CN206328757U - A kind of pile hole construction instrument - Google Patents

A kind of pile hole construction instrument Download PDF

Info

Publication number
CN206328757U
CN206328757U CN201621431762.8U CN201621431762U CN206328757U CN 206328757 U CN206328757 U CN 206328757U CN 201621431762 U CN201621431762 U CN 201621431762U CN 206328757 U CN206328757 U CN 206328757U
Authority
CN
China
Prior art keywords
tool
power set
pile
attachment means
construction instrument
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201621431762.8U
Other languages
Chinese (zh)
Inventor
李众
韩旭
张海
李伟
段崇宝
韩彤
李爱国
王宜凡
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Eighth Engineering Division Co Ltd
First Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd
Original Assignee
China Construction Eighth Engineering Division Co Ltd
First Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Eighth Engineering Division Co Ltd, First Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd filed Critical China Construction Eighth Engineering Division Co Ltd
Priority to CN201621431762.8U priority Critical patent/CN206328757U/en
Application granted granted Critical
Publication of CN206328757U publication Critical patent/CN206328757U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Earth Drilling (AREA)

Abstract

The utility model proposes a kind of pile hole construction instrument, including:Power set;Handle, is connected with the power set;Attachment means, are connected with the power set;Tool heads, are connected with the attachment means, including excavate pulverizing tool and cleaning tool.Pile hole construction instrument described in the utility model, including excavating pulverizing tool and cleaning tool, excavating pulverizing tool has helical blade, it is easy to pierce in the mud silt soil in pile tube stake holes, when pulverizing tool is excavated in lifting, helical blade can bring out the silt soil of the mud in pile tube stake holes in large quantities;Cleaning tool has steel tendon, and using motor driving, horsepower is powerful, and the cleaning effect to pile tube stake holes inwall is that manual cleaning is incomparable.

Description

A kind of pile hole construction instrument
Technical field
The utility model is related to the realm of building construction, particularly relates to a kind of pile hole construction instrument.
Background technology
In current China building trade skyscraper, pile foundation is widely used.Pile foundation is a kind of new base form, stake Base technology experienced a certain degree of evolution, now, either pile foundation material and stake type, or pile foundation is mechanical and applies Work method has huge development, has formd modernization foundation engineering system.In some cases, use the pile foundation can be with A large amount of consumption for reducing job site workload and material.Prestressed concrete pipe pile is the most frequently used stake in building pile foundation engineering One of type.Before foundation ditch is excavated, pile tube is vertically sunk on the ground first, making the pile crown of pile tube, (that is, pile tube sinks to underground Most shallow part) sink to the predetermined depth of foundation ditch.Then excavation pit, straight to dig at the predetermined depth of foundation ditch, exposes pile tube Pile crown.Pile tube is during ground is sunk to, in the stake tail (that is, pile tube sink to underground most deep part) and pile crown of pile tube Silt substantial amounts of mud silt soil in partial stake holes up, and in the center section (that is, the part between pile crown and stake tail) of pile tube Then no soil silts up.When pile tube is connected with the basis of building, need to the center section of pile tube and pile crown part stake holes Inside pour wadding weft variation.And the soil in the stake holes of tubular pile head part must be cleared up dry before wadding weft variation is poured Only, reliably bonded with ensureing to produce between wadding weft variation and pile tube inwall.
Used existing instrument includes semicircle shovel and Luoyang Spade when removing the silt soil in pile tube stake holes, and clears up in pile tube During wall, generally cleared up using the method for man-hour manually hand-held wire brush.The shortcoming of these instruments or method is that labor intensity is big, Inefficiency, speed of application is slow, and stake holes inner wall cleaning effect is undesirable, it is difficult to meet the requirement of detail design.
Utility model content
The utility model proposes a kind of pile hole construction instrument, the problem of solving above-mentioned in the prior art.
What the technical solution of the utility model was realized in:
A kind of pile hole construction instrument, including:
Power set;
Handle, is connected with the power set;
Attachment means, are connected with the power set;
Tool heads, are connected with the attachment means, including excavate pulverizing tool and cleaning tool.
Further, the excavation pulverizing tool includes:
Drilling rod, is connected with the attachment means;
Helical blade, is arranged on the drilling rod;
Apex point, is connected with the drilling rod.
Further, the cleaning tool includes:
Connecting rod, is connected with the attachment means;
Guide head, is connected with the connecting rod;
Receiving hole, is arranged in the connecting rod;
Motion bar, is arranged in the connecting rod;
Mounting hole, is arranged on the motion bar, is matched with the receiving hole;
Steel tendon, is arranged in the mounting hole.
Preferably, the power set are specially motor.
Preferably, the power set be specially can orientation adjusting motor.
Further, pile hole construction instrument described in the utility model, also includes:
Speed change gear, is connected with the power set and the attachment means.
The beneficial effects of the utility model are:
Pile hole construction instrument described in the utility model, including pulverizing tool and cleaning tool are excavated, excavate pulverizing tool With helical blade, it is easy to pierce in the mud silt soil in pile tube stake holes, when pulverizing tool is excavated in lifting, helical blade can So that the mud silt soil in pile tube stake holes to be brought out in large quantities;Cleaning tool has steel tendon, and using motor driving, horsepower is strong Strength, the cleaning effect to pile tube stake holes inwall is that manual cleaning is incomparable.
Brief description of the drawings
, below will be to embodiment in order to illustrate more clearly of the utility model embodiment or technical scheme of the prior art Or the accompanying drawing to be used needed for description of the prior art is briefly described, it should be apparent that, drawings in the following description are only It is some embodiments of the present utility model, for those of ordinary skill in the art, before creative labor is not paid Put, other accompanying drawings can also be obtained according to these accompanying drawings.
Fig. 1 is a kind of structural representation of pile hole construction instrument of the utility model;
Fig. 2 is a kind of another structural representation of pile hole construction instrument of the utility model;
Fig. 3 is a kind of structural representation of the cleaning tool of pile hole construction instrument of the utility model.
In figure:
1st, power set;2nd, handle;3rd, attachment means;4th, pulverizing tool is excavated;401st, drilling rod;402nd, helical blade; 403rd, apex point;5th, cleaning tool;501st, connecting rod;502nd, guide head;503rd, receiving hole;504th, motion bar;505th, steel tendon;6、 Speed change gear.
Embodiment
Below in conjunction with the accompanying drawing in the utility model embodiment, the technical scheme in the utility model embodiment is carried out Clearly and completely describe, it is clear that described embodiment is only a part of embodiment of the utility model, rather than whole Embodiment.Based on the embodiment in the utility model, those of ordinary skill in the art are not under the premise of creative work is made The every other embodiment obtained, belongs to the scope of the utility model protection.
As Figure 1-3, a kind of pile hole construction instrument described in the utility model, including:
Power set 1;
Handle 2, is connected with power set 1;
Attachment means 3, are connected with power set 1;
Tool heads, are connected with attachment means 3, including excavate pulverizing tool 4 and cleaning tool 5.
Wherein, the excavation pulverizing tool 4 can include:
Drilling rod 401, is connected with attachment means 3;
Helical blade 402, is arranged on drilling rod 401;
Apex point 403, is connected with drilling rod 401.
Wherein, the cleaning tool 5 can include:
Connecting rod 501, is connected with attachment means 3;
Guide head 502, is connected with connecting rod 501;
Receiving hole 503, is arranged in connecting rod 501;
Motion bar 504, is arranged in connecting rod 501;
Mounting hole, is arranged on motion bar 504, is matched with receiving hole 503;
Steel tendon 505, is arranged in mounting hole.
Specifically, cavity is provided with connecting rod 501, motion bar 504 is movably arranged in cavity, receiving hole 503 Area is more than the area of mounting hole, when specifically used, when steel tendon 505 is by resistance, can drive motion bar 504 in connection Moved up and down in bar 501 so that more smooth using process;And steel tendon 505 has preferably toughness, can obtain preferably Cleaning effect.
Wherein it is preferred to, the power set 1 are specially motor.
Wherein it is preferred to, the power set 1 are specially can orientation adjusting motor.
Wherein it is preferred to, the attachment means 3 are specially flange connecting apparatus.
Wherein, pile hole construction instrument described in the utility model, can also include:
Speed change gear 6, is connected with power set 1 and attachment means 3.
Pile hole construction instrument described in the utility model, including pulverizing tool 4 and cleaning tool 5 are excavated, excavate grinders Tool 4 has helical blade 402, it is easy to pierce in the mud silt soil in pile tube stake holes, when pulverizing tool 4 is excavated in lifting, spiral shell Vane piece 402 can bring out the silt soil of the mud in pile tube stake holes in large quantities;Cleaning tool 5 has steel tendon 505, and uses Motor drives, and horsepower is powerful, and the cleaning effect to pile tube stake holes inwall is that manual cleaning is incomparable.
Preferred embodiment of the present utility model is the foregoing is only, it is all at this not to limit the utility model Within the spirit and principle of utility model, any modifications, equivalent substitutions and improvements made etc. should be included in the utility model Protection domain within.

Claims (6)

1. a kind of pile hole construction instrument, it is characterised in that including:
Power set (1);
Handle (2), is connected with the power set (1);
Attachment means (3), are connected with the power set (1);
Tool heads, are connected with the attachment means (3), including excavate pulverizing tool (4) and cleaning tool (5).
2. pile hole construction instrument according to claim 1, it is characterised in that the excavation pulverizing tool (4) includes:
Drilling rod (401), is connected with the attachment means (3);
Helical blade (402), is arranged on the drilling rod (401);
Apex point (403), is connected with the drilling rod (401).
3. pile hole construction instrument according to claim 1, it is characterised in that the cleaning tool (5) includes:
Connecting rod (501), is connected with the attachment means (3);
Guide head (502), is connected with the connecting rod (501);
Receiving hole (503), is arranged in the connecting rod (501);
Motion bar (504), is arranged in the connecting rod (501);
Mounting hole, is arranged on the motion bar (504), is matched with the receiving hole (503);
Steel tendon (505), is arranged in the mounting hole.
4. pile hole construction instrument according to claim 1, it is characterised in that the power set (1) are specially motor.
5. pile hole construction instrument according to claim 4, it is characterised in that the power set (1) are specially can tuning Motor.
6. pile hole construction instrument according to claim 1, it is characterised in that also include:
Speed change gear (6), is connected with the power set (1) and the attachment means (3).
CN201621431762.8U 2016-12-26 2016-12-26 A kind of pile hole construction instrument Expired - Fee Related CN206328757U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621431762.8U CN206328757U (en) 2016-12-26 2016-12-26 A kind of pile hole construction instrument

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621431762.8U CN206328757U (en) 2016-12-26 2016-12-26 A kind of pile hole construction instrument

Publications (1)

Publication Number Publication Date
CN206328757U true CN206328757U (en) 2017-07-14

Family

ID=59292395

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621431762.8U Expired - Fee Related CN206328757U (en) 2016-12-26 2016-12-26 A kind of pile hole construction instrument

Country Status (1)

Country Link
CN (1) CN206328757U (en)

Similar Documents

Publication Publication Date Title
CN105649012B (en) Upper-soft lower-hard ground subway station building enclosure drilled pile construction method
CN201952802U (en) Pile hole cleaning tool for concrete tubular pile
CN105649083B (en) The clear stake device of the disposable rotary-cutting type of full-sleeve and its clear piling method
CN203174589U (en) Deep layer cement mixing pile machine drill bit blade device
CN109723373A (en) A kind of light weathered granite stratum rotary digging drilling hole bored concrete pile construction method
CN105421389A (en) Circular-arc folding equipment for crossed piles and rectangular piles
CN102182180B (en) Rotary extrusion sleeve anchor rod and construction method thereof
CN107938652B (en) Rock-inlaid steel reinforced cement stirring wall and construction method thereof
CN204199289U (en) A kind of pipe pile core mud cleaning tool
CN210513758U (en) Environmental science soil property sampler
CN206328757U (en) A kind of pile hole construction instrument
CN105421398A (en) Trapezoidal inserting device for cross pile and rectangular pile
CN101906778B (en) Construction site tubular pile muddredger and manufacturing method thereof
CN213121198U (en) Soil sampling device for foundation detection
CN203049636U (en) Concrete pole foundation excavation tool
CN203948024U (en) The latent horizontal square hole rig that revolves of formula
CN208934599U (en) Rectangular punching drill bit of rotary drilling rig for large-section rectangular anchoring pile
CN206570796U (en) A kind of circulating high pressure water clears up the device of pile tube stake holes
CN206457823U (en) A kind of device for clearing up Prefabricated hollow pile stake core
CN208777311U (en) A kind of prefabricated concrete pipe pile hole cleaning device
CN218030047U (en) Device for reaming position of steel casing of cast-in-situ bored pile by rotary drilling rig
CN202073087U (en) Soil-absorbing hole-forming drilling bit of diamond drill
CN221074195U (en) Rotary drilling rig drill bit soil sampling device
CN103953283A (en) Submersible transverse rotating square hole drilling machine
CN208009432U (en) A kind of prestressed concrete pipe pile stake core hole cleaning device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170714

Termination date: 20171226