will result in the prolongation of construction period.It is positioned at support column bottom thread The base coordinated, it is possible to whole bearing height is lowered in the rotation in screwed hole and threaded post, it is not necessary to readjust support again The installation site of device, the engineering time of shortening, improves efficiency of construction.
As optimization, the bottom of described base is fixedly connected with the base plate being horizontally disposed with and being coaxially disposed with described base, The bottom surface of described base plate is bonded with one layer of rubber blanket.It is more stable that horizontally disposed base plate can make support column place on bottom surface, And then make the batter post being articulated and connected with support column more stable, preferably it is directed at corresponding installation position.Additionally base plate bottom surface Rubber blanket can provide bigger frictional force, it is to avoid support column is shifted over during supporting.
As optimization, described stabilising arrangement also includes the stay cord elevator dress being respectively fixedly connected with in anchor ear II left and right sides Putting, one end of described stay cord is fixedly connected on described stay cord winding plant, and described stay cord winding plant can be to described stay cord Carrying out rolling, described stay cord winding plant is additionally provided with can the elevator locking system of stay cord winding plant described in locking.? In the case of not using, utilize stay cord winding plant by stay cord rolling, and when in use, it is also possible to make according to scene By situation, pulling out the stay cord of different length, and utilize elevator locking system that stay cord winding plant is carried out locking, fixed pulling rope draws Go out length, to adapt to different fixing points.
In sum, the beneficial effects of the utility model are: this utility model simple in construction, easy to use, make batter post During installing, it is no longer influenced by the restriction of support means, accomplishes the controllability at angle of inclination, shorten construction period, Improve efficiency of construction.
Accompanying drawing explanation
In order to make the purpose of utility model, technical scheme and advantage clearer, new to this practicality below in conjunction with accompanying drawing Type is described in further detail, wherein:
Fig. 1 is structural representation of the present utility model;
Fig. 2 is for scheming wherein enlarged diagram at A.
Detailed description of the invention
The utility model is described in further detail below in conjunction with the accompanying drawings.
As depicted in figs. 1 and 2, the batter post in this detailed description of the invention installs auxiliary support apparatus, including being separately positioned on The support means on batter post 1 top and be arranged on the stabilising arrangement of batter post 1 bottom, described support means include can banding described Anchor ear I 2 on batter post 1, the lower section being positioned at anchor ear I 2 is provided with support column 3, and the top of described support column 3 is hinged with described anchor ear I 2 Connecting, the bottom of described support column 3 can abut on the ground;Described stabilising arrangement include can banding on described batter post 1 Anchor ear II 4, the left and right sides being positioned at anchor ear II 4 is respectively arranged with stay cord 5, and one end of stay cord 5 is fixedly connected on described anchor ear On II 4, the other end of stay cord 5 can be fixedly connected on ground.
In this detailed description of the invention, the bottom thread of described support column 3 is combined with length adjustment device, described length adjustment Device includes base 6, and the top of base 6 is provided with threaded post 11 along its axial direction, and the left and right sides of base 6 is respectively fixedly connected with Having the handle 7 being easy to grip, the bottom of described support column 3 is provided with along its axis direction can be with described threaded post 11 threaded engagement Screwed hole.
In this detailed description of the invention, the bottom of described base 6 is fixedly connected with and is horizontally disposed with and coaxially sets with described base 6 The base plate 8 put, the bottom surface of described base plate 8 is bonded with one layer of rubber blanket.
In this detailed description of the invention, described stabilising arrangement also includes being respectively fixedly connected with drawing in anchor ear II 4 left and right sides Rope winding plant 9, one end of described stay cord 5 is fixedly connected on described stay cord winding plant 9, described stay cord winding plant 9 energy Enough described stay cord 5 being carried out rolling, described stay cord winding plant 9 is additionally provided with can stay cord winding plant 9 described in locking Elevator locking system.
During being embodied as, the end of described stay cord 5 is fixedly connected with clamping head 10, and clamping head 10 can facilitate Quickly object is gripped, and then the left and right directions of batter post is fixed.
Finally illustrate, above example only in order to the technical solution of the utility model to be described and unrestricted, although logical Cross and this utility model is described with reference to preferred embodiment of the present utility model, but those of ordinary skill in the art Should be appreciated that and in the form and details it can be made various change, without departing from appended claims institute The spirit and scope of the present utility model limited.

Claims (4)

