CN206308997U - A kind of construction hanging basket - Google Patents
A kind of construction hanging basket Download PDFInfo
- Publication number
- CN206308997U CN206308997U CN201621423027.2U CN201621423027U CN206308997U CN 206308997 U CN206308997 U CN 206308997U CN 201621423027 U CN201621423027 U CN 201621423027U CN 206308997 U CN206308997 U CN 206308997U
- Authority
- CN
- China
- Prior art keywords
- plate
- sliding
- guiding piece
- steel wire
- hanging basket
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Revetment (AREA)
Abstract
The utility model discloses a kind of construction hanging basket, its drip irrigation device is that at least two steel wire ropes are installed between support body, operating platform is provided with steel wire rope, it is provided between operating platform and steel wire rope for operating platform along steel cable sliding component, the pull rope parallel with steel wire rope is provided between support body, guiding piece is provided with pull rope, sliding assembly is provided between guiding piece and pull rope, stop assembly is provided with sliding assembly, the traction groove held for staff is provided with the guiding piece, effect easy to use has been reached.
Description
Technical field
The utility model is related to a kind of construction auxiliary equipment field, more particularly to a kind of construction hanging basket.
Background technology
With continuing to develop for China's economy, architectural style and structure are constantly innovated, the difficulty and complexity of construction
Property is also constantly improved.
The general method using in the full hall formula scaffold of support body side arrangement during construction, but this traditional full hall formula
Scaffold is not suitable for the construction of the larger building of span because span it is larger, it is necessary to laying scaffold area it is larger, peace
Dress high cost, low construction efficiency.
The existing Chinese patent for referring to Application No. 200810021139.9, it discloses a kind of wide span and big area
Furred ceiling nacelle-moving construction method, between the pricncipal rafter on the adjacent axis of wide span and big area furred ceiling, ties steel
Cord, hangs operating platform of the moveable hanging basket as workmen on steel wire rope, rope is connected with hanging basket for hanging basket
Tethered sliding, then, at truss winds up web member set pulley, ceiling board is hung to by installation site by pulley, by hanging basket
The installation that interior workmen carries out ceiling board is fixed.Apply external force to hanging basket, hanging basket can on a steel cord be moved, typically adopted
The method for dragging operation platform with rope body with workmen on the ground, can produce the phenomenon of skidding between staff and rope body,
It is very inconvenient.
Utility model content
The purpose of this utility model is to provide a kind of construction hanging basket easy to use.
Above-mentioned technical purpose of the present utility model technical scheme is that:
A kind of construction hanging basket, is installed with least two steel wire ropes between support body, and operating platform is provided with steel wire rope, behaviour
Make to be provided between platform and steel wire rope to be provided with along steel cable sliding component, between support body for operating platform and put down with steel wire rope
Capable pull rope, is provided with guiding piece on pull rope, sliding assembly is provided between guiding piece and pull rope, is set on sliding assembly
Stop assembly is equipped with, the traction groove held for staff is provided with the guiding piece.
By above-mentioned technical proposal, workman stands on the operational platform, and be fixed on guiding piece on pull rope by stop assembly, work
Staff, equivalent to fixed guiding piece is hold, is dropped traction groove is hold along the length direction of pull rope so that operation
Platform stress, operating platform is slid by slide assemblies along the length direction of steel wire rope, when the position of needs is moved to, is stopped
Only drop.With the movement of operating platform, workman's mobile guiding piece on pull rope by sliding assembly, guiding piece is leading
Sliding motion on messenger so that the workman that guiding piece is always positioned at standing on the operational platform can be with the hand-held position arrived, then with stopping
Be fixed on guiding piece on pull rope by dynamic component, and traction groove is put down to the point of application of workman's stabilization to workman's moving operation
Platform provides facility.
Preferably, being provided with draw bar at operating platform corner, the slide assemblies include being installed at the top of draw bar
Link, the inwall of link is adapted with the outer wall of steel wire rope, and link is set in the outside of steel wire rope and can be along steel wire iope slippage
Motion.
By above-mentioned technical proposal, link under the Action of Gravity Field of operating platform, the inwall of link top and steel wire rope
Top abuts, and when being acted on by external force, link can slide along the length direction of steel wire rope, and link is easy to processing.
Preferably, the sliding assembly includes being installed in being installed with sliding plate on guiding piece, it is provided with sliding plate for leading
The slip hole of messenger sliding.
By above-mentioned technical proposal, pull rope can the sliding motion in slip hole, because slip hole is opened in sliding plate
On, sliding plate is fixedly connected with guiding piece, enables guiding piece along the length direction sliding motion of pull rope, is easy to processing,
Connection is reliable.
Preferably, stop assembly includes the first connecting plate being installed on sliding plate, it is provided with the first connecting plate and cunning
The parallel check plate of plate is moved, the stop hole passed through for traction iope slippage is provided with check plate, be provided with stop hole and sliding
The affixed card rope plate of plate, is provided with the first elastic component between check plate and the first connecting plate, the first elastic component is supplied to check plate
To the close pulling force of the first connecting plate, pulling force causes that be pressed in pull rope on card rope plate by stop hole.
By above-mentioned technical proposal, the first elastic component continues to be pressed in pull rope between card rope plate and stop hole, guiding piece
Position fix.When the position of mobile guiding piece on pull rope is needed, only need workman to check plate away from the first connecting plate
The power in direction, stop hole increases with the distance between rope plate is blocked, and pull rope can be passed through, convenient and swift.First elastic component
Can cause that check plate recovers original position after power disappearance, continue pull rope pushing down tightly, keep guiding piece and traction
Fixation between rope.
Preferably, being provided with the sliding assembly for guiding check plate glide direction between check plate and sliding plate, guide
Component includes the directing plate being installed on sliding plate, and guiding groove is offered on directing plate, is installed with and draws on the side wall of check plate
The bootstrap block that guide groove is adapted.
By above-mentioned technical proposal, during check plate is moved guide sleeves can the sliding motion on leading axle, keep away
Exempt from check plate to be shifted during movement, check plate can only be close to the first connecting plate along the length direction of leading axle
Or away from.
Preferably, setting the limit assembly of restricted guiding piece movement between the operating platform and guiding piece.
By above-mentioned technical proposal, there is provided after limit assembly, when the position of guiding piece is fixed, operating platform can be limited
Sliding motion on a steel cord so that the position of operating platform is fixed, will not cause that operating platform exists due to unexpected external force
Slid on steel wire rope so that more stablize when workman constructs on the operational platform.
Preferably, the limit assembly includes being installed in the fence at operating platform edge, fence includes some fence units,
Size of the gap less than guiding piece between fence unit.
By above-mentioned technical proposal, fence prevents workman from being dropped from the edge of operating platform, plays a protective role.Fence list
Be limited to inside fence for guiding piece movement by unit, and guiding piece can not possibly be by the gap between adjacent pens unit, so as to limit
The position of operating platform.
Preferably, being equipped with cushion pad on the side wall of the support body.
By above-mentioned technical proposal, after steel wire rope is due to unexpected fracture, guiding piece be stuck in adjacent fence unit it
Between.If pull rope is broken from middle part, operating platform completely will not be dropped, but led due to the effect of guiding piece from the air
Messenger and guiding piece are held, and are hit to the side wall of support body, and cushion pad can play cushioning effect, the injured probability of people are reduced, to battalion
Rescue and strive for more times.
Preferably, the inwall of the traction groove is provided with projection, projection is in wavy.
By above-mentioned technical proposal, the finger of workman is placed between wavy projection, can play anti-skidding effect,
Improve the comfort for holding traction groove.
Preferably, being equipped with layer of silica gel on the outer wall of the guiding piece.
By above-mentioned technical proposal, layer of silica gel is made up of silica gel material, and with good tactile experience, level has pliability,
It is indeformable.Being rinsed with clear water can recover clean, be easy to regular maintenance, improve the service life of guiding piece.
In sum, the utility model has the advantages that:The point of application is provided to workman's Mobile operating platform, more
It is easy to hold pull rope, the Mobile operating platform that workman oneself station on the operational platform just can be voluntarily is easy to hold, will not be beaten
It is sliding, it is easy to use.
Brief description of the drawings
Fig. 1 is the structural representation of construction hanging basket;
Fig. 2 is the partial structurtes enlarged diagram at A in Fig. 1;
Fig. 3 is to embody the schematic diagram of the card hardened structure of rope;
Fig. 4 is to embody the schematic diagram of guiding block structure;
Fig. 5 is partial schematic diagram when stirring check plate.
In figure, 1, support body;11st, steel wire rope;12nd, operating platform;121st, draw bar;122nd, link;2nd, pull rope;3rd, draw
Block;31st, groove is drawn;32nd, it is raised;4th, sliding assembly;41st, sliding plate;42nd, slip hole;5th, stop assembly;51st, the first connection
Plate;52nd, check plate;53rd, stop hole;54th, card rope plate;55th, the first elastic component;6th, guide assembly;61st, directing plate;62nd, guide
Groove;63rd, bootstrap block;7th, fence unit;8th, cushion pad.
Specific embodiment
The utility model is described in further detail below in conjunction with accompanying drawing.Wherein identical parts identical accompanying drawing
Mark is represented.It should be noted that the word "front", "rear" for being used in description below, "left", "right", "up" and "down" refer to
It is the direction in accompanying drawing, word " bottom surface " and " top surface ", " interior " and " outward " are referred respectively to towards or away from particular elements geometry
The direction at center.
A kind of construction hanging basket, as shown in figure 1, two groups are installed with support body 1 being parallel to each other and positioned at the steel of same level
Cord 11, every group includes two adjacent steel wire ropes 11.Support body 1 is being installed with cushion pad 8 on the side wall of steel wire rope 11, delays
Pad 8 is rushed to be made up of the material of the high resiliences such as sponge.The lower section of steel wire rope 11 is provided with operating platform 12, and operating platform 12 is in rectangular
Shape platy structure, is provided with fence at the top surface edge of operating platform 12, fence includes the fence that some uniform intervals are set
Unit 7.The draw bar 121 perpendicular to the surface of operating platform 12, draw bar 121 are installed with the upper surface corner of operating platform 12
Top be installed with link 122.Link 122 is enclosed within the outer wall of steel wire rope 11, and top and the steel wire rope 11 of the inwall of link 122 are supported
Connect.Link 122 can drive operating platform 12 along the length of steel wire rope 11 along the length direction sliding motion of steel wire rope 11
Direction sliding motion.
Put down in operation and led through there is the pull rope 2 parallel with steel wire rope 11 on platform, the two ends of pull rope 2 are fixed in support body
On 1.Pull rope 2 is located at the underface of position between two steel wire ropes 11, and through the gap fence unit 7.
With reference to Fig. 2, guiding piece 3 is provided with pull rope 2, guiding piece 3 is located at the inside of fence, is rectangle shape, greatly
Gap between two adjacent pens units 7, guiding piece 3 cannot be flat to operation by the gap between adjacent pens unit 7
Play restriction effect in the position of platform 12.The layer of silica gel that silica gel material is made is installed with the outer wall of guiding piece 3.Set on guiding piece 3
Traction groove 31 is equipped with, wavy some raised 32 are installed with the inwall for drawing groove 31, be easy to hold, prevent from skidding.
As shown in figure 3, being provided with sliding assembly 4 between guiding piece 3 and pull rope 2 so that guiding piece 3 can be along traction
The length direction sliding of rope 2.It is additionally provided with stop assembly 5 so that guiding piece 3 can keep fixing on pull rope 2.
Sliding assembly 4 includes the sliding plate 41 being installed on guiding piece 3, and sliding plate 41 is rectangle, is set on sliding plate 41
Slip hole 42 is equipped with, the inwall of slip hole 42 is adapted with the outer wall of pull rope 2 so that pull rope 2 can freely pass through.Make
Obtaining guiding piece 3 can be along the length direction sliding motion of pull rope 2.
As shown in Fig. 2 stop assembly 5 includes the first connecting plate 51 being installed on guiding piece 3, the first connecting plate 51 is vertical
In sliding plate 41 along the length direction of pull rope 2 side wall.Stop is connected by the first elastic component 55 on the first connecting plate 51
Plate 52, the first connector is spring, the length direction of the length direction of spring perpendicular to pull rope 2.
As shown in figure 3, sliding plate 41 sets on the side wall of the first connecting plate 51, is installed with card near the edge of sliding eye
Rope plate 54.The stop hole 53 with diameter greater than the diameter of slip hole 42 is provided with check plate 52, card rope plate 54 is stretched into stop hole 53.
Pull rope 2 is located at stop hole 53 and is enclosed away from the side wall of the first connecting plate 51 with card rope plate 54 away from the inwall of the first connecting plate 51
Into region in.First connector pulls check plate 52 to the direction near the first connecting plate 51 so that pull rope 2 is stuck in
Between stop hole 53 and card rope plate 54, remain stationary as.
With reference to Fig. 4, guide assembly 6 is provided between check plate 52 and sliding plate 41.Guide assembly 6 includes being installed in cunning
The guiding groove 62 moved on plate 41, the length direction of guiding groove 62 is vertical with the length direction of pull rope 2.It is provided with guiding groove 62
The bootstrap block 63 being adapted.Bootstrap block 63 is fixedly connected with the side wall of check plate 52.When check plate 52 is to away from the first connector
Direction sliding motion when, bootstrap block 63 is on guiding groove 62 along the length direction sliding motion of guiding groove 62 so that stop
What plate 52 was moved more stablizes.
As shown in figure 5, after check plate 52 is moved to the direction away from the first connecting plate 51, due to the position of card rope plate 54
Maintain static, check plate 52 drives stop hole 53 to be moved to the direction away from the first connecting plate 51, and stop hole 53 connects away from first
The region increase that the side wall of fishplate bar 51 is enclosed with card rope plate 54, pull rope 2 can freely pass through.Workman be free to
The position of mobile guiding piece 3 on pull rope 2.After the position of guiding piece 3 is moved into defined location, check plate 52 is unclamped,
In the pulling force effect of the first elastic component 55, check plate 52 drives stop hole 53 to return to original position, and pull rope 2 is by pressure tightly
Between stop hole 53 and card rope plate 54.The position of guiding piece 3 is fixed.
Wherein, during construction, guiding piece 3 is fixed on pull rope 2, and workman is stood on operating platform 12, and traction is dragged by hand
Block 3, the sliding motion on steel wire rope 11 of link 122 drives the sliding motion of operating platform 12, until the movement famous dictum of operating platform 12
Think position.Stir handle part so that guiding piece 3 can be moved on pull rope 2, after guiding piece 3 is moved into corresponding position,
Handle part is unclamped again, and guiding piece 3 continues the state for recovering to be fixed on pull rope 2.Workman can continue through and drop guiding piece 3
To change the position of operating platform 12.It is convenient and swift.
This specific embodiment is only that, to explanation of the present utility model, it is not to limitation of the present utility model, ability
Field technique personnel can make the modification without creative contribution to the present embodiment as needed after this specification is read, but
As long as all being protected by Patent Law in right of the present utility model.
Claims (10)
1. a kind of construction hanging basket, it is characterised in that:At least two steel wire ropes (11), steel wire rope are installed between support body (1)
(11) operating platform (12) is provided with, be provided between operating platform (12) and steel wire rope (11) for operating platform (12) along
Steel wire rope (11) slide assemblies, are provided with the pull rope (2) parallel with steel wire rope (11) between support body (1), pull rope sets on (2)
Guiding piece (3) is equipped with, sliding assembly (4) is provided between guiding piece (3) and pull rope (2), sliding assembly is provided with only on (4)
Dynamic component (5), is provided with the traction groove (31) held for staff on the guiding piece (3).
2. construction hanging basket according to claim 1, it is characterised in that:Draw bar is provided with operating platform (12) corner
(121), the slide assemblies include being installed in the link (122) at the top of draw bar (121), the inwall and steel wire of link (122)
The outer wall of (11) of restricting is adapted, and link (122) is set in the outside of steel wire rope (11) and can be along steel wire rope (11) sliding motion.
3. construction hanging basket according to claim 1, it is characterised in that:The sliding assembly (4) is including being installed in guiding piece
(3) sliding plate (41) is installed with, the slip hole (42) for pull rope (2) sliding is provided with sliding plate (41).
4. construction hanging basket according to claim 3, it is characterised in that:Stop assembly (5) is including being installed in sliding plate (41)
On the first connecting plate (51), the check plate (52) parallel with sliding plate (41), check plate are provided with the first connecting plate (51)
(52) stop hole (53) passed through for pull rope (2) sliding is provided with, is provided with stop hole (53) solid with sliding plate (41)
Card rope plate (54) for connecing, is provided with the first elastic component (55), the first elastic component between check plate (52) and the first connecting plate (51)
(55) it is supplied to check plate (52) to the close pulling force of the first connecting plate (51), pulling force causes stop hole (53) by pull rope (2)
Card is pressed in restrict on plate (54).
5. construction hanging basket according to claim 4, it is characterised in that:It is provided between check plate (52) and sliding plate (41)
Sliding assembly (4) for guiding check plate (52) glide direction, guide assembly (6) is including being installed in drawing on sliding plate (41)
Guide plate (61), offers guiding groove (62) on directing plate (61), be installed with the side wall of check plate (52) and guiding groove (62) phase
The bootstrap block (63) of adaptation.
6. construction hanging basket according to claim 1, it is characterised in that:Between the operating platform (12) and guiding piece (3)
The mobile limit assembly of restricted guiding piece (3) is set.
7. construction hanging basket according to claim 6, it is characterised in that:The limit assembly includes being installed in operating platform
(12) fence at edge, fence includes some fence units (7), chi of the gap between fence unit (7) less than guiding piece (3)
It is very little.
8. construction hanging basket according to claim 1, it is characterised in that:Cushion pad is equipped with the side wall of the support body (1)
(8)。
9. construction hanging basket according to claim 1, it is characterised in that:The inwall of traction groove (31) is provided with projection
(32), raised (32) are in wavy.
10. construction hanging basket according to claim 1, it is characterised in that:Silica gel is equipped with the outer wall of the guiding piece (3)
Layer.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621423027.2U CN206308997U (en) | 2016-12-23 | 2016-12-23 | A kind of construction hanging basket |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621423027.2U CN206308997U (en) | 2016-12-23 | 2016-12-23 | A kind of construction hanging basket |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206308997U true CN206308997U (en) | 2017-07-07 |
Family
ID=59245725
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201621423027.2U Expired - Fee Related CN206308997U (en) | 2016-12-23 | 2016-12-23 | A kind of construction hanging basket |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206308997U (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108487267A (en) * | 2018-06-04 | 2018-09-04 | 山东交通学院 | A kind of roadbed side slope laying device |
CN109778713A (en) * | 2019-03-25 | 2019-05-21 | 中铁五局集团建筑工程有限责任公司 | A kind of steel truss girder bridge scene suspension and slipping assembly device and method |
CN110469102A (en) * | 2019-09-10 | 2019-11-19 | 江苏南通二建集团有限公司 | A kind of high-altitude combined steel beam installs the operating platform and its construction method |
CN113882651A (en) * | 2021-10-19 | 2022-01-04 | 山东滕建建设集团有限公司 | Hanging flower basket fixing device for construction of building outer wall |
-
2016
- 2016-12-23 CN CN201621423027.2U patent/CN206308997U/en not_active Expired - Fee Related
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108487267A (en) * | 2018-06-04 | 2018-09-04 | 山东交通学院 | A kind of roadbed side slope laying device |
CN109778713A (en) * | 2019-03-25 | 2019-05-21 | 中铁五局集团建筑工程有限责任公司 | A kind of steel truss girder bridge scene suspension and slipping assembly device and method |
CN110469102A (en) * | 2019-09-10 | 2019-11-19 | 江苏南通二建集团有限公司 | A kind of high-altitude combined steel beam installs the operating platform and its construction method |
CN110469102B (en) * | 2019-09-10 | 2024-05-07 | 江苏南通二建集团有限公司 | High-altitude combined steel beam member installation operation platform and construction method thereof |
CN113882651A (en) * | 2021-10-19 | 2022-01-04 | 山东滕建建设集团有限公司 | Hanging flower basket fixing device for construction of building outer wall |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN206308997U (en) | A kind of construction hanging basket | |
CN203922264U (en) | A kind of automatic horizontal wire draw drum | |
CN206308998U (en) | Without scaffold hanging basket | |
CN2553834Y (en) | Self-control lifesaving back pack | |
CN206801423U (en) | A kind of coiling type awning curtains | |
CN206308999U (en) | Construction hanging basket | |
CN201676421U (en) | Hook threading device for steel wire rope | |
CN206023046U (en) | Aerial condutor pulley block | |
CN206513007U (en) | A kind of external inclined type nacelle construction device | |
CN205637628U (en) | Hoist and mount construction structures of aerial vestibule furred ceiling | |
CN206299107U (en) | Without scaffold hanging basket | |
CN203253070U (en) | Escape device capable of carrying out decelerating downward sliding | |
CN205346492U (en) | Slot drum type winding machine with dust collector | |
CN210674068U (en) | Suspension type heptafluoropropane extinguishing device | |
CN209084372U (en) | A kind of network communication device of disassembly easy to remove | |
CN205763499U (en) | Manual type safety guide rail is used in a kind of rail processing | |
CN204738733U (en) | Laborsaving insulating slide | |
CN208243931U (en) | A kind of portable fast escaping device | |
CN204210996U (en) | Ornament materials is vertical, horizontal transporter | |
CN2820222Y (en) | Self speed limiting high building life saving cable | |
CN205730002U (en) | A kind of rope reducer structure of high-rise circulation escape device | |
CN205410488U (en) | Portable high low insulation bench | |
CN221346264U (en) | Novel hanging basket for building construction | |
CN107575155A (en) | A kind of electric power first-aid ladder | |
CN204293770U (en) | Shoulder joint rehabiliation apparatus |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |