CN206418506U - A kind of foundation pit supporting construction - Google Patents

A kind of foundation pit supporting construction Download PDF

Info

Publication number
CN206418506U
CN206418506U CN201720025498.6U CN201720025498U CN206418506U CN 206418506 U CN206418506 U CN 206418506U CN 201720025498 U CN201720025498 U CN 201720025498U CN 206418506 U CN206418506 U CN 206418506U
Authority
CN
China
Prior art keywords
pin
wall
bar
anchor cable
foundation pit
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720025498.6U
Other languages
Chinese (zh)
Inventor
林健
颜小锋
吴华
冷晓雨
刘纺
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Co Ltd Of Heavy Industry Architecture Design Institute Of Guangdong Province
Original Assignee
Co Ltd Of Heavy Industry Architecture Design Institute Of Guangdong Province
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Co Ltd Of Heavy Industry Architecture Design Institute Of Guangdong Province filed Critical Co Ltd Of Heavy Industry Architecture Design Institute Of Guangdong Province
Priority to CN201720025498.6U priority Critical patent/CN206418506U/en
Application granted granted Critical
Publication of CN206418506U publication Critical patent/CN206418506U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

A kind of foundation pit supporting construction, it includes hanging pin wall, prestressing force lock pin anchor cable and bar-mat reinforcement, poured into a mould by armored concrete hung described in two formed pin wall wall bottom be vertically embedded into below micro- decomposed rock of foundation ditch be more than 1 meter, the pin coping that hangs sets up Guan Liang, and the concrete beam being erected in the Guan Liang connects two and hangs pin wall;Pin wall is hung described in two higher than the anchor cable waist rail that 20 degree diagonally downward are respectively equipped with 0.5 meter of wall bottom, prestressing force lock pin anchor cable one end is located at the anchor cable waist rail and the junction for hanging pin wall, and other end stretch-draw anchor is in micro- decomposed rock;Bar-mat reinforcement is laid on the gentle breeze rock of pin within the walls in described hang, the bar-mat reinforcement is provided with gunite concrete surface layer on multiple soil nailings, and the bar-mat reinforcement.

Description

A kind of foundation pit supporting construction
Technical field
The utility model be related to underground subway station design and construction technical field, be especially adapted for use in micro- weathered rock it is shallow, A kind of foundation pit supporting construction under the high special geologic condition of rock strength.
Background technology
With social development and progress, the acceleration of urbanization, the continuous expansion of urban area, urban population expands rapidly, Height plus crowd is assembled inhabitation and handled official business, and soil is used as a kind of aobvious anxiety of non-renewable resource day, traffic above-ground congestion Problem is increasingly fierce, the exploitation of Underground Rail Transit and the effective development direction for turning city alleviation traffic above-ground pressure into. Particularly in the routine work and life of provincial capital of China and a line super-large city, Underground Rail Transit plays Economization on land Resource, reduces traffic above-ground pressure, shortens the time that residence is needed with office space of being to and from.The development of Underground Rail Transit is built If not only efficiently solving above-mentioned contradiction, and the discharge capacity of vehicle exhaust is reduced, Urban population is improved indirectly Live and work quality.
Subway station is essential part in Underground Rail Transit, realizes crowd in underground and ground Produce into.Subway station is typically embedded in below ground, and construction has cut and cover method, cap excavation method, shallow burial hidden digging, shield method and this is several The combination of the method for kind and version.Cut and cover method is the more commonly used one kind, in open-cut station firstly the need of design and construction Foundation pit supporting construction.Prior art is typically using diaphragm wall or the supporting construction of bored concrete pile and inner support.But for gentle breeze rock Layer shallower, rock strength it is higher when, using above-mentioned support form there are problems that difficulty of construction it is big, long in time limit,.
The content of the invention
The purpose of this utility model is to overcome drawbacks described above, is reducing engineering time and difficulty and reducing cost simultaneously Improve the security performance of supporting construction.Foundation pit supporting construction of the present utility model is more easy to construction, economic benefit and become apparent from, and energy Effectively shorten the construction period.Supporting construction greatly reduces broken rock amount, and use prestressing force by refining analysis and field monitoring Anchor cable lock pin reduces foundation pit deformation, lifts the security of supporting construction.
The purpose of this utility model is to be achieved by the following technical programs.
A kind of foundation pit supporting construction, it includes hanging pin wall, prestressing force lock pin anchor cable and bar-mat reinforcement, wherein,
Poured into a mould as armored concrete and the wall bottom of pin wall is hung described in two formed be vertically embedded into below micro- decomposed rock of foundation ditch More than 1 meter, the pin coping that hangs sets up Guan Liang, and pin wall is hung in the concrete beam connection being erected in the Guan Liang.
Hung described in two pin wall higher than the anchor cable waist rail that 20 degree diagonally downward are respectively equipped with 0.5 meter of wall bottom, prestressing force Lock pin anchor cable one end is located at the anchor cable waist rail and the junction for hanging pin wall, and other end stretch-draw anchor is in micro- decomposed rock.
Bar-mat reinforcement is laid on the gentle breeze rock of pin within the walls in described hang, the bar-mat reinforcement is provided with multiple soil nailings, and the steel The online gunite concrete surface layer of muscle.
The utility model is exclusively used in that gentle breeze rock stratum is shallower, rock strength is higher, rock is more completely special there is provided one kind Foundation pit supporting construction under geological conditions, hangs pin wall and is put outside no less than 1.2 meters from agent structure outside, it is therefore an objective to met outside wall bottom There are 1.2 meters of rocks side as the construction measure for preventing foundation from being moved into foundation ditch.The Guan Liang on wall top and the reinforcing bar being attached thereto are mixed Solidifying soil support is to ensure that the deformation at the top of foundation ditch meets construction and code requirement.The prestressing force lock pin anchor cable and anchor cable waist rail are For the fixed effect for hanging pin wall bottom.
The utility model is realized micro- weathered rock is shallower, rock strength is higher, the more complete special geology bar of rock Metro station excavation supporting under part, broken rock amount when reducing traditional foundation pit supporting construction construction, when reducing construction Difficulty, the cost for reducing pattern foundation pit supporting structure, the duration of pattern foundation pit supporting structure is shortened, while also ensure that in main structure construction Excavation of foundation pit security reliability.Reach that the safe, economic, efficient etc. of under special geologic condition underground station engineering construction will Summation purpose.
The utility model can use measure further below:Using the lock pin anchor cable system of recoverable, protection is reached Environment, the purpose further economized on resources.
It is highly consistent for station both sides scar, it can be arranged along the bigger region of mileage direction scope using above-mentioned optimization Apply.
Further, the thickness of pin wall is hung at least above 0.5 meter.
Further, supporting surface of the Guan Liang provided with support concrete beam.
Preferably, two prestressing force lock pin anchor cables are symmetrical set, and the soil nailing tilts down 15 degree of insertion institutes State in micro- decomposed rock.
It is highly preferred that hanging setting soil nailing+gunite concrete surface layer on the gentle breeze rock of pin within the walls described.
The utility model has the advantages that.
This supporting construction implements simple, workable, and reliability is high.Hanging pin supporting construction, need not to abolish wall bottom largely high Intensity rock, takes the measure such as wall top inner support and lock pin anchor cable ensure that and hangs the safe and reliable of pin wall.
Cost saving, hangs hanging pin wall and need to only be embedded in below gentle breeze scar 1 meter in pin wall supporting construction, without extending The following build-in in foundation ditch bottom, reduces the grooving of diaphragm wall, has shortened the length of diaphragm wall, so as to save construction costs.
Shorten the duration, because gentle breeze rock intensity it is higher when, can not using general grooving machinery such as more than 50MPa Construction, even if using Double-wheel milling equipment, one day broken rock amount only 0.3m or so, and greatly reduce broken rock using pin wall section is hung Amount, so as to reach the purpose for shortening the duration.
Brief description of the drawings
Fig. 1 is foundation pit supporting construction schematic diagram of the present utility model.
Embodiment
Fig. 1 is foundation pit supporting construction schematic diagram of the present utility model.Referring to Fig. 1, a kind of foundation pit supporting construction, it includes hanging Pin wall 1, prestressing force lock pin anchor cable 4 and bar-mat reinforcement 7.
Poured into a mould as armored concrete and the wall bottom of pin wall 1 is hung described in two formed be vertically embedded into below micro- decomposed rock of foundation ditch At 1 meter, the top for hanging pin wall 1 sets up Guan Liang 2, and the concrete beam 3 being erected in the Guan Liang 2 connects two and hung Pin wall 1.
Pin wall 1 is hung described in two higher than the anchor cable waist rail 5 that 20 degree diagonally downward are respectively equipped with 0.5 meter of wall bottom, prestressing force The one end of lock pin anchor cable 4 is located at the anchor cable waist rail 5 and the junction for hanging pin wall 1, and other end stretch-draw anchor is in micro- decomposed rock In.
Bar-mat reinforcement 7 is laid on the gentle breeze rock hung in pin wall 1, the bar-mat reinforcement is provided with multiple soil nailings 8, and described Gunite concrete surface layer 6 is sprayed on bar-mat reinforcement 7.
The utility model is exclusively used in that gentle breeze scar is shallower, and rock strength is higher, the supporting construction of the more complete foundation ditch of rock, Hang pin wall concrete strength to reach after design requirement below excavation of foundation pit to Guan Liang face at 0.5m, the reinforcement placing coagulation at Guan Liang Native crossbeam, then sets anchor cable waist rail, drilling construction prestress anchorage cable and tensioning anchor after anchor cable waist rail reaches concrete strength Gu.At the absolute altitude of foundation ditch bottom, bar-mat reinforcement is configured to both sides gentle breeze scar and drill setting soil nailing and injection facing concrete Protection.
The utility model realizes that gentle breeze scar is shallower, and rock strength is higher, pattern foundation pit supporting structure when rock is more complete, shortens The foundation pit construction duration, the investment of pattern foundation pit supporting structure is reduced, and safely and reliably ensure the safety during whole station construction.
According to one embodiment of the present utility model, the thickness of pin wall 1 is hung at least above 0.5 meter.
According to another embodiment of the present utility model, supporting surface of the Guan Liang 2 provided with support concrete beam.
According to one embodiment of the present utility model, two prestressing force lock pin anchor cables 4 are symmetrical set.
According to another embodiment of the present utility model, the soil nailing 8 is tilted down in 15 degree of insertion micro- decomposed rocks.
Although embodiment of the present utility model is described above in association with accompanying drawing, the utility model does not limit to In above-mentioned specific embodiments and applications field, above-mentioned specific embodiment be only it is schematical, guiding, without It is restricted.One of ordinary skill in the art is under the enlightenment of this specification and is not departing from the utility model claim In the case of the scope protected, the form of many kinds can also be made, these belong to the row of the utility model protection.

Claims (5)

1. a kind of foundation pit supporting construction, it includes hanging pin wall, prestressing force lock pin anchor cable and bar-mat reinforcement, wherein,
Poured into a mould as armored concrete hung described in two formed pin wall wall bottom be vertically embedded into below micro- decomposed rock of foundation ditch be more than 1 At rice, the pin coping that hangs sets up Guan Liang, and the concrete beam being erected in the Guan Liang connects two and hangs pin wall;
Pin wall is hung described in two higher than the anchor cable waist rail that 20 degree diagonally downward are respectively equipped with 0.5 meter of wall bottom, prestressing force lock pin anchor Suo Yiduan is located at the anchor cable waist rail and the junction for hanging pin wall, and other end stretch-draw anchor is in micro- decomposed rock;
Bar-mat reinforcement is laid on the gentle breeze rock of pin within the walls in described hang, the bar-mat reinforcement is provided with multiple soil nailings, and the bar-mat reinforcement Upper gunite concrete.
2. foundation pit supporting construction according to claim 1, it is characterised in that:The thickness of pin wall is hung at least above 0.5 meter.
3. foundation pit supporting construction according to claim 1, it is characterised in that:The Guan Liang is provided with support concrete beam Supporting surface.
4. foundation pit supporting construction according to claim 1, it is characterised in that:Two prestressing force lock pin anchor cable or so pair Claim to set.
5. foundation pit supporting construction according to claim 1, it is characterised in that:It is described that the soil nailing tilts down 15 degree of insertions In micro- decomposed rock.
CN201720025498.6U 2017-01-10 2017-01-10 A kind of foundation pit supporting construction Expired - Fee Related CN206418506U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720025498.6U CN206418506U (en) 2017-01-10 2017-01-10 A kind of foundation pit supporting construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720025498.6U CN206418506U (en) 2017-01-10 2017-01-10 A kind of foundation pit supporting construction

Publications (1)

Publication Number Publication Date
CN206418506U true CN206418506U (en) 2017-08-18

Family

ID=59574971

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720025498.6U Expired - Fee Related CN206418506U (en) 2017-01-10 2017-01-10 A kind of foundation pit supporting construction

Country Status (1)

Country Link
CN (1) CN206418506U (en)

Similar Documents

Publication Publication Date Title
CN105041349B (en) A kind of excavating construction method that station is digged on the basis of Subway Tunnel shield tunnel
CN105064397B (en) Open excavation construction method for expanding excavation of station on metro interzone shield tunnel foundation
CN104047613B (en) Baseboard of coal mine roadway anchoring process
CN103306289B (en) Foundation pit piled anchor dado concrete anchor cable top beam structure and construction method thereof
CN106013171B (en) A kind of semi-rigid supporting construction semi-flexible and method of deep-foundation side wall
CN102518453A (en) Quick tunnel-entrance construction method for bias-pressure shallow-buried or single-pressure tilting arenaceous loess tunnels
CN108277814A (en) Stake top counterfort wall supporting construction and construction method
CN105089670B (en) Construction method for enlarging and excavating subway station on basis of parallel interval shield tunnel
CN110529151A (en) A kind of fully mechanized workface Grading And Zoning integrative consolidation passing sunk pillars on full method
CN102304927B (en) Prestress anchor cable buttress-type parapet suitable for rock substrate
CN106988760A (en) Facility-sliding strata tunnel portal reinforcing construction and construction method
CN109056810A (en) The transverse direction that open cut or lid dig underground main structure below existing building digs construction and its construction method
CN201288586Y (en) Structure for preventing slipping of filled wall body along spatially keeping lane
CN207211158U (en) Assembled pile board wall foundation pit supporting construction
CN104863183B (en) Damping pilework and construction method is isolated in large cross-section tunnel proximity architecture construction
CN103939115A (en) Semi-subsurface excavation method construction shed tunnel method and structure
CN207452911U (en) A kind of multi-thread crossings on different level abnormal shape deep foundation pit supporting structure
CN211200459U (en) Piping lane normal position protection architecture
CN203729311U (en) Cable-stayed concrete pile fixing slope protection structure
CN206071096U (en) The underpinning device of load bearing wall in brick mix structure
CN205382942U (en) Multilayer underground space curtain posture subsurface excavated construction's supporting construction under existing facility
CN205276285U (en) Compound soil nail wall supporting construction
CN208815566U (en) The transverse direction that open cut or lid dig underground main structure below existing building digs construction
CN206418506U (en) A kind of foundation pit supporting construction
CN203625911U (en) Soil discharging construction structure with pit-in-pit door opening arranged in deep foundation pit

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170818

Termination date: 20200110

CF01 Termination of patent right due to non-payment of annual fee