CN211549117U - Assembled enclosure - Google Patents

Assembled enclosure Download PDF

Info

Publication number
CN211549117U
CN211549117U CN201922145810.7U CN201922145810U CN211549117U CN 211549117 U CN211549117 U CN 211549117U CN 201922145810 U CN201922145810 U CN 201922145810U CN 211549117 U CN211549117 U CN 211549117U
Authority
CN
China
Prior art keywords
prefabricated
wall
base
wallboard
enclosure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201922145810.7U
Other languages
Chinese (zh)
Inventor
杨立新
杨静
杨原
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Inner Mongolia Liyuan Pipe Culvert Engineering LLC
Original Assignee
Inner Mongolia Liyuan Pipe Culvert Engineering LLC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Inner Mongolia Liyuan Pipe Culvert Engineering LLC filed Critical Inner Mongolia Liyuan Pipe Culvert Engineering LLC
Priority to CN201922145810.7U priority Critical patent/CN211549117U/en
Application granted granted Critical
Publication of CN211549117U publication Critical patent/CN211549117U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The embodiment of the application discloses assembled enclosure. The technical scheme that this application embodiment provided is through making prefabricated base in advance, prefabricated stand and prefabricated wallboard, again to prefabricated base at the job site, prefabricated stand and prefabricated wallboard are assembled, need not set up the reinforcing bar now, template and concreting, construction speed has been accelerated, and through the laminating of the bottom of the prefabricated base of pegging graft each other on the horizontal direction and prefabricated wallboard, guarantee the correctness of prefabricated wallboard installation angle, and guarantee that the more firm installation of prefabricated wallboard is in predetermined position, improve the stability of enclosure.

Description

Assembled enclosure
Technical Field
The embodiment of the application relates to an assembly type building, in particular to an assembly type enclosure.
Background
The wall is a vertical space partition structure in architecture, and the enclosing wall is generally formed by enclosing wall boards and upright posts which are arranged at intervals in sequence according to a certain direction and used for enclosing, dividing or protecting a certain area.
The traditional enclosure construction method is that earthwork is excavated on the ground, then reinforced concrete is poured to form a foundation and stand columns, then wall surfaces and a top pressing are built among the stand columns by bricks, and finally cement mortar is coated on the wall surfaces to form a whole, so that a large amount of time is consumed, and the construction efficiency is low.
SUMMERY OF THE UTILITY MODEL
The embodiment of the application provides an assembled enclosure to accelerate the efficiency of construction of enclosure.
The embodiment of the application provides an assembled enclosure, including a plurality of prefabricated wallboards, prefabricated stand and prefabricated base, wherein:
the prefabricated bases are sequentially and adjacently arranged along the edge of the enclosing wall, and the adjacent prefabricated bases are mutually inserted and connected in the horizontal direction;
the prefabricated upright columns are arranged at intervals along the edge of the enclosing wall, and the bottoms of the prefabricated upright columns are inserted into the prefabricated base;
prefabricated wallboard follows the marginal interval of enclosure sets up, and every prefabricated wallboard is located two liang of neighbours between the prefabricated stand, the both sides of prefabricated wallboard respectively with the laminating of prefabricated stand, the bottom of prefabricated wallboard peg graft in prefabricated base, and with the laminating of prefabricated base.
Further, the length of the prefabricated base is smaller than that of the prefabricated wall panel.
Furthermore, the prefabricated base is provided with a slot for inserting the prefabricated stand column and the prefabricated wall panel at the position corresponding to the prefabricated stand column and the prefabricated wall panel.
Furthermore, the prefabricated base is formed by inwards recessing the groove walls of the insertion grooves to form guide grooves, the guide grooves are arranged along the vertical direction, the top ends of the guide grooves are opened, and guide blocks matched with the guide grooves are arranged at the bottom of the prefabricated wall board.
Furthermore, a first jack is inwards arranged on one side of the prefabricated base, and a second jack is arranged at the corresponding position of the prefabricated wall board and the first jack.
Furthermore, a limit groove is formed in the vertical direction of the prefabricated stand column, and the side edge of the prefabricated wallboard is inserted into the limit groove.
Furthermore, the prefabricated base is connected with the prefabricated upright post and the prefabricated wall plate through a vertical grouting joint.
Furthermore, the top of the prefabricated wall board is connected with a wall top coping, the bottom of the wall top coping is inwards sunken and is bonded with the top end of the prefabricated wall board through cement mortar.
Furthermore, the top of the prefabricated stand column is connected with a stand column coping, the bottom of the stand column coping is inwards sunken and is bonded with the top end of the prefabricated stand column through cement mortar.
Furthermore, the one end of prefabricated base is provided with the connecting block towards the horizontal direction, the other end of prefabricated base be provided with the spread groove of connecting block adaptation.
This application embodiment is through making prefabricated base in advance, prefabricated stand and prefabricated wallboard, again to the job site prefabricated base, prefabricated stand and prefabricated wallboard are assembled, need not set up the reinforcing bar now, template and concreting for construction speed, and through the laminating of the bottom of the prefabricated base of pegging graft each other on the horizontal direction and prefabricated wallboard, guarantee the correctness of prefabricated wallboard installation angle, and guarantee that the more firm installation of prefabricated wallboard is in predetermined position, improve the stability of enclosure.
Drawings
Fig. 1 is a schematic structural diagram of an assembled enclosure according to an embodiment of the present application;
FIG. 2 is a schematic diagram illustrating the relationship between prefabricated wall panels, prefabricated columns and prefabricated base according to an embodiment of the present application;
FIG. 3 is a schematic diagram of the relationship between prefabricated wall panels, prefabricated columns and prefabricated base provided in the second embodiment of the present application;
FIG. 4 is a schematic structural view of a prefabricated wall panel provided in example two of the present application;
fig. 5 is a schematic view of the connection between prefabricated upright posts and prefabricated wall panels provided in the second embodiment of the present application.
Reference numerals: 1. prefabricating a wallboard; 2. prefabricating a stand column; 3. prefabricating a base; 4. a slot; 5. a guide groove; 6. a guide block; 7. a first jack; 8. a second jack; 9. a limiting groove; 10. pressing the top of the wall; 11. connecting blocks; 12. connecting grooves; 13. pressing the upright post; 14. a first reinforcing bar; 15. a second reinforcing bar; 16. grouting a casing pipe; 17. grouting pipes; 18. and (4) a pulp outlet pipe.
Detailed Description
In order to make the objects, technical solutions and advantages of the present application more apparent, specific embodiments of the present application will be described in detail with reference to the accompanying drawings. It is to be understood that the specific embodiments described herein are merely illustrative of the application and are not limiting of the application. It should be further noted that, for the convenience of description, only some but not all of the relevant portions of the present application are shown in the drawings.
In the description of the embodiments of the present application, unless explicitly stated or limited otherwise, the terms "connected," "connected," and "fixed" are to be construed broadly, e.g., as meaning either a fixed connection, a removable connection, or an integral part; can be mechanically or electrically connected; either directly or indirectly through intervening media, either internally or in any other relationship. The specific meaning of the above terms in the present application can be understood in a specific case by those of ordinary skill in the art.
Example one
The utility model provides an assembled enclosure, figure 1 has given the structural schematic diagram of an assembled enclosure that this application embodiment provided, as shown in figure 1, the assembled enclosure that this application embodiment provided includes a plurality of prefabricated wallboard 1, prefabricated stand 2 and prefabricated base 3, and prefabricated wallboard 1, prefabricated stand 2 and prefabricated base 3 are reinforced concrete structure, and it adopts the factory prefabrication, transports to the job site again after steam curing and carries out assembling of enclosure. The enclosure is rectangular, and one side of the enclosure is provided with a notch which is used as an inlet and an outlet of the inside and the outside of the enclosure.
Fig. 2 shows a schematic relationship diagram of prefabricated wall panel 1, prefabricated upright column 2 and prefabricated base 3 provided in the first embodiment of the present application. With reference to fig. 1 and 2, the prefabricated bases 3 are arranged in a raised shape, and the prefabricated bases 3 are sequentially and closely arranged adjacent to each other along the edge of the enclosure, and meanwhile, the adjacent prefabricated bases 3 are inserted into each other in the horizontal direction, so that the adjacent prefabricated bases 3 are limited to each other in the vertical direction, and the adjacent prefabricated bases 3 are kept relatively stable in height.
For example, in the present embodiment, a cylindrical connecting block 11 (which may be integrally cast with the prefabricated base 3 or serve as the connecting block 11 through embedded steel bars) is disposed at one end of the prefabricated base 3 in the horizontal direction, a connecting groove 12 adapted to the connecting block 11 is disposed at the other end of the prefabricated base 3, and the adjacent prefabricated bases 3 are inserted into each other in the horizontal direction through the insertion fit between the connecting block 11 and the connecting groove 12. In other embodiments, connecting grooves 12 may be provided at both ends of the prefabricated bases 3, and the steel bars are used as connecting blocks 11 to be simultaneously inserted into the connecting grooves 12 of two adjacent prefabricated bases 3, so that the adjacent prefabricated bases 3 are horizontally inserted into each other. Wherein the connecting block 11 is provided in plurality and arranged equally at the end of the prefabricated base 3.
Further, the both sides of prefabricated wallboard 1 are laminated with prefabricated stand 2 respectively, and the bottom of prefabricated wallboard 1 is pegged graft in prefabricated base 3 to laminate with prefabricated base 3. Specifically, the prefabricated upright posts 2 are arranged at intervals along the edge of the enclosing wall, and the bottoms of the prefabricated upright posts are inserted into the prefabricated base 3. Prefabricated wallboard 1 sets up along the marginal interval of enclosure to every prefabricated wallboard 1 is located between two liang of adjacent prefabricated stand 2, and prefabricated base 3 is provided with confession prefabricated stand 2 and prefabricated wallboard 1 male slot 4 in the department of corresponding with prefabricated stand 2 and prefabricated wallboard 1. Wherein the both ends of slot 4 communicate to the width of slot 4 and the width adaptation of prefabricated stand 2 and prefabricated wallboard 1 that correspond. And performing joint filling treatment on the prefabricated upright columns 2 and the prefabricated wall boards 1 by using cement mortar at the connecting joints with the inserting grooves 4.
Further, spacing groove 9 has been seted up along vertical direction in the both sides of prefabricated stand 2 and the 1 laminating of prefabricated wallboard to the upper and lower both ends opening of spacing groove 9, the side of prefabricated wallboard 1 is toward outer outstanding and plug in spacing groove 9, strengthens the stability between prefabricated wallboard 1 and the prefabricated stand 2. And joint filling treatment is performed between the prefabricated wall panel 1 and the limiting groove 9 by using cement mortar.
Above-mentioned, through prefabricated base 3 made in advance, prefabricated stand 2 and prefabricated wallboard 1, again to prefabricated base 3 at the job site, prefabricated stand 2 and prefabricated wallboard 1 assemble, need not set up the reinforcing bar now, template and concreting, construction speed has been accelerated, and laminate through the bottom of prefabricated base 3 and prefabricated wallboard 1 of pegging graft each other on the horizontal direction, guarantee the correctness of prefabricated wallboard 1 installation angle, and guarantee that prefabricated wallboard 1 is more firm installs in the position of predetermineeing, improve the stability of enclosure.
Example two
Fig. 3 shows a relationship schematic diagram of a prefabricated wall panel 1, a prefabricated upright post 2 and a prefabricated base 3 provided by the second embodiment of the present application. As shown in fig. 3, the fabricated enclosure provided by the embodiment of the application includes a plurality of prefabricated wall panels 1, prefabricated columns 2 and prefabricated bases 3, and the prefabricated wall panels 1, the prefabricated columns 2 and the prefabricated bases 3 are all of reinforced concrete structures, are prefabricated in a factory, and are transported to a construction site for assembly of an enclosure after steam curing. The enclosure is rectangular (similar to fig. 1) and has a notch at one side for the entrance and exit of the enclosure.
Fig. 4 shows a schematic structural diagram of prefabricated wall panel 1 provided in example two of the present application. With reference to fig. 3 and 4, the prefabricated bases 3 are arranged in a raised shape, and the prefabricated bases 3 are sequentially and closely arranged adjacent to each other along the edge of the enclosing wall, and meanwhile, the adjacent prefabricated bases 3 are inserted into each other in the horizontal direction, so that the adjacent prefabricated bases 3 are limited to each other in the vertical direction, and the adjacent prefabricated bases 3 are kept relatively stable in height.
For example, in the present embodiment, a cylindrical connecting block 11 (which may be integrally cast with the prefabricated base 3 or serve as the connecting block 11 through embedded steel bars) is disposed at one end of the prefabricated base 3 in the horizontal direction, a connecting groove 12 adapted to the connecting block 11 is disposed at the other end of the prefabricated base 3, and the adjacent prefabricated bases 3 are inserted into each other in the horizontal direction through the insertion fit between the connecting block 11 and the connecting groove 12. In other embodiments, connecting grooves 12 may be provided at both ends of the prefabricated bases 3, and the steel bars are used as connecting blocks 11 to be simultaneously inserted into the connecting grooves 12 of two adjacent prefabricated bases 3, so that the adjacent prefabricated bases 3 are horizontally inserted into each other.
Further, the both sides of prefabricated wallboard 1 are laminated with prefabricated stand 2 respectively, and the bottom of prefabricated wallboard 1 is pegged graft in prefabricated base 3 to laminate with prefabricated base 3. Specifically, the prefabricated upright posts 2 are arranged at intervals along the edge of the enclosing wall, and the bottoms of the prefabricated upright posts are inserted into the prefabricated base 3. Prefabricated wallboard 1 sets up along the marginal interval of enclosure to every prefabricated wallboard 1 is located between two liang of adjacent prefabricated stand 2, and prefabricated base 3 is provided with confession prefabricated stand 2 and prefabricated wallboard 1 male slot 4 in the department of corresponding with prefabricated stand 2 and prefabricated wallboard 1. Wherein the both ends of slot 4 communicate to the width of slot 4 and the width adaptation of prefabricated stand 2 and prefabricated wallboard 1 that correspond. And performing joint filling treatment on the prefabricated upright columns 2 and the prefabricated wall boards 1 by using cement mortar at the connecting joints with the inserting grooves 4.
In this embodiment, the length of prefabricated base 3 is less than the length of prefabricated wall panel 1 for a plurality of prefabricated bases 3 correspond to one prefabricated wall panel 1. Specifically, the length of the prefabricated base 3 corresponding to the prefabricated wall panel 1 is one third of the length of the prefabricated wall panel 1, the length of the prefabricated base 3 corresponding to the prefabricated upright column 2 is consistent with the width of the prefabricated upright column 2, namely, when the prefabricated wall panel 1 and the prefabricated upright column 2 are arranged, every 3 prefabricated bases 3 corresponding to the prefabricated wall panel 1 are arranged, and every two adjacent prefabricated bases 3 corresponding to the prefabricated upright column 2 are provided with 3 prefabricated bases 3 corresponding to the prefabricated wall panel 1. Utilize a plurality of prefabricated bases 3 to fix a prefabricated wallboard 1 jointly, will strengthen the stability of prefabricated wallboard 1 installation.
Further, spacing groove 9 has been seted up along vertical direction in the both sides of prefabricated stand 2 and the 1 laminating of prefabricated wallboard to the upper and lower both ends opening of spacing groove 9, the side of prefabricated wallboard 1 is toward outer outstanding and plug in spacing groove 9, strengthens the stability between prefabricated wallboard 1 and the prefabricated stand 2. And joint filling treatment is performed between the prefabricated wall panel 1 and the limiting groove 9 by using cement mortar.
Prefabricated base 3 is formed with guide way 5 in two cell walls departments of slot 4 are inwards sunken, and guide way 5 sets up along vertical direction to the top opening of guide way 5, the bottom of prefabricated wallboard 1 is provided with the guide block 6 with the adaptation of guide way 5, when splicing prefabricated wallboard 1 and prefabricated base 3, leads prefabricated wallboard 1 the motion of vertical side through the sliding connection cooperation of guide block 6 with guide way 5, improves the stability that prefabricated wallboard 1 was assembled.
Simultaneously, prefabricated base 3's one side has inwards seted up first jack 7, first jack 7 communicates a cell wall of slot 4 from one side of prefabricated base 3, and extend to another relative cell wall of slot 4, prefabricated wallboard 1 is provided with second jack 8 with first jack 7 department of correspondence, after prefabricated wallboard 1 inserts slot 4, second jack 8 and the coincidence of the axis of second jack 8, usable reinforcing bar inserts between first jack 7 and the second jack 8 this moment, with prefabricated wallboard 1 preliminary positioning on prefabricated base 3, thereby fix prefabricated wallboard 1 and prefabricated base 3 in vertical direction, reduce the condition that prefabricated wallboard 1 appears the slope in the installation.
The top of prefabricated wallboard 1 is connected with wall top coping 10, and wherein wall top coping 10 bottom is inwards sunken to pass through cement mortar bonding at the top of sunken department with prefabricated wallboard 1, simultaneously, the top of prefabricated stand 2 is connected with stand coping 13, and stand coping 13 bottom is inwards sunken, and passes through cement mortar bonding with the top of prefabricated stand 2. Further, polyurethane foam caulking agents are used for caulking between the wall top pressing top 10 and the prefabricated wall panel 1 and between the column pressing tops 13.
Fig. 5 shows a schematic connection diagram of prefabricated upright post 2 and prefabricated wall panel 1 provided in the second embodiment of the present application. As shown in fig. 5, the prefabricated base 3 is connected with the prefabricated upright column 2 and the prefabricated wall panel 1 through a vertical grouting joint, specifically, taking the connection of the prefabricated base 3 with the prefabricated wall panel 1 as an example, a first steel bar 14 and a grouting sleeve 16 are pre-embedded in the prefabricated base 3, the first steel bar 14 penetrates into the grouting sleeve 16 from the bottom of the grouting sleeve 16 and is fixedly connected (e.g. welded or screwed) with the grouting sleeve 16, the grouting sleeve 16 is hollow to form a cavity, the top end of the grouting sleeve 16 is open, and the top end of the grouting sleeve 16 is flush with the bottom of the slot 4. Second reinforcing steel bars 15 are embedded in the bottom of the prefabricated wall panel 1, the bottom ends of the second reinforcing steel bars 15 extend out of the bottom end of the prefabricated wall panel 1, and the second reinforcing steel bars 15 are inserted into the grouting sleeve 16 from the top end opening position of the grouting sleeve 16.
The position that grout sleeve 16 and the bottom and the top of cavity correspond is connected with grout pipe 17 and grout outlet 18 respectively, grout pipe 17 and grout outlet 18 all are the level and arrange, the both ends of grout pipe 17 communicate the bottom of territory cavity and the outside of prefabricated base 3 respectively, the both ends of grout outlet 18 communicate the top of territory cavity and the outside of prefabricated base 3 respectively, through grout mouthful grouting concrete or rapid hardening concrete in to the cavity, make mortar concrete or rapid hardening concrete wrap up second reinforcing bar 15 in the cavity, until mortar concrete overflows from the grout outlet, the position between fixed prefabricated wallboard 1 and the prefabricated base 3. The connection mode of the prefabricated base 3 and the prefabricated upright column 2 is similar to that of the prefabricated base 3 and the prefabricated wall plate 1, and the description is omitted here. In other embodiments, the prefabricated vertical columns 2 and the prefabricated wall panels 1 can be connected by grouting.
When the enclosure is constructed, the prefabricated base 3, the prefabricated upright post 2, the prefabricated wall plate 1, the wall top coping 10 and the upright post coping 13 which are manufactured in advance are transported to a construction site, ditches are dug well on the ground according to the edge shape of the enclosure, plain soil is tamped and leveled, and the prefabricated base 3 is sequentially and closely laid on the trench. Then place prefabricated stand 2 and prefabricated wallboard 1 in proper order on the prefabricated base 3 of laying to insert the reinforcing bar between first jack 7 and the second jack 8, with prefabricated wallboard 1 preliminary positioning to prefabricated base 3. Grouting mortar concrete or quick-setting concrete into the cavity through the grouting opening, so that the mortar concrete or the quick-setting concrete comprises a second reinforcing steel bar 15 in the cavity until the mortar concrete overflows from the grout outlet, and fixing the position between the prefabricated wallboard 1 and the prefabricated base 3. And then, taking out the steel bars in the first jack 7 and the second jack 8, filling the steel bars with cement mortar, and installing a wall top coping 10 and an upright post coping 13 on the corresponding prefabricated wall panel 1 and the corresponding prefabricated upright post 2 to complete the construction of the enclosing wall.
Above-mentioned, through prefabricated base 3 made in advance, prefabricated stand 2 and prefabricated wallboard 1, again to prefabricated base 3 at the job site, prefabricated stand 2 and prefabricated wallboard 1 assemble, need not set up the reinforcing bar now, template and concreting, construction speed has been accelerated, and laminate through the bottom of prefabricated base 3 and prefabricated wallboard 1 of pegging graft each other on the horizontal direction, guarantee the correctness of prefabricated wallboard 1 installation angle, and guarantee that prefabricated wallboard 1 is more firm installs in the position of predetermineeing, improve the stability of enclosure. Through the cooperation of guide block 6 and guide way 5, first jack 7 and second jack 8, stability when improving prefabricated wallboard 1 and installing.
In the description herein, references to the description of "an embodiment," "an example" or the like are intended to mean that a particular feature, structure, material, or characteristic described in connection with the embodiment or example is included in at least one embodiment or example of the application. In this specification, the schematic representations of the terms used above do not necessarily refer to the same embodiment or example.
Furthermore, it should be understood that although the present description refers to embodiments, not every embodiment may contain only a single embodiment, and such description is for clarity only, and those skilled in the art should integrate the description, and the embodiments may be appropriately combined to form other embodiments as will be appreciated by those skilled in the art.
The foregoing is considered as illustrative of the preferred embodiments of the invention and the technical principles employed. The present application is not limited to the particular embodiments described herein, but is capable of various obvious changes, rearrangements and substitutions as will now become apparent to those skilled in the art without departing from the scope of the invention. Therefore, although the present application has been described in more detail with reference to the above embodiments, the present application is not limited to the above embodiments, and may include other equivalent embodiments without departing from the spirit of the present application, and the scope of the present application is determined by the scope of the claims.

Claims (10)

1. An assembled enclosure, comprising a plurality of prefabricated wall panels (1), prefabricated columns (2) and prefabricated bases (3), wherein:
the prefabricated bases (3) are sequentially and adjacently arranged along the edge of the enclosing wall, and the adjacent prefabricated bases (3) are mutually inserted and connected in the horizontal direction;
the prefabricated upright columns (2) are arranged at intervals along the edge of the enclosing wall, and the bottoms of the prefabricated upright columns are inserted into the prefabricated base (3);
prefabricated wallboard (1), follow the marginal interval of enclosure sets up, and every prefabricated wallboard (1) is located two liang of neighbours between prefabricated stand (2), the both sides of prefabricated wallboard (1) respectively with prefabricated stand (2) laminating, the bottom of prefabricated wallboard (1) peg graft in prefabricated base (3), and with prefabricated base (3) laminating.
2. Assembled enclosure according to claim 1, wherein the length of the prefabricated base (3) is smaller than the length of the prefabricated wall panel (1).
3. Assembled enclosure according to claim 1, wherein the prefabricated base (3) is provided with slots (4) for insertion of the prefabricated uprights (2) and the prefabricated wall panels (1) in correspondence of the prefabricated uprights (2) and the prefabricated wall panels (1).
4. The assembled type enclosure wall according to claim 3, wherein the prefabricated base (3) is formed with a guide groove (5) at the groove wall of the insertion groove (4) in an inward recessed manner, the guide groove (5) is arranged in a vertical direction, the top end of the guide groove (5) is opened, and the bottom of the prefabricated wall panel (1) is provided with a guide block (6) matched with the guide groove (5).
5. The assembled type enclosure wall as claimed in claim 1, wherein one side of the prefabricated base (3) is opened with a first jack (7) inwards, and a second jack (8) is arranged at the position of the prefabricated wall panel (1) corresponding to the first jack (7).
6. The assembled type enclosure wall as claimed in claim 1, wherein the prefabricated upright columns (2) are provided with limiting grooves (9) along the vertical direction, and the side edges of the prefabricated wall panels (1) are inserted into the limiting grooves (9).
7. Assembled enclosure according to claim 1, wherein the prefabricated base (3) is connected to the prefabricated upright (2) and the prefabricated wall panel (1) by means of vertical grouting joints.
8. The assembled type enclosure wall according to claim 1, wherein a wall coping (10) is connected to the top of the prefabricated wall panel (1), and the bottom of the wall coping (10) is recessed inwards and bonded with the top end of the prefabricated wall panel (1) through cement mortar.
9. The assembled type enclosure wall according to claim 1, wherein a column coping (13) is connected to the top of the prefabricated column (2), and the bottom of the column coping (13) is recessed inwards and is bonded with the top end of the prefabricated column (2) through cement mortar.
10. The assembled type enclosure wall according to claim 1, wherein one end of the prefabricated base (3) is provided with a connecting block (11) in a horizontal direction, and the other end of the prefabricated base (3) is provided with a connecting groove (12) which is matched with the connecting block (11).
CN201922145810.7U 2019-12-03 2019-12-03 Assembled enclosure Active CN211549117U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201922145810.7U CN211549117U (en) 2019-12-03 2019-12-03 Assembled enclosure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201922145810.7U CN211549117U (en) 2019-12-03 2019-12-03 Assembled enclosure

Publications (1)

Publication Number Publication Date
CN211549117U true CN211549117U (en) 2020-09-22

Family

ID=72504362

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201922145810.7U Active CN211549117U (en) 2019-12-03 2019-12-03 Assembled enclosure

Country Status (1)

Country Link
CN (1) CN211549117U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113931525A (en) * 2021-11-22 2022-01-14 中国建筑第二工程局有限公司 Anti-collision enclosure for building construction and use method thereof
CN114122994A (en) * 2021-11-02 2022-03-01 国网河北省电力有限公司保定供电分公司 Safety device for electric power equipment fault maintenance
CN114135050A (en) * 2021-12-02 2022-03-04 江苏和天下节能科技股份有限公司 Prefabricated wallboard convenient to installation
CN115853122A (en) * 2022-12-14 2023-03-28 山东鼎实建筑设计有限公司 Framework of modular building

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114122994A (en) * 2021-11-02 2022-03-01 国网河北省电力有限公司保定供电分公司 Safety device for electric power equipment fault maintenance
CN113931525A (en) * 2021-11-22 2022-01-14 中国建筑第二工程局有限公司 Anti-collision enclosure for building construction and use method thereof
CN113931525B (en) * 2021-11-22 2023-02-24 中国建筑第二工程局有限公司 Anti-collision enclosure for building construction and use method thereof
CN114135050A (en) * 2021-12-02 2022-03-04 江苏和天下节能科技股份有限公司 Prefabricated wallboard convenient to installation
CN115853122A (en) * 2022-12-14 2023-03-28 山东鼎实建筑设计有限公司 Framework of modular building
CN115853122B (en) * 2022-12-14 2023-10-13 山东鼎实建筑设计有限公司 Framework of modular building

Similar Documents

Publication Publication Date Title
CN211549117U (en) Assembled enclosure
US4328651A (en) Precast concrete constructions
US4319440A (en) Building blocks, wall structures made therefrom and methods of making the same
US4398378A (en) Building construction system component parts and method for assembling same
CA1083377A (en) Prefabricated self-supporting modular room elements
US11761204B2 (en) Insulated concrete form construction method and system
US8375677B1 (en) Insulated poured concrete wall structure with integal T-beam supports and method of making same
CN109898642A (en) A kind of plug-in type assembled house
EP2365145A1 (en) A prefabricated modular building
KR100758504B1 (en) Method of construction for underground diaphragm wall and underground diaphragm wall structure
CN212175806U (en) Assembled underground structure
US3834094A (en) Track system wall assembly for houses or the like
US5150552A (en) Building system for extension of progressive housing
CN219690800U (en) Prefabricated assembled wall
CN220550923U (en) Modularized assembly type concrete low-rise civil house structure
KR20040027840A (en) Process for constructing retaining walls diversely
CN217998513U (en) Partition plate convenient to set up door opening
CN215595078U (en) Building basic module and high-rise modular building structure system
CN112227407B (en) Connecting system and connecting method for prefabricated superposed foundation and prefabricated concrete column
CN107268837A (en) A kind of swollen stone walling plate of assembled and combinations thereof installation method
CN109057084B (en) Construction method
KR100394063B1 (en) method for construction of a soundproofed wall
CN115538573A (en) Fabricated concrete module building and assembling method thereof
CN112523546A (en) Building basic module and high-rise modular building structure system
CN115772912A (en) Assembled prefabricated electric well and construction method thereof

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant