CN206328959U - A kind of roof boarding and roof system - Google Patents
A kind of roof boarding and roof system Download PDFInfo
- Publication number
- CN206328959U CN206328959U CN201621087587.5U CN201621087587U CN206328959U CN 206328959 U CN206328959 U CN 206328959U CN 201621087587 U CN201621087587 U CN 201621087587U CN 206328959 U CN206328959 U CN 206328959U
- Authority
- CN
- China
- Prior art keywords
- roof boarding
- roof
- connecting portion
- wallboard
- boarding
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02B—CLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
- Y02B10/00—Integration of renewable energy sources in buildings
- Y02B10/10—Photovoltaic [PV]
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/50—Photovoltaic [PV] energy
Abstract
The utility model belongs to building structure field, specifically disclose a kind of roof boarding and roof system, the main body of the roof boarding includes concrete prefabricated board, the top surface of the concrete prefabricated board is fixedly connected support frame, support frame as described above is made up of frame and orthogonal connecting rod, and the frame constitutes with connecting rod and solar panels are filled with accommodation space, the accommodation space, the side of the roof boarding is provided with the first connecting portion being connected with beam, and opposite side is provided with the second connecting portion being connected with wallboard.This roof boarding is using concrete prefabricated, intensity is big, single domatic using one piece of roof boarding, is connected by first connecting portion with beam, it is set to be beneficial on wallboard by second connecting portion, roof structure is configured to, and the function of solar power generation is integrated with roofing, secondary operation is carried out without follow-up workman, roofing configuration is not only without using roof truss, the work that the later stage installs is saved, the installation effectiveness of roofing configuration is considerably increased, improves working security cost-effective while.
Description
Technical field
The utility model belongs to building structure field, and in particular to a kind of roof boarding and roof system.
Background technology
Traditional roof structure is that roof truss is found on wallboard or beam, tile is then laid on roof truss, with modern architecture
Rise, the variation that the structure of roofing becomes, roofing collection is heat-insulated, water-proof function is integral, is generally divided into the laying of cast-in-place and roof boarding
Two ways.Cast-in-site roof, especially pitched roof, formwork are difficult, and mold shape is more, complex process, and roofing weight is larger,
It is unfavorable for antidetonation.In roof boarding laying structure, mainly being stood on wallboard has steel roof truss, and roof boarding, roofing is then placed above
Plate is made up of " profiled sheet+warming plate+profiled sheet ", but this roof boarding is placed, and not only needs roof truss, and
Need to set purlin on roof truss, not only take material, high cost, and generally after the completion of roof boarding framework, need to also be in roof boarding
Tile is laid after upper setting tile batten, in addition, for roof boarding, especially in the roof structure of villa construction, in roofing structure
After the completion of type, it will usually carry out the installation of solar energy mould soon, the function of making it possess certain solar power generation, and in construction
During, due to workman trample or the setting of self threading pin would generally cause certain destruction to roof boarding, influence its waterproof
Performance and heat-insulating property, and whole roofing construction technique is more complicated.
In summary, it is cost-effective, improves efficiency of construction, a kind of new roof boarding of offer and a kind of construction is provided badly
The convenient, roof system for including above-mentioned roof boarding of material economy.
Utility model content
The purpose of this utility model is to provide a kind of new roof boarding and a kind of easy construction, material economy and included
The roof system of above-mentioned roof boarding.
Above-mentioned purpose is to be achieved through the following technical solutions:A kind of roof boarding, the main body of the roof boarding includes concrete
Prefabricated board, the top surface of the concrete prefabricated board is fixedly connected support frame, and support frame as described above is by frame and orthogonal connecting rod
Constitute, the frame constitutes with connecting rod and solar panels, the side of the roof boarding are filled with accommodation space, the accommodation space
Provided with the first connecting portion being connected with beam, opposite side is provided with the second connecting portion being connected with wallboard.This roof boarding uses concrete
Prefabricated, intensity is big, and single domatic using one piece of roof boarding, installation process only needs to be hung on beam, then by the
One connecting portion is connected with beam, it is beneficial on wallboard by second connecting portion, is configured to roof structure, and the utility model will
Solar panels are integrated on roof boarding, and also complete that roof solar mould constructs soon while roof boarding, which is lifted, to be completed applies
Work, after circuit is attached, the function of solar power generation is integrated with roofing, carries out secondary operation without follow-up workman, no
Understand the damage to causing roof boarding, influence its water resistance and heat-insulating property, while aerial work can be reduced as far as possible, improve
The security of construction.Thus, not only without using roof truss during roofing configuration, it is only necessary to roof boarding is hung on beam and connected i.e.
Can, while having saved the work of later stage installation, the installation effectiveness of roofing configuration is considerably increased, is improved cost-effective while
The security of construction.
Further, support frame as described above is provided with fixture, and the fixture is embedded in concrete prefabricated board.It is arranged such,
The fixture part of support frame is embedded in it i.e. during concrete prefabricated sheet metal forming, such support frame and concrete
Prefabricated board globality more preferably, is connected more firm.
Further, connector is embedded with the concrete prefabricated board, the connector part is exposed to concrete prefabricated
The top surface of plate, the exposed position to concrete prefabricated board of the connector connects support frame as described above.
Further, support frame as described above is provided with force bearing plate, and the force bearing plate is arranged on accommodation space bottom, the solar energy
Plate is arranged on force bearing plate, and headspace, the top of the concrete prefabricated board are provided between the force bearing plate and top of concrete
Face is equipped with waterproof roll.The setting of headspace, facilitates the laying of circuit in solar panels installation process, so more beautiful
See, while middle air layer can play certain heat-insulated effect, the top surface of concrete prefabricated board, which is equipped with waterproof roll, to be had
Play a part of waterproof and every vapour.
Further, the first connecting portion and second connecting portion are equipped with built-in fitting, and the built-in fitting part is exposed to room
Panel bottom.It is arranged such, is easy to be connected with beam and wallboard formation by built-in fitting.
Further, the built-in fitting includes fixed plate and the anchoring supporting leg being connected with fixed plate, the anchoring supporting leg anchor
Gu inside roof boarding, the fixed plate is at least partly exposed to roof boarding bottom surface.It is arranged such, built-in fitting not only anchoring property
Good, fixed plate is at least partly exposed to be easy to it to realize with beam and wallboard to be reliably connected to roof boarding bottom surface.It is preferred that, fixed plate only connects
Junction is exposed.
Further, the first connecting portion is provided with built-in fitting, and the first connecting portion is provided with built-in fitting, second connection
Portion is provided with notch, opens up and patchhole is provided with notch.
The utility model also provides a kind of roof system, and the roof system is stood on wallboard, and the roof system includes beam and above-mentioned
The described roof boarding of meaning, the roof boarding is in predetermined slope and is arranged at the both sides of the beam, the first connection of the roof boarding
Portion is connected with beam, and second connecting portion is connected with wallboard.Thus, roof structure configuration is simple, it is only necessary to which roof boarding is hung into Liang Heqiang
On plate, then it is connected by first connecting portion with beam, it is beneficial on wallboard by second connecting portion, be configured to roof structure.
Thus, without using roof truss during roofing configuration, while having saved the work of tile laying, considerably increasing roofing configuration
Installation effectiveness, the security of construction is improved cost-effective while.
Further, the beam is provided with the first connecting bracket, and the panel tops are provided with the second connecting bracket, the beam both sides
Roof boarding first connecting portion and second connecting portion it is solid by fixed plate and the first connecting bracket and the second connecting bracket respectively
Fixed connection.In the technical program, enter to be about to roof boarding lifting after the completion of the following structural wall board of roofing, floor etc. are constructed, the
Two connecting brackets fall in panel tops, and the first connecting bracket falls on roof girder, after roof boarding dropping place, on the roof boarding of beam both sides
Portion is fixedly connected by the first built-in fitting with the first connecting bracket.Above-mentioned roof system is without using roof truss, and easy for installation, safety can
Lean on, good integrity, and low cost.
Further, the beam is provided with the first connecting bracket, and the first connecting portion of the roof boarding of the beam both sides passes through fixation
Plate is fixedly connected with the first connecting bracket;The wallboard is provided with anchoring piece, and panel tops are stretched in the notch, the anchoring
Part is penetrated in the patchhole along panel tops, and described insert in the hole is perfused with mortar.In the technical program, tied below roofing
Structure wallboard, floor etc. enter to be about to roof boarding lifting after the completion of constructing, connecting bracket is arranged on roof girder, roof boarding dropping place
Afterwards, it is connected on the upside of roof boarding by built-in fitting with connecting bracket, panel tops are stretched in the notch on the downside of the roof boarding, together
When anchoring piece one end of stretching wallboard penetrate in the patchhole, so roof boarding is stood on wallboard and beam, and is inserting
Enter anchoring of being in the milk in hole, so stand on roof boarding on wallboard, wallboard plays a part of supporting roof boarding.Above-mentioned roof system increases
Added the installation effectiveness of roof boarding, said structure feature is conducive to the conduction of power between roof boarding and wallboard, the utility model without
Roof truss need to be used, it is easy for installation, safe and reliable, and low cost.It is preferred that, the anchoring piece is anchor bar.
Brief description of the drawings
Constitute a part of accompanying drawing of the present utility model to be used for providing further understanding to of the present utility model, this practicality is new
The schematic description and description of type is used to explain the utility model, does not constitute to improper restriction of the present utility model.
Fig. 1 is the structural representation of the roof boarding involved by a kind of embodiment of the utility model;
The horizontal section schematic diagram of involved roof boarding in Fig. 2 Fig. 1;
Fig. 3 is the vertical cross section figure of the concrete prefabricated board involved by a kind of embodiment of the utility model;
Fig. 4 and Fig. 5 are respectively the structural representation of the roof system involved by a kind of embodiment of the utility model;
Fig. 6 is the structural representation of the first connecting bracket involved by a kind of embodiment of the utility model;
Fig. 7 is the structural representation at involved another visual angle of the first connecting bracket in Fig. 6;
Fig. 8 is the disassemblying structure schematic diagram of involved the second connecting bracket in Fig. 4;
Fig. 9 is the front schematic view of the second connecting bracket involved by the utility model another embodiment;
Figure 10 is the structural representation of the first built-in fitting involved by a kind of embodiment of the utility model;
Figure 11 is the front schematic view of involved the first built-in fitting in Figure 10;
Figure 12 is the structural representation of the second built-in fitting involved by a kind of embodiment of the utility model;
The structural representation of the connecting node of roof boardings and wallboard of the Figure 13 involved by a kind of embodiment of the utility model
Figure;
Figure 14 is the structural representation of the concrete prefabricated board of involved roof boarding in Fig. 5.
In figure:
The built-in fitting of 1 roof boarding, 2 beam, 3 wallboard 4 first
The cover plate of 5 second built-in fitting, 6 stirrup, 7 in-situ layer 8
The connecting plate of 9 top board, 10 first supporting plate, 11 second supporting plate 12 first
The side plate of 13 second connecting plate, 14 first reinforcer, 15 second reinforcer 16 first
The fixed plate 19 of 17 second side plate 18 anchors the connecting rod of supporting leg 20
The elongated base plate of muscle 24 of 21 supporting leg, 22 heat-insulation layer 23
The elastic base of 25 the 3rd 27 anchoring piece of the 3rd connecting plate of supporting plate 26 28
The I-steel of 29 screw, 30 screw rod, 31 locating part 32
The solar panels of 33 first 34 second connecting bracket of connecting bracket, 35 patchhole 36
The connector of 37 support frame, 38 notch, 39 concrete prefabricated board 40
Embodiment
The utility model is described in detail below in conjunction with the accompanying drawings, the description of this part be only it is exemplary and explanatory,
There should not be any restriction effect to protection domain of the present utility model.In addition, those skilled in the art's retouching according to this document
State, respective combination can be carried out to feature in embodiment in this document and not in be the same as Example.
The utility model embodiment is as follows, referring to Figures 1 and 2, and a kind of roof boarding 1, the main body of the roof boarding 1 includes
Concrete prefabricated board 39, the top surface of the concrete prefabricated board 39 is fixedly connected support frame 37, support frame as described above 37 by frame and
Orthogonal connecting rod is constituted, and the frame constitutes with connecting rod and solar panels 36 are filled with accommodation space, the accommodation space,
The side of the roof boarding 1 is provided with the first connecting portion being connected with beam 2, and opposite side is provided with the second connecting portion being connected with wallboard 3.
This roof boarding 1 uses concrete prefabricated, and intensity is big, and single domatic using one piece of roof boarding 1, installation process is only needed it
It is hung on beam 2, is then connected by first connecting portion with beam 2, it is beneficial on wallboard 3 by second connecting portion, be configured to room
Face structure, and solar panels 36 are integrated on roof boarding 1 by the utility model, it is also complete while roof boarding 1, which is lifted, to be completed
The construction constructed soon into roof solar mould, after circuit is attached, the function of solar power generation, nothing are integrated with roofing
Need follow-up workman to carry out secondary operation, its water resistance and heat-insulating property will not be influenceed, simultaneously to causing the damage of roof boarding 1
Aerial work can be reduced as far as possible, improve the security of construction.Thus, not only without using room during roofing configuration
Frame, it is only necessary to roof boarding 1 is hung on beam 2 and connected, while having saved the work of later stage installation, roofing configuration is considerably increased
Installation effectiveness, the security of construction is improved cost-effective while.
On the basis of above-described embodiment, in another embodiment of the utility model, support frame as described above 37 is provided with fixture, institute
Fixture is stated to be embedded in concrete prefabricated board 39.Being arranged such that during concrete prefabricated board 39 is molded will support
The fixture part of frame 37 is embedded in it, and such support frame 37 more preferably, is connected more firm with the globality of concrete prefabricated board 39
Gu.
On the basis of above-described embodiment, in another embodiment of the utility model, such as Fig. 2, the concrete prefabricated board 39
Connector 40 is inside embedded with, the exposed top surface to concrete prefabricated board 39 in the part of connector 40, the connector 40 is exposed
Support frame as described above 37 is connected to the position of concrete prefabricated board 39.
On the basis of above-described embodiment, in another embodiment of the utility model, such as Fig. 2, support frame as described above is provided with and held
Power plate, the force bearing plate is arranged on accommodation space bottom, and the solar panels 36 are arranged on force bearing plate, and the force bearing plate is with mixing
Headspace is provided between solidifying soil top surface, the top surface of the concrete prefabricated board 39 is equipped with waterproof roll.Headspace is set
Put, facilitate the laying of circuit in the installation process of solar panels 36, it is so more attractive in appearance, while middle air layer can be played necessarily
Heat-insulated effect, the top surface of concrete prefabricated board 39, which is equipped with waterproof roll, can play waterproof and every vapour.Above-mentioned
On the basis of embodiment, in another embodiment of the utility model, such as Fig. 1, the roof boarding 1 is provided with heat-insulation layer 22.It is arranged such,
Roof boarding 1 has good heat-insulating property, strengthens the integral heat insulation effect of building.
On the basis of above-described embodiment, in another embodiment of the utility model, such as Fig. 3, the first connecting portion and the
Two connecting portions are equipped with built-in fitting, and the built-in fitting part is exposed to the bottom of roof boarding 1.It is arranged such, is easy to by built-in fitting
It is connected with beam 2 and the formation of wallboard 3.
On the basis of above-described embodiment, in another embodiment of the utility model, such as Figure 10 and 11, the built-in fitting includes
Fixed plate 18 and the anchoring supporting leg 19 being connected with fixed plate 18, the anchoring supporting leg 19 are anchored inside roof boarding 1, described solid
Fixed board 18 is at least partly exposed to the bottom surface of roof boarding 1.It is arranged such, not only anchoring property is good for built-in fitting, at least portion of fixed plate 18
Exceptionally revealing to the bottom surface of roof boarding 1 is easy to it to be reliably connected with beam 2 and the realization of wallboard 3.It is preferred that, the only joint face of fixed plate 18 is exposed.
On the basis of above-described embodiment, in another embodiment of the utility model, such as Fig. 5 and 14, the first connecting portion
Provided with built-in fitting, the first connecting portion is provided with built-in fitting, and the second connecting portion is provided with notch 38, opens up and be provided with notch 38
Patchhole 35.
The utility model also provides a kind of roof system, and embodiment is as follows, and reference picture 4 and Fig. 5, the roof system are stood on wallboard 3,
The roof system includes beam 2 and above-mentioned any described roof boarding 1, and the roof boarding 1 is in predetermined slope and is arranged at the beam 2
Both sides, the first connecting portion of the roof boarding 1 is connected with beam 2, and second connecting portion is connected with wallboard 3.Thus, roof structure structure
Type is simple, it is only necessary to which roof boarding 1 is hung on beam 2 and wallboard 3, is then connected by first connecting portion with beam 2, passes through the second connection
Portion makes it be beneficial on wallboard 3, is configured to roof structure.Thus, without using roof truss during roofing configuration, while saving
The work of tile laying, considerably increases the installation effectiveness of roofing configuration, and the safety of construction is improved cost-effective while
Property.
After above-mentioned 1 rigging out of roof boarding, such as Fig. 4, cover plate 8 preferably on ridge form wedge angle ridge.Cover plate
8 are connected with roof boarding 1 by nailing or self threading pin.
On the basis of above-described embodiment, in another embodiment of the utility model, such as Fig. 4, the beam 2 is provided with the first connection
Support 33, the top of wallboard 3 is provided with the second connecting bracket 34, the first connecting portion and second of the roof boarding 1 of the both sides of beam 2
Connecting portion is fixedly connected by fixed plate 18 with the first connecting bracket 33 and the second connecting bracket 34 respectively.In the technical program,
Enter to be about to roof boarding 1 after the completion of the following structural wall board 3 of roofing, floor etc. are constructed to lift, the second connecting bracket 34 falls in wall
The top of plate 3, the first connecting bracket 33 falls on roof girder 2, after the dropping place of roof boarding 1, and the top of roof boarding 1 of the both sides of beam 2 passes through the
One built-in fitting 4 is fixedly connected with the first connecting bracket 33.Above-mentioned roof system is easy for installation, safe and reliable, overall without using roof truss
Property is good, and low cost.
On the basis of above-described embodiment, in another embodiment of the utility model, such as Fig. 6 and Fig. 7, the first connection branch
Frame 33 includes top board 9, support member, connector 40 and reinforcer, wherein, the support member includes the first supporting plate 10 and second
Fagging 11, the supporting plate 11 of the first supporting plate 10 and second is separately positioned on the both sides of the bottom of top board 9 and to the top
The lower section extension of plate 9, the connector 40 includes the first connecting plate 12 and the second connecting plate 13, first connecting plate 12 and the
Both sides of two connecting plates 13 respectively with the top board 9 are connected, and the connecting plate 13 of the first connecting plate 12 and second is in predetermined slope
Degree, the reinforcer at least includes the first reinforcer 14 and the second reinforcer 15, and first reinforcer 14 connects described first
The supporting plate 10 of connecting plate 12 and first, second reinforcer 15 connects the supporting plate 11 of the second connecting plate 13 and second.Make
Used time, the first connecting bracket 33 is shelved on crossbeam 2, crossbeam 2 be clamped in the first supporting plate 10 and the second supporting plate 11 it
Between, after 1 dropping place of roof boarding of the both sides of beam 2, by the first anchoring piece 27 in the both sides roof boarding 1 of beam 2 respectively with the first connecting plate
12 are fixedly connected with the second connecting plate 13, realize the connection of roof boarding 1 and beam 2, and the load of roof boarding 1 is passed to by reinforcer
Support member, is ultimately transferred to beam 2, certainly, and the beam 2 is provided on wallboard 3.Thus, considerably increasing the installation of roof boarding 1
Efficiency, and cost has been saved, the first connecting bracket 33 itself is simple in construction, easy to use, and connection is reliable.It should be appreciated that this
Locate the first connecting plate 12 and being specifically referred in the predetermined gradient described in the second connecting plate 13 is in coupled roof boarding 1
The gradient is consistent, is so easy to the first connecting bracket 33 to connect roof boarding 1 and beam 2.
On the basis of above-described embodiment, in another embodiment of the utility model, such as Fig. 4, the top board 9 is arranged on beam 2
Top, the supporting plate 11 of the first supporting plate 10 and second respectively be located at the beam 2 both sides.It is preferred that, the first supporting plate 10
Match with the distance between the second supporting plate 11 and the width of beam 2, i.e. the first supporting plate 10 and the second supporting plate 11 are attached to institute
State on the side wall of beam 2.
On the basis of above-described embodiment, in another embodiment of the utility model, such as Fig. 6, first connecting bracket 33
Also include the first side plate 16 and the second side plate 17, the supporting plate 10 of the first side plate 16 and first is oppositely arranged and added by first
Strong part 14 is connected with the first supporting plate 10, and the supporting plate 11 of the second side plate 17 and second is oppositely arranged and by the second reinforcer
15 are connected with the second supporting plate 11, the top of the side plate 17 of the first side plate 16 and second respectively with first connecting plate 12 and
Second connecting plate 13 is connected.It is arranged such, the utility model structure is more firm, the ability for bearing the load of roof boarding 1 is stronger.
On the basis of above-described embodiment, in another embodiment of the utility model, such as Fig. 8, second connecting bracket 34
Including base plate 24, the 3rd supporting plate 25 and the 3rd connecting plate 26, wherein, the 3rd supporting plate 25 be arranged on base plate 24 and with
Base plate 24 is fixedly connected, and the top surface of the 3rd supporting plate 25 is in the predetermined gradient, and the 3rd connecting plate 26 is fixed on described
On the top surface of 3rd supporting plate 25, the built-in fitting of the second connecting portion is fixedly connected with the 3rd connecting plate 26, the base plate 24
Stand on wallboard 3.Second connecting bracket 34 is used to connect roof boarding 1 and wallboard 3, roof boarding 1 is stood on wallboard 3, such nothing
Roof truss need to be used, it is only necessary to which roof boarding 1 is hung on wallboard 3, be connected using the second connecting bracket 34.In use, base plate 24
Stand on wallboard 3, after 1 dropping place of roof boarding, it is to realize that the built-in fitting of second connecting portion is fixedly connected with the 3rd connecting plate 26
The connection of roof boarding 1 and wallboard 3, or the second connecting bracket 34 and roof boarding 1 it is integral, during dropping place, the dropping place of base plate 24 is in wall
The top surface of plate 3.Thus, considerably increasing the installation effectiveness of roof boarding 1, and cost, the second connecting bracket 34 itself are saved
It is simple in construction, easy to use, and connection is reliable.It should be appreciated that herein described in the top surface of the 3rd supporting plate 25 be in predetermined slope
Degree specifically refers to consistent with the gradient that roof boarding 1 is in, and is so easy to the second connecting bracket 34 connection roof boarding 1 and wallboard 3.It is excellent
Choosing, described roof boarding 1 is formed using concrete prefabricated.
On the basis of above-described embodiment, in another embodiment of the utility model, such as Fig. 8, the bottom of base plate 24 is provided with
Elastic base 28.Due to roof boarding 1 have certain weight, especially concrete face-board for room 1, the setting of elastic base 28,
Certain cushioning effect is played during the dropping place of roof boarding 1, meanwhile, elastic deformation can occur for elastic base 28, it is easy to adjust
The flatness of roof boarding 1.It should be noted that the elastic base 28 can be fixedly connected with base plate 24, also can not be with base plate 24
It is fixedly connected.
On the basis of above-described embodiment, in another embodiment of the utility model, such as Fig. 8, the elastic base 28 and bottom
Plate 24 is bolted.
On the basis of above-described embodiment, in another embodiment of the utility model, the elastic base 28 is board-like rubber
Pad.Board-like rubber blanket is not only wear-resisting but also load performance is good, durable in use.
On the basis of above-described embodiment, in another embodiment of the utility model, such as Fig. 9 and 13, the elastic base 28
Bottom is provided with locating part 31.Wallboard 3 is caught in it by the locating part 31, so can ensure that during the dropping place of roof boarding 1
Two connecting brackets 34 will not be moved relative to wallboard 3;The locating part 31 is preferably U-shaped steel, U-shaped steel and elastic base 28 and base plate
24 are fixedly connected, and wallboard 3 is caught in the U-type groove of U-shaped steel;It is preferred that the top of the wallboard 3 is embedded with I-steel 32, U-shaped steel with it is pre-
Bury I-steel 32 to be welded, such second connecting bracket 34 is fixedly connected with wallboard 3, connect more reliable.
On the basis of above-described embodiment, in another embodiment of the utility model, such as Fig. 8, the 3rd supporting plate 25 to
Include two pieces of vertically arranged floors less, two pieces of described floors are arranged on the both sides of base plate 24.
On the basis of above-described embodiment, in another embodiment of the utility model, such as Fig. 8, the floor is provided with screw 29,
The bottom surface of screw 29 from the floor extends to top surface, and the elastic base 28 and base plate 24 are provided with through hole, the floor,
Elastic base 28 and base plate 24 are connected by screw rod 30, and the screw rod 30, which is worn, connects the through hole and screw 29.It is arranged such, passes through
Floor, elastic base 28 and base plate 24 can be connected integral by screw rod 30, simple in construction, easy for installation.
On the basis of above-described embodiment, in another embodiment of the utility model, the 3rd connecting plate 26 and base plate 24
Between be provided with reinforcing plate.The setting of reinforcing plate, shares the load that the 3rd supporting plate 25 is born, and can effectively prevent that supporting plate from becoming
Shape, extends the service life of this support frame 37.
On the basis of above-described embodiment, in another embodiment of the utility model, such as Fig. 5, the beam 2 is provided with the first connection
Support 33, the first connecting portion of the roof boarding 1 of the both sides of beam 2 is fixedly connected by fixed plate 18 with the first connecting bracket 33;
The wallboard 3 is provided with anchoring piece 27, and the top of wallboard 3 is stretched in the notch 38, and the anchoring piece 27 is penetrated along the top of wallboard 3
In the patchhole 35, mortar is perfused with the patchhole 35.In the technical program, when the following structural wall board 3 of roofing, floor
Deng entering to be about to roof boarding 1 and lift after the completion of constructing, connecting bracket is arranged on roof girder 2, after the dropping place of roof boarding 1, roof boarding 1
Upside is connected by built-in fitting with connecting bracket, and the top of wallboard 3 is stretched in the notch 38 of the downside of roof boarding 1, while anchor
One end of the stretching wallboard 3 of firmware 27 is penetrated in the patchhole 35, so stands on roof boarding 1 on wallboard 3 and beam 2, and
It is in the milk and anchors in patchhole 35, so stand on roof boarding 1 on wallboard 3, wallboard 3 plays a part of supporting roof boarding 1.It is above-mentioned
Roof system considerably increases the installation effectiveness of roof boarding 1, and said structure feature is conducive to the conduction of power between roof boarding 1 and wallboard 3,
The utility model is easy for installation, safe and reliable without using roof truss, and low cost.It is preferred that, the anchoring piece 27 is anchoring steel
Muscle.
On the basis of above-described embodiment, in another embodiment of the utility model, such as Fig. 4 and Fig. 5, the first connecting portion
The second built-in fitting 5 is additionally provided with, side of second built-in fitting 5 along roof boarding 1 is stretched out and extended to the outside of roof boarding 1, described
Stirrup 6 is provided with beam 2, the part of stirrup 6 extend out to the top of the beam 2, the roof boarding 1 of the both sides of beam 2 and the institute of beam 2
In-situ layer 7 is filled with the region enclosed, second built-in fitting 5 stretches out the position of roof boarding 1 and the stirrup 6 stretches out institute
The position for stating beam 2 is anchored in in-situ layer 7.In the technical program, when the following structural wall board 3 of roofing, floor etc. are constructed completion
Laggard roof boarding 1 of being about to is lifted, and the second connecting bracket 34 falls at the top of wallboard 3, and the first connecting bracket 33 falls on roof girder 2,
After the dropping place of roof boarding 1, pouring for in-situ layer 7 is carried out on the top of beam 2, when cast-in-place, by 1 point of beam 2 and the roof boarding of its both sides
Not Zu Cheng bed die and side form, gap between beam 2 and roof boarding 1 is blocked using strip template, or covers envelope using waterproof roll
It is stifled, or using rubber strip closure, completion node is cast-in-place after closure, second built-in fitting 5 stretches out position and the institute of roof boarding 1
State stirrup 6 and stretch out the position of the beam 2 and be anchored in in-situ layer 7, the second built-in fitting 5, stirrup 6 and in-situ layer 7 are reliably connected simultaneously
Overall common stress is formed, thus, beam 2 is connected with the roof boarding 1 of its both sides by the second built-in fitting 5, stirrup 6 and in-situ layer 7
It is integral, it is configured to roof structure.Certainly, beam 2 is on dropping place wallboard 3.
On the basis of above-described embodiment, in another embodiment of the utility model, second built-in fitting 5 is pre-buried steel
Muscle.To ensure to be provided with structure muscle, i.e. embedded bar in the intensity of roof boarding 1, prefabrication process, to save in material, prefabrication process
Embedded bar stretches out roof boarding 1 and used as built-in fitting.
On the basis of above-described embodiment, in another embodiment of the utility model, such as Figure 12, second built-in fitting 5 is wrapped
The supporting leg 21 for including connecting rod 20 and being arranged in connecting rod 20, the supporting leg 21 is anchored inside roof boarding 1, the connecting rod
20 extend out to the outside of roof boarding 1 along the side of roof boarding 1.Thus, anchoring property is preferable.
On the basis of above-described embodiment, in another embodiment of the utility model, such as Fig. 5, the in-situ layer 7 is interior provided with logical
Long muscle 23, the elongated muscle 23 passes through the stirrup 6.It is arranged such, can be not only effectively increased the intensity of in-situ layer 7, while can
Increase the globality of beam 2 and in-situ layer 7.
The above is only preferred embodiment of the present utility model, it is noted that for the common skill of the art
For art personnel, on the premise of the utility model principle is not departed from, some improvements and modifications can also be made, these improve and
Retouching also should be regarded as protection domain of the present utility model.
Claims (10)
1. a kind of roof boarding, it is characterised in that the main body of the roof boarding includes concrete prefabricated board, the concrete prefabricated board
Top surface be fixedly connected support frame, support frame as described above is made up of frame and orthogonal connecting rod, and the frame and connecting rod are constituted
Solar panels are filled with accommodation space, the accommodation space, the side of the roof boarding is provided with the first connection being connected with beam
Portion, opposite side is provided with the second connecting portion being connected with wallboard.
2. roof boarding according to claim 1, it is characterised in that support frame as described above is provided with supporting leg, the supporting leg is embedded in
In concrete prefabricated board.
3. roof boarding according to claim 1, it is characterised in that connector, institute are embedded with the concrete prefabricated board
The exposed top surface to concrete prefabricated board in connector part is stated, the exposed position to concrete prefabricated board of the connector connects institute
State support frame.
4. roof boarding according to claim 1, it is characterised in that support frame as described above is provided with force bearing plate, the force bearing plate
Accommodation space bottom is arranged on, the solar panels are arranged on force bearing plate, is provided between the force bearing plate and top of concrete
Headspace, the top surface of the concrete prefabricated board is equipped with waterproof roll.
5. the roof boarding according to Claims 1 to 4 any one, it is characterised in that the first connecting portion and second connects
Socket part is equipped with built-in fitting, and the built-in fitting part is exposed to roof boarding bottom.
6. roof boarding according to claim 5, it is characterised in that the built-in fitting include fixed plate and with fixed plate phase
Anchoring supporting leg even, the anchoring supporting leg is anchored inside roof boarding, and the fixed plate is at least partly exposed to roof boarding bottom surface.
7. the roof boarding according to Claims 1 to 4 any one, it is characterised in that the first connecting portion is provided with pre-buried
Part, the first connecting portion is provided with built-in fitting, and the second connecting portion is provided with notch, opens up and patchhole is provided with notch.
8. a kind of roof system, the roof system is stood on wallboard, it is characterised in that the roof system includes beam and claim 1~7 times
Roof boarding described in meaning one, the roof boarding is in predetermined slope and is arranged at the both sides of the beam, and the first of the roof boarding
Connecting portion is connected with beam, and second connecting portion is connected with wallboard.
9. a kind of roof system, the roof system is stood on wallboard, it is characterised in that the roof system is included described in beam and claim 6
Roof boarding, the roof boarding is in predetermined slope and is arranged at the both sides of the beam, and the beam is provided with the first connecting bracket, described
Panel tops are provided with the second connecting bracket, and the first connecting portion and second connecting portion of the roof boarding of the beam both sides are respectively by solid
Fixed board is fixedly connected with the first connecting bracket and the second connecting bracket.
10. a kind of roof system, the roof system is stood on wallboard, it is characterised in that the roof system is included described in beam and claim 7
Roof boarding, the roof boarding is in predetermined slope and is arranged at the both sides of the beam, and the beam is provided with the first connecting bracket, described
The first connecting portion of the roof boarding of beam both sides is fixedly connected by fixed plate with the first connecting bracket;The wallboard is provided with anchoring
Part, panel tops are stretched in the notch, and the anchoring piece is penetrated in the patchhole along panel tops, described to insert in the hole
It is perfused with mortar.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621087587.5U CN206328959U (en) | 2016-09-28 | 2016-09-28 | A kind of roof boarding and roof system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621087587.5U CN206328959U (en) | 2016-09-28 | 2016-09-28 | A kind of roof boarding and roof system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206328959U true CN206328959U (en) | 2017-07-14 |
Family
ID=59286660
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201621087587.5U Active CN206328959U (en) | 2016-09-28 | 2016-09-28 | A kind of roof boarding and roof system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206328959U (en) |
-
2016
- 2016-09-28 CN CN201621087587.5U patent/CN206328959U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN207597609U (en) | A kind of precast concrete concrete frame joint | |
CN106351379A (en) | Roof assembly method | |
CN106284801A (en) | A kind of assembled roof system | |
CN205024884U (en) | Compound shear force wall of welded steel fabric frame | |
CN106351380A (en) | Roof assembly method | |
CN206328959U (en) | A kind of roof boarding and roof system | |
CN106481011A (en) | A kind of assembly method of roof system | |
CN206189697U (en) | Assembled room lid | |
CN206189694U (en) | Assembled room lid | |
CN106320589A (en) | Roof assembling method | |
CN207003840U (en) | A kind of roof boarding and roof system | |
CN206815654U (en) | A kind of roof boarding and roof system | |
CN206189702U (en) | Connected node of roof boarding and wallboard | |
CN206189696U (en) | Roof boarding and room lid | |
CN106284795A (en) | A kind of assembled roof system | |
CN206385698U (en) | A kind of connecting node of roof boarding and wallboard | |
CN206279682U (en) | A kind of roof boarding and its installation node | |
CN206289837U (en) | A kind of assembly type roof system | |
CN106284798A (en) | A kind of assembled roof system | |
CN206815635U (en) | A kind of assembly type roof system | |
CN206408807U (en) | A kind of connecting bracket | |
CN207160268U (en) | A kind of bending resistance shape attachment structure being used in assembling type steel structure | |
CN206189692U (en) | Assembled room lid | |
CN206408805U (en) | A kind of roof boarding and its installation node | |
CN106284799A (en) | A kind of assembly method of roof system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |