CN206299107U CN201621439891.1U CN201621439891U CN206299107U CN 206299107 U CN206299107 U CN 206299107U CN 201621439891 U CN201621439891 U CN 201621439891U CN 206299107 U CN206299107 U CN 206299107U
Authority
CN
China
Prior art keywords
steel wire
wire rope
operating platform
hanging basket
clip
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201621439891.1U
Other languages
Chinese (zh)
Inventor
赵国庆
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tianjin Bosite Film Decoration Engineering Co Ltd
Original Assignee
Tianjin Bosite Film Decoration Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tianjin Bosite Film Decoration Engineering Co Ltd filed Critical Tianjin Bosite Film Decoration Engineering Co Ltd
Priority to CN201621439891.1U priority Critical patent/CN206299107U/en
Application granted granted Critical
Publication of CN206299107U publication Critical patent/CN206299107U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)

Abstract

The utility model discloses one kind without scaffold hanging basket, its drip irrigation device is to be installed with least two steel wire ropes being parallel to each other between taut film steel pipe, operating platform is provided with steel wire rope, operating platform is supplied between operating platform and steel wire rope along the sliding assembly of steel wire iope slippage, the hoop component of fixed operating platform position is provided between operating platform and steel wire rope, the effect for ensureing that workman stablizes construction on the operational platform has been reached.

Description

Without scaffold hanging basket
Technical field
The utility model is related to a kind of construction auxiliary equipment field, and more particularly to one kind is without scaffold hanging basket.
Background technology
Membrane structure is by various high-strength thin-film materials and stiffener(Steelframe, steel column or cable wire)It is made by certain way Inside produces certain pre- tensile stress to form certain spatial form, as covered structure, and can bear certain external load work A kind of space structure form.Membrane structure can be divided into air-supported membrane structure and the major class of jacking membrane structure two.Air-supported membrane structure is to lean on Indoor constantly inflation, makes indoor and outdoor produce certain pressure poor, and the pressure official post roof system film cloth of indoor and outdoor is by certain upward Buoyancy, so as to realize larger span.Jacking membrane structure is then supported by post and steelframe or tensioning cable is molded.
Membrane of Tensile Buildings is fixed on taut film steel pipe, referred to as taut film.In taut membrane process, workman is first fixed on taut film steel pipe Position to be installed, then works to carrying out taut film on taut film steel pipe again.It is general to arrange full hall formula pin hand using in taut film steel pipe side The method of frame, but this traditional full hall formula scaffold is not suitable for the installation of the larger Membrane of Tensile Buildings of span, because span is larger Membrane of Tensile Buildings, area is larger, if using the method for full hall formula scaffold, installation cost is too high, low construction efficiency.
The existing Chinese patent for referring to Application No. 200810021139.9, it discloses a kind of wide span and big area Furred ceiling nacelle-moving construction method, between the pricncipal rafter on the adjacent axis of wide span and big area furred ceiling, ties steel Cord, hangs moveable hanging basket on steel wire rope, rope is connected with as the operating platform of workmen, on hanging basket for hanging basket Tethered sliding, then, at truss winds up web member set pulley, ceiling board is hung to by installation site by pulley, by hanging basket The installation that interior workmen carries out ceiling board is fixed.
Utility model content
The purpose of this utility model be to provide another structure without scaffold hanging basket.
Above-mentioned technical purpose of the present utility model technical scheme is that:
One kind is installed with least two steel wire ropes being parallel to each other, steel wire rope without scaffold hanging basket between taut film steel pipe On be provided with operating platform, between operating platform and steel wire rope for operating platform along steel wire iope slippage sliding assembly, operation The hoop component of fixed operating platform position is provided between platform and steel wire rope.
By above-mentioned technical proposal, operating platform when being acted on by external force, by sliding assembly along steel wire rope length The sliding of degree direction, when the position of needs is moved to, is fixed by hoop component by the position of operating platform, will not be due to accident External force cause that operating platform slides on a steel cord, it is ensured that when workman constructs on the operational platform, more stablize.
Preferably, being provided with draw bar at operating platform corner, the sliding assembly includes being installed at the top of draw bar Link, the inwall of link is adapted with the outer wall of steel wire rope, and link is set in the outside of steel wire rope and can be along steel wire iope slippage Motion.
By above-mentioned technical proposal, link under the Action of Gravity Field of operating platform, the inwall of link top and steel wire rope Top abuts, and when being acted on by external force, link can slide along the length direction of steel wire rope, and link is easy to processing.
Preferably, the hoop component includes the clip body of wherein at least one link both sides, the inwall and steel of clip body The outer wall of cord is abutted to be fixed.
By above-mentioned technical proposal, clip body is fixed on abutting in the both sides of link, by being frictionally held in steel wire rope On.Be defined for the position of link by two clip bodies so that link cannot sliding motion on a steel cord, it is ensured that operating platform Stabilization in construction.
Preferably, clip body includes the left clip and right clip that are hinged, left clip and right clip are away from hinged place Side is detachably fixed connection with the first bolt.
By above-mentioned technical proposal, left clip and right clip are hinged, and can reduce the number of part, it is to avoid in dismounting During clip body part lose.
Preferably, the inwall of clip body is installed with slipmat.
By above-mentioned technical proposal, the frictional force between clip body and steel wire rope can be increased, while slipmat has one Determine high flexibility, can be while clamping be ensured, it is to avoid by the damaged surfaces of steel wire rope, it is ensured that the service life of steel wire rope, Ensure the safety of workman.
Preferably, the operating platform upper surface is easy to be provided with guardrail body, it is provided with guardrail body and is hinged with door body, door Latch assembly is provided between body and guardrail body.
By above-mentioned technical proposal, guardrail body prevents workman from being dropped from the edge of operating platform, plays a protective role.Door body Entered on operating platform from the outside for workman.When workman constructs on the operational platform, door body is fixed on latch assembly In guardrail body, it is to avoid door body is rocked.
Preferably, the latch assembly includes the first latch being installed in guardrail body, side of the door body away from hinged place Edge is installed with the second latch, and the first latch is fixedly connected with the second latch by clamping screw.
By above-mentioned technical proposal, be fixed together for the first latch and the second latch by clamping screw, due to first Latch is fixedly connected with guardrail body, and the second latch is fixedly connected with door body, so as to realize that door body and the fixed of guardrail body connect Connect.So that the state that door body is remained closed when being fixed with guardrail body.
Preferably, the steel wire rope is provided with many being used into stock.
By above-mentioned technical proposal, increase the degree of safety of intensity and operating platform, after wherein steel cable has broken, Remaining steel wire rope can also continue to use, and improve the service life of equipment, it is ensured that use safety.
Preferably, being provided with the safety rope for operating personnel's hanging safety belt between taut film steel pipe.
By above-mentioned technical proposal, workman hangs on safety rope safety belt, can be when steel wire rope is broken, to work The personal safety of people plays a protective role.
In sum, the utility model has the advantages that:When ensureing that workman constructs on the operational platform, more surely It is fixed, it is ensured that personal safety, improve service life.
Brief description of the drawings
Fig. 1 is the structural representation without scaffold hanging basket;
Fig. 2 is the close-up schematic view at A in Fig. 1;
Fig. 3 is the close-up schematic view at B in Fig. 1;
Fig. 4 is the schematic diagram opened without scaffold hanging basket door body;
Fig. 5 is the close-up schematic view at C in Fig. 4;
Fig. 6 is the close-up schematic view at D in Fig. 4;
Fig. 7 is the close-up schematic view at E in Fig. 4.
In figure, 1, taut film steel pipe;2nd, steel wire rope;3rd, operating platform;31st, draw bar;4th, link;5th, clip body;51st, Zuo Ka Hoop;52nd, right clip;53rd, the first bolt;6th, slipmat;7th, guardrail body;71st, door body;72nd, latch assembly;721st, the first locking Plate;722nd, the second latch;723rd, clamping screw;8th, safety rope.
Specific embodiment
The utility model is described in further detail below in conjunction with accompanying drawing.Wherein identical parts identical accompanying drawing Mark is represented.It should be noted that the word "front", "rear" for being used in description below, "left", "right", "up" and "down" refer to It is the direction in accompanying drawing, word " bottom surface " and " top surface ", " interior " and " outward " are referred respectively to towards or away from particular elements geometry The direction at center.
One kind is without scaffold hanging basket, as shown in figure 1, being installed with two groups of steel wire ropes 2 being parallel to each other on taut film steel pipe 1.Two Safety rope 8 is provided between group steel wire rope 2, the two ends of safety rope 8 are installed on taut film steel pipe 1, for workman's safety harness.
Every group of steel wire rope 2 includes two steel wire ropes 2 being disposed adjacent.Operating platform 3 is provided with steel wire rope 2.Operation Platform 3 is rectangle platy structure, and guardrail body 7 is installed with the top surface edge of operating platform 3.
With reference to Fig. 4, Fig. 5 and Fig. 6, door body 71, door are provided with the guardrail body 7 of the termination of the length direction of operating platform 3 The side of body 71 is hinged with guardrail body 7, and door body 71 is provided with latch assembly 72 away between the side of hinged place and guardrail body 7.
As shown in Fig. 2 latch assembly 72 includes the first latch 721 being installed in guardrail body 7, set in guardrail body 7 There is the second latch 722, the first latch 721 and the shape of the second latch 722 are square.When door body 71 is closed, the One latch 721 and the second latch 722 are abutted, and are fixed with clamping screw 723.
Fig. 1 is reviewed, the draw bar 31 perpendicular to the plane of operating platform 3 is installed with the upper surface corner of operating platform 3, led The termination for drawing bar 31 is installed with link 4, and link 4 is enclosed within two adjacent outer walls of steel wire rope 2, the top of the inwall of link 4 and steel Cord 2 is abutted.Link 4 can drive operating platform 3 along the length of steel wire rope 2 along the length direction sliding motion of steel wire rope 2 Degree direction sliding motion.
With reference to Fig. 3 and Fig. 7, hoop component is provided with by a link 4 wherein.Hoop component splits including two and hangs The clip body 5 of the both sides of ring 4, clip body 5 includes the inwall and steel wire of left clip 51 and right clip 52, left clip 51 and right clip 52 The outer wall of rope 2 is adapted and fits.It has been respectively and fixedly connected with the inwall that left clip 51 and right clip 52 are fitted with steel wire rope 2 anti-skidding Pad 6, slipmat 6 is made up of materials such as natural rubbers, with service life higher.
The side of left clip 51 and right clip 52 is hinged, and left clip 51 is installed with left boss away from the side of hinged place, right Clip 52 is installed with right boss away from the side of hinged place, and the first spiral shell for fixing the two is provided with left boss and right boss Bolt 53.First bolt 53 tenses left clip 51 and right clip 52.The position of two clip bodies 5 on steel wire rope 2 is fixed, and will hang Ring 4 is limited between two clip bodies 5 so that link 4 cannot keep workman along the length direction sliding motion of steel wire rope 2 Stability when being constructed on operation platform.
Wherein, during construction, workman is stood on operating platform 3, and steel wire rope 2 is dragged by hand, and link 4 slides on steel wire rope 2 Motion, drives the sliding motion of operating platform 3, or other are dropped by other external force or promote operating platform 3, the edge of operating platform 3 The length direction sliding motion of steel wire rope 2.When operating platform 3 moves to ideal position, two clip bodies 5 are fixed on steel In cord 2, the sliding motion of the link 4 between two clip bodies 5 is limited so that operating platform 3 keeps stabilization.Can certainly So that the both sides of each link 4 are respectively provided with clip body 5, operating platform 3 can more be stablized.When needing to be moved to operating platform 3 During next station, the first bolt 53 is rotated so that the releasing that is fixedly connected of clip body 5 and steel wire rope 2, then to operating platform 3 Apply external force so that operating platform 3 can be relatively low and easy to use along the length direction sliding motion of steel wire rope 2, cost.
This specific embodiment is only that, to explanation of the present utility model, it is not to limitation of the present utility model, ability Field technique personnel can make the modification without creative contribution to the present embodiment as needed after this specification is read, but As long as all being protected by Patent Law in right of the present utility model.

Claims (9)

1. one kind is without scaffold hanging basket, it is characterised in that:At least two steel being parallel to each other are installed between taut film steel pipe (1) Cord (2), is provided with operating platform (3) on steel wire rope (2), operating platform (3) is supplied between operating platform (3) and steel wire rope (2) Along the sliding assembly that steel wire rope (2) slides, fixed operating platform (3) position is provided between operating platform (3) and steel wire rope (2) The hoop component put.
2. according to claim 1 without scaffold hanging basket, it is characterised in that:Traction is provided with operating platform (3) corner Bar (31), the sliding assembly includes being installed in the link (4) at the top of draw bar (31), inwall and the steel wire rope (2) of link (4) Outer wall be adapted, link (4) is set in the outside of steel wire rope (2) and can be along steel wire rope (2) sliding motion.
3. according to claim 2 without scaffold hanging basket, it is characterised in that:The hoop component includes wherein at least one The clip body (5) of link (4) both sides, the inwall of clip body (5) abuts fixation with the outer wall of steel wire rope (2).
4. according to claim 3 without scaffold hanging basket, it is characterised in that:Clip body (5) includes the left card that is hinged Hoop (51) and right clip (52), left clip (51) and right clip (52) are detachable with the first bolt (53) away from the side of hinged place It is fixedly connected.
5. according to claim 3 without scaffold hanging basket, it is characterised in that:The inwall of clip body (5) is installed with slipmat (6)。
6. according to claim 1 without scaffold hanging basket, it is characterised in that:It is easy to set in operating platform (3) upper surface Guardrail body (7) is equipped with, is provided with guardrail body (7) and is hinged with door body (71), lock is provided between door body (71) and guardrail body (7) Tight component (72).
7. according to claim 6 without scaffold hanging basket, it is characterised in that:The latch assembly (72) is including being installed in shield The first latch (721) on column body (7), door body (71) is installed with the second latch (722), first away from the edge of hinged place Latch (721) is fixedly connected with the second latch (722) by clamping screw (723).
8. according to claim 1 without scaffold hanging basket, it is characterised in that:The steel wire rope (2) is provided with many into stock Use.
9. according to claim 1 without scaffold hanging basket, it is characterised in that:Be provided between taut film steel pipe (1) for The safety rope (8) of operating personnel's hanging safety belt.
CN201621439891.1U 2016-12-26 2016-12-26 Without scaffold hanging basket Active CN206299107U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621439891.1U CN206299107U (en) 2016-12-26 2016-12-26 Without scaffold hanging basket

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621439891.1U CN206299107U (en) 2016-12-26 2016-12-26 Without scaffold hanging basket

Publications (1)

Publication Number Publication Date
CN206299107U true CN206299107U (en) 2017-07-04

Family

ID=59204044

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621439891.1U Active CN206299107U (en) 2016-12-26 2016-12-26 Without scaffold hanging basket

Country Status (1)

Country Link
CN (1) CN206299107U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108222483A (en) * 2017-12-13 2018-06-29 安徽电气集团股份有限公司 A kind of building hanging basket for house construction engineering
CN114439247A (en) * 2022-03-10 2022-05-06 安徽伟宏钢结构集团股份有限公司 Large-span large-breadth suspended ceiling moving construction method

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108222483A (en) * 2017-12-13 2018-06-29 安徽电气集团股份有限公司 A kind of building hanging basket for house construction engineering
CN114439247A (en) * 2022-03-10 2022-05-06 安徽伟宏钢结构集团股份有限公司 Large-span large-breadth suspended ceiling moving construction method
CN114439247B (en) * 2022-03-10 2023-11-17 安徽伟宏钢结构集团股份有限公司 Large-span large-breadth suspended ceiling mobile construction method

Similar Documents

Publication Publication Date Title
CN209419096U (en) Transmission line of electricity block device
CN105822072A (en) Hoisting construction structure and method for air corridor ceiling
CN206299107U (en) Without scaffold hanging basket
CN207728298U (en) A kind of maintenance of roofing uses stainless steel retractable cat ladder
CN206299108U (en) One kind is without scaffold hanging basket
CN205637628U (en) Hoist and mount construction structures of aerial vestibule furred ceiling
CN103541557B (en) For the easy device of vertical steel pipe
CN204024015U (en) Operation platform modular unit and operation platform thereof
CN109707084B (en) Flexible curtain wall elastic support and external ribbon system
CN210828284U (en) Personnel protection device is set up to outrigger
CN204299157U (en) The mounted lifting device in attached lifting scaffold side
CN201176567Y (en) Mobile angular adjustment frame hanging at end of staying cable beam
CN206487129U (en) Safety hanging cradle for industrial premises Construction of Steel Structure
CN202518943U (en) Creeper-traveler for coating bridge location
CN102989091B (en) A kind of rescue net
CN207330285U (en) A kind of removable spider-man's lifting-point device
CN109162466A (en) Room level units formula curtain wall installing structure and method
CN205583524U (en) Composite insulator cat ladder of being qualified for next round of competitions
CN205000625U (en) H shaped steel roof beam hanging flower basket safety rope fixing device
CN206308998U (en) Without scaffold hanging basket
CN110924850B (en) Working method of climbing equipment for high-altitude construction of bridge
CN209896606U (en) Liftable temporary power cable erecting device
CN110924851B (en) Climbing equipment for high-altitude construction of bridge
JP3462576B2 (en) Method and apparatus for narrow space construction of exterior finishing panel
CN206735691U (en) A kind of handling apparatus for deep basal pit installation reinforcing bar

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant