CN206267524U - Formwork construction structure of the one-time cast-forming with corner protector clear water stair - Google Patents

Formwork construction structure of the one-time cast-forming with corner protector clear water stair Download PDF

Info

Publication number
CN206267524U
CN206267524U CN201621369004.8U CN201621369004U CN206267524U CN 206267524 U CN206267524 U CN 206267524U CN 201621369004 U CN201621369004 U CN 201621369004U CN 206267524 U CN206267524 U CN 206267524U
Authority
CN
China
Prior art keywords
stair
corner protector
swash plate
check
clear water
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201621369004.8U
Other languages
Chinese (zh)
Inventor
梁福生
武群虎
余文元
宋海波
牛常青
乔建文
高震
魏星
葛小龙
王亚军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
First Engineering Co Ltd of China Railway 20th Bureau Group Co Ltd
Original Assignee
First Engineering Co Ltd of China Railway 20th Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by First Engineering Co Ltd of China Railway 20th Bureau Group Co Ltd filed Critical First Engineering Co Ltd of China Railway 20th Bureau Group Co Ltd
Priority to CN201621369004.8U priority Critical patent/CN206267524U/en
Application granted granted Critical
Publication of CN206267524U publication Critical patent/CN206267524U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Steps, Ramps, And Handrails (AREA)

Abstract

The utility model discloses a kind of formwork construction structure of one-time cast-forming with corner protector clear water stair, including support system and stairway die, the stairway die includes stair swash plate, check of staircase and ladder template, the stair swash plate is fixed between half space and lower half space, the stair swash plate both sides are provided with check of staircase, the check of staircase is vertical with stair swash plate, multiple ladder templates are arranged at intervals between two check of staircases, ladder template is located on stair swash plate, the side of the ladder template upper concrete is installed with corner protector.The utility model once can be cast directly on stair corner protector, save operation, it is to avoid the quality problems that secondary construction occurs, simple structure is easy to promote the use of.

Description

Formwork construction structure of the one-time cast-forming with corner protector clear water stair
Technical field
The utility model belongs to clear water stair technical field of construction, more particularly to a kind of one-time cast-forming band corner protector clear water The formwork construction structure of stair.
Background technology
In recent years, with the construction that high-rise, Super high-rise dwelling house is like a raging fire at home, to construction quality requirement increasingly Height, the common portion stair effect increasing as Function is evacuated, common portion escape stair typically tightly uses cement The common quality defects such as the secondary decoration of mortar surface layer, the hollowing easily occurred for the secondary cement screedn of stair step, external corner destruction Problem, the construction technique principle of clear water shaping of main body construction stage stair step concrete and technological process can solve two Secondary cement screedn quality problems;By the main body construction stage in the embedded anticollision angle steel of stair step external corner part, with biography The stair step of system is compared by secondary pargeting construction method, can effectively be prevented during decorations and use Occurs the generation of common quality defect problem because plastering, while improving impression quality, reduction construction cost and shortening on the duration all Generate notable benefit.
Utility model content
Technical problem to be solved in the utility model is for above-mentioned deficiency of the prior art, there is provided one kind is once Formwork construction structure of the moulding by casting with corner protector clear water stair, corner protector can once be cast directly on stair, saved by it Operation, it is to avoid the quality problems that secondary construction occurs.
In order to solve the above technical problems, the technical solution adopted in the utility model is:A kind of one-time cast-forming band corner protector The formwork construction structure of clear water stair, including support system and stairway die, it is characterised in that:The stairway die includes stair Swash plate, check of staircase and ladder template, the stair swash plate are fixed between half space and lower half space, the stair Swash plate both sides are provided with check of staircase, and the check of staircase is vertical with stair swash plate, are set between two check of staircases The side for having multiple ladder templates, the ladder template upper end cast stair is fixed with corner protector.
A kind of formwork construction structure of the above-mentioned one-time cast-forming with corner protector clear water stair, it is characterised in that:The shield Angle is steel angle structure, and anchor bar is provided with a medial surface of the corner protector, is offered on another medial surface of the corner protector Screwed hole.
A kind of formwork construction structure of the above-mentioned one-time cast-forming with corner protector clear water stair, it is characterised in that:The anchor Gu the quantity of the screwed hole of reinforcing bar has three.
A kind of formwork construction structure of the above-mentioned one-time cast-forming with corner protector clear water stair, it is characterised in that:The shield Length of the length at angle less than ladder template.
A kind of formwork construction structure of the above-mentioned one-time cast-forming with corner protector clear water stair, it is characterised in that:The rank The opposite side of terraced pouring template stair is provided with the lumps of wood.
A kind of formwork construction structure of the above-mentioned one-time cast-forming with corner protector clear water stair, it is characterised in that:The building The flatness of terraced swash plate, check of staircase and ladder pouring template concrete one side is 2mm.
The utility model has advantages below compared with prior art:
1st, the utility model on corner protector by being threaded hole so that corner protector can be fixed on joggle die before casting On plate, can be cast on stair with one-time formed in cast.
2nd, the utility model can make joggle die plate ensure enough hardness and intensity in cast by setting the lumps of wood, Do not deform, while also increasing the mold use life-span.
3rd, the utility model makes connection of the corner protector on stair more firm, outside by setting anchor bar on corner protector The lower guarantee of power impact does not fall off.
In sum, the utility model its once corner protector can be cast directly on stair, save operation, it is to avoid The quality problems that secondary construction occurs, simple structure is easy to promote the use of.
Below by drawings and Examples, the technical solution of the utility model is described in further detail.
Brief description of the drawings
Fig. 1 is structural representation of the present utility model.
Fig. 2 is the scheme of installation of the utility model corner protector.
Fig. 3 is the structural representation of the utility model corner protector.
Description of reference numerals:
1-stair swash plate;2-check of staircase;3-ladder template;
4-corner protector;4-1-anchor bar;4-2-screwed hole;
5-lumps of wood;6-upper half space;7-lower half space.
Specific embodiment
As shown in figure 1, the utility model include support system and stairway die, the stairway die include stair swash plate 1, Check of staircase 2 and ladder template 3, the stair swash plate 1 are fixed between half space 6 and lower half space 7, the stair The both sides of swash plate 1 are provided with check of staircase 2, and the check of staircase 2 is vertical with stair swash plate 1, between two check of staircases 2 Multiple ladder templates 3 are provided with, the side of the upper end of the ladder template 3 cast stair is fixed with corner protector 4.
It should be noted that the stair swash plate 1 is on dormitory support system, the support system bottom is fixed on built On stationary plane, the stationary plane can be that ground can also be the stair built, and the support system top is provided with adjustable The jacking of height and the keel of the support stair swash plate 1, the stair swash plate 1 is subject to the face of whole stair weight, in branch Must ensure that the support force of the stair swash plate 1 is reliable enough when mould, the deformation and movement of stair swash plate 1 should be avoided, Otherwise pour into a mould concrete when be likely to cause stair deformation even occur security incident, described one end of stair swash plate 1 with it is upper The lower surface of half space 6 intersects, and the other end intersects with the lower surface of platform 7 of going downstairs, this ensure that stair and upper rest Bonding strength between platform 6 and lower half space 7, and good appearance;
The effect of the check of staircase 2 is to prevent concrete side from overflowing, and the check of staircase 2 is strong with the connection of stair swash plate 1 Degree ensures that the height of check of staircase 2 need to be high not less than the highest of the installation site of ladder template 3 by setting split bolt Degree, fixation is fixed on check of staircase 2 come the formation of the vertical plane for ensureing stair step vertically in the ladder template 3.
In the present embodiment, the corner protector 4 is steel angle structure, and anchor bar 4- is provided with a medial surface of the corner protector 4 1, offer screwed hole 4-2 on another medial surface of the corner protector 4.
In the present embodiment, the quantity of the screwed hole 4-2 of the anchor bar 4-1 has three.
It should be noted that the quantity of the anchor bar 4-1 is multiple, the quantity that the anchor bar 4-1 is set is too The bending strength of I haven't seen you for ages influence corner protector 4, the quantity that the anchor bar 4-1 is set can influence the combination of corner protector 4 and stair too much Intensity, it is preferred that in the present embodiment, the anchor bar 4-1 is provided with three, and the quantity of the screwed hole 4-2 is multiple, spiral shell The effect of pit 4-2 is that corner protector 4 is fixed in ladder template 3, it is preferred that in the present embodiment, the quantity of the screwed hole 4-2 There are three, the installation upper surface of the corner protector 4 is coplanar with the upper surface of ladder template 3, it is ensured that corner protector 4 is after stair are poured into a mould It is coplanar with stair step upper surface, facilitate secondary decoration.
In the present embodiment, the length of the length less than ladder template 3 of the corner protector 4.The length of corner protector 4 is less than stair and steps on The length of step, because stair step two ends are not frequently used and intensity is higher, the length of the length less than stair step of corner protector 4 Protect stair step external corner, and reduce the material usage of corner protector 4, shorten cost.
In the present embodiment, the opposite side of the cast of ladder template 3 stair is provided with the lumps of wood 5.Preferably, in the present embodiment The quantity of the lumps of wood 5 has two, is separately fixed in ladder template 3 in laying up and down, the upper surface of the lumps of wood 5 above With the upper surface flush of ladder template 3, the lower surface of the underlying lumps of wood 5 is equal with the lower surface of ladder template 3 Together.It is that, in order to fix corner protector 4, corner protector 4 increased fixed by screw bolt passes ladder template 3 and the lumps of wood 5 to install the lumps of wood 5 Intensity, makes corner protector 4 more be stably mounted in ladder template 3, the upper surface of the lumps of wood 5 and the coplanar convenience in upper surface of ladder template Secondary construction, the lower surface of the lumps of wood 5 is coplanar with the lower surface of ladder template 3 to prevent the lumps of wood 5 from influenceing adjacent next water marked time The shaping of plane.
In the present embodiment, the flatness of the stair swash plate 1, check of staircase 2 and ladder template 3 cast concrete one side is 2mm.Ensure the shape of stair each forming surfaces, it is to avoid increase operation, one-shot forming, it is to avoid stair deformations, influence outward appearance is very Used to influence.
When the utility model is used, first pass through stair of the existing building surface to be built and be supported system and build, Then stair swash plate 1 is fixed on the support system put up, adjustment position is to correct position, then sets up check of staircase 2, Check of staircase 2 is fixed on the stair swash plate put up and vertical runs, can first by the He of corner protector 4 when setting up ladder template 3 The lumps of wood 5 is fixed in ladder template 3 in advance, and the ladder template 3 after then fixing is arranged on check of staircase 2, also may be used After first ladder template 3 is ridden upon on check of staircase 2, then corner protector 4 and the lumps of wood 5 are arranged on the ladder template 3 for having set On, fix after ladder template 3, concreting is carried out in the template put up.
The above, is only preferred embodiment of the present utility model, and not the utility model is imposed any restrictions, every Any simple modification, change and the equivalent structure change made to above example according to the utility model technical spirit, still Belong in the protection domain of technical solutions of the utility model.

Claims (6)

1. formwork construction structure of the one-time cast-forming with corner protector clear water stair, including support system and stairway die, its feature It is:The stairway die includes stair swash plate (1), check of staircase (2) and ladder template (3), and the stair swash plate (1) is fixed Between upper half space (6) and lower half space (7), stair swash plate (1) both sides are provided with check of staircase (2), institute State check of staircase (2) vertical with stair swash plate (1), multiple ladder templates are arranged at intervals between two check of staircases (2) (3), on stair swash plate (1), the side of ladder template (3) the upper concrete is installed with ladder template (3) Corner protector (4).
2. according to formwork construction structure of the one-time cast-forming described in claim 1 with corner protector clear water stair, it is characterised in that: The corner protector (4) is steel angle structure, and anchor bar (4-1), the corner protector (4) are provided with a medial surface of the corner protector (4) Another medial surface on offer screwed hole (4-2).
3. according to formwork construction structure of the one-time cast-forming described in claim 2 with corner protector clear water stair, it is characterised in that: The quantity of the anchor bar (4-1) and the screwed hole (4-2) has three.
4. according to formwork construction structure of the one-time cast-forming described in claim 1 with corner protector clear water stair, it is characterised in that: Length of the length of the corner protector (4) less than ladder template (3).
5. according to formwork construction structure of the one-time cast-forming described in claim 1 with corner protector clear water stair, it is characterised in that: Opposite side on the ladder template (3) is provided with the lumps of wood (5).
6. according to formwork construction structure of the one-time cast-forming described in claim 1 with corner protector clear water stair, it is characterised in that: The flatness of the one side of the stair swash plate (1), check of staircase (2) and ladder template (3) cast concrete is 2mm.
CN201621369004.8U 2016-12-13 2016-12-13 Formwork construction structure of the one-time cast-forming with corner protector clear water stair Active CN206267524U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621369004.8U CN206267524U (en) 2016-12-13 2016-12-13 Formwork construction structure of the one-time cast-forming with corner protector clear water stair

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621369004.8U CN206267524U (en) 2016-12-13 2016-12-13 Formwork construction structure of the one-time cast-forming with corner protector clear water stair

Publications (1)

Publication Number Publication Date
CN206267524U true CN206267524U (en) 2017-06-20

Family

ID=59043517

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621369004.8U Active CN206267524U (en) 2016-12-13 2016-12-13 Formwork construction structure of the one-time cast-forming with corner protector clear water stair

Country Status (1)

Country Link
CN (1) CN206267524U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107283606A (en) * 2017-08-22 2017-10-24 程丹松 Stair pour mould and stair

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107283606A (en) * 2017-08-22 2017-10-24 程丹松 Stair pour mould and stair

Similar Documents

Publication Publication Date Title
CN106378861B (en) A kind of prefabricated assembled concrete stairway die and stair manufacturing method
CN206616862U (en) Formwork root bracing means
CN110219461A (en) A kind of inner cylinder aluminum alloy pattern plate and outline border plank sheathing gang form construction method
CN205894680U (en) Closed staircase aluminum alloy template
CN108149819B (en) Integrated superposed outer wall of building bottom reinforcing area and production and construction method thereof
CN108824632A (en) A kind of prefabricated assembled bay window constructing structure of residential building and method
CN110409860A (en) A kind of reconstruction structure and its remodeling method in old house
CN111287370A (en) Externally-hung glass curtain wall system and construction method thereof
CN109895239B (en) Fabricated concrete stair slow platform beam slab and construction method thereof
CN205475884U (en) Cast -in -place whole outer wall system of assembling heat preservation exterior sheathing of prefabricated dismounting -free of building
CN107630531A8 (en) A kind of large cantilever clear-water concrete stair and its construction method
CN206267524U (en) Formwork construction structure of the one-time cast-forming with corner protector clear water stair
CN202055517U (en) Thin-walled cylinder pouring formwork supporting and lifting device
CN103470038B (en) Concrete one-step forming process of building appearance moulding and main structure
CN105544815B (en) One kind is cast-in-place to build prefabricated whole assembly heat preservation exterior sheathing assembling structure free of demolition
CN101886470B (en) Construction method of exposed concrete ribbed beams
CN208533894U (en) A kind of lightweight precast concrete stair
CN205475883U (en) Cast -in -place whole heat preservation exterior sheathing assembly structure that assembles of prefabricated dismounting -free that builds
CN104908150B (en) A kind of piping shaft making template and the method based on factorial praluction piping shaft
CN107642241A (en) The stress supporting construction and construction method of a kind of prefabricated balcony
CN204097885U (en) For the combined steel board fixing structure of ring road bridge anti-collision wall construction
CN211714007U (en) Construction elevator foundation structure
CN209891597U (en) Cast-in-situ plate type stair with sliding support at high-end ladder beam supporting position
CN207499274U (en) A kind of concrete prefabricated stairs for building being easily installed
CN207244960U (en) A kind of Prefabricated stacking floor with tool-typed formwork for being used to drop plate region

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant