CN206256451U - H type component building enclosures are supportted before a kind of steel pipe - Google Patents

H type component building enclosures are supportted before a kind of steel pipe Download PDF

Info

Publication number
CN206256451U
CN206256451U CN201621103524.4U CN201621103524U CN206256451U CN 206256451 U CN206256451 U CN 206256451U CN 201621103524 U CN201621103524 U CN 201621103524U CN 206256451 U CN206256451 U CN 206256451U
Authority
CN
China
Prior art keywords
steel pipe
soil
component
tie beam
collar tie
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201621103524.4U
Other languages
Chinese (zh)
Inventor
谢晓东
周玉石
谢曙东
谢益飞
赵伟明
黄立伟
鲍国强
汤武
张群
裴奇斌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHANGHAI CHENGDI ROCK-SOIL DESIGN Co.,Ltd.
Shanghai chengdixiangjiang Data Technology Co.,Ltd.
Original Assignee
Shanghai City Ground Ground Design Co Ltd
SHANGHAI CHENGDI CONSTRUCTION CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai City Ground Ground Design Co Ltd, SHANGHAI CHENGDI CONSTRUCTION CO Ltd filed Critical Shanghai City Ground Ground Design Co Ltd
Priority to CN201621103524.4U priority Critical patent/CN206256451U/en
Application granted granted Critical
Publication of CN206256451U publication Critical patent/CN206256451U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Piles And Underground Anchors (AREA)
  • Bulkheads Adapted To Foundation Construction (AREA)

Abstract

The utility model body supports H type component building enclosures before being related to a kind of steel pipe, it is characterised in that the building enclosure includes bear down on one collar tie beam, Soil-cement Wall, H types component and one group of steel pipe;The H types component is inserted in Soil-cement Wall and is vertically arranged with the collar tie beam that bears down on one, and one end of the steel pipe is connected with the collar tie beam that bears down on one, and with the angled setting of H types component.The utility model has the advantages that:H types component is prefabricated, easy construction;Low cost, promotes facility;Have reinforcement antiskid, earth-retaining, sealing multiple action concurrently, go along with sb. to guard him in the range of the anti-slide performance of the soil body, resistance capacity to deformation significantly improve.

Description

H type component building enclosures are supportted before a kind of steel pipe
Technical field
The utility model belongs to base pit engineering technical field, and in particular to H type component building enclosures are supportted before a kind of steel pipe.
Background technology
For the base pit engineering in cutting depth 5m, the building enclosure form used in current existing support technology is typically adopted Excavated with Cement-soil Gravity enclosure wall, shaped steel Soil-cement Wall, slope.
Cement-soil Gravity enclosure wall is characterized in " grid-like " soil cement of the soil-baffling structure by multiple row lap connection in length and breadth Stake composition, the cement earth pile be with cement based material as curing agent, by Mixing Machine using shotcrete construction by curing agent and Foundation soil is stirred by force, formed lap connection, have the reinforcing body barricade of certain thickness and building-in depth, by wall deadweight, The passive earth pressure stabilization wall of the following soil body in excavation of foundation pit face before wall bottom frictional resistance and wall, to meet the overall steady of enclosure wall Fixed, stability against over turning, Against Sliding Stability and control deformation of wall etc. are required.Its advantage is:Without support in general hole, it is easy to quick digging Soil, has the dual-use function of earth-retaining and sealing concurrently.Shortcoming is:Bit andits control ability is weaker, construction quality is difficult to control to, economy Typically.
Shaped steel Soil-cement Wall be lap connection triaxial cement stake be inserted into shaped steel formation compound earth-retaining every Water-bound.Its advantage is:It is applicable that soil property scope is wider, barrier performance small to surrounding environment influence is good, environmental protection and energy saving, be applicable soil Layer scope wide, short time limit, reduced investment etc..Have the disadvantage:For 5m within every meter of cost of foundation ditch it is higher and with the duration change, and Construction requirement is higher, and cement piling quality is difficult to control.
It is a kind of Pit Excavation Methods for using and staying and set oblique slight slope that slope is excavated, it is characterized in that under non-support measure, By increasing width suitable for reading of cutting the earth, while taking classification slope, bank protection, precipitation etc. to maintain the ancillary method of stability of slope, can prevent Only native wall avalanche, keeps stability of slope in digging process, and, the advantage of low cost shorter with the duration has the disadvantage slope slope than wanting Ask larger, need to simultaneously meet stability of slope requirement and width requirement suitable for reading, and larger are influenceed on surrounding enviroment.
In sum, current foundation pit supporting construction depth 5m or so excavation area it is big, go along with sb. to guard him length foundation ditch long also Do not have both economical and safe to go along with sb. to guard him mode.
Utility model content
The purpose of this utility model is according to above-mentioned the deficiencies in the prior art part, there is provided H type components are supportted before a kind of steel pipe Building enclosure, the building enclosure is set by the collar tie beam that bears down on one, Soil-cement Wall, H type structures by the certain distance outside foundation ditch sideline Part and one group of fabricated construction of steel pipe composition, it is controllable to reach enhancing foundation ditch crater wall stability and building enclosure cost Purpose.
The utility model purpose is realized being completed by following technical scheme:
H type component building enclosures are supportted before a kind of steel pipe, the building enclosure includes bear down on one collar tie beam, Soil-cement Wall, H types Component and one group of steel pipe;The H types component is inserted in Soil-cement Wall and is vertically arranged with the collar tie beam that bears down on one, the steel One end of pipe is connected with the collar tie beam that bears down on one, and is set in 5 °~60 ° angles with the H types component.
The steel pipe is at least made up of row's steel pipe.
The Soil-cement Wall is made up of two row's mixing piles of lap connection, inserts described in the Soil-cement Wall H type components.
Described being connected refers to that the H types component, one end of steel pipe whole are poured in the collar tie beam that bears down on one.
Described steel pipe is applied in oblique high-pressure rotary jet grouting pile.
The utility model has the advantages that, have both reinforcement, earth-retaining, sealing multiple action, soil deformation is constrained, enhance base Hole crater wall stability, can uprightly excavate, it is to avoid conventional slope excavation method occupied ground face big problem, while significantly reducing The traditional cements soil gravity type enclosure wall scale of construction, overcomes its speed of application slow, and cost is high, the shortcomings of wall quality is difficult to control, and Cost is controllable, overcomes the shortcoming that shaped steel Soil-cement Wall cost changes by the duration, wide can be applied to foundation ditch work within 7m Journey;The characteristics of can conveniently being pulled out using steel-tube construction, constructing, it is rear recyclable to finish, and recycles, and economy can be greatly enhanced.
Brief description of the drawings
Fig. 1 is foundation pit enclosure generalized section
1 bears down on one in the foundation ditch of 26 accessory bed course of Soil-cement Wall 3H types component 4 steel pipe, 5 high-pressure rotary jet grouting pile of collar tie beam 7 The soil body
Fig. 2 is building enclosure horizontal layout form
1 bears down on one the Soil-cement Wall 3H type components of collar tie beam 2
Specific embodiment
The utility model is described in detail with specific embodiment below in conjunction with the accompanying drawings.The present embodiment is with the utility model Implemented premised on technical scheme, given detailed implementation method and specific operating process, but guarantor of the present utility model Shield scope is not limited to following embodiments.
Embodiment
As shown in figure 1, supportting H type component building enclosures before a kind of steel pipe, the building enclosure includes the collar tie beam 1, cement that bears down on one Soil stirring wall 2, H types component 3 and one group of steel pipe 4.The H types component 3 be inserted in Soil-cement Wall 2 and with the circle that bears down on one Beam 1 is vertically arranged, and one end of the steel pipe 4 is connected with the collar tie beam 1 that bears down on one, and angled with the H types component 2 sets Put.
H type component building enclosures are supportted before a kind of steel pipe involved by the utility model, its construction is concretely comprised the following steps:
1) smooth construction site, full pattern is released according to construction drawing;
2) after H types component 3 and the site acceptance of steel pipe 4, stack to the position for being easy to construction;
3) Soil-cement Wall 2 is applied at a certain distance from foundation ditch sideline is stepped back;
4) start piling machinery, H types component 3 described in step 2 vertically inserted in inside Soil-cement Wall 2 described in step 3, And reserve outside Soil-cement Wall described in step 32 its top certain length;
5) anchor pile machine is in place, and steel pipe 4 is enclosed within into anchor pile driver drilling rod outside, starts Power Component, drilling rod while creeping into, Steel pipe 4 is pressed into drilling rod oblique foundation ditch inner side direction, when construction is to bottom of foundation ditch absolute altitude, opens high-pressure rotary whitewashing, Bottom of foundation ditch forms one section of continuous high-pressure rotary jet grouting pile 5;
6) steel pipe 4 is persistently pressed into, until default elevation location, extracts drilling rod, anchor pile machine displacement next steel pipe of construction 4;
7) collar tie beam is beared down on one so that the integral structure in top of the H types component and steel pipe described in pouring;
8) fluting uprightly excavates the soil body of the inner side of the Soil-cement Wall 2, and pours reinforced bed 6 in time at hole bottom;
9) soil body 7 in slope excavation pit.

Claims (5)

1. H type component building enclosures are supportted before a kind of steel pipe, it is characterised in that the building enclosure includes bear down on one collar tie beam, soil cement Stirring wall, H types component and one group of steel pipe;The H types component is inserted in Soil-cement Wall and vertical with the collar tie beam that bears down on one Set, one end of the steel pipe is connected with the collar tie beam that bears down on one, and set in 5 °~60 ° angles with the H types component.
2. H type component building enclosures are supportted before a kind of steel pipe according to claim 1, it is characterised in that the steel pipe is at least It is made up of row's steel pipe.
3. H type component building enclosures are supportted before a kind of steel pipe according to claim 1, it is characterised in that the soil cement is stirred Mix wall to be made up of two row's mixing piles of lap connection, the H types component is inserted in the Soil-cement Wall.
4. H type component building enclosures are supportted before a kind of steel pipe according to claim 1, it is characterised in that described connection is consolidated Surely refer to that the H types component, one end of steel pipe whole are poured in the collar tie beam that bears down on one.
5. H type component building enclosures are supportted before a kind of steel pipe according to claim 1, it is characterised in that described steel pipe is Apply in oblique high-pressure rotary jet grouting pile.
CN201621103524.4U 2016-09-30 2016-09-30 H type component building enclosures are supportted before a kind of steel pipe Active CN206256451U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621103524.4U CN206256451U (en) 2016-09-30 2016-09-30 H type component building enclosures are supportted before a kind of steel pipe

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621103524.4U CN206256451U (en) 2016-09-30 2016-09-30 H type component building enclosures are supportted before a kind of steel pipe

Publications (1)

Publication Number Publication Date
CN206256451U true CN206256451U (en) 2017-06-16

Family

ID=59022301

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621103524.4U Active CN206256451U (en) 2016-09-30 2016-09-30 H type component building enclosures are supportted before a kind of steel pipe

Country Status (1)

Country Link
CN (1) CN206256451U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107882039A (en) * 2016-09-30 2018-04-06 上海城地建设股份有限公司 H type component building enclosures and its construction method are supportted before a kind of steel pipe

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107882039A (en) * 2016-09-30 2018-04-06 上海城地建设股份有限公司 H type component building enclosures and its construction method are supportted before a kind of steel pipe

Similar Documents

Publication Publication Date Title
CN102518135B (en) Horizontal jet grouting soil anchor and castinplace pile Composite Foundation Pit supporting construction engineering method
CN103031839B (en) Construction method of hand-dug piles
CN105525619B (en) A kind of water rich strata bored tunnel occlusion pipe curtain
CN103410156B (en) Support space enclosing structure and application process thereof before a kind of recyclable vertical type steel pipe
CN103321244B (en) Sand foundation existing building sets up the construction method of basement
CN204199335U (en) A kind of pressure release well reducing PHC tube pile construction soil compaction effect
CN110130909B (en) Construction method for shield to penetrate existing station in silt stratum
CN102966110A (en) Vertically-combined type impermeable waterproof curtain structure and construction method thereof
CN103015429A (en) Long auger rotary-jet mixing steel reinforced cement-soil pile foundation pit water-resisting and supporting method
CN113338361A (en) Deviation rectifying method for settlement of overlying building caused by subway construction in soft soil stratum
CN109610473A (en) A kind of construction method of the large-scale pool structure foundation pit supporting system of municipal administration
CN113216832A (en) Water-mill drilling construction method for pile hole in karst area
CN108360528A (en) A kind of method for protecting support in soft clay area Super Large Deep Foundation Pit Construction
CN110055973B (en) Foundation pit enclosure structure under high-speed railway bridge with limited construction space and water stopping method
CN105625420A (en) Extension type manual hole digging pile support structure and construction method thereof
CN110747848A (en) Construction method of gravel layer foundation deep cement mixing pile diaphragm wall
CN206768832U (en) Support, anchor cable post-tensioning H type component building enclosures before a kind of steel pipe
CN109577322A (en) A kind of constructing device for inside soil body existing pile foundation pile extension
CN113216215A (en) Deep groove support reverse construction method in complex environment
CN206256451U (en) H type component building enclosures are supportted before a kind of steel pipe
CN206768831U (en) Support, anchor cable post-tensioning HU type building enclosures before a kind of steel pipe
CN210013191U (en) Connecting structure of dam abutment impact drilling groove thin impervious wall and grouted stone dam body
CN217974332U (en) Concrete precast pile structure
CN111021378A (en) Highway subgrade slope broken line type anchoring pile retaining structure and construction method thereof
CN103015435A (en) Long auger down hole hammer vibration rotary-jet steel reinforced cement-soil pile foundation pit water-resisting and supporting method

Legal Events

Date Code Title Description
GR01 Patent grant
CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: 201806, B, Lane 518, Lane 1, Heng Yong Road, Shanghai, Jiading District 502-1

Co-patentee after: SHANGHAI CHENGDI ROCK-SOIL DESIGN Co.,Ltd.

Patentee after: Shanghai chengdixiangjiang Data Technology Co.,Ltd.

Address before: 201806, B, Lane 518, Lane 1, Heng Yong Road, Shanghai, Jiading District 502-1

Co-patentee before: SHANGHAI CHENGDI ROCK-SOIL DESIGN Co.,Ltd.

Patentee before: SHANGHAI CHENGDI CONSTRUCTION Co.,Ltd.