CN206204984U - Full cable outlet integral type GIS foundation arrangement - Google Patents
Full cable outlet integral type GIS foundation arrangement Download PDFInfo
- Publication number
- CN206204984U CN206204984U CN201621234287.5U CN201621234287U CN206204984U CN 206204984 U CN206204984 U CN 206204984U CN 201621234287 U CN201621234287 U CN 201621234287U CN 206204984 U CN206204984 U CN 206204984U
- Authority
- CN
- China
- Prior art keywords
- gis
- foundation
- raft
- ditch body
- outlet
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Abstract
Full cable outlet integral type GIS foundation arrangement, it is that GIS raft foundations are merged with outlet cable ditch body, described outlet cable ditch body is directly arranged in GIS outlets lower section, GIS raft foundations are zigzag, and the GIS raft foundations integrated poured construction together with outlet cable ditch body is formed;The top surface absolute altitude of the GIS raft foundations is in 0.20m and is embedded in underground, the 0.8m of GIS raft foundations thickness 0.6;Integral type raft foundation is adapted to subsoil and pile foundation raft foundation, and being made on GIS raft foundations has GIS foundation buttress;Width B1=1.5m, B2=0.5m of the outlet cable ditch body, depth H=2.0m, the outlet cable ditch body are open design or are arranged to tunnel structure;It has can reach easy construction, safeguard that smooth, operation safety etc. is required, it is easy to the features such as popularization and application.
Description
Technical field
The utility model relates to full cable outlet integral type GIS foundation arrangement in a kind of transformer station, it is adaptable to
Transformer station, current conversion station, power plant etc. need the engineering of arrangement GIS device, belong to project of transmitting and converting electricity design field.
Background technology
As State Grid Corporation of China " amphitypy one is changed " transformer substation construction is advanced, intensive miniaturization GIS equipment is adopted extensively
With requirement more and more higher of the city to environment, to avoid overhead transmission line inconvenience, is increased increasingly using substation with cable outlets
It is many.
Existing civil Engineering Design connects ditch (well) with GIS outlets often through pipe laying, and GIS device basis is divided with duct (well) is gone out
From design, usual GIS foundation uses pile foundation, and ditch (well) often uses subsoil, in coastal soft clay area, separation design
Differential settlement between the two will be caused, the safe operation of transformer station will be threatened.Existing conventional GIS foundation separate layout structure is shown in
Shown in Fig. 1.
The content of the invention
The purpose of this utility model is to overcome the shortcomings of that prior art is present, and provides one kind and reach easy construction, dimension
The requirements such as shield is smooth, operation safety, it is easy to the full cable outlet integral type GIS foundation arrangement of popularization and application.
The purpose of this utility model is completed by following technical solution, a kind of full cable outlet integral type GIS bases
Plinth arrangement, it is that GIS raft foundations are merged with outlet cable ditch body, the described outlet cable direct cloth of ditch body
GIS outlets lower section is placed in, GIS raft foundations are zigzag, and the GIS raft foundations are integrated poured together with outlet cable ditch body to be applied
Work is formed.
As preferred:The top surface absolute altitude of the GIS raft foundations is in -0.20m and is embedded in underground, GIS raft foundation thickness
0.6-0.8m;Integral type raft foundation is adapted to subsoil and pile foundation raft foundation, and being made on GIS raft foundations has GIS foundation
Buttress;Width B1=1.5m, B2=0.5m of the outlet cable ditch body, depth H=2.0m, the outlet cable ditch body is unlimited
Structure is arranged to tunnel structure.
The utility model uses integral type basis, reduces the earth excavation backfill on basis, make civil engineering and electrically install,
Cable laying is more convenient, can arbitrarily change outlet direction, solves the uncertainty of distant view outlet direction, it is to avoid soft clay area
Foundation uneven settlement;It can reduce the land seizure area of power distribution equipment, save land resource, by State Grid Corporation of China
The propulsion of " amphitypy one is changed " transformer substation construction is deeply.
The utility model has can reach easy construction, safeguard that smooth, operation safety etc. is required, it is easy to the spy such as popularization and application
Point.
Brief description of the drawings
Fig. 1 is existing conventional GIS foundation separate layout structural representation.
Fig. 2 is integral type GIS foundation arrangement schematic diagram described in the utility model.
Fig. 3 is the A-A cross section structure diagrams of Fig. 2.
Specific embodiment
The utility model is described in detail below in conjunction with accompanying drawing:Fig. 2, shown in 3, one kind described in the utility model
Full cable outlet integral type GIS foundation arrangement, it be by GIS raft foundations 1 and outlet cable ditch body it is 2-in-1 and together with,
Described outlet cable ditch body 2 is directly arranged in the lower section of GIS outlets 3, and described GIS raft foundations 1 are made into zigzag, should
The integrated poured construction together with outlet cable ditch body 2 of GIS raft foundations 1 is formed.
Shown in figure, the GIS raft foundations 1 top surface absolute altitude is in -0.20m and is embedded in underground, GIS raft foundations 1 are thick
Degree 0.6-0.8m;Integral type raft foundation is adapted to subsoil and pile foundation raft foundation, and being made on GIS raft foundations 1 has GIS bases
Plinth buttress 4;Width B1=1.5m, B2=0.5m of the outlet cable ditch body 2, depth H=2.0m, the outlet cable ditch body 2 is
Open design is arranged to tunnel structure.
Advantageous Effects of the present utility model are:
1)GIS foundation unites two into one with duct (well) is gone out, and using integral type basis, integral type cast basis applies civil engineering
Work and electrically installation, cable laying are more convenient, can arbitrarily change outlet direction, solve the uncertain of distant view outlet direction
Property, integral type basis can also avoid soft clay area foundation uneven settlement.
2)GIS foundation with go out duct(Well)Unite two into one, using integral type basis, reduce the earth excavation backfill on basis,
The land seizure area of power distribution equipment is reduced, State owned land resource has been saved, by State Grid Corporation of China " amphitypy one is changed " transformer station
Build propulsion deeply.
Specific case is applied in the utility model to be set forth principle of the present utility model and implementation method, with
The explanation of upper embodiment is only intended to help and understands method of the present utility model and core concept;The contents of the section should not be construed as
To limitation of the present utility model.
Claims (2)
1. full cable outlet integral type GIS foundation arrangement, it is to merge one GIS raft foundations with outlet cable ditch body
Rise, it is characterised in that described outlet cable ditch body is directly arranged in GIS outlets lower section, GIS raft foundations are zigzag, should
The integrated poured construction together with outlet cable ditch body of GIS raft foundations is formed.
2. full cable outlet integral type GIS foundation arrangement according to claim 1, it is characterised in that the GIS rafts
Plate basis top surface absolute altitude is in -0.20m and is embedded in underground, GIS raft foundation thickness 0.6-0.8m;Integral type raft foundation is adapted to
Subsoil and pile foundation raft foundation, being made on GIS raft foundations has GIS foundation buttress;The width of the outlet cable ditch body
B1=1.5m, B2=0.5m, depth H=2.0m, the outlet cable ditch body are open design or are arranged to tunnel structure.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621234287.5U CN206204984U (en) | 2016-11-17 | 2016-11-17 | Full cable outlet integral type GIS foundation arrangement |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621234287.5U CN206204984U (en) | 2016-11-17 | 2016-11-17 | Full cable outlet integral type GIS foundation arrangement |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206204984U true CN206204984U (en) | 2017-05-31 |
Family
ID=58749311
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201621234287.5U Active CN206204984U (en) | 2016-11-17 | 2016-11-17 | Full cable outlet integral type GIS foundation arrangement |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206204984U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106759450A (en) * | 2016-11-17 | 2017-05-31 | 中国能源建设集团浙江省电力设计院有限公司 | A kind of full cable outlet integral type GIS foundation arrangement |
-
2016
- 2016-11-17 CN CN201621234287.5U patent/CN206204984U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106759450A (en) * | 2016-11-17 | 2017-05-31 | 中国能源建设集团浙江省电力设计院有限公司 | A kind of full cable outlet integral type GIS foundation arrangement |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106202766B (en) | Soil body vertical deformation calculation method caused by the suction/discharge type shield method tunnel construction of ground | |
CN205530280U (en) | Novel prefabricated two walls unification foundation ditch enclosure system | |
Egan et al. | Overview of the 500MW EirGrid East-West Interconnector, considering System Design and execution-phase issues | |
CN103132539A (en) | Construction method of underground continuous wall connector cutting | |
CN104420480A (en) | Collapsible loess area integrated pipe network layout method and structure | |
CN206204984U (en) | Full cable outlet integral type GIS foundation arrangement | |
CN202577363U (en) | H-shaped steel joint structure of underground diaphragm wall | |
CN106759450A (en) | A kind of full cable outlet integral type GIS foundation arrangement | |
CN203625883U (en) | Steel sheet support pile with pipes for foundation pit construction | |
CN203260979U (en) | Cable trench and cover plate thereof | |
CN105421498A (en) | Foundation pit anti-seepage and settlement control method based on stereoscopic curtain-well group system | |
CN214993751U (en) | Novel embedded sleeve milling joint | |
CN103967033A (en) | Hydropower house foundation handling method | |
CN112177006B (en) | Construction method for protecting municipal pipeline | |
CN101552384B (en) | Method for laying direct current grounding pole | |
CN103595001A (en) | Composite reinforced HDPE cable sheath tube | |
CN204690730U (en) | Diaphragm wall skeleton | |
CN204570637U (en) | A kind of mud-dumping yard overflow system | |
CN210724048U (en) | MPP cable sleeve convenient to connect | |
CN204098037U (en) | Contact grouting one-way check grout box | |
CN203452335U (en) | Water and electricity installation structure for constructional engineering | |
CN103469766B (en) | Method for connecting rigid body and flexible body of dam foundation of reservoir | |
CN202595755U (en) | Raft foundation structure of narrow foundation power transmission tower | |
CN207092031U (en) | A kind of dam | |
CN104790380A (en) | Underground diaphragm wall framework |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |