CN208934599U - Rectangular punching drill bit of rotary drilling rig for large-section rectangular anchoring pile - Google Patents
Rectangular punching drill bit of rotary drilling rig for large-section rectangular anchoring pile Download PDFInfo
- Publication number
- CN208934599U CN208934599U CN201821208574.8U CN201821208574U CN208934599U CN 208934599 U CN208934599 U CN 208934599U CN 201821208574 U CN201821208574 U CN 201821208574U CN 208934599 U CN208934599 U CN 208934599U
- Authority
- CN
- China
- Prior art keywords
- rectangle
- drill bit
- drilling rig
- welded
- rectangular box
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000005553 drilling Methods 0.000 title claims abstract description 19
- 238000004873 anchoring Methods 0.000 title description 6
- 238000004080 punching Methods 0.000 title 1
- 229910000831 Steel Inorganic materials 0.000 claims description 14
- 239000010959 steel Substances 0.000 claims description 14
- 210000000515 tooth Anatomy 0.000 claims description 11
- 229910000926 A-3 tool steel Inorganic materials 0.000 claims description 4
- 230000003014 reinforcing effect Effects 0.000 claims description 3
- 238000010276 construction Methods 0.000 abstract description 22
- 238000000034 method Methods 0.000 abstract description 4
- 238000005422 blasting Methods 0.000 abstract description 3
- 239000011435 rock Substances 0.000 abstract description 3
- 238000003466 welding Methods 0.000 abstract description 2
- 239000000956 alloy Substances 0.000 abstract 1
- 229910045601 alloy Inorganic materials 0.000 abstract 1
- 239000002689 soil Substances 0.000 description 3
- 241001074085 Scophthalmus aquosus Species 0.000 description 2
- 230000009172 bursting Effects 0.000 description 2
- 238000004140 cleaning Methods 0.000 description 2
- 238000010586 diagram Methods 0.000 description 2
- 101100443249 Caenorhabditis elegans dig-1 gene Proteins 0.000 description 1
- 229910000639 Spring steel Inorganic materials 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 239000003818 cinder Substances 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 239000002360 explosive Substances 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 239000002893 slag Substances 0.000 description 1
- 239000000126 substance Substances 0.000 description 1
Landscapes
- Earth Drilling (AREA)
Abstract
The utility model provides a big cross-section rectangle anchor pile digs rig rectangle die-cut drill bit soon, including digging the drill bit soon, dig the drill bit bottom soon and be provided with the rectangle box, the rectangle box includes rectangle upper surface and four rectangle sides, rectangle upper surface and four rectangle sides welded fastening dig the center of drill bit lower surface welding on the rectangle box upper surface soon, all be provided with the limit tooth bottom every rectangle side of rectangle box. The utility model discloses the alloy drill bit of the big different models of torque fit of rig is dug soon in the utilization can high-efficient pore-forming in the higher rock stratum of intensity, adopts different model drill bit combinations, obtains the anchor pile cross-section and the degree of depth that accord with the designing requirement through drilling many times to replaced traditional anchor pile manual blasting operation, avoided the safety risk of artifical lower hole construction, reduced dado construction process simultaneously, improved the efficiency of construction of anchor pile pore-forming greatly, reduced anchor pile construction cost.
Description
Technical field
The utility model belongs to construction field of tool, and in particular to a kind of big section rectangle anchoring pile rotary drilling rig square
Shape is punched drill bit.
Background technique
With the quickening of pace of construction in recent years and the progress of tunnel construction technology, Tunnel Project has become mountain area, mound
The main body of mound area project construction, and the actual environment of Tunnel Project construction becomes increasingly complex, in order to guarantee construction and later period fortune
Anchor pile often is arranged in locations such as tunnel portal, barrel biass, such as Jiangxi Jiu Jingqu project thunder tor No.1 tunnel in battalion's safety
Shallow Section is because landform bias is seriously arranged 6 anchor piles, and new No. 2 tunnel portals of furnace are because landform bias is arranged 2 anchor piles, and tunnel
The construction speed of road anchor pile decides the speed of tunnel and the duration of constructing tunnel.For unit in charge of construction progress,
Duration is equal to benefit and cost.And consuming time is long for traditional bursting work anchoring pile constructing process, construction risk is high, often
Restrict the construction of tunnel main body.Even individual work points can not further be reduced because of the restriction of blasting environment using bursting work
Construction efficiency, increases construction cost, if furnace new No. 2 hole anchor piles are because close to provincial highway and passenger station, blasting environment is complicated,
It needs to carry out road closed and passenger station evacuating personnel if using blast working, otherwise can not carry out blast working, Jin Jindao
Road block and this expense of evacuating personnel cause cost wholesale to increase, the exactly almost impossible receiving of unit in charge of construction.
Utility model content
Purpose of the utility model is to solve the above-mentioned problems of the prior art, provide a kind of big section rectangle anchor
Gu pile rotary drilling rig rectangle die cut drill bit.
To achieve the above objectives, the present invention adopts the following technical solutions: a kind of big section rectangle anchor pile churning driven
Machine rectangle die cut drill bit, including rotary digging drill bit, rotary digging drill bit bottom are provided with rectangular box, and rectangular box includes rectangular top surface
With four rectangle sides, rectangular top surface is welded and fixed with four rectangle sides, and rotary digging drill bit lower surface is welded on rectangular box
Each rectangle sides bottom at the center of upper surface, rectangular box is provided with heel teeth.
Rectangular box is internally provided with reinforcing stull.
Diagonal brace is vertically arranged between the side of rotary digging drill bit and the upper surface of rectangular box.
At least provided with two heel teeths, heel teeth is welded on rectangle sides bottom using steel spring plate for each rectangle sides bottom
Portion.
There are two the reinforcing stulls at least, reinforces stull using A3 steel plate and is welded on box house.
There are four the diagonal braces, and diagonal brace is triangular steel plate diagonal brace, and a right-angle side of triangular steel plate diagonal brace is welded on
On rotary digging drill bit outer wall, on the diagonal line for the rectangular top surface that another right-angle side is welded on cabinet.
The utility model has the beneficial effects that: conjunction of the utility model using rotary drilling rig large torque cooperation different model
Golden drill bit efficient pore-forming can be met by the acquisition that repeatedly drills and be set using the combination of different model drill bit in the higher rock stratum of intensity
Desired anchor pile section and depth are counted, to evade artificial lower opening instead of traditional anchor pile human-generated explosives operation and apply
The security risk of work, while reducing panelling construction process, the construction efficiency of anchor pile pore-forming is substantially increased, anchoring is reduced
Pile driving construction cost.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of the utility model.
Fig. 2 is the bottom substance schematic diagram of Fig. 1.
Specific embodiment
The utility model is described in further detail with reference to the accompanying drawings and detailed description.
Embodiment 1
As depicted in figs. 1 and 2, the present embodiment provides a kind of big section rectangles to anchor pile rotary drilling rig rectangle die cut drill bit,
Including rotary digging drill bit 1,1 bottom of rotary digging drill bit is provided with rectangular box 2, and rectangular box 2 includes rectangular top surface and four rectangles
Side, rectangular top surface are welded and fixed with four rectangle sides, and 1 lower surface of rotary digging drill bit is welded on 2 upper surface of rectangular box
Center, each rectangle sides bottom of rectangular box 2 are respectively provided with there are three heel teeth 3, and heel teeth 3 is welded on rectangle using steel spring plate
Side bottom is uniformly arranged inside rectangular box 2 there are two stull 4 is reinforced, and is reinforced stull 4 using A3 steel plate and is welded on rectangular box
Inside body 2, it is vertically arranged between the side of rotary digging drill bit 1 and the upper surface of rectangular box 2 there are four diagonal brace 5, diagonal brace 5 is triangle
One right-angle side of shape steel plate diagonal brace, triangular steel plate diagonal brace is welded on 1 outer wall of rotary digging drill bit, and another right-angle side is welded on
On the diagonal line of the rectangular top surface of rectangular box 2.
Embodiment 2
The present embodiment provides a kind of big section rectangles to anchor pile rotary drilling rig rectangle die cut drill bit, including rotary digging drill bit 1, rotation
Dig 1 bottom of drill bit and be provided with rectangular box 2, rectangular box 2 includes rectangular top surface and four rectangle sides, rectangular top surface with
Four rectangle sides are welded and fixed, and 1 lower surface of rotary digging drill bit is welded on the center of 2 upper surface of rectangular box, the ruler of rectangular box 2
Very little is long 1.0m ╳ wide 1.0m ╳ high 0.6m, and two blocks of steel plates of welding reinforce 4 steel plate of stull as stull 4 is reinforced in rectangular box 2
Size be long 1.0m ╳ high 0.55m, be all made of the common A3 steel plate of 20mm thickness, 2 four side bottoms of rectangular box are welded respectively
3 heel teeths 3 are connect, totally 12 heel teeths 3, the size of each heel teeth 3 is high 300mm ╳ wide 150mm ╳ thickness 20mm, and material is spring steel
Plate, rectangular box 2 and rotary digging drill bit 1 are welded to connect with triangular steel plate diagonal brace, and triangular steel plate diagonal brace totally 4, each triangle
Shape steel plate diagonal brace with a thickness of 20mm.
In certain construction site work progress, anchoring dowel section area is 2.75m*2.5m, the long 19m of stake, using 31 heavy industrys
SR280R churning driven drilling machine pore-forming, drill bit of drilling machine include diameter be 0.6m fishing subdrilling head, diameter be 1.25m fishing subdrilling head and
Three kinds of model drill bits of rectangle die cut drill bit, hard rock need to recycle its excess-three kind drill bit to construct with taper bit precrushing.
Weak weathered stratum uses diameter to carry out drawing angular bit hole for the fishing subdrilling head of 0.6m and apply first in order to guarantee to anchor stake body dead size
Work recycles the fishing subdrilling head construction interstitial hole that diameter is 1.25m, carries out precrushing using taper bit when drilling is difficult, then
Brill is applied using 1.25m fishing subdrilling head, brill is continuously applied in anchor pile interface, scarfing cinder is finally completed pore-forming.Severely-weathered stratum or
Texture stratum anchor pile is directly continuously applied using the fishing subdrilling head that diameter is 1.25m and is drilled into design altitude, utilizes after drilling
Drill bit carries out first time borehole cleaning, a little soil body, more bit change can be left in surrounding after emptying, using rectangle die cut drill bit to extra
The soil body, which is self-possessed and pressurizes using churning driven, is punched out finishing to the extra soil body, secondary using rotary drilling rig progress after finishing
Slag borehole cleaning is drawn, the operation of anchor pile pore-forming is completed.
The above is preferred embodiments of the present invention, it is noted that for those skilled in the art,
The present utility model is not limited to the above embodiments, under the premise of not departing from the utility model general idea, can also make
Several changes and improvements, these also should be considered as the protection scope of the utility model.
Claims (6)
1. a kind of big section rectangle anchors pile rotary drilling rig rectangle die cut drill bit, including rotary digging drill bit, it is characterised in that: churning driven
Head bottom is provided with rectangular box, and rectangular box includes rectangular top surface and four rectangle sides, rectangular top surface and four squares
Shape side is welded and fixed, and rotary digging drill bit lower surface is welded at the center of rectangular box upper surface, each rectangle of rectangular box
Side bottom is provided with heel teeth.
2. big section rectangle as described in claim 1 anchors pile rotary drilling rig rectangle die cut drill bit, it is characterised in that: rectangular box
Body is internally provided with reinforcing stull.
3. big section rectangle as described in claim 1 anchors pile rotary drilling rig rectangle die cut drill bit, it is characterised in that: churning driven
Diagonal brace is vertically arranged between the side of head and the upper surface of rectangular box.
4. big section rectangle as described in claim 1 anchors pile rotary drilling rig rectangle die cut drill bit, it is characterised in that: Mei Geju
For shape side bottom at least provided with two heel teeths, heel teeth is welded on rectangle sides bottom using steel spring plate.
5. big section rectangle as claimed in claim 2 anchors pile rotary drilling rig rectangle die cut drill bit, it is characterised in that: described to add
Gu there are two stulls at least, stull is reinforced using A3 steel plate and is welded on box house.
6. big section rectangle as claimed in claim 3 anchors pile rotary drilling rig rectangle die cut drill bit, it is characterised in that: described oblique
There are four supports, and diagonal brace is triangular steel plate diagonal brace, and a right-angle side of triangular steel plate diagonal brace is welded on rotary digging drill bit outer wall,
On the diagonal line for the rectangular top surface that another right-angle side is welded on cabinet.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821208574.8U CN208934599U (en) | 2018-07-28 | 2018-07-28 | Rectangular punching drill bit of rotary drilling rig for large-section rectangular anchoring pile |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821208574.8U CN208934599U (en) | 2018-07-28 | 2018-07-28 | Rectangular punching drill bit of rotary drilling rig for large-section rectangular anchoring pile |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208934599U true CN208934599U (en) | 2019-06-04 |
Family
ID=66716750
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201821208574.8U Active CN208934599U (en) | 2018-07-28 | 2018-07-28 | Rectangular punching drill bit of rotary drilling rig for large-section rectangular anchoring pile |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208934599U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN115653503A (en) * | 2022-11-16 | 2023-01-31 | 中建二局第三建筑工程有限公司 | Directional drill bit convenient for hole forming of cast-in-place pile in complex soil body and construction method |
-
2018
- 2018-07-28 CN CN201821208574.8U patent/CN208934599U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN115653503A (en) * | 2022-11-16 | 2023-01-31 | 中建二局第三建筑工程有限公司 | Directional drill bit convenient for hole forming of cast-in-place pile in complex soil body and construction method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105649012B (en) | Upper-soft lower-hard ground subway station building enclosure drilled pile construction method | |
AU2020100911A4 (en) | Shield structure for effectively controlling ground subsidence | |
CN106088064A (en) | A kind of hard stratum precrushing three axle cement mixing pile drilling tool and construction method thereof | |
CN202673154U (en) | Drill bit used for mixing pile machine and mixing pile machine | |
CN206801460U (en) | A kind of rectangle friction pile drilling construction device | |
CN1265062C (en) | Construction for making piles and tools | |
CN109826657A (en) | One kind being used for soft rock tunnel solidifying of the working face device and its construction method | |
CN105887820A (en) | Circular arc socket herringbone pile manufacturing equipment | |
CN105735283A (en) | Circular arc inserting and buckling cross pile manufacturing equipment | |
CN201943067U (en) | Glaze retaining wall structure of artificially digging pile hole | |
CN205152983U (en) | Stratum pre -reinforcing of underground space construction handles structure | |
CN208934599U (en) | Rectangular punching drill bit of rotary drilling rig for large-section rectangular anchoring pile | |
CN105951756A (en) | Wall forming device for latching piling wall | |
CN103334449A (en) | Square hole girdling cutter and method for performing holing construction of deep cutting stab-pile wall by utilizing same | |
CN108049804B (en) | Non-excavation in-situ replacement spiral drilling method for unconsolidated formation | |
CN207436063U (en) | Friction pile churning driven fast pore-creating edger | |
CN110130321A (en) | The processing method of rock in a kind of manual digging pile construction | |
CN110130393A (en) | Soft rock underwater foundation pit drilling and punching point position arrangement method | |
CN203361147U (en) | Recyclable anchor rod and bearing plate type anchor pile | |
CN105178355A (en) | Stratum pre-reinforcement treatment method for underground space construction | |
CN104480947A (en) | Construction method of prestress cast-in-place pile and soil cement pile engagement support | |
CN212656293U (en) | Groove grooving equipment | |
CN109555127A (en) | A kind of construction for the flush type multimedium built pile that drills | |
CN209780906U (en) | Tunnel hole-entering structure | |
CN111980093A (en) | Groove grooving equipment |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |