CN204298850U - Integrated pipe canal in a kind of soft soil layer - Google Patents

Integrated pipe canal in a kind of soft soil layer Download PDF

Info

Publication number
CN204298850U
CN204298850U CN201420403810.7U CN201420403810U CN204298850U CN 204298850 U CN204298850 U CN 204298850U CN 201420403810 U CN201420403810 U CN 201420403810U CN 204298850 U CN204298850 U CN 204298850U
Authority
CN
China
Prior art keywords
sheet pile
steel sheet
steel
box culvert
sides
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420403810.7U
Other languages
Chinese (zh)
Inventor
廖四海
刘振华
谭博
王述红
王存根
刘小高
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CCFEB Civil Engineering Co Ltd
Original Assignee
CCFEB Civil Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CCFEB Civil Engineering Co Ltd filed Critical CCFEB Civil Engineering Co Ltd
Priority to CN201420403810.7U priority Critical patent/CN204298850U/en
Application granted granted Critical
Publication of CN204298850U publication Critical patent/CN204298850U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model relates to the underground cavern excavation technical field of Geotechnical Engineering, specifically disclose integrated pipe canal in a kind of soft soil layer, comprise CFG stake, steel sheet pile, intercepting ditch, I-steel waist rail, supporting steel pipe, box culvert, concrete bed course, steel sheet pile is laid above CFG stake, box culvert is installed in the top of steel sheet pile, concrete bed course is had between steel sheet pile and box culvert, steel sheet pile is installed on the both sides of CFG stake and box culvert, by angle bracket, supporting steel pipe is installed between the steel sheet pile on both sides, I-steel waist rail is arranged on supporting steel pipe, all offers intercepting ditch above the steel sheet pile on both sides.The utility model is applicable to soft clay area, has safety and stability in use procedure, and Appropriate application space resources, realize the maximization of economic benefit.

Description

Integrated pipe canal in a kind of soft soil layer
Technical field
The utility model relates to the underground cavern excavation technical field of Geotechnical Engineering, specifically integrated pipe canal in a kind of soft soil layer.
Background technology
City integrated pipe trench (corridor) is also referred to as common trench, build municipal public use tunnel space at Urban Underground, by municipal public use pipelines such as electric power, communication, water supply, concentrate according to the requirement of planning and be laid in structures, implement unified planning, design, construction and management.Integrated pipe canal is the inevitable outcome of urbanization and economic height development, and being a kind of means of comprehensive utilization urban underground space, is ensure that city has the important infrastructure of the capability of sustainable development.Build trend and trend that integrated pipe canal has become urban infrastructure modernization Renovation and reconstruction and urban modernization construction.Along with the quickening of China's Development of China's Urbanization and the raising of comprehensive strength, the complexity of City Buried Pipeline and importance all require to adopt integrated pipe canal Model construction city that is intensive, sustainability.Political affairs utilities pipeline.Solve the many contradictions that caused by the management system of barrier between different departments by building integrated pipe canal and avoid urban road secondary excavation by urban construction person and manager are known together.
Along with the raising of China's economic strength and the quickening of urbanization process, many cities start the construction exploring integrated pipe canal, have accumulated preliminary design, construction, construction, managerial experiences, but compared with developed countries, the construction of China mainland areas comprehensive pipe trench is also in the starting stage.But the integrated pipe canal at present for soft clay area is deficienter.
Utility model content
The purpose of this utility model is to provide integrated pipe canal in a kind of safe, stable, economic soft soil layer, to solve the problem proposed in above-mentioned background technology.
For achieving the above object, the utility model provides following technical scheme:
Integrated pipe canal in a kind of soft soil layer, comprise CFG stake, steel sheet pile, intercepting ditch, I-steel waist rail, supporting steel pipe, box culvert, concrete bed course, steel sheet pile is laid above described CFG stake, box culvert is installed in the top of described steel sheet pile, have concrete bed course between steel sheet pile and box culvert, steel sheet pile is installed on the both sides of CFG stake and box culvert, installs supporting steel pipe between the steel sheet pile on both sides by angle bracket, I-steel waist rail is arranged on supporting steel pipe, all offers intercepting ditch above the steel sheet pile on both sides.
As further program of the utility model: described steel sheet pile adopts Larsen type III material.
As further program of the utility model: described concrete bed course adopts C15 armored concrete material.
Compared with prior art, the beneficial effects of the utility model are: the integrated pipe canal being applicable to soft clay area has safety and stability in use procedure, and Appropriate application space resources, realize the maximization of economic benefit.
Accompanying drawing explanation
Fig. 1 is integrated pipe canal structural representation in soft soil layer;
Fig. 2 is the overall cross-sectional configuration schematic diagram in pipe trench and road surface;
In figure: 1--CFG stake, 2-steel sheet pile, 3-pavement structure, 4-intercepting ditch, 5-I-steel waist rail, 6-supporting steel pipe, 7-box culvert, 8-angle bracket, 9-concrete bed course.
Detailed description of the invention
Below in conjunction with the accompanying drawing in the utility model embodiment, be clearly and completely described the technical scheme in the utility model embodiment, obviously, described embodiment is only the utility model part embodiment, instead of whole embodiments.Based on the embodiment in the utility model, those of ordinary skill in the art are not making the every other embodiment obtained under creative work prerequisite, all belong to the scope of the utility model protection.
Refer to Fig. 1 and Fig. 2, in the utility model embodiment, integrated pipe canal in a kind of soft soil layer, comprise CFG stake 1, steel sheet pile 2, intercepting ditch 4, I-steel waist rail 5, supporting steel pipe 6, box culvert 7, concrete bed course 9, described CFG stake 1 can make full use of the bearing capacity acting in conjunction of inter-pile soil, and load can be transmitted in deep foundation base, there is good technical performance and economic effect, steel sheet pile 2 is laid above CFG stake 1, box culvert 7 is installed in the top of described steel sheet pile 2, concrete bed course 9 is had between steel sheet pile 2 and box culvert 7, CFG stake 1 installs steel sheet pile 2 with the both sides of box culvert 7, by angle bracket 8, supporting steel pipe 6 is installed between the steel sheet pile 2 on both sides, I-steel waist rail 5 is arranged on supporting steel pipe 6, there is support, the effect of bending resistance, intercepting ditch 4 is all offered above the steel sheet pile 2 on both sides, interception hillside flows to the water of roadbed, thus protection roadbed, steel sheet pile 2 adopts Larsen type III, Larsen steel sheet pile is not only green, environmental protection and speed of application fast, operating expenses is low, there is good water-proof function, concrete bed course 9 adopts C15 armored concrete material, and compression strength is high, good stability.The utility model is applicable to soft clay area, has safety and stability in use procedure, and Appropriate application space resources, realize the maximization of economic benefit.
To those skilled in the art, obvious the utility model is not limited to the details of above-mentioned one exemplary embodiment, and when not deviating from spirit of the present utility model or essential characteristic, can realize the utility model in other specific forms.Therefore, no matter from which point, all should embodiment be regarded as exemplary, and be nonrestrictive, scope of the present utility model is limited by claims instead of above-mentioned explanation, and all changes be therefore intended in the implication of the equivalency by dropping on claim and scope are included in the utility model.Any Reference numeral in claim should be considered as the claim involved by limiting.
In addition, be to be understood that, although this description is described according to embodiment, but not each embodiment only comprises an independently technical scheme, this narrating mode of description is only for clarity sake, those skilled in the art should by description integrally, and the technical scheme in each embodiment also through appropriately combined, can form other embodiments that it will be appreciated by those skilled in the art that.

Claims (3)

1. integrated pipe canal in a soft soil layer, comprise CFG stake (1), steel sheet pile (2), intercepting ditch (4), I-steel waist rail (5), supporting steel pipe (6), box culvert (7), concrete bed course (9), it is characterized in that, steel sheet pile (2) is laid in described CFG stake (1) top, box culvert (7) is installed in the top of described steel sheet pile (2), concrete bed course (9) is had between steel sheet pile (2) and box culvert (7), CFG stake (1) installs steel sheet pile (2) with the both sides of box culvert (7), by angle bracket (8), supporting steel pipe (6) is installed between the steel sheet pile (2) on both sides, I-steel waist rail (5) is arranged on supporting steel pipe (6), intercepting ditch (4) is all offered in steel sheet pile (2) top on both sides.
2. integrated pipe canal in a kind of soft soil layer according to claim 1, is characterized in that, described steel sheet pile (2) adopts Larsen type III material.
3. integrated pipe canal in a kind of soft soil layer according to claim 1, is characterized in that, described concrete bed course (9) adopts C15 armored concrete material.
CN201420403810.7U 2014-07-22 2014-07-22 Integrated pipe canal in a kind of soft soil layer Expired - Fee Related CN204298850U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420403810.7U CN204298850U (en) 2014-07-22 2014-07-22 Integrated pipe canal in a kind of soft soil layer

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420403810.7U CN204298850U (en) 2014-07-22 2014-07-22 Integrated pipe canal in a kind of soft soil layer

Publications (1)

Publication Number Publication Date
CN204298850U true CN204298850U (en) 2015-04-29

Family

ID=53104399

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420403810.7U Expired - Fee Related CN204298850U (en) 2014-07-22 2014-07-22 Integrated pipe canal in a kind of soft soil layer

Country Status (1)

Country Link
CN (1) CN204298850U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104179194A (en) * 2014-07-22 2014-12-03 中建五局土木工程有限公司 Integrated pipe trench in soft soil stratum and construction method of integrated pipe trench

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104179194A (en) * 2014-07-22 2014-12-03 中建五局土木工程有限公司 Integrated pipe trench in soft soil stratum and construction method of integrated pipe trench

Similar Documents

Publication Publication Date Title
CN204662499U (en) Concrete of basement exterior wall, waterproof, fertile groove integrated construction structure
CN105298507B (en) A kind of underground pipe gallery construction method of top open cut bottom tunneler construction
CN104179194A (en) Integrated pipe trench in soft soil stratum and construction method of integrated pipe trench
CN101886479B (en) Underground storey-adding process of frame structural building by one-by-one independent foundation underpinning method
CN105951876A (en) Cover plate type precast concrete urban comprehensive pipe gallery and construction method thereof
CN102654055A (en) Construction method for compound construction of large-scale underground space structure by holes, groove and piles
CN204551487U (en) A kind of steel support structure that can realize Adjacent Pit synchronous construction
CN103410152B (en) A kind of construction method for long and narrow deep foundation pit earthwork digging
CN103061777A (en) Method for building urban underground tunnel shield cutter repairing space with preset reinforcing pile groups
CN104234056A (en) Construction method for preventing deformation of utility tunnel at high-water-level liquefaction region
CN104652470B (en) Light-duty self-anchored type prefabricated reinforced concrete retaining wall and construction method
CN101638898B (en) Suspension type construction method of top pipe shaft
CN203904857U (en) Precast-concrete three-arch culvert pipe
CN204298850U (en) Integrated pipe canal in a kind of soft soil layer
CN204825969U (en) Inspection shaft subsides prevents and treats structure
CN205000325U (en) Urban road ground that tubular pile was handled
CN104294859A (en) Stability judgment method of foundation pit basal-heave resistant system
CN208023600U (en) A kind of caisson structure suitable for complex environment
CN206668275U (en) A kind of subsurface excavation method Pipe rack
CN206457856U (en) A kind of ground crack resistence structure
CN206220212U (en) pavement comprehensive pipe network and drainage system
CN205205885U (en) Steel stand verticality deviation processing unit
CN204163085U (en) The supporting of bored pile foundation ditch
CN203247497U (en) Bridge type hoisting reconstruction construction structure for communication optical cables
CN204040048U (en) A kind of marine soft soil foundation improvement structure

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150429

Termination date: 20190722

CF01 Termination of patent right due to non-payment of annual fee