CN109518949A - A kind of working pouring frame fixed form structure of civil construction project - Google Patents
A kind of working pouring frame fixed form structure of civil construction project Download PDFInfo
- Publication number
- CN109518949A CN109518949A CN201811394992.5A CN201811394992A CN109518949A CN 109518949 A CN109518949 A CN 109518949A CN 201811394992 A CN201811394992 A CN 201811394992A CN 109518949 A CN109518949 A CN 109518949A
- Authority
- CN
- China
- Prior art keywords
- connection component
- frame
- crossbeam column
- working
- construction project
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000010276 construction Methods 0.000 claims abstract description 16
- 238000010586 diagram Methods 0.000 description 5
- 238000009415 formwork Methods 0.000 description 4
- 238000009434 installation Methods 0.000 description 3
- 239000007787 solid Substances 0.000 description 3
- 230000009286 beneficial effect Effects 0.000 description 2
- 238000000034 method Methods 0.000 description 2
- 238000009435 building construction Methods 0.000 description 1
- 238000005266 casting Methods 0.000 description 1
- 238000005553 drilling Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 239000002699 waste material Substances 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G13/00—Falsework, forms, or shutterings for particular parts of buildings, e.g. stairs, steps, cornices, balconies foundations, sills
- E04G13/02—Falsework, forms, or shutterings for particular parts of buildings, e.g. stairs, steps, cornices, balconies foundations, sills for columns or like pillars; Special tying or clamping means therefor
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G13/00—Falsework, forms, or shutterings for particular parts of buildings, e.g. stairs, steps, cornices, balconies foundations, sills
- E04G13/02—Falsework, forms, or shutterings for particular parts of buildings, e.g. stairs, steps, cornices, balconies foundations, sills for columns or like pillars; Special tying or clamping means therefor
- E04G13/023—Falsework, forms, or shutterings for particular parts of buildings, e.g. stairs, steps, cornices, balconies foundations, sills for columns or like pillars; Special tying or clamping means therefor with means for modifying the sectional dimensions
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Moulds, Cores, Or Mandrels (AREA)
Abstract
The present invention provides a kind of working pouring frame fixed form structure of civil construction project, including multiple template, multiple templates surround cylindrical cavity to be poured, multiple templates are connected by connection component, it is equipped on the outside of multiple connection components and adjusts frame, the adjusting frame is connect by multiple threaded components with the connection component, multiple template is plugged into the U-shaped inserting groove of the connection component of L-type, Internal baffle is snapped fit onto groove, first it is fixedly connected, frame will be adjusted simultaneously to be connected on multiple threaded rods of connection component simultaneously by multiple clamping grooves one and multiple clamping grooves two, and it is locked by locking nut to frame is adjusted, latch segment is under the locking of locking nut, connection component is fixedly connected, prevent template from shifting or being not connected firmly phenomenon;It adjusts frame to cooperate by the inserting groove on the grafting block and crossbeam column two on crossbeam column one, the size Telescopic for adjusting frame may be implemented.
Description
Technical field
The present invention relates to the realm of building construction, and in particular to it is solid for a kind of working pouring frame of civil construction project
Solid plate structure.
Background technique
It pours, refers to it is the materials such as mixed mud to be poured into mould predetermined body is made, in civil construction project to make
With a process in construction projects.The product being prefabricated by this form is formwork for placing.
Formwork for placing is a kind of temporary supporting structure, is made by design requirement, tramples mixed mud structure, hook by defined
Position, geometric dimension forming, keep correct position, and bear the external load of formwork for placing self weight and effect on it.It is cast-in-place
The working formwork for placing structure of concrete structure engineering, mainly by panel, support construction and connector three parts composition.
Template is inconvenient when fixed when traditional top beam pours, and nail or screw through walls is mostly used to carry out template greatly
Fixed, the fixed mass of template is poor, and structural integrity is poor;And one is integrally formed not flexible tune for existing fixed frame
Section, changes the size of frame;One is the frames that multiple beam rails are formed by overlapping, it is difficult to guarantee the stability of frame, and install
Disassembly is more troublesome, and be easy to cause security risk.
Summary of the invention
The purpose of the present invention is to provide a kind of working pouring frame fixed form structures of civil construction project, have solved
Certainly template fixed mass is poor in the prior art, and structural integrity is poor, and fixed frame is difficult to telescopic adjustment, and replacement disassembly is more numb
Tired problem.
To achieve the above object, the invention provides the following technical scheme: a kind of civil construction project is working to pour frame
Frame fixed form structure, including multiple template, multiple templates surround cylindrical cavity to be poured, and multiple templates are logical
Connection component connection is crossed, is equipped on the outside of multiple connection components and adjusts frame, the adjusting frame passes through multiple threaded components
It is connect with the connection component, the threaded components are arranged on the connection component.
Preferably, the connection component is L font, and two vertical side side lengths of the connection component are equal, described
The two sides of connection component, which are opened, is equipped with U-shaped inserting groove, and the notch of two U-shaped inserting grooves is equal in magnitude, and two described U-shaped
The two sides of inserting groove are divided into outer baffle and Internal baffle.
Preferably, threaded components are equipped on two outer baffles, the threaded components include latch segment, the locking
Block sliding is located in the sliding groove of outer baffle, and the outer end of the latch segment is fixedly connected with threaded rod, is arranged on the threaded rod
There is baffle, the baffle is arranged on the threaded rod by locking nut.
Preferably, the adjusting frame includes crossbeam column one and crossbeam column two, and the crossbeam column one passes through the grafting of grafting block
Into crossbeam column two, the grafting block is fixed by tie down screw and is locked by the crossbeam column two.
Preferably, multiple clamping grooves one, multiple clamping grooves one and the spiral shell are uniformly provided on the crossbeam column one
The threaded rod of line component is clamped, and one both ends of crossbeam column are respectively and fixedly provided with grafting block, offer multiple lockings on the grafting block
Hole, multiple locking holes and the tie down screw cooperate.
Preferably, multiple clamping grooves two, multiple clamping grooves two and the spiral shell are uniformly provided on the crossbeam column two
The threaded rod of line component is clamped, and the both ends of the crossbeam column two are uniformly provided with multiple inserting grooves, and the inserting groove is inserted with described
Block corresponding matching grafting is connect, the both ends of the crossbeam column two are fixed with nut, and the nut thread is connected with tie down screw, institute
The two sides for stating inserting groove offer tapped through hole, and the tie down screw passes through the tapped through hole and is locked in the locking hole.
Preferably, open up fluted in multiple templates, the Internal baffle of the connection component is located in the groove, institute
The outer surface of the inner surface and the template of stating outer baffle fits closely, and the adjusting frame is locked at by locking nut fixation
On the outer baffle of the connection component.
Compared with prior art, beneficial effects of the present invention: multiple template is plugged into the U-shaped grafting of the connection component of L-type
In slot, Internal baffle is snapped fit onto groove, is first fixedly connected, while frame will be adjusted and pass through multiple clamping grooves one and multiple
Clamping groove two is connected on multiple threaded rods of connection component simultaneously, and is locked by locking nut to frame is adjusted, and is locked
Tight block is fixedly connected connection component under the locking of locking nut, prevents template from shifting or being not connected firmly now
As;It adjusts frame to cooperate by the inserting groove on the grafting block and crossbeam column two on crossbeam column one, may be implemented to adjust frame
Size Telescopic, while passing through the cooperation of tie down screw and multiple locking holes, crossbeam column one can be fixed on crossbeam column two
On, convenient for the size telescopic adjustment of frame, suitable for pouring frame column of different sizes, frame is adjusted by loosening locking nut
It can directly be removed from connection component, convenient for adjusting the disassembly installation of frame entirety.
It is to be understood that above-mentioned general description and following specific embodiments are merely illustrative and illustrative, not
The range of the invention to be advocated can be limited.
Detailed description of the invention
Following attached drawing is part of specification of the invention, depicts example embodiments of the present invention, appended attached
Figure is used to illustrate the principle of the present invention together with the description of specification.
Fig. 1 is schematic perspective view of the invention;
Fig. 2 is structural schematic diagram of the invention;
Fig. 3 is the structural schematic diagram of adjusting frame of the invention;
Fig. 4 is the structural schematic diagram of connection component of the invention;
Fig. 5 is the partial enlarged view of A of the invention;
Fig. 6 is the structural schematic diagram of crossbeam column one of the invention;
Fig. 7 is the structural schematic diagram of crossbeam column two of the invention.
Description of symbols:
1- template, 11- groove, 2- connection component, 21- outer baffle, 22-U type inserting groove, 23- Internal baffle, 24- sliding groove, 25-
Threaded components, 25a- latch segment, 25b- threaded rod, 25c- baffle, 25d- locking nut, 3- adjusting frame, 4- crossbeam column one,
41- clamping groove, 42- grafting block, 43- locking hole, 5- crossbeam column two, 51- clamping groove two, 52- inserting groove, 53- tapped through hole,
54- nut, 55- tie down screw, 6- cavity.
Specific embodiment
The existing various exemplary embodiment that the present invention will be described in detail, the detailed description are not considered as to limit of the invention
System, and it is understood as the more detailed description to certain aspects of the invention, characteristic and embodiment.
Without departing substantially from the scope or spirit of the invention, the specific embodiment of description of the invention can be done more
Kind improvements and changes, this will be apparent to those skilled in the art.Other realities obtained by specification of the invention
Applying mode for technical personnel is apparent obtain.Present specification and embodiment are merely exemplary.
Refering to shown in attached drawing 1-7, it is hardened that the present invention provides a kind of working pouring frame stent of civil construction project
Structure, including multiple template 1, multiple templates 1 surround cylindrical cavity 6 to be poured, and multiple templates 1 pass through connection group
Part 2 connects, and is equipped on the outside of multiple connection components 2 and adjusts frame 3, the adjustings frame 3 by multiple threaded components 25 and
The connection component 2 connects, and the threaded components 25 are arranged on the connection component 2.
In the present embodiment, refering to attached drawing 4, the connection component 2 is L font, and the two of the connection component 2 are vertical
Side side length is equal, and the two sides of the connection component 2, which are opened, is equipped with U-shaped inserting groove 22, the slot of two U-shaped inserting grooves 22
Mouth is equal in magnitude, and the two sides of two U-shaped inserting grooves 22 are divided into outer baffle 21 and Internal baffle 23, when building, adjacent two
Template 1 is plugged into U-shaped inserting groove 22, and Internal baffle 23 is located in the groove of template 1, and connection component 2 offsets two pieces of templates
Splicing, avoids the occurrence of spillage or template connects unstable phenomenon when preventing from pouring.
In the present embodiment, refering to attached drawing 2,4, threaded components 25, the screw thread are equipped on two outer baffles 21
Component 25 includes latch segment 25a, and the sliding of latch segment 25 is located in the sliding groove 24 of outer baffle 21, the latch segment 25a's
Outer end is fixedly connected with threaded rod 25b, and baffle 25c is arranged on the threaded rod 25b, and the baffle 25c passes through locking nut
25d is arranged on the threaded rod 25b.
In the present embodiment, refering to attached drawing 1,2,3, the adjusting frame 3 includes crossbeam column 1 and crossbeam column 25, described
Crossbeam column 1 is plugged into crossbeam column 25 by grafting block 42, and the crossbeam column 25 passes through tie down screw 55 for the grafting
The fixed locking of block 42.
In the present embodiment, refering to attached drawing 1,3,6, multiple clamping grooves 1 are uniformly provided on the crossbeam column 1, it is more
A clamping groove 1 and the threaded rod 25b of the threaded components 25 are clamped, and one 4 both ends of crossbeam column are respectively and fixedly provided with grafting
Block 42, multiple locking holes 43 are offered on the grafting block 42, and multiple locking holes 43 cooperate with the tie down screw 55.
In the present embodiment, refering to attached drawing 1,3,5,7, multiple clamping grooves 2 51 are uniformly provided on the crossbeam column 25,
Multiple clamping grooves 2 51 and the threaded rod 25b of the threaded components 25 are clamped, and the both ends of the crossbeam column 25 uniformly open up
There are multiple inserting grooves 52, the inserting groove 52 and the 42 corresponding matching grafting of grafting block, the both ends of the crossbeam column 25 are solid
Surely there is nut 54, the nut 54 is threaded with tie down screw 55, and the two sides of the inserting groove 52 offer tapped through hole 53,
The tie down screw 55 passes through the tapped through hole 53 and is locked in the locking hole 43.
Adjust the assembling steps of frame 3:
A, the length and height for designing crossbeam column 1 and crossbeam column 25 as needed, take out two crossbeam columns 1 and two cross
Beam column 25 places 25 horizontal symmetrical of crossbeam column;
B, 25 both ends of crossbeam column are fixed with nut 54, and rotation lock screw rod 55 is located in inserting groove 52 by nut 54, inserting groove
52 can be opened up by way of drilling;
C, two crossbeam columns 1 are plugged into crossbeam by the correspondence of grafting block 42 at both ends by the size of frame size as needed
In the inserting groove 52 of column 25, the locking hole 43 on grafting block 42 is outside;
D, rotation lock screw rod 55 is plugged into locking hole 43 by tapped through hole 53 again, by crossbeam column 1 and crossbeam column two
It is fixedly connected, can not have to screw tie down screw 55 at this time, be easily installed on connection component 2.
In the present embodiment, refering to attached drawing 1,2, fluted 11 are opened up in multiple templates 1, the connection component 2
Internal baffle 23 is located in the groove 11, and the inner surface of the outer baffle 21 and the outer surface of the template 1 fit closely, described
Frame 3 is adjusted to be locked on the outer baffle 21 of the connection component 2 by locking nut 25d fixation.
Two pieces of adjacent templates 1: being passed through the cooperation of outer baffle 21 and Internal baffle 23 on L-type connection component 2 by working principle,
It is tentatively fixedly connected, avoids occurring spillage phenomenon in casting process, the adjusting frame 3 for setting size is socketed in more
The outer surface of the outer baffle 21 of a connection component 2, and by adjusting clamping groove 1 and the clamping of clamping groove 2 41 on frame 3
Onto the threaded rod 25b of outer baffle 21, in the cooperation by locking nut 25d and baffle 25c on threaded rod 25b, will adjust
Frame 3 is locked, and the latch segment 25a on threaded rod 25b is arranged under the fastening of locking nut 25d, can be enhanced
Connection component 2 when preventing from pouring, generates loose phenomenon to the connective stability of template 1;The adjustable adjusting of operator simultaneously
55 pairs of adjusting frames 3 of tie down screw on frame 3 are further fixed, and spillage phenomenon is generated when avoiding pouring, is also convenient for simultaneously
The installation for adjusting frame 3, can be poured after being completed.
When form removal, operator loosens the tie down screw 55 at 25 both ends of crossbeam column, and tie down screw 55 is made to be detached from locking
Hole 43 does not need to take out tie down screw 55, convenient for the placement of tie down screw 55, subsequent operation is facilitated to use, while spiral shell
Line through-hole 53 plays connection function to tie down screw 55, prevents tie down screw 55 from falling phenomenon, while with spanner by threaded rod 25b
On locking nut 25d unclamp, loosen to adjust frame 3 can be detached from threaded rod 25b, do not need to take locking nut 25d
Under, operator can remove the entire frame 3 that adjusts from template 1, keep adjusting frame 3 easy for assemble or unload in template 1
Fast.
In conclusion beneficial effects of the present invention: multiple template is plugged into the U-shaped inserting groove of the connection component of L-type, will
Internal baffle snaps fit onto groove, is first fixedly connected, while will adjust frame and pass through multiple clamping grooves one and multiple clamping grooves
Two are connected on multiple threaded rods of connection component simultaneously, and are locked by locking nut to frame is adjusted, and latch segment exists
Under the locking of locking nut, connection component is fixedly connected, prevents template from shifting or being not connected firmly phenomenon;It adjusts
Frame is cooperated by the inserting groove on the grafting block and crossbeam column two on crossbeam column one, and the size that may be implemented to adjust frame is flexible
Function, while passing through the cooperation of tie down screw and multiple locking holes, crossbeam column one can be fixed on crossbeam column two, be convenient for frame
The size telescopic adjustment of frame can be direct by loosening locking nut adjusting frame suitable for pouring frame column of different sizes
It is removed from connection component, convenient for adjusting the disassembly installation of frame entirety;
Operator loosens the tie down screw at two both ends of crossbeam column, so that tie down screw is detached from locking hole, does not need to lock
Tight screw rod takes out, and equally, is unclamped the locking nut on threaded rod with spanner, threaded rod can be detached from i.e. by loosening to adjusting frame
Can, it does not need to remove locking nut, convenient for the placement of tie down screw and locking nut, decrease because of locking nut or locking
The loss of screw rod leaves about, and causes unnecessary loss and waste, reduces the production cost of enterprise.
The foregoing is merely the schematical specific embodiments of the present invention, before not departing from conceptions and principles of the invention
It puts, the equivalent changes and modifications that any those skilled in the art is made should belong to the scope of protection of the invention.
Claims (7)
1. a kind of working pouring frame fixed form structure of civil construction project, including multiple template (1), multiple moulds
Plate (1) surrounds cylindrical cavity to be poured (6), which is characterized in that and multiple templates (1) are connected by connection component (2),
Be equipped on the outside of multiple connection components (2) and adjust frame (3), the adjustings frame (3) by multiple threaded components (25) and
Connection component (2) connection, the threaded components (25) are arranged on the connection component (2).
2. a kind of working pouring frame fixed form structure of civil construction project, feature exist according to claim 1
It is L font in, the connection component (2), and two vertical side side lengths of the connection component (2) are equal, the connection group
The two sides of part (2), which are opened, to be equipped with U-shaped inserting groove (22), and the notch of two U-shaped inserting grooves (22) is equal in magnitude, two institutes
The two sides for stating U-shaped inserting groove (22) are divided into outer baffle (21) and Internal baffle (23).
3. a kind of working pouring frame fixed form structure of civil construction project, feature exist according to claim 2
In being equipped with threaded components (25) on two outer baffles (21), the threaded components (25) include latch segment (25a), institute
It states latch segment (25a) sliding to be located in the sliding groove (24) of outer baffle (21), the outer end of the latch segment (25) is fixedly connected with
Threaded rod (25b) is arranged with baffle (25c) on the threaded rod (25b), and the baffle (25c) is set by locking nut (25d)
It sets on the threaded rod (25b).
4. a kind of working pouring frame fixed form structure of civil construction project, feature exist according to claim 1
In the adjusting frame (3) includes crossbeam column one (4) and crossbeam column two (5), and the crossbeam column one (4) passes through grafting block (42)
It is plugged into crossbeam column two (5), the grafting block (42) is fixed by tie down screw (55) and locked by the crossbeam column two (5).
5. a kind of working pouring frame fixed form structure of civil construction project, feature exist according to claim 4
In being uniformly provided with multiple clamping grooves one (41) on the crossbeam column one (4), multiple clamping grooves one (41) and the screw thread
The threaded rod (25b) of component (25) is clamped, and crossbeam column one (4) both ends are respectively and fixedly provided with grafting block (42), the grafting block
(42) it is offered on multiple locking holes (43), multiple locking holes (43) and the tie down screw (55) cooperate.
6. a kind of working pouring frame fixed form structure of civil construction project, feature exist according to claim 5
In being uniformly provided with multiple clamping grooves two (51) on the crossbeam column two (5), multiple clamping grooves two (51) and the screw thread
The threaded rod (25b) of component (25) is clamped, and the both ends of the crossbeam column two (5) are uniformly provided with multiple inserting grooves (52), described
Inserting groove (52) and grafting block (42) the corresponding matching grafting, the both ends of the crossbeam column two (5) are fixed with nut (54),
The nut (54) is threaded with tie down screw (55), and the two sides of the inserting groove (52) offer tapped through hole (53), institute
Tie down screw (55) are stated to be locked in the locking hole (43) across the tapped through hole (53).
7. a kind of working pouring frame fixed form structure of civil construction project, feature exist according to claim 3
In being opened up fluted (11) on multiple templates (1), the Internal baffle (23) of the connection component (2) is located at the groove
(11) in, the inner surface of the outer baffle (21) and the outer surface of the template (1) are fitted closely, and the adjusting frame (3) is logical
Locking nut (25d) fixation is crossed to be locked on the outer baffle (21) of the connection component (2).
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201811394992.5A CN109518949A (en) | 2018-11-22 | 2018-11-22 | A kind of working pouring frame fixed form structure of civil construction project |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201811394992.5A CN109518949A (en) | 2018-11-22 | 2018-11-22 | A kind of working pouring frame fixed form structure of civil construction project |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN109518949A true CN109518949A (en) | 2019-03-26 |
Family
ID=65778429
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201811394992.5A Pending CN109518949A (en) | 2018-11-22 | 2018-11-22 | A kind of working pouring frame fixed form structure of civil construction project |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN109518949A (en) |
Cited By (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN111038078A (en) * | 2019-12-12 | 2020-04-21 | 福建长城华兴玻璃有限公司 | Adjustable printing screen frame screen surface structure |
| CN112681740A (en) * | 2020-12-24 | 2021-04-20 | 岳敏 | Building steel formwork connecting assembly and forming processing method thereof |
| CN112982980A (en) * | 2021-03-05 | 2021-06-18 | 河南宏程工程建设有限责任公司 | Fixed template structure of pouring frame for construction engineering construction |
| CN113585090A (en) * | 2021-09-01 | 2021-11-02 | 江苏江海杭萧绿色建筑科技有限公司 | Support with assembled steel construction of easily dismantling |
| CN115162193A (en) * | 2022-08-03 | 2022-10-11 | 张海林 | Hanging basket construction bracket with shockproof function for high pier stud |
| CN120946091A (en) * | 2025-10-17 | 2025-11-14 | 中铁建工集团第五建设有限公司 | A formwork for in-situ casting of UHPC hollow columns |
Citations (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPH04277233A (en) * | 1991-03-01 | 1992-10-02 | Shimizu Corp | Column false part frame molding method and molding plate therefor |
| KR20050006598A (en) * | 2003-07-09 | 2005-01-17 | 조홍준 | Assembly type matrix made concrete for construction |
| CN103470030A (en) * | 2013-09-13 | 2013-12-25 | 许金锔 | Quick insertion clamping frame of concrete blinding and method for clamping concrete blinding |
| CN204370802U (en) * | 2014-12-17 | 2015-06-03 | 邱垂亮 | Building clear water model of the column rack system |
| CN206289969U (en) * | 2016-12-12 | 2017-06-30 | 国网北京市电力公司 | Mark time template |
-
2018
- 2018-11-22 CN CN201811394992.5A patent/CN109518949A/en active Pending
Patent Citations (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPH04277233A (en) * | 1991-03-01 | 1992-10-02 | Shimizu Corp | Column false part frame molding method and molding plate therefor |
| KR20050006598A (en) * | 2003-07-09 | 2005-01-17 | 조홍준 | Assembly type matrix made concrete for construction |
| CN103470030A (en) * | 2013-09-13 | 2013-12-25 | 许金锔 | Quick insertion clamping frame of concrete blinding and method for clamping concrete blinding |
| CN204370802U (en) * | 2014-12-17 | 2015-06-03 | 邱垂亮 | Building clear water model of the column rack system |
| CN206289969U (en) * | 2016-12-12 | 2017-06-30 | 国网北京市电力公司 | Mark time template |
Cited By (9)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN111038078A (en) * | 2019-12-12 | 2020-04-21 | 福建长城华兴玻璃有限公司 | Adjustable printing screen frame screen surface structure |
| CN111038078B (en) * | 2019-12-12 | 2021-08-17 | 福建长城华兴玻璃有限公司 | Adjustable printing screen frame screen surface structure |
| CN112681740A (en) * | 2020-12-24 | 2021-04-20 | 岳敏 | Building steel formwork connecting assembly and forming processing method thereof |
| CN112982980A (en) * | 2021-03-05 | 2021-06-18 | 河南宏程工程建设有限责任公司 | Fixed template structure of pouring frame for construction engineering construction |
| CN113585090A (en) * | 2021-09-01 | 2021-11-02 | 江苏江海杭萧绿色建筑科技有限公司 | Support with assembled steel construction of easily dismantling |
| CN113585090B (en) * | 2021-09-01 | 2023-01-13 | 江苏江海杭萧绿色建筑科技有限公司 | Support with assembled steel construction of easily dismantling |
| CN115162193A (en) * | 2022-08-03 | 2022-10-11 | 张海林 | Hanging basket construction bracket with shockproof function for high pier stud |
| CN120946091A (en) * | 2025-10-17 | 2025-11-14 | 中铁建工集团第五建设有限公司 | A formwork for in-situ casting of UHPC hollow columns |
| CN120946091B (en) * | 2025-10-17 | 2026-01-30 | 中铁建工集团第五建设有限公司 | A formwork for in-situ casting of UHPC hollow columns |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN109518949A (en) | A kind of working pouring frame fixed form structure of civil construction project | |
| CN109853946A (en) | A kind of structure and its installation method of column template | |
| EP2206831B1 (en) | Device and method for lifting and aligning rails | |
| EP0380149B1 (en) | Floor shuttering system for erecting the formwork of a concrete floor | |
| US3357672A (en) | Concrete wall form panel with particular tie rod assembly | |
| CN218715092U (en) | Template system for secondary structure constructional column | |
| CN208380073U (en) | Template tie | |
| CN108868130B (en) | Double-layer connecting beam opening formwork system and construction method thereof applied to double-layer connecting beam | |
| CN208884991U (en) | Deformation slit formwork | |
| CN112727062B (en) | Wall connecting piece structure of scaffold and construction method thereof | |
| CN111472567B (en) | Vertical hole plugging mechanism and plugging mechanism construction method | |
| CN222686136U (en) | An assembly-adjustable formwork device | |
| CN222822091U (en) | A formwork support structure for cast-in-place concrete bridge flange slab | |
| CN212154123U (en) | A structural column template | |
| DE2748083C2 (en) | Device for the assembly and support of planar components | |
| CN209099596U (en) | Detachable steel bar truss floor support plate connector | |
| CN215038556U (en) | U-shaped building block forming die | |
| CN116290068B (en) | Cup rim foundation template and construction method thereof | |
| CN219931590U (en) | Concrete building template for civil engineering | |
| WO1989001554A1 (en) | An apparatus and method for making an adobe brick structure | |
| CN106481074A (en) | Cast-in-situ concrete beam die clamper and concrete cast-in-situ beam mould | |
| CN206957199U (en) | Coagulation earth steps platform plate device | |
| CN218951979U (en) | Cast-in-situ box girder template placing bent | |
| CN217812348U (en) | Split type roof beam bearing structure convenient to early tear open | |
| CN217678631U (en) | Cast-in-place box girder mould of concrete |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PB01 | Publication | ||
| PB01 | Publication | ||
| SE01 | Entry into force of request for substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20190326 |
|
| WD01 | Invention patent application deemed withdrawn after publication |