CN206289969U - Mark time template - Google Patents

Mark time template Download PDF

Info

Publication number
CN206289969U
CN206289969U CN201621363741.7U CN201621363741U CN206289969U CN 206289969 U CN206289969 U CN 206289969U CN 201621363741 U CN201621363741 U CN 201621363741U CN 206289969 U CN206289969 U CN 206289969U
Authority
CN
China
Prior art keywords
block
time
body part
marking time
board body
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201621363741.7U
Other languages
Chinese (zh)
Inventor
蔡成军
盛军
李小泉
韩绍州
刘明
边洋
黄澎
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Electric Power Engineering Co Ltd
State Grid Corp of China SGCC
State Grid Beijing Electric Power Co Ltd
Original Assignee
BEIJING POWER ENGINEERING Co
State Grid Corp of China SGCC
State Grid Beijing Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by BEIJING POWER ENGINEERING Co, State Grid Corp of China SGCC, State Grid Beijing Electric Power Co Ltd filed Critical BEIJING POWER ENGINEERING Co
Priority to CN201621363741.7U priority Critical patent/CN206289969U/en
Application granted granted Critical
Publication of CN206289969U publication Critical patent/CN206289969U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model is marked time template there is provided one kind, including:Multiple is marked time block, and multiple blocks of marking time splice successively along the circumference of the borehole wall, two neighboring block grafting of marking time;Multiple fastening assemblies, two adjacent with each block connections of marking time of each fastening assembly, so that each two adjacent block of marking time is fastenedly connected.Template of marking time of the present utility model solves the problems, such as that the mode for installing template of marking time in the prior art is less efficient.

Description

Mark time template
Technical field
The utility model is related to well room to build field by laying bricks or stones, is marked time template in particular to one kind.
Background technology
At present, when traditional handicraft is constructed, when the type concrete walling of pouring is marked time, it is necessary in borehole wall supporting module.In well When room is built by laying bricks or stones, should synchronously install and mark time, position should be accurate, mark time after installation, regulation is not reached in masonry mortar or concrete Must not be trampled before compression strength.Being marked time for concrete walling installed when prefabricated or cast-in-place.
However, the mode of supporting module of the prior art has tedious process, lost labor and material, construction period It is long, need many work posts to coordinate the problem for completing construction etc., i.e., supporting module of the prior art it is less efficient.
Utility model content
Main purpose of the present utility model is to provide one kind to mark time template, to solve to install template of marking time in the prior art The less efficient problem of mode.
To achieve these goals, according to one side of the present utility model, there is provided one kind is marked time template, including:It is many Individual block of marking time, multiple blocks of marking time splice successively along the circumference of the borehole wall, two neighboring block grafting of marking time;Multiple fastening assemblies, each Two adjacent with each block connections of marking time of fastening assembly, so that each two adjacent block of marking time is fastenedly connected.
Further, template of marking time has an accommodating chamber, and accommodating chamber is spliced by multiple block of marking time.
Further, accommodating chamber is rectangular opening.
Further, multiple block of marking time includes:First block and second of marking time is marked time block, and the second first end for marking time block is plugged In the first first end for marking time block, first marks time block and the second junction for marking time block is provided with fastening assembly.
Further, first block is marked time and the second cross section for marking time block is the reeded U-shaped of tool, the second block of marking time is inserted Be located at first mark time block groove in.
Further, first block is marked time with the first board body part, the second board body part and connection the first board body part and second 3rd board body part of board body part, the first board body part, the second board body part and the 3rd board body part surround U-shaped structure.
Further, second block is marked time with the 4th board body part, the 5th board body part and connection the 4th board body part and the 5th 6th board body part of board body part, the 4th board body part, the 5th board body part and the 6th board body part constitute U-shaped structure.
Further, the second one end insertion first for marking time block mark time block groove in, the 4th board body part and the first plate body Portion is fitted, and the 5th board body part is fitted with the second board body part, and the 6th board body part is fitted with the 3rd board body part.
Further, fastening assembly includes the first fastener and the second fastener, and the first fastener is supported with the first board body part Connect, the second fastener is arranged on and is abutted with the 4th board body part.
Further, first block is marked time and the second block of marking time is L-shaped bar, first the first bar segment of block and second of marking time is stepped on Walk block the first bar segment grafting, first mark time the second bar segment of block and second mark time block the second bar segment direction it is identical.
Further, multiple block of marking time also is marked time block including the 3rd block and the 4th of marking time, the 3rd mark time block first end with First the second bar segment grafting for marking time block, the 3rd marks time the second end of block and the 4th first end grafting for marking time block, and the 4th marks time The second bar segment grafting that block is marked time in second end of block with second.
Further, the 3rd block is marked time and the 4th block of marking time is L-type bar, the 3rd the first bar segment of block and first of marking time is stepped on Walk the second bar segment grafting of block, the 3rd marks time the second bar segment of block and the 4th the first bar segment grafting for marking time block, the 4th marks time block The the second bar segment grafting of marking time block with second of the second bar segment.
Template of marking time of the present utility model realizes the making of template of marking time by multiple blocks of marking time with multiple fastening assemblies, Wherein, multiple blocks of marking time splice successively along the circumference of the borehole wall, two neighboring block grafting of marking time, and make fastening assembly with adjacent two Individual block of marking time is all connected with, and two blocks of marking time that each can be made adjacent are fastenedly connected, so as to quickly complete template of marking time Make, solve the problems, such as that the mode for installing template of marking time in the prior art is less efficient.
Brief description of the drawings
The Figure of description for constituting the part of the application is used for providing being further understood to of the present utility model, this practicality New schematic description and description is used to explain the utility model, does not constitute to improper restriction of the present utility model. In the accompanying drawings:
Fig. 1 shows the structural representation of the block of marking time according to template of marking time of the present utility model;
Fig. 2 shows the splicing schematic diagram of the block of marking time according to template of marking time of the present utility model;
Fig. 3 shows the assembling schematic diagram of the block of marking time according to template of marking time of the present utility model;And
Fig. 4 shows the partial cutaway schematic of the block of marking time according to template of marking time of the present utility model.
Wherein, above-mentioned accompanying drawing is marked including the following drawings:
10th, fastening assembly;11st, the first fastener;12nd, the second fastener;20th, first mark time block;30th, second mark time block; 40th, the 3rd mark time block;50th, the 4th mark time block.
Specific embodiment
It should be noted that in the case where not conflicting, the feature in embodiment and embodiment in the application can phase Mutually combination.Describe the utility model in detail below with reference to the accompanying drawings and in conjunction with the embodiments.
The utility model is marked time template there is provided one kind, refer to Fig. 1 to Fig. 4, and template of marking time includes:Multiple is marked time block, Multiple block of marking time splices successively along the circumference of the borehole wall, two neighboring block grafting of marking time;Multiple fastening assemblies 10, multiple is marked time block, Multiple block of marking time splices successively along the circumference of the borehole wall, two neighboring block grafting of marking time;Multiple fastening assemblies 10, each fastening assembly 10 adjacent with each two block connections of marking time, so that each two adjacent block of marking time is fastenedly connected.
Template of marking time of the present utility model realizes the system of template of marking time by multiple blocks of marking time with multiple fastening assemblies 10 Make, wherein, multiple blocks of marking time splice successively along the circumference of the borehole wall, two neighboring block grafting of marking time, and make fastening assembly 10 and phase Two adjacent blocks of marking time are all connected with, and two blocks of marking time that each can be made adjacent are fastenedly connected, and are marked time so as to quickly complete The making of template, solves the problems, such as that the mode for installing template of marking time in the prior art is less efficient.
In order to meet use demand, as shown in figure 3, template of marking time has an accommodating chamber, accommodating chamber is spliced by multiple block of marking time Form.
Preferably, accommodating chamber is rectangular opening.
Specifically, as shown in Figure 2 and Figure 4, multiple block of marking time includes:First block 20 and second of marking time is marked time block 30, second Mark time block 30 first end be plugged in first mark time block 20 first end in, first marks time block 20 and the second connection for marking time block 30 Place is provided with fastening assembly 10.Block 20 by first is marked time by fastening assembly 10 and the second block 30 of marking time stably is connected.
In order to by second mark time block 30 be plugged in first mark time block 20 groove in, the first block 20 and second of marking time is marked time block 30 cross section is the reeded U-shaped of tool, second mark time block 30 be plugged in first mark time block 20 groove in.By by first Mark time block 20 and the second cross section for marking time block 30 is set to have reeded U-shaped, can cause that the second block 30 of marking time is plugged in First mark time block 20 groove in.
Preferably, first block 20 is marked time with the first board body part, the second board body part and connection the first board body part and second 3rd board body part of board body part, the first board body part, the second board body part and the 3rd board body part surround U-shaped structure.By by first Block 20 of marking time is set to the 3rd plate with the first board body part, the second board body part and the first board body part of connection and the second board body part Body portion, wherein, the first board body part and the second board body part surround U-shaped structure, can be set to the cross section that first marks time block 20 Has reeded U-shaped.
Correspondingly, second block 30 is marked time with the 4th board body part, the 5th board body part and connection the 4th board body part and the 5th 6th board body part of board body part, the 4th board body part, the 5th board body part and the 6th board body part constitute U-shaped structure.Stepped on by by second Step block 30 is set to the 6th plate body with the 4th board body part, the 5th board body part and the 4th board body part of connection and the 5th board body part Portion, the 4th board body part, the 5th board body part and the 6th board body part constitute U-shaped structure, can set the cross section that second marks time block 30 It is set to the reeded U-shaped of tool.
For specific splicing, second mark time block 30 one end insertion first mark time block 20 groove in, the 4th plate Body portion is fitted with the first board body part, and the 5th board body part is fitted with the second board body part, and the 6th board body part is fitted with the 3rd board body part.
In order to ensure second one end for marking time block 30 be stably inserted into first mark time block 20 groove in, as shown in figure 4, tightly Gu component 10 includes the first fastener 11 and the second fastener 12, the first fastener 11 is abutted with the first board body part, the second fastening Part 12 is arranged on and is abutted with the 4th board body part.By being provided with the first fastener 11 in the first board body part, in the second board body part The second fastener 12 is provided with, wherein, the first fastener 11 is abutted with the first board body part, the second fastener 12 and the 4th board body part Abut, thus achieve by one end that second marks time block 30 be stably inserted into first mark time block 20 groove in.
Preferably, fastening assembly 10 also includes support, and support is U-shaped, and the first fastener 11 is arranged on a bar of support Duan Shang, the second fastener 12 is arranged in another bar segment of support.
The accommodating chamber with rectangular opening is spliced into order to pass through multiple blocks of marking time, the first block 20 and second of marking time is marked time Block 30 is L-shaped bar, and first marks time the first bar segment of block 20 and the second the first bar segment grafting for marking time block 30, and first marks time block 20 The second bar segment with second mark time block 30 the second bar segment direction it is identical.
Additionally, the 3rd cross section for marking time block 50 of block 40 and the 4th of marking time is the reeded U-shaped of tool.
Preferably, multiple block of marking time also is marked time block 50 including the 3rd block 40 and the 4th of marking time, and the 3rd marks time the first of block 40 The second bar segment grafting that block 20 is marked time in end with first, the 3rd mark time the second end of block 40 with the 4th mark time block 50 first end it is slotting Connect, the 4th marks time the second end of block 50 and the second the second bar segment grafting for marking time block 30.
In order to obtain complete template of marking time, the 3rd block 50 of marking time of block 40 and the 4th of marking time is L-type bar, and the 3rd marks time block The second bar segment grafting that 40 the first bar segment marks time block 20 with first, the 3rd the second bar segment of block 40 and the 4th of marking time is marked time block 50 The first bar segment grafting, the 4th marks time the second bar segment of block 50 and the second the second bar segment grafting for marking time block 30.
3rd marks time block 40 with the first plate section, the second plate section and connects the 3rd plate of the first plate section and the second plate section Section, the first plate section surrounds U-shaped structure with the second plate section and the 3rd plate section.
Correspondingly, the 4th mark time block 50 with the 4th plate section, the 5th plate section and connection the 4th plate section and the 5th plate section 6th plate section, the plates of the 4th plate Duan Yu five section and the 6th plate section surround U-shaped structure.
Preferably, first mark time the shape and size of block 20 and the 4th mark time block 50 shape and size it is identical, second steps on Walk block 30 shape and size and the 4th mark time block 50 shape and size it is identical.
Develop a kind of transformer station's borehole wall to mark time construction particular manufacturing craft, template when pouring of being marked time as transformer station's borehole wall makes It is pluggable flexible with, the template, realize that size is arbitrarily adjusted, meet the various boreholes wall of transformer station and mark time formwork demand.
Template of marking time of the present utility model is illustrated by specific embodiment:
Template of marking time of the present utility model is made up of the stainless steel channel-section steel of 2 groups of different sizes.The splicing rear pattern plate length of side is maximum Length is 2 meters, can form 4 ㎡ and mark time.Size specification template has the upper and lower 5mm spaces can to realize that template is pulled and pushed.Template splicing is completed Fixed using pressing method using fixing bolt afterwards, achievable template size is arbitrarily adjusted, it is any that this specification can meet transformer station The borehole wall is marked time size, is adapted to sizes requirement.
It is described as follows for specific component:
1st, borehole wall template is that the right angle stainless steel channel-section steel that 1060mm and 2 group of length of side is 1058.5mm is constituted by 2 groups of length of sides.Spell Rear pattern plate length of side maximum length is connect for 2 meters, 4 ㎡ can be formed and marked time.
2nd, using 2 groups of stainless steel materials of different size, stainless steel wall thickness is 1.5mm to template.Second marks time block 30 highly It is 100mm (including wall thickness) that first marks time the height of block 20 for 113mm.Size specification template has the upper and lower 5mm spaces can to realize template Pull and push.
3rd, after the completion of template splicing, fixed at 2 per side and reach template monolithic stability.
4th, fixing bolt is fixed using pressing method, and achievable template size is arbitrarily adjusted, and is adapted to various requirements.In template Maximum concrete square amount is 0.2m3, thickness is usually 10cm.Itself has resistance to overturning after the completion of splice type model sheetinstallat. Being fixed using " squash type " bolt can bear come the lateral pressure of self-template concrete completely.
5th, the splice type borehole wall marks time mould material from 1.5mm thickness stainless steel materials.
As can be seen from the above description, the utility model the above embodiments realize following technique effect:
Template of marking time of the present utility model realizes the system of template of marking time by multiple blocks of marking time with multiple fastening assemblies 10 Make, wherein, multiple blocks of marking time splice successively along the circumference of the borehole wall, two neighboring block grafting of marking time, and make fastening assembly 10 and phase Two adjacent blocks of marking time are all connected with, and two blocks of marking time that each can be made adjacent are fastenedly connected, and are marked time so as to quickly complete The making of template, solves the problems, such as that the mode for installing template of marking time in the prior art is less efficient.
Preferred embodiment of the present utility model is the foregoing is only, the utility model is not limited to, for this For the technical staff in field, the utility model can have various modifications and variations.It is all it is of the present utility model spirit and principle Within, any modification, equivalent substitution and improvements made etc. should be included within protection domain of the present utility model.

Claims (12)

1. one kind is marked time template, it is characterised in that including:
Multiple is marked time block, and multiple blocks of marking time splice successively along the circumference of the borehole wall, it is two neighboring described in mark time block grafting;
Multiple fastening assemblies (10), block connection of marking time described in adjacent with each two of each described fastening assembly (10), with The block that makes to be marked time described in each adjacent two is fastenedly connected.
2. template of marking time according to claim 1, it is characterised in that the template of marking time has accommodating chamber, the receiving Chamber block of being marked time as described in multiple is spliced.
3. template of marking time according to claim 2, it is characterised in that the accommodating chamber is rectangular opening.
4. template of marking time according to claim 1, it is characterised in that the multiple block of marking time includes:
First block (20) and second of marking time is marked time block (30), and the described second first end for marking time block (30) is plugged in described first and steps on In the first end of step block (20), described first mark time block (20) and the described second junction for marking time block (30) be provided with it is described tightly Gu component (10).
5. template of marking time according to claim 4, it is characterised in that the described first block (20) and described second of marking time is marked time The cross section of block (30) is the reeded U-shaped of tool, and the described second block (30) of marking time is plugged in described first and marks time block (20) In groove.
6. template of marking time according to claim 5, it is characterised in that described first marks time block (20) with the first plate body 3rd board body part in portion, the second board body part and connection first board body part and second board body part, first plate body Portion, second board body part and the 3rd board body part surround U-shaped structure.
7. template of marking time according to claim 6, it is characterised in that described second marks time block (30) with the 4th plate body 6th board body part in portion, the 5th board body part and connection the 4th board body part and the 5th board body part, the 4th plate body Portion, the 5th board body part and the 6th board body part constitute U-shaped structure.
8. template of marking time according to claim 7, it is characterised in that described second mark time block (30) one end insertion it is described First mark time block (20) groove in, the 4th board body part is fitted with first board body part, the 5th board body part and institute The laminating of the second board body part is stated, the 6th board body part is fitted with the 3rd board body part.
9. template of marking time according to claim 8, it is characterised in that the fastening assembly (10) includes the first fastener (11) and the second fastener (12), the first fastener (11) is abutted with first board body part, and the second fastener (12) is arranged on Abutted with the 4th board body part.
10. template of marking time according to claim 4, it is characterised in that the described first block (20) and described second of marking time is stepped on Step block (30) is L-shaped bar, and described first marks time the first bar segment of block (20) and the described second the first bar segment for marking time block (30) Grafting, described first mark time the second bar segment of block (20) and described second mark time block (30) the second bar segment direction it is identical.
11. templates of marking time according to claim 10, it is characterised in that the multiple block of marking time also is marked time block including the 3rd (40) marked time block (50) with the 4th, the described 3rd marks time the first end of block (40) and the described first the second bar segment for marking time block (20) Grafting, the described 3rd marks time the second end of block (40) and the described 4th first end grafting for marking time block (50), and the described 4th marks time The second bar segment grafting that block (30) is marked time in second end of block (50) with described second.
12. templates of marking time according to claim 11, it is characterised in that the described 3rd block (40) and the described 4th of marking time is stepped on Step block (50) is L-type bar, and the described 3rd marks time the first bar segment of block (40) and the described first the second bar segment for marking time block (20) Grafting, the described 3rd marks time the second bar segment of block (40) and the described 4th the first bar segment grafting for marking time block (50), the described 4th The second bar segment of block (50) of marking time and the described second the second bar segment grafting for marking time block (30).
CN201621363741.7U 2016-12-12 2016-12-12 Mark time template Active CN206289969U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621363741.7U CN206289969U (en) 2016-12-12 2016-12-12 Mark time template

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621363741.7U CN206289969U (en) 2016-12-12 2016-12-12 Mark time template

Publications (1)

Publication Number Publication Date
CN206289969U true CN206289969U (en) 2017-06-30

Family

ID=59098328

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621363741.7U Active CN206289969U (en) 2016-12-12 2016-12-12 Mark time template

Country Status (1)

Country Link
CN (1) CN206289969U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109518949A (en) * 2018-11-22 2019-03-26 董佑军 A kind of working pouring frame fixed form structure of civil construction project

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109518949A (en) * 2018-11-22 2019-03-26 董佑军 A kind of working pouring frame fixed form structure of civil construction project

Similar Documents

Publication Publication Date Title
US7415805B2 (en) Wall system with masonry external surface and associated method
US8893450B2 (en) Methods and devices for making a building block for mortar-free construction
US10273698B2 (en) Connector for form boards and system for cast construction
CN105696817A (en) Multilayer cold-formed steel integrally prefabricated house and splicing method thereof
US8955282B2 (en) Soloarmar construction engineering system
CN207392526U (en) A kind of concrete light hollow wall panel connection structure
CN211549117U (en) Assembled enclosure
CN112081372A (en) Reinforcing device and reinforcing method for construction column template at right angle position
CN203729489U (en) Precast reinforced concrete members and assembled buildings composed of precast reinforced concrete members
CN102535495A (en) U-shaped groove base for prefabricated building and construction method thereof
CN206289969U (en) Mark time template
CN102791934A (en) Building elements and building system using such elements
CN210233414U (en) Door opening mold for prefabricated wallboard
CN105970995A (en) Bearing platform mold
CN215978040U (en) Prefabricated decoration insulation construction integration wallboard unit and connection structure thereof
CN214329246U (en) High-rise assembled house convenient to disassemble and assemble
CN211472963U (en) Connecting structure of cast-in-situ hidden column and prefabricated part
CN211286252U (en) Tenon-and-mortise type stone expansion wall block and combined wall thereof
CN108824819B (en) Modular building structure building system
CN207110119U (en) A kind of swollen stone walling plate of assembled
CN112746630A (en) Open cut method rail transit station engineering prefabricated assembly type structure and construction method
ITVE20090027A1 (en) PANEL IN LOW DENSITY POLYMER MATERIAL SELF-SUPPORTING FOR THE CONSTRUCTION OF WALLS AND ITS PROCEDURE.
CN111502038A (en) Assembly type PC building structure and construction method thereof
CN101892750B (en) Integral house constructed by building blocks and constructing method thereof
CN217897287U (en) Constructional column template system for synchronous construction of external wall constructional column and main body

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder

Address after: 100031 Beijing Qianmen West Street, Xicheng District, No. 41

Co-patentee after: State Grid Corporation of China

Patentee after: State Grid Beijing Electric Power Company

Co-patentee after: Beijing Electric Power Engineering Co., Ltd.

Address before: 100031 Beijing Qianmen West Street, Xicheng District, No. 41

Co-patentee before: State Grid Corporation of China

Patentee before: State Grid Beijing Electric Power Company

Co-patentee before: Beijing Power Engineering Company