Prior art keywords
drilling
foundation pit
punching
underwater foundation
diameter
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910427674.2A
Other languages
Chinese (zh)
Inventor
刘良成
郭忠奎
张奎
秦林
陈龙
刘瑞杰
李卓
刘九涛
车纵横
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Tiesiju Civil Engineering Group Co Ltd CTCE Group
Third Construction Co Ltd of CTCE Group
Original Assignee
China Tiesiju Civil Engineering Group Co Ltd CTCE Group
Third Construction Co Ltd of CTCE Group
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Tiesiju Civil Engineering Group Co Ltd CTCE Group, Third Construction Co Ltd of CTCE Group filed Critical China Tiesiju Civil Engineering Group Co Ltd CTCE Group
Priority to CN201910427674.2A priority Critical patent/CN110130393A/en
Publication of CN110130393A publication Critical patent/CN110130393A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D19/00Keeping dry foundation sites or other areas in the ground
    • E02D19/02Restraining of open water
    • E02D19/04Restraining of open water by coffer-dams, e.g. made of sheet piles
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/32Foundations for special purposes
    • E02D27/52Submerged foundations, i.e. submerged in open water
    • E02D27/525Submerged foundations, i.e. submerged in open water using elements penetrating the underwater ground
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B7/00Special methods or apparatus for drilling

Abstract

The invention discloses a kind of underwater foundation pit drilling of soft rock and punching point arrangement methods, the following steps are included: (1) determines the size and depth of underwater foundation pit, underwater foundation pit elder generation compartment drilling, it forms remaining rock stratum like cellular cylinder, then is cut by percussive drill impact, is broken;(2) torque specification parameter of rotary drilling rig and the diameter of respective bore are determined according to the soft or hard and integrated degree of geology, stable case when according to bore operation determines the hole location clear distance of drilling.(3) diameter of punching is determined according to the size like honeycomb cylinder region formed after drilling, the all standing to guarantee remaining area is laid in the occlusion of punching point, and the diameter of punching point is determined according to impact operation degree of stability and single-point target efficiency.The present invention improves the construction efficiency and construction precision of the underwater excavation of foundation pit of soft rock, has ensured quick smooth sinking, the implantation of steel boxed cofferdam.

Description

A kind of underwater foundation pit drilling of soft rock and punching point arrangement method
Technical field
The invention belongs to bridge deepwater foundation technical field of construction, in particular to a kind of underwater foundation pit of soft rock drills and punching Point arrangement method.
Background technique
It constructs currently, steel boxed cofferdam technology has been widely used in bridge deepwater foundation, but is rock, base in riverbed When rock class, riverbed need to be excavated to underwater foundation pit of corresponding size, so that steel boxed cofferdam smoothly sinks and implantation.
Subaqueous rock class excavation of foundation pit mainly has mechanical excavation and underwater demolition two ways.
Mechanical excavation is suitable for pan soil and soft rock, generally boat-carrying high-front shovel operation.It is benefit when mechanical excavation operation Hull is coupled by ship anchor with flexible cable, hull shakes obvious when operation, can not real fixed hull position, cannot be to excavating Machine provides enough reversed support forces, therefore it is lower to excavate efficiency, and cutting depth is limited by excavator brachium.
Underwater demolition be suitable for hard rock, but explosion formality declaration, scarfing cinder construction etc. long period, and exist at This investment is big, security risk is high, influences many insufficient and drawbacks such as big to existing construction installation and natural ecology.
In some projects, such as the Suining township Lao Chi to Pengxi study ditch farming family crosses grand bridge project, bridge site area riverbed Matter is cobble and weathered mudstone.Cobble overburden cover reaches 3m, and weathered mudstone intensity reaches 5.1MPa, and it is soft that rock mass is divided into IV class The excavation effect of stone, underwater drilling and blasting is poor.And the maximum construction depth of water reaches 19.5m, the backactors such as high-front shovel at pier position Tool ability is unable to reach requirement.
For the excavation of the underwater foundation pit of soft rock, the rotary drilling rig drilling of use and the technique of percussive drill punching do not have still at present Have to form a set of efficient, reliable, unified technology and standard criterion, directly restrict underwater excavation efficiency and applies The promotion of work precision.
Summary of the invention
For the technical problems in the prior art, the present invention provides a kind of underwater foundation pit drilling of soft rock and punching point Distribution method is constructed using the group technology of rotary drilling rig drilling and percussive drill punching, solves the underwater excavation of foundation pit of soft rock Problem, ensured steel boxed cofferdam it is smooth sinking and implantation.
In order to solve the above technical problems, the technical solution adopted by the present invention is that:
A kind of underwater foundation pit drilling of soft rock and punching point arrangement method, comprising the following steps:
(1) size and depth of underwater foundation pit are determined according to steel boxed cofferdam size and bed elevation, underwater foundation pit first leads to The drilling of rotary drilling rig compartment is crossed, forms remaining rock stratum like cellular cylinder, then is cut by percussive drill impact, is broken It is broken;
(2) according to the soft or hard and integrated degree of geology determine rotary drilling rig torque specification parameter and respective bore it is straight Diameter, stable case when further according to bore operation determine the hole location clear distance of drilling.
(3) size like honeycomb cylinder region formed after being drilled according to rotary drilling rig determines the straight of percussive drill punching Diameter size, the occlusion of punching point are laid all standing to guarantee remaining area, are impacted according to impact operation degree of stability and single-point Efficiency determines the diameter of punching point.
Preferably, the size range of the underwater foundation pit in step (1) than steel boxed cofferdam surrounding sideline respectively extend out 1m~ 1.5m, the surrounding crater wall of underwater foundation pit perpendicular shape from top to bottom.
Preferably, the range of the bore diameter of rotary drilling rig is 1.5m~2.2m in step (2).
Preferably, rotary drilling rig drilling the ratio between the hole location clear distance and bore diameter are 1:3~1:4.
Preferably, the drilling point is evenly arranged mode, the drilling hole location of same row and same row using vertical, horizontal Diameter and clear distance are all the same.
Preferably, the percussive drill punching hole diameter is greater thanWherein, D1 is bore diameter, L For the hole location clear distance that drills.
Preferably, the punching point diameter is 1.8m~2.5m.
Preferably, the ratio between the percussive drill punching pitch and punching hole diameter are 2:3~5:6.
Compared with prior art, the present invention has the beneficial effects that
1) construction efficiency and construction precision for improving the underwater excavation of foundation pit of soft rock have ensured the quick suitable of steel boxed cofferdam Benefit sinking, implantation.
2) rotary drilling rig and respective bore diameter that respective performances parameter is selected according to the soft or hard and integrated degree of geology, are bored Hole point is vertically and horizontally uniformly distributed, and the hole location clear distance by adjusting rotary drilling rig drilling makes bore operation reach more stable shape State ensure that bore operation construction precision and construction efficiency.
3) according to the corresponding punching of honeycomb rock stratum size and Load for construction ability selection formed after drilling Bore dia, and so that the stability for impacting operation and target efficiency is reached more excellent state, and punching by adjusting punching pitch size Point arrangement ensure that all standing of remaining formation area.
4) by reasonably being designed rotary digging drilling hole diameter and hole location clear distance, percussive drill punching hole diameter and pitch-row and Arrangement forms a set of efficient, reliable technology and standard criterion, is the construction efficiency and construction of the underwater excavation of foundation pit of soft rock The promotion of precision provides effectively reference and reliable basis.
Detailed description of the invention
Fig. 1 is a kind of drilling point plane of arrangement of soft rock underwater foundation pit drilling and punching point arrangement method in the present invention Schematic diagram;
Fig. 2 is a kind of punching point plane of arrangement of soft rock underwater foundation pit drilling and punching point arrangement method in the present invention Schematic diagram;
Fig. 3 is a kind of drilling and punching point cloth that the underwater foundation pit of soft rock drills with punching point arrangement method in the present invention Horizontalization face perspective view of the explosion.
In figure, 1. underwater foundation pits;2. drill point;3. the first punching point;4. the second punching point.
Specific embodiment
Technical solution in order to enable those skilled in the art to better understand the present invention, in the following with reference to the drawings and specific embodiments It elaborates to the present invention.
Embodiment one
As shown in Figure 1 to Figure 3, embodiment of the invention discloses a kind of underwater foundation pit drilling of soft rock and punching point arrangements Method, comprising the following steps:
(1) size and depth of underwater foundation pit 1 are determined according to steel boxed cofferdam size and bed elevation, underwater foundation pit 1 is first It is drilled by rotary drilling rig compartment, forms remaining rock stratum like cellular cylinder, then cut by percussive drill impact, It is broken;
(2) according to the soft or hard and integrated degree of geology determine rotary drilling rig torque specification parameter and respective bore it is straight Diameter, stable case when further according to bore operation determine the hole location clear distance of drilling.
(3) size like honeycomb cylinder region formed after being drilled according to rotary drilling rig determines the straight of percussive drill punching The all standing to guarantee remaining area is laid in diameter size, the occlusion of punching point, and the pore size of punching point is according to impact operation Degree of stability and single-point target efficiency carry out selection determination.
In step (1), the size of underwater foundation pit is determined according to the outside dimension of steel boxed cofferdam, to guarantee steel boxed cofferdam Smoothly to sink, the size range of underwater foundation pit 1 respectively extends out 1m~1.5m compared with steel boxed cofferdam surrounding sideline, and the four of underwater foundation pit 1 All crater walls are vertical configuration from top to bottom.Underwater foundation pit 1 lays drilling point 2 by compartment, is bored from top to bottom by rotary drilling rig Take multiple pilot holes;The first punching point 3 and the second punching point are laid by biting connecions in the region like honeycomb type remaining after drilling again Position 4, potential energy and instantaneous impact when using impact hammer head free-falling impact soil layer and cut, are crushed and break up rock.
In step (2), according to the optimization of rotary drilling rig torsional performance parameter size and drilling construction workload, cost, really The bore diameter D1 for determining rotary drilling rig is 1.5m~2.2m.When bore diameter is excessive it is then more demanding to the performance parameter of drilling machine and Drilling efficiency is lower;Then the drilling hole amount needed for the underwater foundation pit of same size increases when bore diameter is too small, increases construction and makees Industry amount and construction cost.
Drilling point 2 is evenly arranged mode using vertical, horizontal, the 2 diameter D1 of drilling point of same row and same row and net It is all the same away from L.Rotary drilling rig drills the ratio between hole location clear distance L and bore diameter D1 as 1:3~1:4, avoids because hole location clear distance L is too small The rough sledding that " run and bore " occurs influences construction speed or because of the excessive influence punched hole construction efficiency of hole location clear distance L and construction speed. When hole location clear distance L is too small, remaining formation honeycombed rock level product is smaller after drilling, when the area of plane of single-point rock stratum is less than punching Percussion area when hole, in subsequent punched hole construction, Yi Fasheng " sliding hammer " phenomenon, that is, impact hammer head is unstable, topples over, slides It falls, influences construction efficiency.In addition, when hole location clear distance L is too small in drilling Yi Fasheng " run bore " rough sledding, i.e. drilling rod to having become The hole location in hole tilts and larger deflection, deviation occur for the verticality of drilling rod and center, this is because net in too small hole location Rock stratum away from lower formation is in thin-walled high-wall shape, and axial rigidity is smaller, can not be provided when rotary drilling rig drills for drilling rod enough Constraint and supporting role, compared to being that therefore drilling rod easily tends to the hole location of pore-forming and inclines weak location for undisturbed formation Tiltedly, deviation.The cellular rock stratum area that hole location clear distance L is formed when excessive is larger, and in subsequent punching, then target efficiency is lower, Reduce integral construction progress.
In step (3), percussive drill punching hole diameter D2 is greater thanTo guarantee 3 He of the first punching point Second punching point 4 will can all be covered like honeycomb rock stratum, avoid effectively being overlapped generation triangle zone because of punching point " blind area ".It is met the requirements for power load when ensuring percussive drill operation, and to reach impact job execution efficiency, impacting and apply The relatively optimization of work workload, cost determines that punching hole diameter D2 is 1.8m~2.5m.Then to power supply for construction when punching hole diameter D2 is excessive Burden requirement is larger and the construction efficiency of single-point impact operation is lower;When punching hole diameter D2 is too small, then same after drilling Punching quantity needed for the underwater foundation pit remaining area of size increases, and increases construction operation amount and construction cost.
The ratio between percussive drill punching pitch W and punching hole diameter D2 are 2:3~5:6, be can avoid because of the too small generation of punching pitch W The rough sledding of " sliding hammer ", or because punching pitch W is excessive, punching point can not effectively be overlapped to generate blind area and reduce to impact effect Rate.When punching pitch W is too small, i.e., impact operation when impact engagement region it is larger, the hole location of pore-forming is rushed to around When hitting operation, because low spot occurs in the hole location surrounding, easily occurs " sliding hammer " rough sledding when impact hammer head is impacted, impact hammer head is to hole Inclination, offset, significantly reduce the stability of impact operation around position.When punching pitch W is excessive, that is, rushing when impacting operation It is smaller to hit engagement region, in fact it could happen that generate blind area because punching point can not be effectively overlapped, reduce single-point target efficiency.
The present invention excavates the underwater foundation pit of soft rock by using the group technology of rotary drilling rig drilling and percussive drill punching, leads to It crosses and rotary digging drilling hole diameter D1 and hole location clear distance L, percussive drill punching hole diameter D2 and pitch-row W is reasonably designed and arranged, A set of efficient, reliable technology and standard criterion are formed, is the construction efficiency and construction precision of the underwater excavation of foundation pit of soft rock Promotion provide effectively reference and reliable basis.
Embodiment two
In another embodiment of the invention, the main pier of grand bridge project is crossed with the Suining township Lao Chi to Pengxi study ditch farming family For the underwater excavation of cushion cap, riverbed geology is cobble and weathered mudstone.Cobble overburden cover reaches 3m, weathering mud Rock intensity reaches 5.1MPa, and rock mass is divided into IV class soft rock.The underwater excavation of foundation pit of cushion cap is drilled using rotary drilling rig and percussive drill The group technology of punching is constructed, and solves the problems, such as the underwater excavation of foundation pit of soft rock, ensured the smooth sinking of steel boxed cofferdam with Implantation.It designs underwater 1 range of foundation pit and respectively extends out 1m compared with steel boxed cofferdam surrounding sideline, carry out drilling and punching point in the area Position is designed and arranged.Rotary drilling rig bore diameter is 2.0m, and hole location clear distance is 0.6m;Percussive drill punching hole diameter is 2.2m, Pitch-row is 1.8m.
The underwater foundation pit drilling of one of present invention soft rock and punching point arrangement method preferably solve technical background In the various deficiencies mentioned, and achieve preferable construction effect.Two underwater excavation of foundation pit of cushion cap start to construct certainly, when sharing 106 days, the total 7000m of earthwork3.Construction efficiency and homework precision are highly improved, and steel boxed cofferdam in subsequent construction Smoothly sink simultaneously implantation.
Above embodiments are only exemplary embodiment of the present invention, are not used in the limitation present invention, protection scope of the present invention It is defined by the claims.Those skilled in the art can within the spirit and scope of the present invention make respectively the present invention Kind modification or equivalent replacement, this modification or equivalent replacement also should be regarded as being within the scope of the present invention.

Claims (8)

1. a kind of underwater foundation pit drilling of soft rock and punching point arrangement method, which comprises the following steps:
(1) size and depth of underwater foundation pit are determined according to steel boxed cofferdam size and bed elevation, underwater foundation pit first passes through rotation It digs drilling machine compartment to drill, forms remaining rock stratum like cellular cylinder, then cutting is impacted by percussive drill, is crushed;
(2) torque specification parameter of rotary drilling rig and the diameter of respective bore are determined according to the soft or hard and integrated degree of geology, then Stable case when according to bore operation determines the hole location clear distance of drilling.
(3) size like honeycomb cylinder region formed after being drilled according to rotary drilling rig determines that the diameter of percussive drill punching is big Small, all standing to guarantee remaining area is laid in the occlusion of punching point, according to impact operation degree of stability and single-point target efficiency Determine the diameter of punching point.
2. the underwater foundation pit drilling of a kind of soft rock according to claim 1 and punching point arrangement method, which is characterized in that step Suddenly the size range of the underwater foundation pit in (1) respectively extends out 1m~1.5m, the surrounding of underwater foundation pit than steel boxed cofferdam surrounding sideline Crater wall perpendicular shape from top to bottom.
3. the underwater foundation pit drilling of a kind of soft rock according to claim 1 and punching point arrangement method, which is characterized in that step Suddenly the range of the bore diameter of rotary drilling rig is 1.5m~2.2m in (2).
4. the underwater foundation pit drilling of a kind of soft rock according to claim 1 and punching point arrangement method, which is characterized in that institute Stating rotary drilling rig drilling the ratio between hole location clear distance and bore diameter is 1:3~1:4.
5. the underwater foundation pit drilling of a kind of soft rock according to claim 4 and punching point arrangement method, which is characterized in that institute It states drilling point and mode is evenly arranged using vertical, horizontal, the drilling hole location diameter and clear distance of same row and same row are all the same.
6. the underwater foundation pit drilling of a kind of soft rock according to claim 1 and punching point arrangement method, which is characterized in that institute Percussive drill punching hole diameter is stated to be greater thanWherein, D1 is bore diameter, and L is drilling hole location clear distance.
7. the underwater foundation pit drilling of a kind of soft rock according to claim 6 and punching point arrangement method, which is characterized in that institute Stating punching point diameter is 1.8m~2.5m.
8. the underwater foundation pit drilling of a kind of soft rock according to claim 1 and punching point arrangement method, which is characterized in that institute Stating the ratio between percussive drill punching pitch and punching hole diameter is 2:3~5:6.
CN201910427674.2A 2019-05-22 2019-05-22 A kind of underwater foundation pit drilling of soft rock and punching point arrangement method Pending CN110130393A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910427674.2A CN110130393A (en) 2019-05-22 2019-05-22 A kind of underwater foundation pit drilling of soft rock and punching point arrangement method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910427674.2A CN110130393A (en) 2019-05-22 2019-05-22 A kind of underwater foundation pit drilling of soft rock and punching point arrangement method

Publications (1)

Publication Number Publication Date
CN110130393A true CN110130393A (en) 2019-08-16

Family

ID=67572122

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910427674.2A Pending CN110130393A (en) 2019-05-22 2019-05-22 A kind of underwater foundation pit drilling of soft rock and punching point arrangement method

Country Status (1)

Country Link
CN (1) CN110130393A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113153384A (en) * 2021-03-24 2021-07-23 中交路桥建设有限公司 Construction method for deep-buried subway station under rock geology
CN113502863A (en) * 2021-08-11 2021-10-15 金山 Foundation ditch vertical road excavation device for construction

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006194031A (en) * 2005-01-17 2006-07-27 Ps Mitsubishi Construction Co Ltd Pillar construction method
CN102392458A (en) * 2011-10-17 2012-03-28 中铁一局集团有限公司 Piling beam cofferdam construction method used for bare rock foundation construction in water
CN108179759A (en) * 2017-12-29 2018-06-19 重庆华力建设有限公司 The underwater drill core slotting of driftway is without bottom sealing method
CN109610494A (en) * 2018-11-30 2019-04-12 福建建中建设科技股份有限公司 A kind of embedding rock construction technology of large-diameter pile foundation

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006194031A (en) * 2005-01-17 2006-07-27 Ps Mitsubishi Construction Co Ltd Pillar construction method
CN102392458A (en) * 2011-10-17 2012-03-28 中铁一局集团有限公司 Piling beam cofferdam construction method used for bare rock foundation construction in water
CN108179759A (en) * 2017-12-29 2018-06-19 重庆华力建设有限公司 The underwater drill core slotting of driftway is without bottom sealing method
CN109610494A (en) * 2018-11-30 2019-04-12 福建建中建设科技股份有限公司 A kind of embedding rock construction technology of large-diameter pile foundation

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113153384A (en) * 2021-03-24 2021-07-23 中交路桥建设有限公司 Construction method for deep-buried subway station under rock geology
CN113502863A (en) * 2021-08-11 2021-10-15 金山 Foundation ditch vertical road excavation device for construction

Similar Documents

Publication Publication Date Title
CN104947690B (en) Grooving construction method for embedding underground continuous wall into rock
CN103046931B (en) Method for forming holes of vertical shaft/pilot shaft through impact type drilling machine in impacting mode
CN106759282B (en) A kind of mechanical hole building method of super-large diameter hard rock bored concrete pile half
CN102644275A (en) Rotary-digging combined pile-forming construction method in complicated geological conditions
CN104831708A (en) Foundation excavation retaining and protecting cast-in-situ bored pile construction method and equipment thereof
CN103774690A (en) Grabbing, drilling and punching combined underground continuous wall grooving construction method
CN1265062C (en) Construction for making piles and tools
CN110130393A (en) A kind of underwater foundation pit drilling of soft rock and punching point arrangement method
CN110374091A (en) A kind of rectangle friction pile mechanical hole building construction method
CN109797749A (en) A kind of underwater foundation pit construction device and construction method
JP2023501743A (en) Foundation pit support method in geological conditions where stones are mixed in the soil layer
CN203584301U (en) Hole guide equipment
CN109610439A (en) The construction method of underground obstacle ultra-deep underground continuous wall grooving
CN206956717U (en) Marine rock drilling strike-on type large diameter pile structure
CN112901074A (en) Rock-socketed drilling pore-forming process of marine large-diameter inclined pile rotary excavator
CN105256819A (en) Improving method for open caisson sinking construction in geology of sludge layer
CN112627199A (en) Construction method for foundation pit support of cyclone well
CN114215066B (en) Collapse-prevention excavation construction method for side wall of open cut foundation pit
JPH08184058A (en) Landslide protection construction
CN214883599U (en) Pipe twisting device of rotary drilling rig and matched steel casing matching device
CN201190279Y (en) Construction equipment for spiral digging small-diameter bored pile
CN209780906U (en) Tunnel hole-entering structure
CN103967000A (en) Rotary excavating pile construction method in combined construction
CN100593052C (en) Open cut foundation pit supporting and protecting method
CN208472721U (en) A kind of anchor pole constructed in loose media stratum using hand air drill

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20190816