CN206308999U - Construction hanging basket - Google Patents

Construction hanging basket Download PDF

Info

Publication number
CN206308999U
CN206308999U CN201621423029.1U CN201621423029U CN206308999U CN 206308999 U CN206308999 U CN 206308999U CN 201621423029 U CN201621423029 U CN 201621423029U CN 206308999 U CN206308999 U CN 206308999U
Authority
CN
China
Prior art keywords
plate
sliding
connecting plate
rope
steel wire
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201621423029.1U
Other languages
Chinese (zh)
Inventor
刘连强
古鹏程
王贵生
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tianjin Senyuan Construction Co Ltd
Original Assignee
Tianjin Senyuan Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tianjin Senyuan Construction Co Ltd filed Critical Tianjin Senyuan Construction Co Ltd
Priority to CN201621423029.1U priority Critical patent/CN206308999U/en
Application granted granted Critical
Publication of CN206308999U publication Critical patent/CN206308999U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Revetment (AREA)

Abstract

The utility model discloses a kind of construction hanging basket,Its drip irrigation device is that at least two steel wire ropes are installed between support body,Operating platform is provided with steel wire rope,It is provided between operating platform and steel wire rope for operating platform along steel cable sliding component,The pull rope parallel with steel wire rope is provided between support body,Guiding piece is provided with pull rope,Sliding assembly is provided between guiding piece and pull rope,Stop assembly is provided with sliding assembly,Stop assembly includes the first connecting plate being installed on sliding plate,The check plate parallel with sliding plate is provided with first connecting plate,The stop hole passed through for traction iope slippage is provided with check plate,The card rope plate affixed with sliding plate is provided with stop hole,The first elastic component is provided between check plate and the first connecting plate,First elastic component is supplied to check plate to the close pulling force of the first connecting plate,Pulling force causes that be pressed in pull rope on card rope plate by stop hole,Effect easy to use is reached.

Description

Construction hanging basket
Technical field
The utility model is related to a kind of construction auxiliary equipment field, more particularly to a kind of construction hanging basket.
Background technology
With continuing to develop for China's economy, architectural style and structure are constantly innovated, the difficulty and complexity of construction Property is also constantly improved.
The general method using in the full hall formula scaffold of support body side arrangement during construction, but this traditional full hall formula Scaffold is not suitable for the construction of the larger building of span because span it is larger, it is necessary to laying scaffold area it is larger, peace Dress high cost, low construction efficiency.
The existing Chinese patent for referring to Application No. 200810021139.9, it discloses a kind of wide span and big area Furred ceiling nacelle-moving construction method, between the pricncipal rafter on the adjacent axis of wide span and big area furred ceiling, ties steel Cord, hangs operating platform of the moveable hanging basket as workmen on steel wire rope, rope is connected with hanging basket for hanging basket Tethered sliding, then, at truss winds up web member set pulley, ceiling board is hung to by installation site by pulley, by hanging basket The installation that interior workmen carries out ceiling board is fixed.Apply external force to hanging basket, hanging basket can on a steel cord be moved, typically adopted The method for dragging operation platform with rope body with workmen on the ground, can produce the phenomenon of skidding between staff and rope body, It is very inconvenient.
Utility model content
The purpose of this utility model is to provide a kind of construction hanging basket easy to use.
Above-mentioned technical purpose of the present utility model technical scheme is that:
A kind of construction hanging basket, is installed with least two steel wire ropes between support body, and operating platform is provided with steel wire rope, behaviour Make to be provided between platform and steel wire rope to be provided with along steel cable sliding component, between support body for operating platform and put down with steel wire rope Capable pull rope, is provided with guiding piece on pull rope, sliding assembly is provided between guiding piece and pull rope, and sliding assembly includes The sliding plate of guiding piece is installed in, the slip hole for traction iope slippage is provided with sliding plate, stop is provided with sliding assembly Component, stop assembly includes the first connecting plate being installed on sliding plate, is provided with the first connecting plate parallel with sliding plate Check plate, is provided with the stop hole passed through for traction iope slippage on check plate, the card affixed with sliding plate is provided with stop hole Rope plate, is provided with the first elastic component between check plate and the first connecting plate, the first elastic component is supplied to check plate to the first connection The close pulling force of plate, pulling force causes that be pressed in pull rope on card rope plate by stop hole.
By above-mentioned technical proposal, workman stands on the operational platform, and be tightly pressed at pull rope on card rope plate by stop hole, Check plate is fixed relative to pull rope so that guiding piece is fixed relative to pull rope position, and guiding piece is consolidated by stop assembly It is scheduled on pull rope, workman's hand is dropped so that operating platform stress guiding piece is hold along the length direction of pull rope, grasps Make platform to be slid along the length direction of steel wire rope by slide assemblies, when the position of needs is moved to, stop.Operation After the movement of platform, workman to check plate away from the first connecting plate direction power, stop hole and card rope the distance between plate increase, Pull rope can be passed through.The position of mobile guiding piece, by sliding assembly, the sliding motion on pull rope is caused guiding piece The workman that guiding piece is always positioned at standing on the operational platform can be with the hand-held position arrived, when the hand of workman disappears to the power of guiding piece Afterwards, the first elastic component continues to be pressed in pull rope between card rope plate and stop hole, and the position of guiding piece is fixed, and is moved to workman and grasped Make platform and facility is provided.
Preferably, being provided with draw bar at operating platform corner, the slide assemblies include being installed at the top of draw bar Link, the inwall of link is adapted with the outer wall of steel wire rope, and link is set in the outside of steel wire rope and can be along steel wire iope slippage Motion.
By above-mentioned technical proposal, link under the Action of Gravity Field of operating platform, the inwall of link top and steel wire rope Top abuts, and when being acted on by external force, link can slide along the length direction of steel wire rope, and link is easy to processing.
Preferably, the side of the first connecting plate is provided with second connecting plate affixed with sliding plate in check plate, the The second elastic component for being supplied to check plate to the close thrust of the first connecting plate is provided between two connecting plates and check plate.
By above-mentioned technical proposal, after the hand of workman disappears to the power of guiding piece, the first elastic component continues pull rope It is pressed between card rope plate and stop hole, the second elastic component pushes the edge of stop hole to card rope plate so that pull rope is more stablized Be crushed between card rope plate and the edge of stop hole, the position of guiding piece is more stablized, it is to avoid guiding piece is sent out on pull rope It is raw to skid, provide facility to workman's Mobile operating platform.
Preferably, the guide assembly for guiding check plate glide direction is provided between the check plate and sliding plate, institute Show that guide assembly includes the leading axle being installed on sliding plate, sliding is arranged with the guide sleeves affixed with check plate on leading axle.
By above-mentioned technical proposal, during check plate is moved guide sleeves can the sliding motion on leading axle, keep away Exempt from check plate to be shifted during movement, check plate can only be close to the first connecting plate along the length direction of leading axle Or away from.
Preferably, being installed with handle part on the check plate.
By above-mentioned technical proposal, handle part gives workman's staff one impetus, is easy to workman to give check plate applying power, gives Workman's movement check plate provides facility.
Preferably, the handle part is installed in check plate away from the surface of sliding plate side.
By above-mentioned technical proposal, space is big, is easy to operation, provides more convenient to workman's movement check plate, saves operation Time, improve efficiency.
Preferably, be provided with first connecting plate being protruding to the first connecting plate away from check plate side for handle part Locking groove.
By above-mentioned technical proposal, space is big, is easy to operation, provides more convenient to workman's movement check plate, saves operation Time, improve efficiency.
Preferably, the handle part protrudes be installed with catch on the outer wall of the first connecting plate, catch is supported with the first connecting plate When connecing, the space formed between card rope plate and stop hole is just passed through for pull rope.
By above-mentioned technical proposal, when people presses handle part, handle part drives check plate to the side away from the first connecting plate To movement, after setting catch, catch is abutted with the first connecting plate, continues firmly cannot also cause that handle part is continued to move to, it is ensured that People by handle part by earth when pull rope can just move, save manpower, be easy to workman to judge the opportunity of mobile guiding piece.
Preferably, being installed with anti-skid bulge on the handle part outer wall.
By above-mentioned technical proposal, by increasing capacitance it is possible to increase the frictional force between staff and handle part, it is easy to operate handle part, prevents The phenomenon of skidding is produced.
In sum, the utility model has the advantages that:The point of application is provided to workman's Mobile operating platform, more It is easy to hold pull rope, the Mobile operating platform that workman oneself station on the operational platform just can be voluntarily will not skid, be easy to make With.
Brief description of the drawings
Fig. 1 is the structural representation of construction hanging basket in embodiment 1;
Fig. 2 is the close-up schematic view at A in Fig. 1;
Fig. 3 is partial schematic diagram when stirring handle part;
Fig. 4 is the partial schematic diagram of construction hanging basket in embodiment 2;
Fig. 5 is the close-up schematic view at B in Fig. 4;
Fig. 6 is partial schematic diagram when pressing handle part;
Fig. 7 is to embody the partial schematic diagram of handle part structure.
In figure, 1, support body;11st, steel wire rope;12nd, operating platform;121st, draw bar;122nd, link;2nd, pull rope;3rd, draw Block;4th, sliding assembly;41st, sliding plate;42nd, slip hole;5th, stop assembly;51st, the first connecting plate;52nd, check plate;53rd, stop Hole;54th, card rope plate;55th, the first elastic component;56th, the second connecting plate;57th, the second elastic component;6th, guide assembly;61st, leading axle; 62nd, guide sleeves;7th, handle part;71st, locking groove;72nd, catch;73rd, anti-skid bulge.
Specific embodiment
The utility model is described in further detail below in conjunction with accompanying drawing.Wherein identical parts identical accompanying drawing Mark is represented.It should be noted that the word "front", "rear" for being used in description below, "left", "right", "up" and "down" refer to It is the direction in accompanying drawing, word " bottom surface " and " top surface ", " interior " and " outward " are referred respectively to towards or away from particular elements geometry The direction at center.
Embodiment 1:A kind of construction hanging basket, as shown in figure 1, two groups are installed with support body 1 being parallel to each other and positioned at same water The steel wire rope 11 of plane, the quantity of every group of steel wire rope 11 have two and two it is tightly adjacent.The lower section of steel wire rope 11 is provided with operation Platform 12, operating platform 12 is rectangle platy structure, and guardrail body is provided with the top surface edge of operating platform 12.In operation The draw bar 121 perpendicular to the surface of operating platform 12 is installed with the upper surface corner of platform 12, the top of draw bar 121 is installed with Link 122.Link 122 is enclosed within the outer wall of steel wire rope 11, and the top of the inwall of link 122 abuts with steel wire rope 11.The energy of link 122 Enough length direction sliding motions along steel wire rope 11, drive operating platform 12 to slide fortune along the length direction of steel wire rope 11 It is dynamic.
With reference to Fig. 2, consolidate through the two ends for having the pull rope 2 parallel with steel wire rope 11, pull rope 2 on platform in operation flat being led It is connected on support body 1.Pull rope 2 is located at the underface of position between two steel wire ropes 11.
Guiding piece 3 is provided with pull rope 2, guiding piece 3 is located inside guardrail body.Set between guiding piece 3 and pull rope 2 It is equipped with sliding assembly 4 so that guiding piece 3 can slide along the length direction of pull rope 2.It is additionally provided with stop assembly 5 so that Guiding piece 3 can keep fixing on pull rope 2.
Sliding assembly 4 includes the sliding plate 41 being installed on guiding piece 3, and sliding plate 41 is rectangle, is set on sliding plate 41 Slip hole 42 is equipped with, the inwall of slip hole 42 is adapted with the outer wall of pull rope 2 so that pull rope 2 can freely pass through.Make Obtaining guiding piece 3 can be along the length direction sliding motion of pull rope 2.
Stop assembly 5 includes the first connecting plate 51 and the second connecting plate 56 that are installed on guiding piece 3, the first connecting plate 51 It is oppositely arranged with the second connecting plate 56.First connecting plate 51 and the second connecting plate 56 are each perpendicular to sliding plate 41 along pull rope 2 The side wall of length direction.Check plate 52 is connected by the first elastic component 55 on the first connecting plate 51, the first connector is first Spring, the length direction of the length direction of the first spring perpendicular to pull rope 2.Connected between second connecting plate 56 and check plate 52 There is the second connector, the second connector is second spring, the length direction of the length direction of second spring perpendicular to pull rope 2.
Card rope plate 54 is installed with the side wall of the first connecting plate 51 of setting of sliding plate 41, near the edge of sliding eye. The stop hole 53 with diameter greater than the diameter of slip hole 42 is provided with check plate 52, card rope plate 54 is stretched into stop hole 53.Pull rope 2 Positioned at the area that stop hole 53 is enclosed with card rope plate 54 away from the inwall of the first connecting plate 51 away from the side wall of the first connecting plate 51 In domain.First connector pulls check plate 52 to the direction near the first connecting plate 51 so that pull rope 2 is stuck in stop hole Between 53 and card rope plate 54, remain stationary as.
As shown in figure 3, being installed with handle part 7 on side wall of the check plate 52 away from sliding plate 41.To away from the first connection Handle part 7 is stirred in the direction of plate 51, by stirring handle part 7, can give the applying power of check plate 52 so that check plate 52 overcomes The thrust of the pulling force of a connection piece and the second connector, to the direction sliding motion away from the first connector.
Guide assembly 6 is provided between check plate 52 and sliding plate 41(With reference to Fig. 2).Guide assembly 6 includes being installed in Leading axle 61 on sliding plate 41, the length direction of leading axle 61 is vertical with the length direction of pull rope 2.The outer wall of leading axle 61 It is arranged with the guide sleeves 62 being adapted.The outer wall of guide sleeves 62 is fixedly connected with check plate 52.When check plate 52 is to away from first During the direction sliding motion of connector, guide sleeves 62, along the length direction sliding motion of leading axle 61, make on leading axle 61 Obtain more stablizing for the movement of check plate 52.
As shown in figure 3, after check plate 52 is moved to the direction away from the first connecting plate 51, due to the position of card rope plate 54 Maintain static, check plate 52 drives stop hole 53 to be moved to the direction away from the first connecting plate 51, and stop hole 53 connects away from first The region increase that the side wall of fishplate bar 51 is enclosed with card rope plate 54, pull rope 2 can freely pass through.Workman be free to The position of mobile guiding piece 3 on pull rope 2.After the position of guiding piece 3 is moved into defined location, handle part 7 is unclamped, Under the pulling force effect of the first elastic component 55, the thrust of the second elastic component 57, stop hole 53 returns to original position, pull rope 2 are tightly pressed between stop hole 53 and card rope plate 54.The position of guiding piece 3 is fixed.
Wherein, during construction, guiding piece 3 is fixed on pull rope 2, and workman is stood on operating platform 12, and traction is dragged by hand Block 3, the sliding motion on steel wire rope 11 of link 122 drives the sliding motion of operating platform 12, until the movement famous dictum of operating platform 12 Think position.Stir handle part 7 so that guiding piece 3 can be moved on pull rope 2, and guiding piece 3 is moved into corresponding position Afterwards, then handle part 7 is unclamped, guiding piece 3 continues the state for recovering to be fixed on pull rope 2.Workman can continue through to drop and lead Draw block 3 to change the position of operating platform 12.It is convenient and swift.
Embodiment 2:Difference with embodiment 1 is that as shown in Figure 4 and Figure 5, handle part 7 is installed in check plate 52 On the side wall of sliding plate 41, handle part 7 is L-shaped(With reference to Fig. 7), locking groove 71 is offered on the first connecting plate 51, hold Portion 7 stretches into locking groove 71, and is stretched out from locking groove 71, extends side of first connecting plate 51 away from check plate 52.
Handle part 7 to protrude and be installed with anti-skid bulge 73 on the outer wall of the part of the first connecting plate 51.The protrusion of handle part 7 first Catch 72 is installed with the outer wall of connecting plate 51, when guiding piece 3 is fixed on pull rope 2, the connecting plate 51 of catch 72 and first Leave distance.As shown in Figure 6 and Figure 7, workman presses handle part 7, and catch 72 is to the first connecting plate 51 near until connecting with first Fishplate bar 51 is abutted, and the space formed between card rope plate 54 and stop hole 53 is just freely passed through for pull rope 2.Again exert oneself also without Method causes that handle part 7 is continued to move to, it is ensured that people by handle part 7 by earth when pull rope 2 can just move, save manpower, just Judge the opportunity of mobile guiding piece 3 in workman.
This specific embodiment is only that, to explanation of the present utility model, it is not to limitation of the present utility model, ability Field technique personnel can make the modification without creative contribution to the present embodiment as needed after this specification is read, but As long as all being protected by Patent Law in right of the present utility model.

Claims (9)

1. a kind of construction hanging basket, it is characterised in that:At least two steel wire ropes (11), steel wire rope are installed between support body (1) (11) operating platform (12) is provided with, be provided between operating platform (12) and steel wire rope (11) for operating platform (12) along Steel wire rope (11) slide assemblies, are provided with the pull rope (2) parallel with steel wire rope (11) between support body (1), pull rope sets on (2) Guiding piece (3) is equipped with, sliding assembly (4) is provided between guiding piece (3) and pull rope (2), sliding assembly (4) is including being installed in The sliding plate (41) of guiding piece (3), is provided with the slip hole (42) for pull rope (2) sliding, sliding assembly on sliding plate (41) (4) it is provided with stop assembly (5) on, stop assembly (5) includes the first connecting plate (51) for being installed on sliding plate (41), first The check plate (52) parallel with sliding plate (41) is provided with connecting plate (51), is provided with check plate (52) for pull rope (2) Slide in the stop hole (53) passed through, stop hole (53) and be provided with card rope plate (54) affixed with sliding plate (41), check plate (52) be provided with the first elastic component (55) and the first connecting plate (51) between, the first elastic component (55) be supplied to check plate (52) to The close pulling force of first connecting plate (51), pulling force causes that pull rope (2) is pressed in card and restricted on plate (54) by stop hole (53).
2. construction hanging basket according to claim 1, it is characterised in that:Draw bar is provided with operating platform (12) corner (121), the slide assemblies include being installed in the link (122) at the top of draw bar (121), the inwall and steel wire of link (122) The outer wall of (11) of restricting is adapted, and link (122) is set in the outside of steel wire rope (11) and can be along steel wire rope (11) sliding motion.
3. construction hanging basket according to claim 1, it is characterised in that:In check plate (52) away from the first connecting plate (51) Side is provided with second connecting plate (56) affixed with sliding plate (41), is set between the second connecting plate (56) and check plate (52) Be provided with to the second elastic component (57) from check plate (52) to the close thrust of the first connecting plate (51).
4. construction hanging basket according to claim 1, it is characterised in that:Set between the check plate (52) and sliding plate (41) There is the guide assembly (6) for guiding check plate (52) glide direction, the guide assembly (6) is including being installed in sliding plate (41) On leading axle (61), on leading axle (61) sliding be arranged with the guide sleeves (62) affixed with check plate (52).
5. construction hanging basket according to claim 1, it is characterised in that:Handle part (7) is installed with the check plate (52).
6. construction hanging basket according to claim 5, it is characterised in that:It is remote that the handle part (7) is installed in check plate (52) On the surface of sliding plate (41) side.
7. construction hanging basket according to claim 5, it is characterised in that:It is provided with first connecting plate (51) for holding Portion (7) is protruding to locking groove (71) of the first connecting plate (51) away from check plate (52) side.
8. construction hanging basket according to claim 7, it is characterised in that:The handle part (7) protrudes the first connecting plate (51) Outer wall on be installed with catch (72), when catch (72) is abutted with the first connecting plate (51), card rope plate (54) with stop hole (53) Between formed space just for pull rope (2) process.
9. construction hanging basket according to claim 8, it is characterised in that:It is installed with handle part (7) outer wall anti-skidding convex Rise (73).
CN201621423029.1U 2016-12-23 2016-12-23 Construction hanging basket Expired - Fee Related CN206308999U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621423029.1U CN206308999U (en) 2016-12-23 2016-12-23 Construction hanging basket

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621423029.1U CN206308999U (en) 2016-12-23 2016-12-23 Construction hanging basket

Publications (1)

Publication Number Publication Date
CN206308999U true CN206308999U (en) 2017-07-07

Family

ID=59245707

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621423029.1U Expired - Fee Related CN206308999U (en) 2016-12-23 2016-12-23 Construction hanging basket

Country Status (1)

Country Link
CN (1) CN206308999U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113047168A (en) * 2021-04-01 2021-06-29 安徽虹达道路桥梁工程有限公司 Movable safety construction platform

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113047168A (en) * 2021-04-01 2021-06-29 安徽虹达道路桥梁工程有限公司 Movable safety construction platform

Similar Documents

Publication Publication Date Title
CN201987468U (en) Counterweight type high-rise window cleaning machine
CN206308997U (en) A kind of construction hanging basket
CN206308999U (en) Construction hanging basket
CN203822085U (en) Three-door synchronous extension and retraction sliding door window
CN103806801A (en) Sliding door/window with three synchronously telescoping panels
CN206308998U (en) Without scaffold hanging basket
CN102797485B (en) Rotary accommodating platform for hydraulic support for fully mechanized mining for coal mine
CN105544957B (en) A kind of jenny scaffold and its construction method for the construction of horizontal aerial pipeline
CN204376311U (en) The heavy electric power cable high-altitude of lifting formula is handed over across unfolding device
CN203476246U (en) Sucker rod lifting system device
CN202625763U (en) Self-propelled automatic lifting high-altitude working machine
CN203865929U (en) Portable crane
CN206299107U (en) Without scaffold hanging basket
CN202718380U (en) Hydraulic climbing frame for construction of high-rise building
CN204738733U (en) Laborsaving insulating slide
CN207685680U (en) Pulley trolley system suitable for the installation of truss-type bridges accessory structure
CN205933127U (en) Erection equipment of various steel inner panel in factory building roof
CN204940869U (en) A kind of down-throwing scaffold dismounting and gathering-device
CN205410488U (en) Portable high low insulation bench
CN201119850Y (en) Suspending structure of cleaning machine for exterior wall of buildings
CN201459602U (en) Equipment for bridge construction
CN204528933U (en) Sliding drilling electric cable folding and unfolding storage rack
CN204299137U (en) A kind of finishing scaffold of built-in stair
CN205839582U (en) Plug-in self-traveling hanging basket on a kind of anticollision barrier
CN212447501U (en) Cable car traction device with stable transmission

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170707

Termination date: 20181223

CF01 Termination of patent right due to non-payment of annual fee