CN202595755U - Raft foundation structure of narrow foundation power transmission tower - Google Patents

Raft foundation structure of narrow foundation power transmission tower Download PDF

Info

Publication number
CN202595755U
CN202595755U CN 201220133412 CN201220133412U CN202595755U CN 202595755 U CN202595755 U CN 202595755U CN 201220133412 CN201220133412 CN 201220133412 CN 201220133412 U CN201220133412 U CN 201220133412U CN 202595755 U CN202595755 U CN 202595755U
Authority
CN
China
Prior art keywords
power transmission
foundation
transmission tower
narrow
foundation structure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN 201220133412
Other languages
Chinese (zh)
Inventor
王小丽
蔡光宗
唐宏德
林勇锋
张崴
倪镭
陆伟明
梅志农
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Municipal Electric Power Co
Shanghai Electric Power Design Institute Co Ltd
Original Assignee
Shanghai Municipal Electric Power Co
Shanghai Electric Power Design Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Municipal Electric Power Co, Shanghai Electric Power Design Institute Co Ltd filed Critical Shanghai Municipal Electric Power Co
Priority to CN 201220133412 priority Critical patent/CN202595755U/en
Application granted granted Critical
Publication of CN202595755U publication Critical patent/CN202595755U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Foundations (AREA)

Abstract

The utility model relates to a raft foundation structure of a narrow foundation power transmission tower, which is fixedly connected to footings of the narrow foundation power transmission tower. The raft foundation structure comprises a foundation plate and an installing slot, wherein the installing slot is arranged on the foundation plate and is of a #-shaped structure, and four connecting points are provided and connected with bulges of the footings of the narrow foundation power transmission tower. Compared with the prior art, the raft foundation structure has the advantages of relative simple requirement of equipment in a construction process so that earthwork exaction is carried out by adopting manual operation or mechanical operation, lower requirement of foundation rib distribution, and little influence of environment during construction.

Description

A kind of narrow basic power transmission tower raft foundation structure
Technical field
The utility model relates to a kind of pile foundation basis, especially relates to a kind of narrow basic power transmission tower raft foundation structure.
Background technology
Transmission line of electricity mainly contains two kinds of forms, overhead wire and underground cable lines.The investment of overhead wire body is little, and transmission capacity is big, is the particularly main mode of extra high voltage network of transmission line of electricity always.
Electric power line pole tower be supporting overhead transmission line conductor and ground wire and make between them and and the earth between keep the rod of certain distance and the structure of turriform, its security reliability is directly connected to the safe operation of whole transmission line of electricity.
Along with steady development of economy; Power demand increases year by year; National grid construction development is accelerated comprehensively; The transmission line length of having built up is from 513903 kilometers of developing into 2008 of 326215 kilometers in 2004, wherein 2005 to 2008 newly-built 55549,31455,43885,56799 kilometers respectively.To in December, 2009, obtain 500kV and the above transmission of electricity project that National Development and Reform Committee approves the construction of and just reach 58.
Along with the construction of China's extra-high voltage grid and with the applying of transmission of electricity new technologies such as many loop lines of tower road, compact line, large-section lead, the trend of the big load of electric power line pole tower, maximization is more obvious.The construction of " resource-conserving, environmentally friendly " society, the security and stability of big electrical network, the complicated unusual security reliability to tower structure of climate change, economy, environmental-protecting performance etc. are all had higher requirement, and transmission line tower structure research is faced with new challenges.
The utility model content
The purpose of the utility model is exactly to provide simple relatively, the basic cloth muscle of a kind of structure to require lower narrow basic power transmission tower raft foundation structure for the defective that overcomes above-mentioned prior art existence.
The purpose of the utility model can realize through following technical scheme:
A kind of narrow basic power transmission tower raft foundation structure is fixedly connected on the footing place of narrow basic power transmission tower, described foundation structure by foundation slab, draw-in groove be installed constituted, described installation draw-in groove is arranged on the foundation slab.
Described installation draw-in groove is the groined type structure, and the four points of connection place is provided with the convexity that connects narrow basic power transmission tower footing.
This foundation structure connects into holistic raft foundation structure for four footing with narrow basic power transmission tower.
This foundation structure is embedded in below the face of land.
Compared with prior art, the utility model is simple relatively to equipment requirements in work progress, cubic metre of earth excavation adopt artificial, machinery all can, basic cloth muscle requires lower, and affected by environment less during construction.
Description of drawings
Fig. 1 is the main TV structure sketch map of the utility model;
Fig. 2 is the plan structure sketch map of the utility model.
Among the figure, 1 is that foundation slab, 2 is footing for draw-in groove, 3 is installed.
The specific embodiment
Below in conjunction with accompanying drawing and specific embodiment the utility model is elaborated.
Embodiment
A kind of narrow basic power transmission tower raft foundation structure; Its structure is shown in Fig. 1-2; Be fixedly connected on footing 3 places of narrow basic power transmission tower, foundation structure is made up of foundation slab 1, installation draw-in groove 2, and it is the groined type structure that draw-in groove 2 is installed; Be arranged on the foundation slab 1, the four points of connection place that draw-in groove 2 is installed is provided with the convexity that connects narrow basic power transmission tower footing 3.This foundation structure is in aggregates with four footing connections of narrow basic power transmission tower, is embedded in below the face of land.The main feature of the utility model is that floor space is big, buried depth is shallow.According to basic pattern characteristics, commbined foundations equipment requirements in work progress is simple relatively, cubic metre of earth excavation adopt artificial, machinery all can, basic cloth muscle requires lower, and affected by environment less during construction.
During installation, according to the soil property situation, in conjunction with iron tower corner size, the in advance inclined to one side value in basis is set rationally when foundation construction, the iron tower of avoiding non-design control occurring tilts; Attention is avoided because the ground disturbance that reasons such as machinery or job practices cause the control of foundation construction method.

Claims (4)

1. one kind narrow basic power transmission tower raft foundation structure is fixedly connected on the footing place of narrow basic power transmission tower, it is characterized in that, described foundation structure by foundation slab, draw-in groove be installed constituted, described installation draw-in groove is arranged on the foundation slab.
2. a kind of narrow basic power transmission tower raft foundation structure according to claim 1 is characterized in that described installation draw-in groove is the groined type structure, and the four points of connection place is provided with the convexity that connects narrow basic power transmission tower footing.
3. a kind of narrow basic power transmission tower raft foundation structure according to claim 1 is characterized in that, this foundation structure connects into holistic raft foundation structure for four footing with narrow basic power transmission tower.
4. a kind of narrow basic power transmission tower raft foundation structure according to claim 1 is characterized in that this foundation structure is embedded in below the face of land.
CN 201220133412 2012-03-31 2012-03-31 Raft foundation structure of narrow foundation power transmission tower Expired - Lifetime CN202595755U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201220133412 CN202595755U (en) 2012-03-31 2012-03-31 Raft foundation structure of narrow foundation power transmission tower

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201220133412 CN202595755U (en) 2012-03-31 2012-03-31 Raft foundation structure of narrow foundation power transmission tower

Publications (1)

Publication Number Publication Date
CN202595755U true CN202595755U (en) 2012-12-12

Family

ID=47313305

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201220133412 Expired - Lifetime CN202595755U (en) 2012-03-31 2012-03-31 Raft foundation structure of narrow foundation power transmission tower

Country Status (1)

Country Link
CN (1) CN202595755U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104458455A (en) * 2014-12-05 2015-03-25 国网福建省电力有限公司 Spatial tower leg structure testing method of narrow-based power transmission steel pipe tower
CN114809065A (en) * 2022-04-13 2022-07-29 中国能源建设集团江苏省电力设计院有限公司 Power transmission tower foundation structure and construction method

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104458455A (en) * 2014-12-05 2015-03-25 国网福建省电力有限公司 Spatial tower leg structure testing method of narrow-based power transmission steel pipe tower
CN104458455B (en) * 2014-12-05 2017-03-29 国网福建省电力有限公司 Narrow base power transmission steel pipe tower space tower leg structured testing method
CN114809065A (en) * 2022-04-13 2022-07-29 中国能源建设集团江苏省电力设计院有限公司 Power transmission tower foundation structure and construction method

Similar Documents

Publication Publication Date Title
CN205530280U (en) Novel prefabricated two walls unification foundation ditch enclosure system
CN204002805U (en) A kind of reducing tunnelling device
CN104110039A (en) Fan base with pressure dispersed type arrangement high-strength pre-stressed anchor rods (cables)
CN208486284U (en) A kind of offshore wind farm gravity block basis
CN202595755U (en) Raft foundation structure of narrow foundation power transmission tower
CN202595756U (en) Piled raft foundation structure of narrow-base power transmission tower
CN201649116U (en) Hollow concrete composite plate foundation of coal mine subsidence area transmission tower
CN205116207U (en) Offshore wind farm fan combined type embedded rock pile basis
CN105507646B (en) Communication base station
CN204780981U (en) Outdoor GIS equipment foundations of shallow formula of burying
CN203782738U (en) Prefabricated type communication base station foundation
CN205153666U (en) Communication base station
CN101552384B (en) Method for laying direct current grounding pole
CN103967033A (en) Hydropower house foundation handling method
CN206942282U (en) A kind of reinforcement type electric force pole tower
CN205205885U (en) Steel stand verticality deviation processing unit
CN201699151U (en) Electric power point type grounding device for urban areas
CN204298850U (en) Integrated pipe canal in a kind of soft soil layer
CN206204984U (en) Full cable outlet integral type GIS foundation arrangement
CN104332727A (en) Concentrated grounding device using displacement current to improve flow dispersion characteristic and arrangement method thereof
CN219287035U (en) Water conservancy and hydropower engineering buried wire device
Tang et al. Overview of Method for Reducing grounding resistance of substation grounding system
CN209873853U (en) Fixed base of box-type substation
CN202007565U (en) Lambdoidal foundation electric pile
CN216413520U (en) Temporary basement power supply system

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20121212