CN206299108U - One kind is without scaffold hanging basket - Google Patents

One kind is without scaffold hanging basket Download PDF

Info

Publication number
CN206299108U
CN206299108U CN201621442514.3U CN201621442514U CN206299108U CN 206299108 U CN206299108 U CN 206299108U CN 201621442514 U CN201621442514 U CN 201621442514U CN 206299108 U CN206299108 U CN 206299108U
Authority
CN
China
Prior art keywords
steel wire
wire rope
plate
operating platform
hanging basket
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201621442514.3U
Other languages
Chinese (zh)
Inventor
赵国庆
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tianjin Bosite Film Decoration Engineering Co Ltd
Original Assignee
Tianjin Bosite Film Decoration Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tianjin Bosite Film Decoration Engineering Co Ltd filed Critical Tianjin Bosite Film Decoration Engineering Co Ltd
Priority to CN201621442514.3U priority Critical patent/CN206299108U/en
Application granted granted Critical
Publication of CN206299108U publication Critical patent/CN206299108U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Revetment (AREA)

Abstract

The utility model discloses one kind without scaffold hanging basket, its drip irrigation device is to be installed with least two steel wire ropes being parallel to each other between taut film steel pipe, operating platform is provided with steel wire rope, operating platform is supplied between operating platform and steel wire rope along the sliding assembly of steel wire iope slippage, the fixation kit of fixed operating platform position is provided between sliding assembly and steel wire rope, the effect for ensureing that workman stablizes construction on the operational platform has been reached.

Description

One kind is without scaffold hanging basket
Technical field
The utility model is related to a kind of construction auxiliary equipment field, and more particularly to one kind is without scaffold hanging basket.
Background technology
Membrane structure is by various high-strength thin-film materials and stiffener(Steelframe, steel column or cable wire)It is made by certain way Inside produces certain pre- tensile stress to form certain spatial form, as covered structure, and can bear certain external load work A kind of space structure form.Membrane structure can be divided into air-supported membrane structure and the major class of jacking membrane structure two.Air-supported membrane structure is to lean on Indoor constantly inflation, makes indoor and outdoor produce certain pressure poor, and the pressure official post roof system film cloth of indoor and outdoor is by certain upward Buoyancy, so as to realize larger span.Jacking membrane structure is then supported by post and steelframe or tensioning cable is molded.
Membrane of Tensile Buildings is fixed on a steel cord, referred to as taut film.In taut membrane process, workman is first fixed on steel wire rope and waits to pacify Holding position, then works to carrying out taut film on steel wire rope again.The general method using in the full hall formula scaffold of steel wire rope side arrangement, But this traditional full hall formula scaffold is not suitable for the installation of the larger Membrane of Tensile Buildings of span, because the larger Membrane of Tensile Buildings of span , area is larger, if using the method for full hall formula scaffold, installation cost is too high, low construction efficiency.
The existing Chinese patent for referring to Application No. 200810021139.9, it discloses a kind of wide span and big area Furred ceiling nacelle-moving construction method, between the pricncipal rafter on the adjacent axis of wide span and big area furred ceiling, ties steel Cord, hangs moveable hanging basket on steel wire rope, rope is connected with as the operating platform of workmen, on hanging basket for hanging basket Tethered sliding, then, at truss winds up web member set pulley, ceiling board is hung to by installation site by pulley, by hanging basket The installation that interior workmen carries out ceiling board is fixed.
Utility model content
The purpose of this utility model be to provide another structure without scaffold hanging basket.
Above-mentioned technical purpose of the present utility model technical scheme is that:
One kind is installed with least two steel wire ropes that are parallel to each other, on steel wire rope without scaffold hanging basket between taut film steel pipe Operating platform is provided with, operating platform is supplied between operating platform and steel wire rope along the sliding assembly of steel wire iope slippage, sliding group The fixation kit of fixed operating platform position is provided between part and steel wire rope.
By above-mentioned technical proposal, operating platform when being acted on by external force, by sliding assembly along steel wire rope length The sliding of degree direction, when the position of needs is moved to, will not be due to accident by the position fixation of operating platform by fixation kit External force cause that operating platform slides on a steel cord, it is ensured that when workman constructs on the operational platform, more stablize.
Preferably, being provided with draw bar at operating platform corner, the sliding assembly includes being installed at the top of draw bar Link, the inwall of link is adapted with the outer wall of steel wire rope, and link is set in the outside of steel wire rope and can be along steel wire iope slippage Motion.
By above-mentioned technical proposal, link under the Action of Gravity Field of operating platform, the inwall of link top and steel wire rope Top abuts, and when being acted on by external force, link can slide along the length direction of steel wire rope, and link is easy to processing.
Preferably, the fixation kit includes the fixed plate being installed on link, fixed plate includes being located at steel wire rope side The first plate and the second plate positioned at steel wire rope opposite side, be provided between the first plate and the second plate for tensing consolidating for the two Determine bolt, the first plate, the second plate, link and fixing bolt enclose FX, and steel wire rope is limited in FX.
By above-mentioned technical proposal, the first plate and the second plate compress steel wire rope, and steel wire rope is limited in FX, So that fixed plate is fixed relative to steel wire rope, because fixed plate is fixed on link so that link cannot be along the length of steel wire rope Degree direction sliding, it is ensured that stability of the operating platform in construction.
Preferably, inner wall size of the size of the fixed plate more than link.
By above-mentioned technical proposal, it is to avoid for a long time using rear fixed plate and link be fixedly connected failure after, link from Pass through in fixed plate.Even if the failure that is fixedly connected of fixed plate and link, fixed plate is fixed on a steel cord, also can be to link edge Restriction effect is played in the sliding motion for a direction of rope capacity direction sliding.
Preferably, the first plate and the second plate are installed with rubber blanket near the side wall of steel wire rope.
By above-mentioned technical proposal, the frictional force between fixed plate and steel wire rope can be increased, while rubber blanket has one Determine high flexibility, can be while the first plate and the second board clamping steel wire rope be ensured, it is to avoid by the damaged surfaces of steel wire rope, protect Demonstrate,prove the service life of steel wire rope, it is ensured that the safety of workman.
Preferably, the rubber blanket is provided with locating slot, the inwall of locating slot is adapted with the outer wall of steel wire rope, locating slot Depth be not more than the radius of steel wire rope.
By above-mentioned technical proposal, steel wire rope is located in locating slot so that the face that rubber blanket is fitted with the outer wall of steel wire rope Product is bigger, and more preferably, operating platform can more be stablized fixed effect.
Preferably, the link inwall be provided with that steel wire rope passes through put grooving.
By above-mentioned technical proposal, when link is hung on a steel cord, steel wire rope is located at and puts in grooving, can avoid link Moved along the direction vertical with rope capacity direction under external force, further avoid rocking for operating platform, improved The stability of operating platform during construction.
Preferably, the steel wire rope is provided with many being used into stock.
By above-mentioned technical proposal, increase the degree of safety of intensity and operating platform, after wherein steel cable has broken, Remaining steel wire rope can also continue to use, and improve the service life of equipment, it is ensured that use safety.
Preferably, being provided with the safety rope for operating personnel's hanging safety belt between steel wire rope.
By above-mentioned technical proposal, workman hangs on safety rope safety belt, can be when steel wire rope is broken, to work The personal safety of people plays a protective role.
In sum, the utility model has the advantages that:When ensureing that workman constructs on the operational platform, more surely It is fixed, it is ensured that personal safety, improve service life.
Brief description of the drawings
Fig. 1 is the structural representation without scaffold hanging basket;
Fig. 2 is the close-up schematic view at A in Fig. 1;
Fig. 3 is to embody the partial schematic diagram of positioning slot structure;
Fig. 4 is the sectional view for putting grooving structure on link in order to embody.
In figure, 1, steel wire rope;2nd, stretch tight film steel pipe;3rd, operating platform;31st, draw bar;32nd, fence;4th, link;41st, rope is put Groove;5th, fixation kit;51st, the first plate;52nd, the second plate;53rd, fixing bolt;6th, rubber blanket;61st, locating slot;7th, safety rope.
Specific embodiment
The utility model is described in further detail below in conjunction with accompanying drawing.Wherein identical parts identical accompanying drawing Mark is represented.It should be noted that the word "front", "rear" for being used in description below, "left", "right", "up" and "down" refer to It is the direction in accompanying drawing, word " bottom surface " and " top surface ", " interior " and " outward " are referred respectively to towards or away from particular elements geometry The direction at center.
One kind is without scaffold hanging basket, as shown in figure 1, being installed with two groups of steel wire ropes 1 being parallel to each other on taut film steel pipe 2.Two Safety rope 7 is provided between group steel wire rope 1, the two ends of safety rope 7 are installed on taut film steel pipe 2, for workman's safety harness.
Every group of steel wire rope 1 includes two steel wire ropes 1 being disposed adjacent.Operating platform 3 is provided with steel wire rope 1.Operation Platform 3 is rectangle platy structure, and guardrail is installed with the top surface edge of operating platform 3.
The draw bar 31 perpendicular to the plane of operating platform 3, adjacent traction are installed with the upper surface corner of operating platform 3 Bracing piece is connected between bar 31.With reference to Fig. 4, the termination of draw bar 31 is installed with link 4, and link 4 is enclosed within two adjacent steel The outer wall of cord 1, is provided with two and puts grooving 41 at the top of the inwall of link 4, each put the inwall of grooving 41 with the top of steel wire rope 1 Portion abuts.Link 4 can drive operating platform 3 along the length of steel wire rope 1 along the length direction sliding motion of steel wire rope 1 Direction sliding motion.
As shown in Figures 2 and 3, fixation kit 5 is installed with a link 4 wherein, fixation kit 5 includes the first plate 51 With the second plate 52, the first plate 51 and the second plate 52 in the similar cuboid platy structure of shape, the first plate 51 be located at the second plate 52 surface.The side wall of the first plate 51 is fixedly connected with the outer wall of link 4.The lower surface of the first plate 51 is installed with rubber blanket 6, rubber The lower surface of rubber cushion 6 is provided with locating slot 61, and locating slot 61 is in two adjacent globoidal structures, and the depth of locating slot 61 is less than steel The radius of cord 1.The upper surface of the second plate 52 is installed with rubber blanket 6, and the upper surface of rubber blanket 6 is provided with determining for same cambered surface Position groove 61.Fixing bolt 53 is connected between first plate 51 and the second plate 52, the first plate 51 and the second plate 52 is tensed, by steel wire In 1 locating slot 61 being clipped between the first plate 51 and the second plate 52 tightly of rope.So that link 4 is fixed position on steel wire rope 1, So that link 4 cannot be along the length direction sliding motion of steel wire rope 1, stabilization when keeping workman to be constructed on operation platform Property.
Wherein, during construction, workman is stood on operating platform 3, and steel wire rope 1 is dragged by hand, and link 4 slides on steel wire rope 1 Motion, drives the sliding motion of operating platform 3, or other are dropped by other external force or promote operating platform 3, the edge of operating platform 3 The length direction sliding motion of steel wire rope 1.When operating platform 3 moves to ideal position, by fixation kit 5 by link 4 It is fixed on steel wire rope 1 so that operating platform 3 keeps stabilization.Fixed fixation kit on each link 4 can certainly be caused 5, operating platform 3 can more be stablized.When needing for operating platform 3 to be moved to next station, fixing bolt 53 is rotated so that The releasing that is fixedly connected of the first plate 51 and the second plate 52 and steel wire rope 1, then apply external force to operating platform 3 so that operating platform 3 Can be relatively low and easy to use along the length direction sliding motion of steel wire rope 1, cost.
This specific embodiment is only that, to explanation of the present utility model, it is not to limitation of the present utility model, ability Field technique personnel can make the modification without creative contribution to the present embodiment as needed after this specification is read, but As long as all being protected by Patent Law in right of the present utility model.

Claims (9)

1. one kind is without scaffold hanging basket, it is characterised in that:At least two steel being parallel to each other are installed between taut film steel pipe (2) Cord (1), is provided with operating platform (3) on steel wire rope (1), operating platform (3) is supplied between operating platform (3) and steel wire rope (1) Along the sliding assembly that steel wire rope (1) slides, fixed operating platform (3) position is provided between sliding assembly and steel wire rope (1) Fixation kit (5).
2. according to claim 1 without scaffold hanging basket, it is characterised in that:Traction is provided with operating platform (3) corner Bar (31), the sliding assembly includes being installed in the link (4) at the top of draw bar (31), inwall and the steel wire rope (1) of link (4) Outer wall be adapted, link (4) is set in the outside of steel wire rope (1) and can be along steel wire rope (1) sliding motion.
3. according to claim 2 without scaffold hanging basket, it is characterised in that:The fixation kit (5) is including being installed in extension Fixed plate on ring (4), fixed plate is included positioned at first plate (51) of steel wire rope (1) side and another positioned at steel wire rope (1) Second plate (52) of side, is provided with the fixing bolt (53) for tensing the two between the first plate (51) and the second plate (52), the One plate (51), the second plate (52), link (4) and fixing bolt (53) enclose FX, and steel wire rope (1) is limited at fixation In region.
4. according to claim 3 without scaffold hanging basket, it is characterised in that:The size of the fixed plate is more than link (4) Inner wall size.
5. according to claim 3 without scaffold hanging basket, it is characterised in that:First plate (51) and the second plate (52) are near steel The side wall of cord (1) is installed with rubber blanket (6).
6. according to claim 5 without scaffold hanging basket, it is characterised in that:The rubber blanket (6) is provided with locating slot (61), the inwall of locating slot (61) is adapted with the outer wall of steel wire rope (1), and the depth of locating slot (61) is not more than steel wire rope (1) Radius.
7. according to claim 2 without scaffold hanging basket, it is characterised in that:Link (4) inwall is provided with steel wire rope (1) what is passed through puts grooving (41).
8. according to claim 1 without scaffold hanging basket, it is characterised in that:The steel wire rope (1) is provided with many into stock Use.
9. according to claim 1 without scaffold hanging basket, it is characterised in that:It is provided with for grasping between steel wire rope (1) Make the safety rope (7) of personnel's hanging safety belt.
CN201621442514.3U 2016-12-26 2016-12-26 One kind is without scaffold hanging basket Active CN206299108U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621442514.3U CN206299108U (en) 2016-12-26 2016-12-26 One kind is without scaffold hanging basket

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621442514.3U CN206299108U (en) 2016-12-26 2016-12-26 One kind is without scaffold hanging basket

Publications (1)

Publication Number Publication Date
CN206299108U true CN206299108U (en) 2017-07-04

Family

ID=59204265

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621442514.3U Active CN206299108U (en) 2016-12-26 2016-12-26 One kind is without scaffold hanging basket

Country Status (1)

Country Link
CN (1) CN206299108U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108252505A (en) * 2018-02-05 2018-07-06 北京奇力建通工程技术有限公司 A kind of moving hanging basket system of energy avoiding obstacles

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108252505A (en) * 2018-02-05 2018-07-06 北京奇力建通工程技术有限公司 A kind of moving hanging basket system of energy avoiding obstacles
CN108252505B (en) * 2018-02-05 2020-05-12 北京奇力建通工程技术有限公司 Movable hanging basket system capable of avoiding obstacles

Similar Documents

Publication Publication Date Title
CN201610631U (en) Traction and movable type lifting platform for construction
CN206722429U (en) A kind of roofing color corrugated sheet steel transportation system
CN104695752B (en) Rapid rush-repair Tower System and its erection method
CN103821340B (en) The mounting method of adhering lifting multilayer operation platform
CN209419096U (en) Transmission line of electricity block device
CN206857993U (en) Material lifts antichattering system outside a kind of high-rise building room
CN206299108U (en) One kind is without scaffold hanging basket
CN206299107U (en) Without scaffold hanging basket
CN206016220U (en) High-altitude column structure construction operation platform
CN114645614A (en) Rapid moving aerial work platform based on rail device
CN207469709U (en) Arc-shaped hanging basket and the circular ring shape hanging basket being spliced with arc-shaped hanging basket
CN204738226U (en) Arched bridge main arch bottom plate rail formula tool car
CN112411992B (en) Construction platform is prevented shaking by suspension type for construction
CN212054063U (en) Novel high-voltage line protection device
CN211714552U (en) Hanging basket for curtain wall installation
CN111851982A (en) Scaffold frame liftable prevents weighing down safety device
CN106968448A (en) A kind of building purging system and cleaning method
CN207620384U (en) Jack device for discharging
CN207813067U (en) A kind of column two pass safety rope high-altitude working safety protective device
CN215254409U (en) Scaffold for elevator well
CN205663229U (en) A sunshade for concrete pouring construction
CN115306137A (en) Operation platform structure for mounting suspended ceiling at bottom of overhead corridor and construction method thereof
CN206308998U (en) Without scaffold hanging basket
CN206299150U (en) One kind construction packway
CN206267511U (en) Packway

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant