CN109723373A - A kind of light weathered granite stratum rotary digging drilling hole bored concrete pile construction method - Google Patents

A kind of light weathered granite stratum rotary digging drilling hole bored concrete pile construction method Download PDF

Info

Publication number
CN109723373A
CN109723373A CN201811601410.6A CN201811601410A CN109723373A CN 109723373 A CN109723373 A CN 109723373A CN 201811601410 A CN201811601410 A CN 201811601410A CN 109723373 A CN109723373 A CN 109723373A
Authority
CN
China
Prior art keywords
drilling
rotary
weathered granite
unilateral
casing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201811601410.6A
Other languages
Chinese (zh)
Other versions
CN109723373B (en
Inventor
朱和杰
王有旗
张纯东
欧阳文
刘普前
辛柱桥
宋昱宇
李苗
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway 25th Bureau Group Co Ltd
Fifth Engineering Co Ltd of China Railway 25th Bureau Group Co Ltd
Original Assignee
China Railway 25th Bureau Group Co Ltd
Fifth Engineering Co Ltd of China Railway 25th Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway 25th Bureau Group Co Ltd, Fifth Engineering Co Ltd of China Railway 25th Bureau Group Co Ltd filed Critical China Railway 25th Bureau Group Co Ltd
Priority to CN201811601410.6A priority Critical patent/CN109723373B/en
Publication of CN109723373A publication Critical patent/CN109723373A/en
Application granted granted Critical
Publication of CN109723373B publication Critical patent/CN109723373B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Earth Drilling (AREA)

Abstract

The present invention relates to a kind of light weathered granite stratum rotary digging drilling hole bored concrete pile construction methods, it is characterized in that, the following steps are included: step S1: removing the sundries in place within the scope of design stake position, smooth construction site guarantees the levelling of the land of rotary drilling rig pedestal and compacting;Step S2: according to design drawing, stake position center is made in in-site measurement setting-out;Step S3: shield-tube embedment;Step S4: drilled pile pore-forming;Step S5: reinforcing bar cage hoisting;Step S6: decentralization conduit;Step S7: underwater concrete is poured.The present invention carries out gentle breeze rockhole pile driving construction using gear wheel cartridge type coring bit, solves the problems, such as to have achieved the purpose that the rapid construction of micro- decomposed rock stratum in micro- decomposed rock stratum constructional difficulties with rotary drilling rig;It is used by using various rotary digging drill bit mix and match, enables rotary drilling rig in bad ground fast pore-creating, greatly accelerate pore-forming efficiency.

Description

A kind of light weathered granite stratum rotary digging drilling hole bored concrete pile construction method
Technical field
The present invention relates to a kind of light weathered granite stratum rotary digging drilling hole bored concrete pile construction methods.
Background technique
Rotary drilling rig is aobvious in drilled pile construction field as relatively advanced construction machinery a kind of in bored pile construction Apparent superiority is shown.Compared with common punching pile machine, rotary drilling rig speed of fulfiling hole is fast, stratum is applied widely, stake contraposition Convenience is accurate, environmental pollution is small, and construction achieves good effect.But for the gentle breeze of more complete stratification crack agensis Granitic formation, using rotary drilling rig construction, there are bigger difficulty.
Summary of the invention
Present invention seek to address that the above problem, provides a kind of light weathered granite stratum rotary digging drilling hole bored concrete pile pore-forming and apply Work technique solves the problems, such as rotary drilling rig in micro- decomposed rock stratum constructional difficulties, accelerates pore-forming efficiency.
A kind of light weathered granite stratum rotary digging drilling hole bored concrete pile construction method, which is characterized in that including following step It is rapid:
Step S1: removing the sundries in place within the scope of design stake position, and smooth construction site guarantees rotary drilling rig pedestal place Smooth and compacting;
Step S2: according to design drawing, stake position center is made in in-site measurement setting-out;
Step S3: shield-tube embedment;
Step S4: drilled pile pore-forming;
Step S5: reinforcing bar cage hoisting;
Step S6: decentralization conduit;
Step S7: underwater concrete is poured.
Preferably, the step S3 includes the following steps,
Step S31: after stake position center determines, 4 interim control stakes are set in casing surrounding appropriate location, and hand over cross Restore stake position center in the center of cross wires;
Step S32: when casing is buried in digging, by the leveling of hole bottom, the center location of casing is then found out, is scheduled on shield with cross hairs Cylinder top or bottom, then moving casing is overlapped the center location of casing with stake position center, is examined with horizontal ruler or plumb bob It looks into, guarantees casing verticality.
Preferably, the step S4 includes the following steps,
Step S41: the walking function and mast jib lubbing mechanism being had by oneself by rotary drilling rig enable drilling tool correctly in place To stake position center, drilling tool is placed to casing center using mast guiding lowering drill pipes;
Step S42: starting to drill after rotary drilling rig is in place, and drilling tool is crept at a slow speed in casing bottom low pressure, is drilled into casing bottom Start normal drilling behind lower 1.0m or so place;
Step S43: it when drilling tool drilling to completion, replaces and is removed the sediment of foot of hole using scouring bit dry Only.
Preferably, in the step S42, the power head device of rotary drilling rig for drilling tool provide torque, rotary drilling rig plus Plus-pressure is passed to drilling tool by way of the power head device that pressurizes by pressure device.
Preferably, the step S42 includes the following steps,
Step S421: when drilling tool in miscellaneous fill layer, rush diluvium facies fine sand layer, rush diluvium facies medium-sand seam, muck soil When layer, farinose argillic horizon and completely weathered granite stratum are drilled, drilling tool is bored using unilateral into native bucket tooth fishing sand borer head Hole, when construction by it is unilateral drop to predetermined depth into native bucket tooth fishing sand borer head after, rotate and unilateral fish out sand borer head into native bucket tooth and add Pressure, the soil of spin-up is squeezed into the unilateral drilling pipe into native bucket tooth fishing sand borer head, after soil is crowded with drilling pipes, is inverted unilateral into the fishing of native bucket tooth Sand borer head, it is unilateral to be closed into native bucket tooth fishing sand borer head bottom and propose that drilling is outer, it then automatically turns on unilateral husky into the fishing of native bucket tooth Drill bit bottom switch, pours out spoir;
Step S422: when drilling to strong weathered granite layer and middle weathering sial, drilling tool is bored using embedding rock pick Cylinder carries out, and first passes through the bit drill revolution fragmented rock body of embedding rock pick drilling pipe, then will be broken into native bucket tooth fishing sand borer head by unilateral Detritus body rotary digging goes out ground;
Step S423: when drilling to light weathered granite rock stratum, drilling tool uses gear wheel cartridge type coring bit, in churning driven Under the powerful torque effect of bar, rotates the brill bucket of gear wheel cartridge type coring bit and be further driven to gear wheel cartridge type coring bit slowly Light weathered granite stratum is cut in rotation, until core column bores bucket full of entire, then is all around swung to and fro brill by drilling rod Monolith core column is finally taken out under core column and brill barrel side frictional resistance interlock action, is so recycled come the core column that fractures by cylinder Back and forth, until drilling to completion.Pay attention to being adjusted to hole perpendicularity in drilling process, stake depth cannot be less than projected depth.
Preferably, crane disposably transfers steel reinforcement cage using two o'clock lifting method, and drilling pile concrete is filled using tremie method Infuse underwater concrete.
The present invention has the advantage that carrying out gentle breeze rockhole pile driving construction using gear wheel cartridge type coring bit, solve With rotary drilling rig micro- decomposed rock stratum constructional difficulties the problem of, the rapid construction of micro- decomposed rock stratum is achieved the purpose that;It is logical It crosses and is used using various rotary digging drill bit mix and match, enable rotary drilling rig in bad ground fast pore-creating, greatly accelerate pore-forming Efficiency.
Detailed description of the invention