1. a batter post installs auxiliary support apparatus, it is characterised in that: the support means that includes being separately positioned on batter post top and Be arranged on the stabilising arrangement of batter post bottom, described support means include can banding anchor ear I on described batter post, be positioned at anchor ear The lower section of I is provided with support column, and the top of described support column is articulated and connected with described anchor ear I, and the bottom of described support column can be supported Connect on the ground;Described stabilising arrangement include can banding anchor ear II on described batter post, be positioned at the left and right sides of anchor ear II Being respectively arranged with stay cord, one end of stay cord is fixedly connected on described anchor ear II, and the other end of stay cord can be fixedly connected on ground On face.
Batter post the most according to claim 1 installs auxiliary support apparatus, it is characterised in that: the bottom thread of described support column Being combined with length adjustment device, described length adjustment device includes base, and the top of base is provided with threaded post along its axial direction, The left and right sides of base is respectively fixedly connected with the handle being easy to grip, and the bottom of described support column is provided with energy along its axis direction Enough screwed holes with described threaded post threaded engagement.
Batter post the most according to claim 2 installs auxiliary support apparatus, it is characterised in that: the bottom of described base is fixing even Being connected to the base plate being horizontally disposed with and being coaxially disposed with described base, the bottom surface of described base plate is bonded with one layer of rubber blanket.
Batter post the most according to claim 1 installs auxiliary support apparatus, it is characterised in that: described stabilising arrangement also includes point Not being fixedly connected on the stay cord winding plant of anchor ear II left and right sides, one end of described stay cord is fixedly connected on described stay cord elevator On device, described stay cord winding plant can carry out rolling to described stay cord, and described stay cord winding plant is additionally provided with can The elevator locking system of stay cord winding plant described in locking.
CN201620603505.1U 2016-06-20 2016-06-20 Batter post installs auxiliary support apparatus Active CN205777600U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620603505.1U CN205777600U (en) 2016-06-20 2016-06-20 Batter post installs auxiliary support apparatus

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620603505.1U CN205777600U (en) 2016-06-20 2016-06-20 Batter post installs auxiliary support apparatus

Publications (1)

Publication Number Publication Date
CN205777600U true CN205777600U (en) 2016-12-07

Family

ID=58132802

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620603505.1U Active CN205777600U (en) 2016-06-20 2016-06-20 Batter post installs auxiliary support apparatus

Country Status (1)

Country Link
CN (1) CN205777600U (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108708557A (en) * 2018-06-25 2018-10-26 中铁第四勘察设计院集团有限公司 Movable inclined column installation equipment and method
CN109356362A (en) * 2018-11-13 2019-02-19 中冶建工集团有限公司 Ash cake assists tools and the method using the tool making ash cake
CN111519753A (en) * 2020-05-06 2020-08-11 无锡锡晟建设有限公司 Steel hoop supporting device for cast-in-situ reinforced concrete inclined cylinder
CN113123606A (en) * 2021-03-30 2021-07-16 中国建筑第八工程局有限公司 Auxiliary supporting device for installing inclined column and construction method thereof
CN116122602A (en) * 2023-04-07 2023-05-16 北京城建集团有限责任公司 V-shaped column auxiliary debugging and installing system and using method

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108708557A (en) * 2018-06-25 2018-10-26 中铁第四勘察设计院集团有限公司 Movable inclined column installation equipment and method
CN109356362A (en) * 2018-11-13 2019-02-19 中冶建工集团有限公司 Ash cake assists tools and the method using the tool making ash cake
CN111519753A (en) * 2020-05-06 2020-08-11 无锡锡晟建设有限公司 Steel hoop supporting device for cast-in-situ reinforced concrete inclined cylinder
CN113123606A (en) * 2021-03-30 2021-07-16 中国建筑第八工程局有限公司 Auxiliary supporting device for installing inclined column and construction method thereof
CN116122602A (en) * 2023-04-07 2023-05-16 北京城建集团有限责任公司 V-shaped column auxiliary debugging and installing system and using method

Similar Documents

Publication Publication Date Title
CN205777600U (en) Batter post installs auxiliary support apparatus
CN102359303B (en) Extra-high voltage common circuit iron tower assembling method
CN208122265U (en) A kind of external wall construction nacelle device
CN102425261B (en) Large-span multiunit tensile membrane structure and installation construction method thereof
WO2020052291A1 (en) Construction elevator wall-attaching frame mounting platform attached to steel platform formwork and method therefor
CN105421859A (en) Electricity grid telegraph pole erecting device and construction method
CN109231023B (en) Method for installing jib system of portal crane
CN103321416A (en) Construction method for prestress of cable-stayed grid structure
CN208899886U (en) Cantilever frame platform
CN107091008A (en) A kind of adhesion type is from lifting pole
CN109826082B (en) Construction method for installing decorative structure in multi-tower combined space of cable-stayed bridge
CN106865422A (en) A kind of folded truss arm hanging device for installing maintenance of wind powered generator group
CN102493664A (en) Non-bracket cable truss construction method for lifting entire body by obliquely drawing fixed jack
CN210316791U (en) Ground-inserting telescopic pillar for travelling tent
CN202689517U (en) Suspension type electric hanging basket support frame
CN203255914U (en) Unit-typed curtain wall lifting device
CN107165269A (en) A kind of method that use hanger structure installs high-altitude bolt-ball net frame
CN105819352A (en) Detachable lifting device for door-like mast building and construction method of lifting device
CN115467505A (en) Climbing system for overhead layer climbing frame
CN210393401U (en) Hoisting and positioning device for stand column
CN112127616A (en) Lifting climbing frame
CN103510742B (en) Multifunctional rotary derrick
CN108518119B (en) Portable power transmission pole maintenance tool and construction method
CN205973671U (en) Hanging flower basket linkage
CN219771528U (en) Wind power tower crane equipment with wind-resistant structure

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant