CN205475883U - Cast -in -place whole heat preservation exterior sheathing assembly structure that assembles of prefabricated dismounting -free that builds - Google Patents

Cast -in -place whole heat preservation exterior sheathing assembly structure that assembles of prefabricated dismounting -free that builds Download PDF

Info

Publication number
CN205475883U
CN205475883U CN201620119627.3U CN201620119627U CN205475883U CN 205475883 U CN205475883 U CN 205475883U CN 201620119627 U CN201620119627 U CN 201620119627U CN 205475883 U CN205475883 U CN 205475883U
Authority
CN
China
Prior art keywords
prefabricated
heat preservation
precast facade
insulation
exterior sheathing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620119627.3U
Other languages
Chinese (zh)
Inventor
张东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tianjin Golden Virtue Energy Sources Technology Development Co ltd
Original Assignee
Tianjin Golden Virtue Energy Sources Technology Development Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tianjin Golden Virtue Energy Sources Technology Development Co ltd filed Critical Tianjin Golden Virtue Energy Sources Technology Development Co ltd
Priority to CN201620119627.3U priority Critical patent/CN205475883U/en
Application granted granted Critical
Publication of CN205475883U publication Critical patent/CN205475883U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Building Environments (AREA)

Abstract

The utility model relates to a cast -in -place whole heat preservation exterior sheathing assembly structure that assembles of prefabricated dismounting -free that builds, cast -in -place whole heat preservation exterior sheathing assembly structure that assembles of prefabricated dismounting -free that builds, including prefabricated exterior wall compound incubation template monomer, prefabricated exterior wall compound incubation template monomer concatenation back forms the prefabricated whole heat preservation exterior sheathing that assembles, the prefabricated whole heat preservation exterior sheathing fixed mounting that assembles is outside prefabricated exterior wall keeps warm on the die carrier, prefabricated exterior wall heat preservation external mold sets up the split bolt subassembly that transversely runs through wall body rebars, the prefabricated exterior wall outer die carrier of heat preservation and inner formword, be equipped with the first prefabricated connecting piece of cartridge in wall body rebars on the prefabricated exterior wall compound incubation template monomer. Compared with the prior art, adopt whole prefabrication and lifting, save the construction of heat preservation secondary, make a heat preservation and major structure component parts of an entirety life -span, increased the durability of heat preservation, building wall thermal insulation performance can be improved, the construction quality has been improved, adopt this system can save construction exterior sheathing and external scaffolding, improve the efficiency of construction.

Description

A kind of cast-in-place build prefabricated exempting from and dismantle overall assembling insulation exterior sheathing assembling structure
Technical field
This utility model belongs to external wall technical field, particularly relates to a kind of cast-in-place building and prefabricated exempt to dismantle overall assembling and protect Temperature exterior sheathing assembling structure.
Background technology
The compulsory execution of building energy-saving standard and city management are to building waste and the strict management and control of construction noise.
Traditional shear wall construction is after reinforcing bar has been pricked, outside workman installs on the landing stage of scaffold and floor respectively, Interior masterplate and support system, inner and outer template in inner support (being typically fixed on steel reinforcement cage with wall thickness equal length reinforcing bar) and Split bolt or to drawing under the common effect of band iron, forms concrete placings cavity, after concrete reaches strength of mould stripping, removes masterplate And support.
At present, in order to reach power conservation requirement, newly-built concrete shear wall external wall is both needed to the structure of heat-insulation layer, existing The scheme of the problem that technology solves insulation mainly has two kinds, and one is to be placed in exterior sheathing with the adiabator plate with steel wire Side, is combined with concrete wall by plugging wire during concrete placings, after form removal, plasters, makees decoration of exterior wall;Two is concrete main body First construct, after paste warming plate, after screening, nailing are reinforced, make wall decoration.These two kinds of schemes are both needed to again take Scaffold or suspension bracket, plaster, the wet trade such as coating, there is high-altitude application and disaster hidden-trouble, the most once protected The quality accident that temperature pull-up falls.Have long in time limit, put into big reality.
A kind of precast facade formwork structure system with heat insulation function and construction method, patent Shen disclosed in prior art Please number: 201510436301.3;Propose precast concrete outer wall template, i.e. include precast concrete outer wall template, prefabricated mixed The inner side of solidifying soil outer wall template is fixed with heat-insulation layer, and the inner side of heat-insulation layer has poured cast-in-place shear wall, treats that concrete reaches institute Template in needing to remove after intensity, forms cast-in-place shear wall, is formed containing precast concrete outer wall template, heat-insulation layer, cast-in-place cuts The external wall system of power wall.But the intensity depending merely on precast concrete outer wall template and heat-insulation layer when implementing cannot be born at all The deadweight of casting concrete and when vibrating lateral pressure to template, it is inadequate for relying solely on split bolt, it is easy to make Become the problems such as swollen mould;After pouring molding the most in time, from the point of view of durability, fastness test, heat-insulation layer bears certainly at all Weight and the weight of precast concrete outer wall template, in turn result in and come off;It main reason is that heat-insulation layer and walls concrete Directly pour molding, first heat-insulation layer changeableness under relatively hightension effect, cause, with walls concrete bonding place, sky occurs Drum;The bonding of two kinds of material heat-insulation layers and concrete is not fitted, and its cohesive force is the most relatively poor, does not reaches expection at all Purpose, and then implement this technology cannot practice and extension, equally, precast concrete outer wall template and heat-insulation layer junction are also There is this problem.
Summary of the invention
This utility model provides a kind of for solving technical problem present in known technology increases heat-insulating property durability, fall Low construction cost, reduction of erection time, save the construction of heat-insulation layer secondary, it is possible to increase construction wall heat-insulating property, improve and build Make quality, meet National Fire design specification, the self-heat conserving that preferably contributes for energy-saving and emission-reduction permanent cast-in-place build pre- System is exempted to dismantle overall assembling insulation exterior sheathing assembling structure.
This utility model is adopted the technical scheme that by solving technical problem present in known technology:
A kind of cast-in-place build prefabricated exempting from and dismantle overall assembling insulation exterior sheathing assembling structure, it is characterised in that: include precast facade Compound heat preservation die plate monomer;Prefabricated overall assembling insulation exterior sheathing is formed after the splicing of precast facade compound heat preservation die plate monomer;
Described prefabricated overall assembling insulation exterior sheathing is fixedly mounted on precast facade and is incubated on outer mould bases, and described precast facade is protected Temperature external mold erection extends transversely through wall steel bar, the precast facade outer mould bases of insulation and the split bolt assembly of interior template on having;Institute State precast facade compound heat preservation die plate monomer and be provided with the prefabricated connector of first be inserted in wall steel bar.
This utility model can also use following technical measures:
Described first prefabricated connector includes shear connector and/or is fixedly mounted with connector, and described shear connector is arranged on adjacent Precast facade compound heat preservation die plate monomer splicing seams between;The described connector that is fixedly mounted with is from precast facade compound heat preservation die plate list The lateral surface of body runs through whole precast facade compound heat preservation die plate monomer, and stretches out in precast facade compound heat preservation die plate monomer Side.
Described precast facade is incubated the external mould frame that outer mould bases includes being surrounded by entablature, sill, left vertical beam and right vertical beam; It is also equipped with mast-up on described external mould frame;The medial surface entablature of described external mould frame, sill, left vertical beam and right vertical beam It is positioned on same datum level;In external mould frame, described entablature, the medial surface of sill are provided with and precast facade complex heat-preservation The first link that template monomer connects;The lateral surface of described external mould frame connects outer support frame;Lateral surface at external mould frame Along between the left vertical beam of short transverse and right vertical beam at least provided with one group of pretension crossbeam;Install and interior template in described pretension crossbeam The split bolt assembly connected;Several heat insulation formwork support beam it is interval with between entablature and sill in external mould frame; The medial surface of several heat insulation formwork support beams is all positioned on same datum level with entablature, sill, left vertical beam and right vertical beam; The side of each heat insulation formwork support beam or both sides are provided with along the short transverse of heat insulation formwork support beam and are combined with precast facade The second link that heat insulation formwork monomer connects;Detachable second prefabricated connector is installed on described second link;Outside Framed interior described entablature, the side of sill are provided with the connection elongated hole connecting the outer mould bases of contiguous prefabricated exterior-wall heat insulation.
Precast facade is installed on described outer support frame and is incubated outer mould bases verticality adjusting device;Described adjusting apparatus includes propping up Support base, described support base is movably installed with adjusting screw, described adjusting screw is fitted with swivel nut, described swivel nut It is fixedly mounted on outer support frame.
This utility model has the advantage that with good effect: owing to this utility model uses above-mentioned technology, have following excellent Point:
1, heat-insulation layer is combined with precast facade compound heat preservation die plate, save the construction of heat-insulation layer secondary, it is possible to increase building Wall insulation performance, improves build guality, meets country's exterior wall fireproof code requirement, can realize body of wall with outer simultaneously Insulation simultaneous construction, and then preferably contribute for energy-saving and emission-reduction.
2, the inner side that prefabricated overall assembling warming plate uses composite construction, i.e. heat-insulation layer to be arranged on cement-based mortar outer coversheet, Avoid exposing to the weather, add the durability of heat-insulation layer.
3, set up interior template in the inner side that prefabricated overall assembling insulation exterior sheathing is corresponding, then will connect assembly through interior template with Prefabricated entirety assembling insulation exterior sheathing and precast facade are incubated outer mould bases fixing connection, can save building exterior sheathing and outer foot Hand cradle, improves efficiency of construction, reduces cost, reduction of erection time.
4, use precast facade to be incubated outer mould bases, support the deadweight of powerful concrete, can resist when pouring simultaneously Vibrate produced side force;The problem solving prior art exterior sheathing bearing capacity difference, causes because of heat-insulation layer deformation The problem that hollowing occurs in junction.
5, improve the connection with concrete wall at precast concrete outer wall template at default connector, overcome heat-insulation plate for external The shearing force of deadweight, improves fastness, extends the durability of heat-insulation layer, fundamentally solves exterior wall heat-preserving system and exists The quality problems such as cracking, a drum come off;
6, this utility model can realize factory normalization production and processing, solves the band of execute-in-place in construction process The quality uncontrollability come;
7, this utility model substantially realizes insulation and builds the same life-span.
In sum, this practicality provides a kind of self-heat conserving, permanent cast-in-place build prefabricated exempting from and dismantle overall assembling insulation external mold Plate assembling structure.
Accompanying drawing explanation
Fig. 1 is this utility model structural representation;
Fig. 2 is the left view of Fig. 3;
Fig. 3 is the right view of Fig. 3;
Fig. 4 is Fig. 3 left view axonometric chart;
Fig. 5 is the right parallax stereogram of Fig. 3;
Fig. 6 is the structural representation of this utility model Construction State;
Fig. 7 is shear wall structure schematic diagram after molding;
Fig. 8 and Fig. 8 a is precast facade compound heat preservation die plate monomer structure schematic diagram;
Fig. 9 is to be fixedly mounted with connecting-piece structure schematic diagram;
Figure 10 is the first pretension gland structure schematic diagram in Fig. 9;
Figure 11 is the second prefabricated connecting-piece structure schematic diagram;
Figure 12 is the second pre-gland body construction schematic diagram in Figure 11;
Figure 13 is the second prefabricated connector and the first link or the second link attachment structure schematic diagram;
Figure 14 is shear connector structural representation;
Figure 15 is A-A sectional view in Figure 14;
Figure 16 is that the precast facade with unilateral external corner is incubated outer die carrier structure schematic diagram;
Figure 17 is that the precast facade with bilateral external corner is incubated outer die carrier structure schematic diagram;
Figure 18 is to be incubated outer die carrier structure schematic diagram with unilateral inner corner trim precast facade;
Figure 19 is to be incubated outer die carrier structure schematic diagram with jack to jack adapter angle precast facade;
Figure 20 is with the prefabricated overall assembling insulation exterior sheathing splicing structure schematic diagram in fire-blocking belt.
In figure: 100, interior template;
200, prefabricated overall assembling insulation exterior sheathing;210, precast facade compound heat preservation die plate monomer;211, pregroove marks; 212, the first pretension groove;213, the second pretension groove;214, cement-based mortar outer coversheet;215, vitrification micropearl morttar mistake Cross layer;216, binding sand pulp layer;217, phenol formaldehyde foam heat-insulation layer;218, rock wool heat-preservation layer;219, cement-based mortar Internal surface layer;220, glass screen cloth or zinc-plated weldering net;230, latticed reinforcement;
300, shear wall;
400, wall steel bar;
500, precast facade is incubated outer mould bases;501, entablature;501-1, connection elongated hole;502, sill;503、 Left vertical beam;504, right vertical beam;505, mast-up;506, the first link;507, outer support frame;508, pretension is horizontal Beam;509, heat insulation formwork support beam;510, the second link;511, the second prefabricated connector;5110, the second pretension Gland;5110-1, the second pre-gland body;5110-2, mounting hole;5111, the second pretension bolt;5111-1, Two nuts;5111-2, the second screw rod;5112, the 3rd pre-load nut;512, adjusting apparatus;5120, base is supported; 5121, adjusting screw;5122, swivel nut;
600, split bolt assembly;
710, shear connector;711, shear resisting board;712, horizontal plate;713, Y type anchoring termination;720, solid Load fitting;721, the first pretension bolt;7210, the first nut;7211, groove is screwed;7212, the first screw rod;722、 First pre-gland;7220, the first pre-gland body;7221, mounting hole;723, the first locking nut;724、 Second locking nut;
Detailed description of the invention
For summary of the invention of the present utility model, feature and effect can be further appreciated that, hereby enumerate following example, and coordinate Accompanying drawing describes in detail as follows:
Refer to Fig. 1 to Fig. 7, a kind of cast-in-place build prefabricated exempting from and dismantle overall assembling insulation exterior sheathing assembling structure, including pre- Exterior wall composite thermal insulation template monomer 210 processed, forms prefabricated overall assembling insulation after the splicing of precast facade compound heat preservation die plate monomer Exterior sheathing 200, described prefabricated overall assembling insulation exterior sheathing 200 is fixedly mounted on precast facade and is incubated on outer mould bases 500, The outer mould bases of described precast facade insulation 500 and the prefabricated overall assembling insulation external mold being arranged on the precast facade outer mould bases of insulation Plate integral hoisting is in the outside of wall steel bar 400 and corresponding with the interior template inside wall steel bar, and at wall steel bar Inside be provided with and extend transversely through wall steel bar 400, precast facade is incubated outer mould bases 500 and the split bolt assembly of interior template 100 600;Described precast facade compound heat preservation die plate monomer 201 is provided with the prefabricated connector of first be inserted in wall steel bar, Described first prefabricated connector is now cast in shear wall 300.
When practice of construction, between prefabricated overall assembling insulation exterior sheathing 200 and interior template 100, form cast-in-place shear wall of building Inner chamber, is banded with wall steel bar 400 at interior intracavity;The inner side of described prefabricated overall assembling insulation exterior sheathing is cast-in-place shear wall 300, described cast-in-place shear wall 300 is to be incubated exterior sheathing 200 and the interior template 100 installed inside it with prefabricated overall assembling Form for supporting cast in situs;
In said structure, described first prefabricated connector includes shear connector 710 and/or is fixedly mounted with connector 720, described Shear connector 710 is arranged between adjacent precast facade compound heat preservation die plate monomer 210 splicing seams;The described company of being fixedly mounted with Fitting 720 runs through whole precast facade compound heat preservation die plate list from the lateral surface of precast facade compound heat preservation die plate monomer 210 Body 210, and stretch out precast facade compound heat preservation die plate monomer 210 medial surface.
Referring to Figure 14 and Figure 15, described shear connector 710 mainly includes shear resisting board 711, one end of described shear resisting board Symmetry is bent with horizontal plate 712, and described plate is inserted into contiguous prefabricated exterior wall composite thermal insulation template monomer 210 side respectively In the pregroove marks 211 offered;The other end of described shear resisting board is provided with Y type anchoring termination 713, described Y type anchoring termination With shear wall 300 one the most cast-in-place build together with.
Refer to Fig. 9 and Figure 10, described in be fixedly mounted with connector 720 and mainly include the first pretension bolt 721, described first pre- Being set with the first pre-gland 722 on tight bolt 721, described first pre-gland 722 spiral-lock is at precast facade complex heat-preservation On template monomer 210 lateral surface in the first pretension groove 212, equipped first locking nut on described first pretension bolt 721 723 and second locking nut 724;Wherein the first locking nut 723 is by the first pretension bolt 721 and the first pre-gland 722 It is fastened on precast facade compound heat preservation die plate monomer 210;Described second locking nut 724 is positioned at the first pretension bolt 721 Outer end insert in shear wall, with shear wall is cast-in-place build together with.The first above-mentioned pretension bolt and the first pre-gland 722 can also use integrative-structure.
First pretension bolt 721 includes the first nut 7210 and the first screw rod 7212, and described first nut outer face is provided with rotation Tight groove 7211, the inner face of the first nut is pyramidal structure;Described first pre-gland 722 includes that the first pre-gland is originally Body 7220 and the mounting hole 7221 installing the first pretension bolt, described mounting hole is and the pyramidal structure of the first nut inner face The taper hole matched;After described first pretension bolt 721 and the first pre-gland 722 and the first locking nut 723 pretension, Ensure outer face and the precast facade compound heat preservation die plate monomer of the outer face of the first pre-gland 722, the first nut 7210 The lateral surface of 210 is in the same plane, thus ensures that the outer surface of prefabricated overall assembling insulation exterior sheathing is more smooth, just Decoration construction in exterior wall.
Refer to Fig. 3 to Fig. 7, described precast facade be incubated outer mould bases 500 include by entablature 501, sill 502, The external mould frame that left vertical beam 503 and right vertical beam 504 surround;Mast-up 505 it is also equipped with on described external mould frame;Described external mould frame Medial surface entablature, sill, left vertical beam and right vertical beam be positioned on same datum level, it is ensured that prefabricated laying precast facade After compound heat preservation die plate monomer, the outer surface of precast facade compound heat preservation die plate monomer is in same level, it is simple to the later stage fills Decorations construction;In external mould frame, described entablature 501, the medial surface of sill 502 are provided with and precast facade compound heat preservation die plate Monomer 210 connect the first link 506, described first link makes L-type structure, it is simple to entablature 501, under The medial surface of crossbeam 502 welds together;The lateral surface of described external mould frame connects outer support frame 507;Outside external mould frame Side along between the left vertical beam of short transverse and right vertical beam at least provided with one group of pretension crossbeam 508;Install in described pretension crossbeam with The split bolt assembly 600 that interior template connects, the purpose of split bolt assembly 600 is precast facade is incubated outer mould bases 500, precast facade compound heat preservation die plate 200 and interior template 100 are connected as an entirety, it is ensured that when pouring, do not occur Fall apart.
Several heat insulation formwork support beam 509 it is interval with between entablature 501 and sill 502 in external mould frame;Several The medial surface of heat insulation formwork support beam is all positioned at same with entablature 501, sill 502, left vertical beam 503 and right vertical beam 504 On one datum level;The side of each heat insulation formwork support beam 509 or both sides set along the short transverse of heat insulation formwork support beam There are the second link 510 being connected with precast facade compound heat preservation die plate monomer, in order to simplify making, described second link 510 also make L-type structure;Detachable second prefabricated connector 511 is installed on described second link 510;Refer to figure 11 to Figure 13;Described second prefabricated connector 511 includes the second pre-gland 5110 and the second pretension bolt 5111, institute State in second pre-gland 5110 spiral-lock the second pretension groove 213 inside precast facade compound heat preservation die plate monomer 210, Second pretension bolt 5111 stretches out from the inner side of precast facade compound heat preservation die plate monomer 210 and passes the first link 506 With the second link 510, on lateral surface second pretension bolt 5111 of the first link 506 and the second link 510 Equipped detachable 3rd pre-load nut 5112;The second above-mentioned pretension bolt 5111 includes the second nut 5111-1 and second Screw rod 5111-2, described second nut 51110 outer face is provided with and screws groove 5111-3, and the inner face of the second nut is taper Structure;Described second pre-gland 5110 includes the second pre-gland body 5110-1 and installs the second pretension bolt 5111 Mounting hole 5110-2, described mounting hole 5110-2 be the cone that the pyramidal structure with the second nut 5111-1 inner face matches Hole;After described second pretension bolt 5111 and the second pre-gland 5110 and the 3rd locking nut 5112 pretension, it is ensured that The outer face of two pre-gland 5110, outer face and the precast facade compound heat preservation die plate monomer 210 of the second nut 5111-1 Lateral surface in the same plane;In external mould frame, to be provided with connection adjacent described entablature 501, the side of sill 502 Precast facade is incubated the connection elongated hole 501-1 of outer mould bases.Second pre-gland 5110 of the second above-mentioned prefabricated connector 511 Integrative-structure can also be used with the second pretension bolt 5111.
According to actual architectural design, described precast facade is incubated on outer mould bases and can also be integrally formed with external corner framework (such as figure 16 and Figure 17) or inner corner trim framework (such as Figure 18), it is possibility to have two inner corner trim frameworks (such as Figure 19).
Precast facade is installed on described outer support frame 507 and is incubated outer mould bases verticality adjusting device 512;Described adjusting apparatus 512 include supporting base 5120, and described support base 5120 is movably installed with adjusting screw 5121, described adjusting screw On be fitted with swivel nut 5122, described swivel nut 5122 is fixedly mounted on outer support frame 507.
Precast facade compound heat preservation die plate monomer 210 preferably employs following structure, refers to Fig. 8 and Fig. 8 a, i.e. from export-oriented Include that cement-based mortar outer coversheet 214, vitrification micropearl morttar transition zone 215, binding sand pulp layer 216, phenolic aldehyde steep the most successively Foam heat-insulation layer 217 or rock wool heat-preservation layer 218 and cement-based mortar internal surface layer 219, wherein cement-based mortar outer coversheet, Glass screen cloth or zinc-plated weldering net 220 it is equipped with in binding sand pulp layer and cement-based mortar internal surface layer;At binding sand pulp layer and phenol Latticed reinforcement 230 it is provided with between aldehyde foam heat-insulation layer or rock wool heat-preservation layer.
Build external thermal insulation design requirement according to reality, prefabricated overall assembling insulation exterior sheathing system increase fire-blocking belt, The material selection rock wool heat-preservation layer of the heat-insulation layer of the precast facade compound heat preservation die plate monomer of described formation fire-blocking belt, as Figure 20.
Precast facade template monomer uses above-mentioned composite construction, have the advantage that 1, design and construction technology simple, it is easy to Large scale application.The load-carrying members form of cast-in-place concrete framework (frame is cut) structure is constant, and beam column and shear wall are still Designing by current standard specifications, design standard and software for calculation are complete, and construction technology is ripe, it is easy to large scale application.
2, integrated technique requirement is reached, it is achieved that building heat preservation and body of wall are with the purpose in life-span.By permanent complex heat-preservation Together with the cast-in-situ concrete members such as the beam column of exterior sheathing and framework (frame is cut) structure and shear wall are cast in, and by connecting Part firmly connects (tensile bearing capacity >=0.5Mpa), reached Synchronization Design, synchronous construction, synchronization check and accept technology want Ask, it is achieved that building heat preservation and body of wall are with the purpose in life-span.
3, use multi-layer structure design pattern, there is higher intensity and good heat-insulating property.Outside permanent complex heat-preservation Template is made up of rock-wool heat insulation plate, inside and outside bonding enhancement layer and insulation transition zone etc., has higher mechanical strength, can be straight Connecing and do exterior sheathing use, thermal and insulating performance is good, meets the standard-required of building energy conservation 65%.
4, use this structure fire technical method, there is good fire protecting performance.Inside and outside heat-insulation layer, main facade is by cement polymerisation Thing mortar cover is coated with, and can be prevented effectively from the generation of fire phenomena in work progress, after architectural engineering is completed, and insulation Outside Ceng, cement mortar protective course reaches more than 30mm, and fire protecting performance is greatly improved, and meets the demand of security against fire.
5, novelty be provided with insulation transition zone, it is to avoid the common quality defect problems such as float coat hollowing, cracking.Forever Property composite thermal-insulating exterior formwork structural shape design in be provided with insulation transition zone, alleviate heat insulation formwork because of environmental change produce Strain, it is to avoid the common quality defect problems such as float coat hollowing, cracking.
6, through engineering approaches preformed patterns is used, it is ensured that product engineering quality.Permanent composite thermal-insulating exterior formwork all uses factory Change prefabricated, in use, without fraud opportunity, the generation of phenomenon of having stopped to use inferior materials and turn out substandard goods, pour into a mould at concrete During, the product quality of permanent composite thermal-insulating exterior formwork is carried out on-site verification, effectively prevent fake and forged product Product are used for architectural engineering.
7, integration composite thermal-insulating exterior formwork uses multi-layer structure design, is provided with interior outboard bonds enhancement layer, improves guarantor The mechanical properties such as the temperature anti-folding of template, resistance to compression, shock resistance, have reached cast in place concrete form use technology requirement, have decreased Template consumption.
8, heat insulation core material uses high-performance pnenolic aldehyde foam heat-insulating board, and heat conductivity is less than 0.024W/m.K, is far superior at present The 0.032W/m.K of mainstay material on market, and owing to this material is thermosetting insulation material, taken into account fire protecting performance excellent. Heat insulation core material uses rock-wool heat insulation plate, and this material is the inorganic material that existing market insulation is optimal, it is ensured that preventing of total system Fire is entirely capable of the A level fire-protection rating specified that is up to state standards.
This utility model also carries that a kind of one is the most cast-in-place with concrete builds prefabricated exempting from and dismantle executing of overall assembling insulation exterior sheathing assembling structure Work method, comprises the following steps:
(1), prefabricated interior template 100, precast facade compound heat preservation die plate monomer 210, precast facade be incubated outer mould bases 500;
(2), the shear connector 710 of the first prefabricated connector is installed on precast facade compound heat preservation die plate monomer and is fixedly mounted with Connector 720, and the second prefabricated connector 511, and it is assembled in formation and precast facade on the precast facade outer mould bases of insulation It is incubated the prefabricated overall assembling insulation exterior sheathing 200 of outer mould bases one;
(3), it is incubated the cast-in-place wall steel bar 400 building shear wall of colligation inside exterior sheathing in prefabricated overall assembling,
(4), the precast facade outer mould bases 500 of insulation is lifted in place, and support fixing, install in the inner side of wall steel bar Interior template 100, interior formwork erection uses prior art, does not repeats at this;Again precast facade is incubated outer mould bases 400 It is connected by split bolt assembly pretension with interior template 100;Described split bolt assembly uses prior art, described to drawing Bolt assembly includes running through wall steel bar, precast facade is incubated outer mould bases and the wall bushing of interior template, is installed on set through walls Pretension bolt in pipe, one end of described pretension bolt stretches out interior template, and the other end of pretension bolt stretches out on adventitia frame Pretension crossbeam, is fitted with pre-load nut respectively at the two ends of pretension bolt;Adjust on prefabricated overall assembling insulation exterior sheathing solid Second locking nut 724 of load fitting;Then adjust precast facade and be incubated the verticality adjusting device 512 outside outer mould bases, Adjust precast facade and be incubated the perpendicularity of outer mould bases, adjust vertical after, according to adjusting on the basis of the precast facade outer mould bases of insulation again Secondary adjustment split bolt assembly so that precast facade insulation outer mould bases pretension parallel with interior template connects;
(5), casting concrete in the wall steel bar between inside template and prefabricated overall assembling insulation exterior sheathing;
(6), after concrete reaches desirable strength, in dismounting, template and precast facade are incubated outer mould bases, form cast-in-place shearing Wall, is formed containing prefabricated overall assembling insulation exterior sheathing, the external wall system of cast-in-place shear wall.
This utility model has the advantage that in sum
1, heat-insulation layer is combined with assembled template component, save the construction of heat-insulation layer secondary, it is possible to increase construction wall is protected Warm nature energy, improves build guality, meets country's exterior wall fireproof code requirement, can realize body of wall simultaneously and external thermal insulation is same Phase constructs, and then preferably contributes for energy-saving and emission-reduction.
2, the inner side that prefabricated overall assembling warming plate uses composite construction, i.e. heat-insulation layer to be arranged on cement-based mortar outer coversheet, Avoid exposing to the weather, add the durability of heat-insulation layer.
3, set up interior template in the inner side that prefabricated overall assembling insulation exterior sheathing is corresponding, then will connect assembly through interior template with Prefabricated entirety assembling insulation exterior sheathing and precast facade are incubated outer mould bases fixing connection, can save building exterior sheathing and outer foot Hand cradle, improves efficiency of construction, reduces cost, reduction of erection time.
4, use precast facade to be incubated outer mould bases, support the deadweight of powerful concrete, can resist when pouring simultaneously Vibrate produced side force;The problem solving prior art exterior sheathing bearing capacity difference, causes because of heat-insulation layer deformation The problem that hollowing occurs in junction.
5, improve the connection with concrete wall at precast concrete outer wall template at default connector, overcome heat-insulation plate for external The shearing force of deadweight, improves fastness, extends the durability of heat-insulation layer, fundamentally solves exterior wall heat-preserving system and exists The quality problems such as cracking, a drum come off;
6, this utility model can realize factory normalization production and processing, solves the band of execute-in-place in construction process The quality uncontrollability come;
7, this utility model substantially realizes insulation and builds the same life-span.
In sum, this utility model increases heat-insulating property durability, reduces construction cost, reduction of erection time, saves insulation Layer secondary construction, it is possible to increase construction wall heat-insulating property, improves build guality, meets National Fire design specification, A grade standard of preventing fires can be reached.
The above is only to preferred embodiment of the present utility model, not makees this utility model any pro forma Limit, every according to technical spirit of the present utility model to any simple modification made for any of the above embodiments, equivalent variations with Modify, belong in the range of technical solutions of the utility model.

Claims (4)

1. cast-in-place building prefabricated exempts to dismantle overall assembling insulation exterior sheathing assembling structure, it is characterised in that: include prefabricated outside Wall compound heat preservation die plate monomer;Prefabricated overall assembling insulation exterior sheathing is formed after the splicing of precast facade compound heat preservation die plate monomer;
Described prefabricated overall assembling insulation exterior sheathing is fixedly mounted on precast facade and is incubated on outer mould bases, and described precast facade is protected Temperature external mold erection extends transversely through wall steel bar, the precast facade outer mould bases of insulation and the split bolt assembly of interior template on having;Institute State precast facade compound heat preservation die plate monomer and be provided with the prefabricated connector of first be inserted in wall steel bar.
Cast-in-place building the most according to claim 1 prefabricated exempts to dismantle overall assembling insulation exterior sheathing assembling structure, its feature It is: described first prefabricated connector includes shear connector and/or is fixedly mounted with connector, and described shear connector is arranged on phase Between adjacent precast facade compound heat preservation die plate monomer splicing seams;The described connector that is fixedly mounted with is from precast facade compound heat preservation die plate The lateral surface of monomer runs through whole precast facade compound heat preservation die plate monomer, and stretches out precast facade compound heat preservation die plate monomer Medial surface, and insert in shear wall.
Cast-in-place building the most according to claim 1 prefabricated exempts to dismantle overall assembling insulation exterior sheathing assembling structure, its feature It is: described precast facade is incubated the external mould frame that outer mould bases includes being surrounded by entablature, sill, left vertical beam and right vertical beam; It is also equipped with mast-up on described external mould frame;
The medial surface entablature of described external mould frame, sill, left vertical beam and right vertical beam are positioned on same datum level;
In external mould frame, described entablature, the medial surface of sill are provided with and are connected with precast facade compound heat preservation die plate monomer First link;
The lateral surface of described external mould frame connects outer support frame;
External mould frame lateral surface along between the left vertical beam of short transverse and right vertical beam at least provided with one group of pretension crossbeam;Described pre- Install, in tight crossbeam, the split bolt assembly being connected with interior template;
Several heat insulation formwork support beam it is interval with between entablature and sill in external mould frame;Several heat insulation formworks support The medial surface of beam is all positioned on same datum level with entablature, sill, left vertical beam and right vertical beam;Each heat insulation formwork props up The support side of beam or both sides be provided with along the short transverse of heat insulation formwork support beam and precast facade compound heat preservation die plate monomer even The second link connect;Detachable second prefabricated connector is installed on described second link;
In external mould frame, described entablature, the side of sill are provided with that to connect the connection of the outer mould bases of contiguous prefabricated exterior-wall heat insulation long Hole.
4. described according to claims 1 to 3 is arbitrary cast-in-place build prefabricated exempting from and dismantle overall assembling insulation exterior sheathing assembling structure, It is characterized in that: precast facade is installed on described outer support frame and is incubated outer mould bases verticality adjusting device;Described adjustment fills Put and include supporting base, described support base is movably installed with adjusting screw, described adjusting screw is fitted with swivel nut, Described swivel nut is fixedly mounted on outer support frame.
CN201620119627.3U 2016-02-07 2016-02-07 Cast -in -place whole heat preservation exterior sheathing assembly structure that assembles of prefabricated dismounting -free that builds Expired - Fee Related CN205475883U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620119627.3U CN205475883U (en) 2016-02-07 2016-02-07 Cast -in -place whole heat preservation exterior sheathing assembly structure that assembles of prefabricated dismounting -free that builds

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620119627.3U CN205475883U (en) 2016-02-07 2016-02-07 Cast -in -place whole heat preservation exterior sheathing assembly structure that assembles of prefabricated dismounting -free that builds

Publications (1)

Publication Number Publication Date
CN205475883U true CN205475883U (en) 2016-08-17

Family

ID=56675207

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620119627.3U Expired - Fee Related CN205475883U (en) 2016-02-07 2016-02-07 Cast -in -place whole heat preservation exterior sheathing assembly structure that assembles of prefabricated dismounting -free that builds

Country Status (1)

Country Link
CN (1) CN205475883U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105544815A (en) * 2016-02-07 2016-05-04 天津鑫德源特能源科技发展有限公司 Cast-in-situ prefabricated non-dismantling integrally-assembled heat preservation outer formwork assembling structure
CN106436773A (en) * 2016-11-30 2017-02-22 中建八局第四建设有限公司 Set-shaped formwork support for construction of connecting part of bottom plate and outer wall

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105544815A (en) * 2016-02-07 2016-05-04 天津鑫德源特能源科技发展有限公司 Cast-in-situ prefabricated non-dismantling integrally-assembled heat preservation outer formwork assembling structure
CN105544815B (en) * 2016-02-07 2019-09-03 天津鑫德源特能源科技发展有限公司 One kind is cast-in-place to build prefabricated whole assembly heat preservation exterior sheathing assembling structure free of demolition
CN106436773A (en) * 2016-11-30 2017-02-22 中建八局第四建设有限公司 Set-shaped formwork support for construction of connecting part of bottom plate and outer wall

Similar Documents

Publication Publication Date Title
CN205475850U (en) Cast -in -place dismounting -free assembled outer wall tectosome of building with heat preservation function
CN105714961A (en) Cast-in-situ dismantling-free assembling-type heat-preservation external formwork assembly, external wall structure and construction method
CN205475882U (en) Cast -in -place dismounting -free assembled heat preservation exterior sheathing component of building
CN205444882U (en) Cast -in -placely build that prefabricated dismounting -free is whole to be assembled assembly of heat preservation exterior sheathing and use outer die carrier
CN105714962B (en) The cast-in-place external wall system and construction method for building prefabricated overall assembling insulation exterior sheathing free of demolition
CN205475884U (en) Cast -in -place whole outer wall system of assembling heat preservation exterior sheathing of prefabricated dismounting -free of building
CN105019573A (en) Prefabricated external wall template structure system with heat insulation function, and construction method thereof
CN104594525B (en) Composite thermo-insulating wall board heat-preserving wall system integrated with building structure and construction technology
CN103343617A (en) Thermal-insulation external form board and dismounting-free external form board insulating system
CN113638489B (en) RC beam column node can be dismantled to assembled
CN105804290A (en) Building heat-insulation and formwork integrated wall structure and construction method thereof
CN107989238A (en) A kind of cast-in-place sandwiched heat-preservation shear wall structure, assembled architecture and engineering method
CN112324017A (en) Light concrete reinforcing steel bar net frame composite heat-insulation wall plate and mounting method thereof
CN105544815B (en) One kind is cast-in-place to build prefabricated whole assembly heat preservation exterior sheathing assembling structure free of demolition
CN205475883U (en) Cast -in -place whole heat preservation exterior sheathing assembly structure that assembles of prefabricated dismounting -free that builds
CN208168032U (en) Assembled built-in heat insulation layer concrete composite wall-light steel frame-floor connecting node
CN220768863U (en) Cast-in-situ template structure without removing mould
CN203603456U (en) Thermal insulation external template and free-dismounting external template thermal insulation system
CN111395570B (en) Fair-faced concrete composite external wall panel and construction method thereof
CN112160468A (en) Built-in heat-insulation cast-in-place concrete composite shear wall structure and construction method
CN110468967B (en) Connecting node of oversized overweight prefabricated cladding plate and main body structure beam and construction method
CN112459307A (en) Construction method of prefabricated heat-preservation-structure integrated wall external formwork
CN206000053U (en) Prefabricated exempt to dismantle overall assembling insulation exterior sheathing and build connector with shear wall is cast-in-place
CN207194226U (en) A kind of assembled integral shear wall connecting node
CN206070598U (en) A kind of poured band of outer wall of basement outboard template and its fixed structure

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160817

Termination date: 20210207