In order to more clearly explain the embodiment of the invention or the technical proposal in the existing technology, to embodiment or will show below There is attached drawing needed in technical description to be briefly described.It should be evident that the accompanying drawings in the following description is only this A kind of embodiment of invention for those of ordinary skill in the art without creative efforts, can be with It is extended according to the attached drawing of offer and obtains other implementation attached drawings.
Fig. 1: flow chart of the invention;
Specific embodiment
The invention will be further described with example with reference to the accompanying drawing:
The embodiment of the present invention is described below in detail, examples of the embodiments are shown in the accompanying drawings, wherein from beginning to end Same or similar label indicates same or similar element or element with the same or similar functions.Below with reference to attached The embodiment of figure description is exemplary, and for explaining only the invention, and is not considered as limiting the invention.
In the description of the present invention, it should be noted that unless otherwise clearly defined and limited, term " installation ", " phase Even ", " connection " shall be understood in a broad sense, for example, it may be being fixedly connected, may be a detachable connection, or be integrally connected;It can It, can also be indirectly connected through an intermediary to be to be connected directly.It for the ordinary skill in the art, can be specific Situation understands the concrete meaning of above-mentioned term in the present invention.
As shown in Figure 1, present embodiments providing a kind of light weathered granite stratum rotary digging drilling hole bored concrete pile drilling construction work Skill, which comprises the following steps:
Step S1: removing the sundries in place within the scope of design stake position, and smooth construction site guarantees rotary drilling rig pedestal place Smooth and compacting;
Step S2: according to design drawing, stake position center is made in in-site measurement setting-out;
Step S3: shield-tube embedment;
Step S4: drilled pile pore-forming;
Step S5: reinforcing bar cage hoisting;
Step S6: decentralization conduit;
Step S7: underwater concrete is poured.
Preferably, the step S3 includes the following steps,
Step S31: after stake position center determines, 4 interim control stakes are set in casing surrounding appropriate location, and hand over cross Restore stake position center in the center of cross wires;
Step S32: when casing is buried in digging, by the leveling of hole bottom, the center location of casing is then found out, is scheduled on shield with cross hairs Cylinder top or bottom, then moving casing is overlapped the center location of casing with stake position center, is examined with horizontal ruler or plumb bob It looks into, guarantees casing verticality.
Preferably, the step S4 includes the following steps,
Step S41: the walking function and mast jib lubbing mechanism being had by oneself by rotary drilling rig enable drilling tool correctly in place To stake position center, drilling tool is placed to casing center using mast guiding lowering drill pipes;
Step S42: starting to drill after rotary drilling rig is in place, and drilling tool is crept at a slow speed in casing bottom low pressure, is drilled into casing bottom Start normal drilling behind lower 1.0m or so place;
Step S43: it when drilling tool drilling to completion, replaces and is removed the sediment of foot of hole using scouring bit dry Only.
Preferably, in the step S42, the power head device of rotary drilling rig for drilling tool provide torque, rotary drilling rig plus Plus-pressure is passed to drilling tool by way of the power head device that pressurizes by pressure device.
Preferably, the step S42 includes the following steps,
Step S421: when drilling tool in miscellaneous fill layer, rush diluvium facies fine sand layer, rush diluvium facies medium-sand seam, muck soil When layer, farinose argillic horizon and completely weathered granite stratum are drilled, drilling tool is bored using unilateral into native bucket tooth fishing sand borer head Hole, when construction by it is unilateral drop to predetermined depth into native bucket tooth fishing sand borer head after, rotate and unilateral fish out sand borer head into native bucket tooth and add Pressure, the soil of spin-up is squeezed into the unilateral drilling pipe into native bucket tooth fishing sand borer head, after soil is crowded with drilling pipes, is inverted unilateral into the fishing of native bucket tooth Sand borer head, it is unilateral to be closed into native bucket tooth fishing sand borer head bottom and propose that drilling is outer, it then automatically turns on unilateral husky into the fishing of native bucket tooth Drill bit bottom switch, pours out spoir;
Step S422: when drilling to strong weathered granite layer and middle weathering sial, drilling tool is bored using embedding rock pick Cylinder carries out, and first passes through the bit drill revolution fragmented rock body of embedding rock pick drilling pipe, then will be broken into native bucket tooth fishing sand borer head by unilateral Detritus body rotary digging goes out ground;
Step S423: when drilling to light weathered granite rock stratum, drilling tool uses gear wheel cartridge type coring bit, in churning driven Under the powerful torque effect of bar, rotates the brill bucket of gear wheel cartridge type coring bit and be further driven to gear wheel cartridge type coring bit slowly Light weathered granite stratum is cut in rotation, until core column bores bucket full of entire, then is all around swung to and fro brill by drilling rod Monolith core column is finally taken out under core column and brill barrel side frictional resistance interlock action, is so recycled come the core column that fractures by cylinder Back and forth, until drilling to completion.Pay attention to being adjusted to hole perpendicularity in drilling process, stake depth cannot be less than projected depth.
Preferably, crane disposably transfers steel reinforcement cage using two o'clock lifting method, and drilling pile concrete is filled using tremie method Infuse underwater concrete.Pay attention to being adjusted to hole perpendicularity in drilling process, stake depth cannot be less than projected depth.
Preferably, crane disposably transfers steel reinforcement cage using two o'clock lifting method, and drilling pile concrete is filled using tremie method Infuse underwater concrete.
The present invention is described by way of example above, but the present invention is not limited to above-mentioned specific embodiment, all to be based on Any changes or modifications that the present invention is done are fallen within the scope of the claimed invention.

Claims (5)

1. a kind of light weathered granite stratum rotary digging drilling hole bored concrete pile construction method, which comprises the following steps:
Step S1: removing the sundries in place within the scope of design stake position, and smooth construction site guarantees the levelling of the land of rotary drilling rig pedestal And compacting;
Step S2: according to design drawing, stake position center is made in in-site measurement setting-out;
Step S3: shield-tube embedment;
Step S4: drilled pile pore-forming;
Step S5: reinforcing bar cage hoisting;
Step S6: decentralization conduit;
Step S7: underwater concrete is poured.
2. a kind of light weathered granite stratum rotary digging drilling hole bored concrete pile construction method as described in claim 1, feature Be: the step S3 includes the following steps,
Step S31: after stake position center determines, 4 interim control stakes are set in casing surrounding appropriate location, and with cross wire Center restore stake position center;
Step S32: when casing is buried in digging, by the leveling of hole bottom, the center location of casing is then found out, is scheduled on casing top with cross hairs Portion or bottom, then moving casing is overlapped the center location of casing with stake position center, with horizontal ruler or plumb bob inspection, protects Demonstrate,prove casing verticality.
3. a kind of light weathered granite stratum rotary digging drilling hole bored concrete pile construction method as described in claim 1, feature Be: the step S4 includes the following steps,
Step S41: the walking function and mast jib lubbing mechanism being had by oneself by rotary drilling rig enable drilling tool correctly to arrive stake in place Drilling tool is placed to casing center using mast guiding lowering drill pipes by position center;
Step S42: start to drill after rotary drilling rig is in place;
Step S43: it when drilling tool drilling to completion, replaces and is removed the sediment of foot of hole using scouring bit clean.
4. a kind of light weathered granite stratum rotary digging drilling hole bored concrete pile construction method as claimed in claim 3, feature Be: in the step S42, the power head device of rotary drilling rig provides torque for drilling tool, the pressurizing device of rotary drilling rig passes through Plus-pressure is passed to drilling tool by the mode of pressurization power head device.
5. a kind of light weathered granite stratum rotary digging drilling hole bored concrete pile construction method as claimed in claim 3, feature Be: the step S42 includes the following steps,
Step S421: when drilling tool in miscellaneous fill layer, rush diluvium facies fine sand layer, rush diluvium facies medium-sand seam, silt soil strata, powder When matter argillic horizon and completely weathered granite stratum are drilled, drilling tool is drilled using unilateral into native bucket tooth fishing sand borer head, is applied Working hour by it is unilateral drop to predetermined depth into native bucket tooth fishing sand borer head after, rotate unilateral fish out into native bucket tooth and sand borer head and pressurize, revolve The soil risen is squeezed into the unilateral drilling pipe into native bucket tooth fishing sand borer head, after soil is crowded with drilling pipes, is inverted unilateral into native bucket tooth fishing sand borer Head, it is unilateral to be closed into native bucket tooth fishing sand borer head bottom and propose that drilling is outer, it then automatically turns on unilateral into native bucket tooth fishing sand borer head Bottom switch pours out spoir;
Step S422: when drilling is to strong weathered granite layer and middle weathering sial, drilling tool using embedding rock pick drilling pipe into Row first passes through the bit drill revolution fragmented rock body of embedding rock pick drilling pipe, then fishes out sand borer head for kata-rocks into native bucket tooth by unilateral Body rotary digging goes out ground;
Step S423: when drilling to light weathered granite rock stratum, drilling tool uses gear wheel cartridge type coring bit, strong in rotary drill rod Under large torque effect, rotates the brill bucket of gear wheel cartridge type coring bit and be further driven to gear wheel cartridge type coring bit rotation cutting Drilling pipe until core column bores bucket full of entire, then is swung to and fro all around by drilling rod to fracture in light weathered granite stratum Monolith core column is finally taken out under core column and brill barrel side frictional resistance interlock action, is looped back and forth like this by core column, until Drilling to completion.
CN201811601410.6A 2018-12-26 2018-12-26 Hole forming construction process for rotary drilling bored pile in slightly weathered granite stratum Active CN109723373B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811601410.6A CN109723373B (en) 2018-12-26 2018-12-26 Hole forming construction process for rotary drilling bored pile in slightly weathered granite stratum

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811601410.6A CN109723373B (en) 2018-12-26 2018-12-26 Hole forming construction process for rotary drilling bored pile in slightly weathered granite stratum

Publications (2)

Publication Number Publication Date
CN109723373A true CN109723373A (en) 2019-05-07
CN109723373B CN109723373B (en) 2020-09-25

Family

ID=66297189

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811601410.6A Active CN109723373B (en) 2018-12-26 2018-12-26 Hole forming construction process for rotary drilling bored pile in slightly weathered granite stratum

Country Status (1)

Country Link
CN (1) CN109723373B (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111021948A (en) * 2019-12-30 2020-04-17 深圳市盛业地下工程有限公司 Pile foundation combination equipment for rapid pore-forming of complex geology
CN111101865A (en) * 2019-12-30 2020-05-05 深圳市盛业地下工程有限公司 High efficiency drilling equipment
CN111560949A (en) * 2020-06-08 2020-08-21 浙江万里建设工程有限公司 Cast-in-place pile construction method
CN112901074A (en) * 2021-03-10 2021-06-04 中交第三航务工程局有限公司宁波分公司 Rock-socketed drilling pore-forming process of marine large-diameter inclined pile rotary excavator
CN113006055A (en) * 2021-03-04 2021-06-22 苏州科大岩土工程技术有限公司 Cast-in-situ bored pile construction method
CN116025282A (en) * 2022-12-17 2023-04-28 中交建筑集团有限公司 Composite pore-forming construction method for multi-boulder stratum oversized-diameter bored pile
CN116927178A (en) * 2023-07-21 2023-10-24 广东省水利水电第三工程局有限公司 Construction method of granite boulder geological underground diaphragm wall

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102758430A (en) * 2012-07-31 2012-10-31 中建五局第三建设有限公司 Large-diameter rotary digging pile construction process for ultra-deep throwing and filling unconsolidated soil body
US20130264118A1 (en) * 2008-10-08 2013-10-10 Potter Drilling, Inc. Methods and Apparatus for Mechanical and Thermal Drilling
CN203822164U (en) * 2014-03-27 2014-09-10 北京市三一重机有限公司 Drilling bucket and rotary drilling rig
US20150322738A1 (en) * 2008-08-20 2015-11-12 Foro Energy, Inc. Methods and apparatus for removal and control of material in laser drilling of a borehole
CN106245626A (en) * 2016-08-15 2016-12-21 中建三局基础设施工程有限公司 A kind of hard formation churning driven enters method
CN107938658A (en) * 2017-11-17 2018-04-20 重庆交通建设(集团)有限责任公司 A kind of construction method of fender post
CN108071110A (en) * 2016-11-11 2018-05-25 上海宝冶集团有限公司 Rotary drilling rig Pile method under complex geological condition

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20150322738A1 (en) * 2008-08-20 2015-11-12 Foro Energy, Inc. Methods and apparatus for removal and control of material in laser drilling of a borehole
US20130264118A1 (en) * 2008-10-08 2013-10-10 Potter Drilling, Inc. Methods and Apparatus for Mechanical and Thermal Drilling
CN102758430A (en) * 2012-07-31 2012-10-31 中建五局第三建设有限公司 Large-diameter rotary digging pile construction process for ultra-deep throwing and filling unconsolidated soil body
CN203822164U (en) * 2014-03-27 2014-09-10 北京市三一重机有限公司 Drilling bucket and rotary drilling rig
CN106245626A (en) * 2016-08-15 2016-12-21 中建三局基础设施工程有限公司 A kind of hard formation churning driven enters method
CN108071110A (en) * 2016-11-11 2018-05-25 上海宝冶集团有限公司 Rotary drilling rig Pile method under complex geological condition
CN107938658A (en) * 2017-11-17 2018-04-20 重庆交通建设(集团)有限责任公司 A kind of construction method of fender post

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
徐克里 等: "《基础工程施工技术》", 31 August 2009, 地质出版社 *
李粮纲 等: "桩钻孔进的旋挖钻头选型与应用研究", 《探矿工程(岩土钻掘工程)》 *

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111021948A (en) * 2019-12-30 2020-04-17 深圳市盛业地下工程有限公司 Pile foundation combination equipment for rapid pore-forming of complex geology
CN111101865A (en) * 2019-12-30 2020-05-05 深圳市盛业地下工程有限公司 High efficiency drilling equipment
CN111560949A (en) * 2020-06-08 2020-08-21 浙江万里建设工程有限公司 Cast-in-place pile construction method
CN113006055A (en) * 2021-03-04 2021-06-22 苏州科大岩土工程技术有限公司 Cast-in-situ bored pile construction method
CN112901074A (en) * 2021-03-10 2021-06-04 中交第三航务工程局有限公司宁波分公司 Rock-socketed drilling pore-forming process of marine large-diameter inclined pile rotary excavator
CN112901074B (en) * 2021-03-10 2024-02-13 中交第三航务工程局有限公司 Rock-socketed drilling pore-forming technology of offshore large-diameter inclined pile rotary digging machine
CN116025282A (en) * 2022-12-17 2023-04-28 中交建筑集团有限公司 Composite pore-forming construction method for multi-boulder stratum oversized-diameter bored pile
CN116927178A (en) * 2023-07-21 2023-10-24 广东省水利水电第三工程局有限公司 Construction method of granite boulder geological underground diaphragm wall
CN116927178B (en) * 2023-07-21 2024-05-28 广东省水利水电第三工程局有限公司 Construction method of granite boulder geological underground diaphragm wall

Also Published As

Publication number Publication date
CN109723373B (en) 2020-09-25

Similar Documents

Publication Publication Date Title
CN109723373A (en) A kind of light weathered granite stratum rotary digging drilling hole bored concrete pile construction method
CN102943466B (en) Construction method for miniature steel pipe concrete pile to penetrate through roadbed layer for reinforcing soft foundation construction
CN102758430B (en) Large-diameter rotary digging pile construction process for ultra-deep throwing and filling unconsolidated soil body
CN108360972A (en) Method for constructing bored pile by combining rotary drilling rig and impact drilling rig
CN111395346A (en) Construction method for pouring concrete into karst cave
CN101429766A (en) Ground strengthened high pressure rotary spraying pile construction technique
CN109610470A (en) A kind of base pit stand construction using three axes agitating pile machine
CN105780763A (en) Construction method of medium-hole vibrating casing wall protection type long spiral cast-in-situ bored pile
CN107905236A (en) The construction method of friction pile churning driven fast pore-creating and concrete placings
CN103321244A (en) Construction method for additionally arranged basement in existing building on sand foundation
CN206801460U (en) A kind of rectangle friction pile drilling construction device
KR101527723B1 (en) Complex Ground Improving Devive and Ground Improving Method Using The Same
CN108842764B (en) Rotary stirring type anchor pipe construction method
CN105040695A (en) Anchor rod structure capable of integrally working and construction method
CN105155519A (en) Rotary-excavating under-reamed bored pile constructing method
CN104532853A (en) Deep foundation pit supporting method and system characterized by steel reinforced cement-soil piles, bolts easy to detach and automatic monitoring and early warning
CN106677166A (en) Flow construction method for forming cast-in-place bored pile for gravel-decomposed rock stratum in double-machine combined mode
CN102304915B (en) New method for controlling top quality of drilled pile
CN105297710A (en) High-pressure-jetting cement soil twist drill and reamed reinforced concrete grouting combined pile and manufacturing method
CN104563104B (en) Pile work drilling machine is with coordinated type breast wall apparatus and use its construction method
CN108978742A (en) One kind cutting stake forced-landing tilt correcting structure, method
KR102028182B1 (en) Construction method of pillar type underground structure using excavation system for structural casing burial
CN209066518U (en) A kind of constructing structure of section of stake forced-landing tilt correcting structure and miniature steel pipe pile
CN112196494A (en) Construction process and construction equipment for geological pipeline jointed between rock and soil layer
CN101338560A (en) Construction method for reinforced concrete pile

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant