CN206376514U - Tool climbing scaffold - Google Patents

Tool climbing scaffold Download PDF

Info

Publication number
CN206376514U
CN206376514U CN201720012280.7U CN201720012280U CN206376514U CN 206376514 U CN206376514 U CN 206376514U CN 201720012280 U CN201720012280 U CN 201720012280U CN 206376514 U CN206376514 U CN 206376514U
Authority
CN
China
Prior art keywords
scaffold
vertical rod
fixedly connected
tool
attached wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720012280.7U
Other languages
Chinese (zh)
Inventor
周洪涛
毛竑
杨驰
杨光地
向诚
孙太伟
李昌仁
熊恒
李梓莘
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Aluminum New Material Chengdu Co Ltd
Original Assignee
China Construction Aluminum New Material Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Aluminum New Material Co Ltd filed Critical China Construction Aluminum New Material Co Ltd
Priority to CN201720012280.7U priority Critical patent/CN206376514U/en
Application granted granted Critical
Publication of CN206376514U publication Critical patent/CN206376514U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model provides a kind of tool climbing scaffold, including the multiple scaffold units mutually spliced;The scaffold unit includes:Attached wall supported rod erecting part, the attached wall supported rod erecting part is provided with attached wall slide rail;Multilayer scaffold board, is fixed on the attached wall supported rod erecting part, and the scaffold board has the splice ends mutually spliced with the adjacent scaffold unit.The utility model, which solves traditional scaffold, to carry out scene using steel tube fastener and sets up, and wastes time and energy, Mechanization Level is low, and quality control differs, the problem of higher to the skill set requirements of setting up workman.

Description

Tool climbing scaffold
Technical field
The utility model is related to a kind of construction aid, and in particular to a kind of tool climbing scaffold.
Background technology
Scaffold is job site for operative and solves vertically and horizontally to transport the various supports set up;Common Traditional scaffold is set up using the steel tube fastener scene of carrying out, the scaffold that this steel tube fastener is set up not only time-consuming expense Power, Mechanization Level is low, and quality control differs, higher to the skill set requirements of setting up workman.As China largely modernizes The appearance of heavy construction system, the need for fastener type steel pipe scaffold has not adapted to construction development, Devoting Major Efforts To Developing and is pushed away Wide application new type scaffold is the task of top priority, particularly the outer protection coherent-wall scaffolding of high-rise and high-rise building.
Utility model content
To overcome the defect present in prior art, a kind of tool climbing scaffold is now provided, to solve traditional pin Hand cradle carries out scene using steel tube fastener and set up, and wastes time and energy, Mechanization Level is low, and quality control differs, to setting up work The problems such as skill set requirements of people are higher.
To achieve the above object there is provided a kind of tool climbing scaffold, including the multiple scaffold units mutually spliced; The scaffold unit includes:
Attached wall supported rod erecting part, the attached wall supported rod erecting part is provided with attached wall slide rail;
Multilayer scaffold board, is fixed on the attached wall supported rod erecting part, and the scaffold board has and the adjacent pin hand The splice ends that frame unit mutually splices.
Further, the attached wall supported rod erecting part includes the first vertical rod and the second vertical rod;The tool climbs pin hand Frame is installed on external wall, and first vertical rod is located at the one of the close external wall of the tool climbing scaffold Side, second vertical rod is located at the side of the remote external wall of the tool climbing scaffold, pin hand described in multilayer Plate is connected between first vertical rod and second vertical rod.
Further, wall-attached supporting seat is installed, the attached wall slide rail is installed on the wall-attached supporting seat on the external wall On.
Further, the scaffold unit also includes the first protective net frame, and first protective net frame is fixedly connected on Between two pieces of adjacent scaffold boards and fit in second vertical rod.
Further, first protective net frame includes:Support body is protected, the protection support body is fixedly connected by connector In the scaffold board;And the safety net on the protection support body.
Further, the connector includes:First fixed plate, is fixedly connected on the scaffold board;Second fixed plate, Gu Surely the protection support body is connected to, first fixed plate is fixedly connected with second fixed plate;And floor of putting more energy into, connection Between first fixed plate and second fixed plate.
Further, the scaffold unit also includes strengthening frame, and the strengthening frame is fixedly connected on first vertical rod, The strengthening frame has the splicing side mutually spliced with the adjacent scaffold unit.
Further, the strengthening frame is truss-like strengthening frame.
Further, the scaffold unit also includes the triangle being connected between first vertical rod and the scaffold board Support.
Further, the trivet includes:
First strut, is fixedly connected on first vertical rod;
Second strut, is fixedly connected on the bottom of the scaffold board;And
Hound, the hound skewed horizontal load is between first strut and second strut.
The beneficial effects of the utility model are that work can be achieved in the simple structure of tool climbing scaffold, its part Factory's Prefabrication, and interchangeability is strong, simple installation, using reliable, and can realize the extension in multiple directions, applicability By force.
Brief description of the drawings
Fig. 1 is the schematic diagram of the utility model tool climbing scaffold.
Fig. 2 is the schematic diagram of the scaffold unit of the utility model tool climbing scaffold.
Fig. 3 is enlarged diagram at A in Fig. 2.
Embodiment
Illustrate embodiment of the present utility model below by way of specific instantiation, those skilled in the art can be by this theory Content disclosed by bright book understands other advantages of the present utility model and effect easily.The utility model can also be by addition Different embodiments are embodied or practiced, and the various details in this specification can also be based on different viewpoints with answering With, without departing from it is of the present utility model spirit under carry out various modifications or alterations.
Fig. 1 is the schematic diagram of the utility model tool climbing scaffold;Fig. 2 is that the utility model tool climbs pin hand The schematic diagram of the scaffold unit of frame;Fig. 3 is enlarged diagram at A in Fig. 2.
Referring to figs. 1 to shown in Fig. 3, the utility model provides a kind of tool climbing scaffold, and tool climbs pin hand Frame is installed on external wall, and tool climbing scaffold includes the multiple scaffold units 1 that can be mutually splicing together. Scaffold unit 1 can horizontal, vertical or horizontal and Longitudinal Extension it is combined and spliced.
Scaffold unit 1 includes:Attached wall supported rod erecting part, multilayer scaffold board 13, the first protective net frame 14, trivet 15, Second protective net frame 16, cross bar 17 and strengthening frame 18.Attached wall supported rod erecting part is provided with attached wall slide rail.Multilayer scaffold board is fixed On attached wall supported rod erecting part, scaffold board 13 has the splice ends mutually spliced with adjacent scaffold unit.First protective net frame 14 are fixedly connected between adjacent two layers of scaffold board 13, and cross bar 17 is fixedly connected on the top of attached wall supported rod erecting part.Second Protective net frame 16 is fixedly connected between cross bar 17 and the scaffold board 13 of top.
Attached wall supported rod erecting part includes the first vertical rod 11 and the second vertical rod 12.First vertical rod 11 is climbed pin hand positioned at tool Frame is close to the side of external wall.Second vertical rod 12 is located at side of the tool climbing scaffold away from external wall.Two One vertical rod 11 be arranged in parallel.First vertical rod 11 setting corresponding with the second vertical rod 12.Along the first vertical rod 11 and the second vertical rod Multilayer scaffold board 13 is provided between 12.The level of scaffold board 13 is located between two first vertical rods 11 and two second vertical rods 12 and formed It is available for workmen to walk and carry out the space of constructing operation.Scaffold board 13 has for being installed on the two of adjacent scaffold unit Individual splice ends, energy implementation tool climbing scaffold is extending transversely to both sides.Two pieces of adjacent in vertical direction scaffold boards 13 Between be connected with the first protective net frame 14.Trivet 15 is provided between the bottom of scaffold board 13 and the first vertical rod 11.Cross bar 17 It is located at the top of two second vertical rods 12.The second protective net frame is fixedly connected between cross bar 17 and the scaffold board of top 13 16.First protective net frame 14, the second protective net frame 16 are fitted in the second vertical rod 12.It is additionally provided with two first vertical rods 11 Strengthening frame 18.Strengthening frame 18 has two splicing sides for being installed on adjacent scaffold unit, in tool climbing scaffold Reinforcing in structure is carried out to two adjacent scaffold units when extending transversely, makes to connect more between two scaffold units It is stable.
When installing tool climbing scaffold of the present utility model, the first vertical rod 11 is close to external wall.Along first On the length direction of vertical rod 11, the first vertical rod 11 interval is opened up provided with the first mounting hole.In the length direction along the second vertical rod 12, Second vertical rod 12 offers second mounting hole corresponding with the first mounting hole.Scaffold board 13 is horizontally arranged at the He of the first vertical rod 11 The platform walked and operated for workmen is formed between second vertical rod 12.
Scaffold board 13 includes rectangular box, the connecting rod being arranged between one group of relative short edge of rectangular box and is located at Plate body on rectangular box.Rectangular box is made up of four cylinders with C-shaped configuration, and the cross section of cylinder is C-shaped.Cylinder can With the lightweight material from C-type steel or channel-section steel etc, in order to lightweight.The 3rd installation is offered in the both sides of scaffold board 13 Hole.3rd mounting hole of the both sides of scaffold board 13 passes through fastener and the first mounting hole of the first vertical rod 11, the second vertical rod 12 respectively The second mounting hole connection.
First protective net frame 14 includes protection support body and safety net.The upper and lower part of protection support body passes through connector respectively 141 are connected between two pieces of neighbouring scaffold boards 13.Connector 141 includes the first fixed plate, the second fixed plate and added Strength floor.First fixed plate is fixedly connected on scaffold board 13;Second fixed plate is fixedly connected on protection support body, the first fixed plate with Second fixed plate is fixedly connected, and the first fixed plate is perpendicular to the second fixed plate;Floor of putting more energy into is connected to the first fixed plate and second Between fixed plate.Safety net is hung on protection support body.Protection support body includes the protection framework of rectangle and is located at protection framework In M shape lever.The bottom and top of framework is protected to pass through connector 141 and two pieces of neighbouring scaffold boards 13 respectively Connection.
Trivet 15 is located between the first vertical rod 11 and scaffold board 13.Trivet 15 include orthogonal first strut, Second strut and hound.First strut is fixedly connected with the first vertical rod 11, and the bottom of the second strut and scaffold board 13 is fixed Connection, hound skewed horizontal load is between the first strut and the second strut.Trivet 15 can be made using hollow square steel.First Strut is arranged in the first vertical rod 11, and the second strut is arranged on the bottom of scaffold board 13.Trivet 15 is conducive to stable and firm Connection between the column 11 of scaffold board 13 and first.
Cross bar 17 uses C-shaped configuration material similar to the rectangular box of scaffold board 13.Cross bar 17 is connected to two second and stood The end of bar 12, forms more stable structure between two second vertical rods 12 made.
In order to ensure being arranged on the safety of workmen on the scaffold board 13 of top layer, in cross bar 17 and the scaffold board 13 of top layer Between be additionally provided with the second protective net frame 16.Second protective net frame 16 is consistent with the structure of the first protective net frame 14.
In order to further strengthen the steadiness of the connection between scaffold unit 1, reinforcing is additionally provided with the first vertical rod 11 Frame 18.The length of strengthening frame 18 is identical with the length of scaffold board 13.Strengthening frame 18 is truss structure, is made of hollow square steel. Strengthening frame 18 includes top boom, lower boom, brace and montant.Top boom and lower boom are separately mounted to two first vertical rods 11 On.Strengthening frame 18 has two relative splicing sides.Mutually splice with adjacent scaffold unit the splicing side of strengthening frame 18 Together.
Foldable drop in leaf is installed in the bottom of scaffold unit 1.Drop in leaf is hinged on the scaffold board of bottom On 13.
In order to further improve the use scope of the utility model tool climbing scaffold, in the outside of the first vertical rod 11 Wall-attached supporting seat can be installed by being connected with attached wall slide rail, attached wall slide rail, then can combine to form a kind of attached scaffold.Further , Lift-on/Lift-off System is equipped with this attached scaffold and then constitutes a kind of Combined type attached lifting scaffold.
In actual assembled tool climbing scaffold of the present utility model, scaffold board and reinforcing can be passed through in the horizontal Frame, fixed Combination is into the scaffold length of needs, and the first vertical rod and the second vertical rod in single scaffold board horizontal length are according to need Set one or two.
In vertical direction, the pin that multilayer scaffold board is combined into needs is installed by the lengthening of the first vertical rod and the second vertical rod Hand cradle height.
The utility model tool climbing scaffold vertical height in theory is not limited, simply in actual production When, limited by material therefor length, transport and installation, the product of limited level can only be produced.When being actually needed more levels When can vertically connect combination at the scene.
The beneficial effects of the utility model are that work can be achieved in the simple structure of tool climbing scaffold, its part Factory's Prefabrication, and interchangeability is strong, simple installation, using reliable, and can realize the extension in multiple directions, applicability By force.
It should be noted that structure, ratio, size depicted in this specification institute accompanying drawings etc., only to coordinate Content disclosed in bright book, so that those skilled in the art is understood with reading, being not limited to the utility model can implement Qualifications, therefore do not have technical essential meaning, the modification of any structure, the change of proportionate relationship or the adjustment of size, In the case where not influenceing the utility model effect that can be generated and the purpose that can reach, all should still it fall disclosed in the utility model Technology contents can cover in the range of.Meanwhile, in this specification it is cited as " on ", " under ", "left", "right", " in Between " and " one " etc. term, be merely convenient to understanding for narration, and be not used to limit the enforceable scope of the utility model, its Relativeness is altered or modified, under without essence change technology contents, when being also considered as the enforceable category of the utility model.
The utility model is described in detail above in association with accompanying drawing embodiment, those skilled in the art can root Many variations example is made to the utility model according to described above.Thus, some of embodiment details should not be constituted to this practicality New restriction, the utility model regard the scope defined using appended claims as protection domain.

Claims (10)

1. a kind of tool climbing scaffold, it is characterised in that:Including the multiple scaffold units mutually spliced;The scaffold Unit includes:
Attached wall supported rod erecting part, the attached wall supported rod erecting part is provided with attached wall slide rail;
Multilayer scaffold board, is fixed on the attached wall supported rod erecting part, and the scaffold board has and the adjacent scaffold list The splice ends of first mutually splicing.
2. tool climbing scaffold according to claim 1, it is characterised in that:The attached wall supported rod erecting part includes the One vertical rod and the second vertical rod;The tool climbing scaffold is installed on external wall, and first vertical rod is located at the work The side of the close external wall of toolization climbing scaffold, second vertical rod is located at the tool climbing scaffold Side away from the external wall, scaffold board described in multilayer is connected between first vertical rod and second vertical rod.
3. tool climbing scaffold according to claim 2, it is characterised in that:Attached wall is installed on the external wall Bearing, the attached wall slide rail is installed on the wall-attached supporting seat.
4. tool climbing scaffold according to claim 3, it is characterised in that:The scaffold unit also includes first Protective net frame, first protective net frame is fixedly connected between two pieces of adjacent scaffold boards and fits in described second and stands Bar.
5. tool climbing scaffold according to claim 4, it is characterised in that first protective net frame includes:It is anti- Retaining frame body, the protection support body is fixedly connected on the scaffold board by connector;And the peace on the protection support body The whole network.
6. tool climbing scaffold according to claim 5, it is characterised in that the connector includes:First fixes Plate, is fixedly connected on the scaffold board;Second fixed plate, is fixedly connected on the protection support body, first fixed plate and institute The second fixed plate is stated to be fixedly connected;And floor of putting more energy into, it is connected between first fixed plate and second fixed plate.
7. tool climbing scaffold according to claim 2, it is characterised in that the scaffold unit also includes reinforcing Frame, the strengthening frame is fixedly connected on first vertical rod, and the strengthening frame has mutually spells with the adjacent scaffold unit The splicing side connect.
8. tool climbing scaffold according to claim 7, it is characterised in that the strengthening frame is reinforced for truss-like Frame.
9. tool climbing scaffold according to claim 2, it is characterised in that the scaffold unit also includes connection Trivet between first vertical rod and the scaffold board.
10. tool climbing scaffold according to claim 9, it is characterised in that the trivet includes:
First strut, is fixedly connected on first vertical rod;
Second strut, is fixedly connected on the bottom of the scaffold board;And
Hound, the hound skewed horizontal load is between first strut and second strut.
CN201720012280.7U 2017-01-06 2017-01-06 Tool climbing scaffold Active CN206376514U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720012280.7U CN206376514U (en) 2017-01-06 2017-01-06 Tool climbing scaffold

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720012280.7U CN206376514U (en) 2017-01-06 2017-01-06 Tool climbing scaffold

Publications (1)

Publication Number Publication Date
CN206376514U true CN206376514U (en) 2017-08-04

Family

ID=59403392

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720012280.7U Active CN206376514U (en) 2017-01-06 2017-01-06 Tool climbing scaffold

Country Status (1)

Country Link
CN (1) CN206376514U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110158941A (en) * 2019-06-03 2019-08-23 李大泽 Build aluminium alloy outrigger

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110158941A (en) * 2019-06-03 2019-08-23 李大泽 Build aluminium alloy outrigger

Similar Documents

Publication Publication Date Title
CN103711323B (en) Utilize the anti-ceiling board construction method of portable tubular truss stage+module roofing
AU2010266835B2 (en) A slab formwork system
CN204126230U (en) Assembly scaffold unit
CN104674665B (en) Large-spatial structures vestibule bridge installation method
CN101503908B (en) Construction method for spacing suspension cable structural template support platform
CN207392716U (en) A kind of tool-type suspension scaffold
CN206376514U (en) Tool climbing scaffold
CN205134919U (en) Modularization suspension type steel tubes clamps scaffold operation platform
CN104775606A (en) Operation platform for prefabricated assembled residential building wall plate construction and construction method thereof
CN106351245A (en) Tower crane foundation base and construction method thereof
CN209798542U (en) safety construction assembled bent cap operation platform
CN103628692A (en) Floor beam mounting bracket and use and construction method thereof
CN208184050U (en) A kind of civilian villa liftable roof truss
CN207905389U (en) Assembled is bolted reinforcing steel processing shed entirely
CN104195954B (en) Overhead column erection without scaffolding platform and erection method thereof
CN205475706U (en) Hanging rack system
CN205711695U (en) Plate girder truss-like combinative structure construction bridge
CN111608377B (en) Comprehensive construction method for building overhanging scaffold
CN204850517U (en) System of pounding is prevented to spelling formula height -adjustable steel construction
CN207993340U (en) Dismantled and assembled single storey industry workshop teaching mode
CN105464218B (en) One kind landing truss bearing pin connecting joint structure
CN214785737U (en) Scaffold for building
CN215007207U (en) Assembled stair teaching aid is used in teaching
CN204531215U (en) For the mobile truss of Standard Factory Room under tile construction
CN217812395U (en) Pump line reinforcing apparatus

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20180720

Address after: 610500 699, Longhu Road, East Industrial Zone, Xindu District, Chengdu, Sichuan

Patentee after: Zhongjian aluminum new material Chengdu Co., Ltd.

Address before: 610073 18 E District, 51 Tengfei Avenue, Qingyang District, Chengdu, Sichuan.

Patentee before: Zhongjian aluminium New Material Co Ltd

TR01 Transfer of patent right