CN206308997U - A kind of construction hanging basket - Google Patents

A kind of construction hanging basket Download PDF

Info

Publication number
CN206308997U
CN206308997U CN201621423027.2U CN201621423027U CN206308997U CN 206308997 U CN206308997 U CN 206308997U CN 201621423027 U CN201621423027 U CN 201621423027U CN 206308997 U CN206308997 U CN 206308997U
Authority
CN
China
Prior art keywords
plate
sliding
guiding piece
steel wire
hanging basket
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201621423027.2U
Other languages
Chinese (zh)
Inventor
刘连强
古鹏程
王贵生
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tianjin Senyuan Construction Co Ltd
Original Assignee
Tianjin Senyuan Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tianjin Senyuan Construction Co Ltd filed Critical Tianjin Senyuan Construction Co Ltd
Priority to CN201621423027.2U priority Critical patent/CN206308997U/en
Application granted granted Critical
Publication of CN206308997U publication Critical patent/CN206308997U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Revetment (AREA)

Abstract

The utility model discloses a kind of construction hanging basket, its drip irrigation device is that at least two steel wire ropes are installed between support body, operating platform is provided with steel wire rope, it is provided between operating platform and steel wire rope for operating platform along steel cable sliding component, the pull rope parallel with steel wire rope is provided between support body, guiding piece is provided with pull rope, sliding assembly is provided between guiding piece and pull rope, stop assembly is provided with sliding assembly, the traction groove held for staff is provided with the guiding piece, effect easy to use has been reached.

Description

A kind of construction hanging basket
Technical field
The utility model is related to a kind of construction auxiliary equipment field, more particularly to a kind of construction hanging basket.
Background technology
With continuing to develop for China's economy, architectural style and structure are constantly innovated, the difficulty and complexity of construction Property is also constantly improved.
The general method using in the full hall formula scaffold of support body side arrangement during construction, but this traditional full hall formula Scaffold is not suitable for the construction of the larger building of span because span it is larger, it is necessary to laying scaffold area it is larger, peace Dress high cost, low construction efficiency.
The existing Chinese patent for referring to Application No. 200810021139.9, it discloses a kind of wide span and big area Furred ceiling nacelle-moving construction method, between the pricncipal rafter on the adjacent axis of wide span and big area furred ceiling, ties steel Cord, hangs operating platform of the moveable hanging basket as workmen on steel wire rope, rope is connected with hanging basket for hanging basket Tethered sliding, then, at truss winds up web member set pulley, ceiling board is hung to by installation site by pulley, by hanging basket The installation that interior workmen carries out ceiling board is fixed.Apply external force to hanging basket, hanging basket can on a steel cord be moved, typically adopted The method for dragging operation platform with rope body with workmen on the ground, can produce the phenomenon of skidding between staff and rope body, It is very inconvenient.
Utility model content
The purpose of this utility model is to provide a kind of construction hanging basket easy to use.
Above-mentioned technical purpose of the present utility model technical scheme is that:
A kind of construction hanging basket, is installed with least two steel wire ropes between support body, and operating platform is provided with steel wire rope, behaviour Make to be provided between platform and steel wire rope to be provided with along steel cable sliding component, between support body for operating platform and put down with steel wire rope Capable pull rope, is provided with guiding piece on pull rope, sliding assembly is provided between guiding piece and pull rope, is set on sliding assembly Stop assembly is equipped with, the traction groove held for staff is provided with the guiding piece.
By above-mentioned technical proposal, workman stands on the operational platform, and be fixed on guiding piece on pull rope by stop assembly, work Staff, equivalent to fixed guiding piece is hold, is dropped traction groove is hold along the length direction of pull rope so that operation Platform stress, operating platform is slid by slide assemblies along the length direction of steel wire rope, when the position of needs is moved to, is stopped Only drop.With the movement of operating platform, workman's mobile guiding piece on pull rope by sliding assembly, guiding piece is leading Sliding motion on messenger so that the workman that guiding piece is always positioned at standing on the operational platform can be with the hand-held position arrived, then with stopping Be fixed on guiding piece on pull rope by dynamic component, and traction groove is put down to the point of application of workman's stabilization to workman's moving operation Platform provides facility.
Preferably, being provided with draw bar at operating platform corner, the slide assemblies include being installed at the top of draw bar Link, the inwall of link is adapted with the outer wall of steel wire rope, and link is set in the outside of steel wire rope and can be along steel wire iope slippage Motion.
By above-mentioned technical proposal, link under the Action of Gravity Field of operating platform, the inwall of link top and steel wire rope Top abuts, and when being acted on by external force, link can slide along the length direction of steel wire rope, and link is easy to processing.
Preferably, the sliding assembly includes being installed in being installed with sliding plate on guiding piece, it is provided with sliding plate for leading The slip hole of messenger sliding.
By above-mentioned technical proposal, pull rope can the sliding motion in slip hole, because slip hole is opened in sliding plate On, sliding plate is fixedly connected with guiding piece, enables guiding piece along the length direction sliding motion of pull rope, is easy to processing, Connection is reliable.
Preferably, stop assembly includes the first connecting plate being installed on sliding plate, it is provided with the first connecting plate and cunning The parallel check plate of plate is moved, the stop hole passed through for traction iope slippage is provided with check plate, be provided with stop hole and sliding The affixed card rope plate of plate, is provided with the first elastic component between check plate and the first connecting plate, the first elastic component is supplied to check plate To the close pulling force of the first connecting plate, pulling force causes that be pressed in pull rope on card rope plate by stop hole.
By above-mentioned technical proposal, the first elastic component continues to be pressed in pull rope between card rope plate and stop hole, guiding piece Position fix.When the position of mobile guiding piece on pull rope is needed, only need workman to check plate away from the first connecting plate The power in direction, stop hole increases with the distance between rope plate is blocked, and pull rope can be passed through, convenient and swift.First elastic component Can cause that check plate recovers original position after power disappearance, continue pull rope pushing down tightly, keep guiding piece and traction Fixation between rope.
Preferably, being provided with the sliding assembly for guiding check plate glide direction between check plate and sliding plate, guide Component includes the directing plate being installed on sliding plate, and guiding groove is offered on directing plate, is installed with and draws on the side wall of check plate The bootstrap block that guide groove is adapted.
By above-mentioned technical proposal, during check plate is moved guide sleeves can the sliding motion on leading axle, keep away Exempt from check plate to be shifted during movement, check plate can only be close to the first connecting plate along the length direction of leading axle Or away from.
Preferably, setting the limit assembly of restricted guiding piece movement between the operating platform and guiding piece.
By above-mentioned technical proposal, there is provided after limit assembly, when the position of guiding piece is fixed, operating platform can be limited Sliding motion on a steel cord so that the position of operating platform is fixed, will not cause that operating platform exists due to unexpected external force Slid on steel wire rope so that more stablize when workman constructs on the operational platform.
Preferably, the limit assembly includes being installed in the fence at operating platform edge, fence includes some fence units, Size of the gap less than guiding piece between fence unit.
By above-mentioned technical proposal, fence prevents workman from being dropped from the edge of operating platform, plays a protective role.Fence list Be limited to inside fence for guiding piece movement by unit, and guiding piece can not possibly be by the gap between adjacent pens unit, so as to limit The position of operating platform.
Preferably, being equipped with cushion pad on the side wall of the support body.
By above-mentioned technical proposal, after steel wire rope is due to unexpected fracture, guiding piece be stuck in adjacent fence unit it Between.If pull rope is broken from middle part, operating platform completely will not be dropped, but led due to the effect of guiding piece from the air Messenger and guiding piece are held, and are hit to the side wall of support body, and cushion pad can play cushioning effect, the injured probability of people are reduced, to battalion Rescue and strive for more times.
Preferably, the inwall of the traction groove is provided with projection, projection is in wavy.
By above-mentioned technical proposal, the finger of workman is placed between wavy projection, can play anti-skidding effect, Improve the comfort for holding traction groove.
Preferably, being equipped with layer of silica gel on the outer wall of the guiding piece.
By above-mentioned technical proposal, layer of silica gel is made up of silica gel material, and with good tactile experience, level has pliability, It is indeformable.Being rinsed with clear water can recover clean, be easy to regular maintenance, improve the service life of guiding piece.
In sum, the utility model has the advantages that:The point of application is provided to workman's Mobile operating platform, more It is easy to hold pull rope, the Mobile operating platform that workman oneself station on the operational platform just can be voluntarily is easy to hold, will not be beaten It is sliding, it is easy to use.
Brief description of the drawings
Fig. 1 is the structural representation of construction hanging basket;
Fig. 2 is the partial structurtes enlarged diagram at A in Fig. 1;
Fig. 3 is to embody the schematic diagram of the card hardened structure of rope;
Fig. 4 is to embody the schematic diagram of guiding block structure;
Fig. 5 is partial schematic diagram when stirring check plate.
In figure, 1, support body;11st, steel wire rope;12nd, operating platform;121st, draw bar;122nd, link;2nd, pull rope;3rd, draw Block;31st, groove is drawn;32nd, it is raised;4th, sliding assembly;41st, sliding plate;42nd, slip hole;5th, stop assembly;51st, the first connection Plate;52nd, check plate;53rd, stop hole;54th, card rope plate;55th, the first elastic component;6th, guide assembly;61st, directing plate;62nd, guide Groove;63rd, bootstrap block;7th, fence unit;8th, cushion pad.
Specific embodiment
The utility model is described in further detail below in conjunction with accompanying drawing.Wherein identical parts identical accompanying drawing Mark is represented.It should be noted that the word "front", "rear" for being used in description below, "left", "right", "up" and "down" refer to It is the direction in accompanying drawing, word " bottom surface " and " top surface ", " interior " and " outward " are referred respectively to towards or away from particular elements geometry The direction at center.
A kind of construction hanging basket, as shown in figure 1, two groups are installed with support body 1 being parallel to each other and positioned at the steel of same level Cord 11, every group includes two adjacent steel wire ropes 11.Support body 1 is being installed with cushion pad 8 on the side wall of steel wire rope 11, delays Pad 8 is rushed to be made up of the material of the high resiliences such as sponge.The lower section of steel wire rope 11 is provided with operating platform 12, and operating platform 12 is in rectangular Shape platy structure, is provided with fence at the top surface edge of operating platform 12, fence includes the fence that some uniform intervals are set Unit 7.The draw bar 121 perpendicular to the surface of operating platform 12, draw bar 121 are installed with the upper surface corner of operating platform 12 Top be installed with link 122.Link 122 is enclosed within the outer wall of steel wire rope 11, and top and the steel wire rope 11 of the inwall of link 122 are supported Connect.Link 122 can drive operating platform 12 along the length of steel wire rope 11 along the length direction sliding motion of steel wire rope 11 Direction sliding motion.
Put down in operation and led through there is the pull rope 2 parallel with steel wire rope 11 on platform, the two ends of pull rope 2 are fixed in support body On 1.Pull rope 2 is located at the underface of position between two steel wire ropes 11, and through the gap fence unit 7.
With reference to Fig. 2, guiding piece 3 is provided with pull rope 2, guiding piece 3 is located at the inside of fence, is rectangle shape, greatly Gap between two adjacent pens units 7, guiding piece 3 cannot be flat to operation by the gap between adjacent pens unit 7 Play restriction effect in the position of platform 12.The layer of silica gel that silica gel material is made is installed with the outer wall of guiding piece 3.Set on guiding piece 3 Traction groove 31 is equipped with, wavy some raised 32 are installed with the inwall for drawing groove 31, be easy to hold, prevent from skidding.
As shown in figure 3, being provided with sliding assembly 4 between guiding piece 3 and pull rope 2 so that guiding piece 3 can be along traction The length direction sliding of rope 2.It is additionally provided with stop assembly 5 so that guiding piece 3 can keep fixing on pull rope 2.
Sliding assembly 4 includes the sliding plate 41 being installed on guiding piece 3, and sliding plate 41 is rectangle, is set on sliding plate 41 Slip hole 42 is equipped with, the inwall of slip hole 42 is adapted with the outer wall of pull rope 2 so that pull rope 2 can freely pass through.Make Obtaining guiding piece 3 can be along the length direction sliding motion of pull rope 2.
As shown in Fig. 2 stop assembly 5 includes the first connecting plate 51 being installed on guiding piece 3, the first connecting plate 51 is vertical In sliding plate 41 along the length direction of pull rope 2 side wall.Stop is connected by the first elastic component 55 on the first connecting plate 51 Plate 52, the first connector is spring, the length direction of the length direction of spring perpendicular to pull rope 2.
As shown in figure 3, sliding plate 41 sets on the side wall of the first connecting plate 51, is installed with card near the edge of sliding eye Rope plate 54.The stop hole 53 with diameter greater than the diameter of slip hole 42 is provided with check plate 52, card rope plate 54 is stretched into stop hole 53. Pull rope 2 is located at stop hole 53 and is enclosed away from the side wall of the first connecting plate 51 with card rope plate 54 away from the inwall of the first connecting plate 51 Into region in.First connector pulls check plate 52 to the direction near the first connecting plate 51 so that pull rope 2 is stuck in Between stop hole 53 and card rope plate 54, remain stationary as.
With reference to Fig. 4, guide assembly 6 is provided between check plate 52 and sliding plate 41.Guide assembly 6 includes being installed in cunning The guiding groove 62 moved on plate 41, the length direction of guiding groove 62 is vertical with the length direction of pull rope 2.It is provided with guiding groove 62 The bootstrap block 63 being adapted.Bootstrap block 63 is fixedly connected with the side wall of check plate 52.When check plate 52 is to away from the first connector Direction sliding motion when, bootstrap block 63 is on guiding groove 62 along the length direction sliding motion of guiding groove 62 so that stop What plate 52 was moved more stablizes.
As shown in figure 5, after check plate 52 is moved to the direction away from the first connecting plate 51, due to the position of card rope plate 54 Maintain static, check plate 52 drives stop hole 53 to be moved to the direction away from the first connecting plate 51, and stop hole 53 connects away from first The region increase that the side wall of fishplate bar 51 is enclosed with card rope plate 54, pull rope 2 can freely pass through.Workman be free to The position of mobile guiding piece 3 on pull rope 2.After the position of guiding piece 3 is moved into defined location, check plate 52 is unclamped, In the pulling force effect of the first elastic component 55, check plate 52 drives stop hole 53 to return to original position, and pull rope 2 is by pressure tightly Between stop hole 53 and card rope plate 54.The position of guiding piece 3 is fixed.
Wherein, during construction, guiding piece 3 is fixed on pull rope 2, and workman is stood on operating platform 12, and traction is dragged by hand Block 3, the sliding motion on steel wire rope 11 of link 122 drives the sliding motion of operating platform 12, until the movement famous dictum of operating platform 12 Think position.Stir handle part so that guiding piece 3 can be moved on pull rope 2, after guiding piece 3 is moved into corresponding position, Handle part is unclamped again, and guiding piece 3 continues the state for recovering to be fixed on pull rope 2.Workman can continue through and drop guiding piece 3 To change the position of operating platform 12.It is convenient and swift.
This specific embodiment is only that, to explanation of the present utility model, it is not to limitation of the present utility model, ability Field technique personnel can make the modification without creative contribution to the present embodiment as needed after this specification is read, but As long as all being protected by Patent Law in right of the present utility model.

Claims (10)

1. a kind of construction hanging basket, it is characterised in that:At least two steel wire ropes (11), steel wire rope are installed between support body (1) (11) operating platform (12) is provided with, be provided between operating platform (12) and steel wire rope (11) for operating platform (12) along Steel wire rope (11) slide assemblies, are provided with the pull rope (2) parallel with steel wire rope (11) between support body (1), pull rope sets on (2) Guiding piece (3) is equipped with, sliding assembly (4) is provided between guiding piece (3) and pull rope (2), sliding assembly is provided with only on (4) Dynamic component (5), is provided with the traction groove (31) held for staff on the guiding piece (3).
2. construction hanging basket according to claim 1, it is characterised in that:Draw bar is provided with operating platform (12) corner (121), the slide assemblies include being installed in the link (122) at the top of draw bar (121), the inwall and steel wire of link (122) The outer wall of (11) of restricting is adapted, and link (122) is set in the outside of steel wire rope (11) and can be along steel wire rope (11) sliding motion.
3. construction hanging basket according to claim 1, it is characterised in that:The sliding assembly (4) is including being installed in guiding piece (3) sliding plate (41) is installed with, the slip hole (42) for pull rope (2) sliding is provided with sliding plate (41).
4. construction hanging basket according to claim 3, it is characterised in that:Stop assembly (5) is including being installed in sliding plate (41) On the first connecting plate (51), the check plate (52) parallel with sliding plate (41), check plate are provided with the first connecting plate (51) (52) stop hole (53) passed through for pull rope (2) sliding is provided with, is provided with stop hole (53) solid with sliding plate (41) Card rope plate (54) for connecing, is provided with the first elastic component (55), the first elastic component between check plate (52) and the first connecting plate (51) (55) it is supplied to check plate (52) to the close pulling force of the first connecting plate (51), pulling force causes stop hole (53) by pull rope (2) Card is pressed in restrict on plate (54).
5. construction hanging basket according to claim 4, it is characterised in that:It is provided between check plate (52) and sliding plate (41) Sliding assembly (4) for guiding check plate (52) glide direction, guide assembly (6) is including being installed in drawing on sliding plate (41) Guide plate (61), offers guiding groove (62) on directing plate (61), be installed with the side wall of check plate (52) and guiding groove (62) phase The bootstrap block (63) of adaptation.
6. construction hanging basket according to claim 1, it is characterised in that:Between the operating platform (12) and guiding piece (3) The mobile limit assembly of restricted guiding piece (3) is set.
7. construction hanging basket according to claim 6, it is characterised in that:The limit assembly includes being installed in operating platform (12) fence at edge, fence includes some fence units (7), chi of the gap between fence unit (7) less than guiding piece (3) It is very little.
8. construction hanging basket according to claim 1, it is characterised in that:Cushion pad is equipped with the side wall of the support body (1) (8)。
9. construction hanging basket according to claim 1, it is characterised in that:The inwall of traction groove (31) is provided with projection (32), raised (32) are in wavy.
10. construction hanging basket according to claim 1, it is characterised in that:Silica gel is equipped with the outer wall of the guiding piece (3) Layer.
CN201621423027.2U 2016-12-23 2016-12-23 A kind of construction hanging basket Expired - Fee Related CN206308997U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621423027.2U CN206308997U (en) 2016-12-23 2016-12-23 A kind of construction hanging basket

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621423027.2U CN206308997U (en) 2016-12-23 2016-12-23 A kind of construction hanging basket

Publications (1)

Publication Number Publication Date
CN206308997U true CN206308997U (en) 2017-07-07

Family

ID=59245725

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621423027.2U Expired - Fee Related CN206308997U (en) 2016-12-23 2016-12-23 A kind of construction hanging basket

Country Status (1)

Country Link
CN (1) CN206308997U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108487267A (en) * 2018-06-04 2018-09-04 山东交通学院 A kind of roadbed side slope laying device
CN109778713A (en) * 2019-03-25 2019-05-21 中铁五局集团建筑工程有限责任公司 A kind of steel truss girder bridge scene suspension and slipping assembly device and method
CN110469102A (en) * 2019-09-10 2019-11-19 江苏南通二建集团有限公司 A kind of high-altitude combined steel beam installs the operating platform and its construction method
CN113882651A (en) * 2021-10-19 2022-01-04 山东滕建建设集团有限公司 Hanging flower basket fixing device for construction of building outer wall

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108487267A (en) * 2018-06-04 2018-09-04 山东交通学院 A kind of roadbed side slope laying device
CN109778713A (en) * 2019-03-25 2019-05-21 中铁五局集团建筑工程有限责任公司 A kind of steel truss girder bridge scene suspension and slipping assembly device and method
CN110469102A (en) * 2019-09-10 2019-11-19 江苏南通二建集团有限公司 A kind of high-altitude combined steel beam installs the operating platform and its construction method
CN110469102B (en) * 2019-09-10 2024-05-07 江苏南通二建集团有限公司 High-altitude combined steel beam member installation operation platform and construction method thereof
CN113882651A (en) * 2021-10-19 2022-01-04 山东滕建建设集团有限公司 Hanging flower basket fixing device for construction of building outer wall

Similar Documents

Publication Publication Date Title
CN206308997U (en) A kind of construction hanging basket
CN203922264U (en) A kind of automatic horizontal wire draw drum
CN206308998U (en) Without scaffold hanging basket
CN2553834Y (en) Self-control lifesaving back pack
CN206801423U (en) A kind of coiling type awning curtains
CN206308999U (en) Construction hanging basket
CN201676421U (en) Hook threading device for steel wire rope
CN206023046U (en) Aerial condutor pulley block
CN206513007U (en) A kind of external inclined type nacelle construction device
CN205637628U (en) Hoist and mount construction structures of aerial vestibule furred ceiling
CN206299107U (en) Without scaffold hanging basket
CN203253070U (en) Escape device capable of carrying out decelerating downward sliding
CN205346492U (en) Slot drum type winding machine with dust collector
CN210674068U (en) Suspension type heptafluoropropane extinguishing device
CN209084372U (en) A kind of network communication device of disassembly easy to remove
CN205763499U (en) Manual type safety guide rail is used in a kind of rail processing
CN204738733U (en) Laborsaving insulating slide
CN208243931U (en) A kind of portable fast escaping device
CN204210996U (en) Ornament materials is vertical, horizontal transporter
CN2820222Y (en) Self speed limiting high building life saving cable
CN205730002U (en) A kind of rope reducer structure of high-rise circulation escape device
CN205410488U (en) Portable high low insulation bench
CN221346264U (en) Novel hanging basket for building construction
CN107575155A (en) A kind of electric power first-aid ladder
CN204293770U (en) Shoulder joint rehabiliation apparatus

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170707

Termination date: 20181223