CN204551487U - A kind of steel support structure that can realize Adjacent Pit synchronous construction - Google Patents
A kind of steel support structure that can realize Adjacent Pit synchronous construction Download PDFInfo
- Publication number
- CN204551487U CN204551487U CN201520184150.2U CN201520184150U CN204551487U CN 204551487 U CN204551487 U CN 204551487U CN 201520184150 U CN201520184150 U CN 201520184150U CN 204551487 U CN204551487 U CN 204551487U
- Authority
- CN
- China
- Prior art keywords
- diagonal brace
- pit
- station
- foundation ditch
- tunnel
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Abstract
The utility model discloses a kind of steel support structure that can realize Adjacent Pit synchronous construction, described Adjacent Pit is made up of station pit and tunnel foundation ditch, described station pit and described tunnel foundation ditch share space enclosing structure, described shared space enclosing structure comprises shared ground-connecting-wall, be provided with the n road station pit diagonal brace being positioned at described station pit bight in the side of described shared ground-connecting-wall, wherein n is greater than 2 integers being less than 4; In described tunnel foundation ditch, be provided with horizontal steel tube to support, it is characterized in that, be provided with the balance diagonal brace of station pit diagonal brace described in the n road being positioned at foundation ditch bight, described tunnel at the opposite side of described shared ground-connecting-wall.The utility model utilizes balance diagonal brace to provide counter-force to the space enclosing structure shared in tunnel foundation ditch, constructs again, can realize synchronous construction, can compress about 4 months duration after making open trench tunnel construction that station need not be waited to complete.
Description
Technical field
The utility model relates to a kind of foundation ditch braced structures, particularly a kind of steel support structure realizing Adjacent Pit synchronous construction.
Background technology
In city rail construction, due to the restriction of urban space, tunnel generally adopts shield construction, and area, rock stratum can adopt Mining Method, can adopt cut and cover tunneling in place open area such as the combination areas of city and country.The tunnel of cut and cover tunneling and subway station is adopted to form Adjacent Pit.The tunnel excavation degree of depth is suitable with the station degree of depth, and foundation ditch width has bigger difference, and support pattern also has difference, and two foundation ditches generally should front and back construction.According to general Metro Construction program, station of should first constructing, carries out the open-cut in tunnel again after topping out.For large-scale transfer station on the same stage, wherein a line adopts open cut, and another line adopts shield construction, the problem that traditional design can cause the duration longer.The working procedure of traditional design is: Metro Excavation station pit → constructing structure to first support → open trench tunnel foundation ditch (abolishing the ground-connecting-wall) → constructing structure that binds → remove simultaneously to binding → the accessory structure construction → shield-tunneling construction of open trench tunnel.Transfer station, because volume is large, complex structure, is generally the duration Controlling vertex of many subway lines, goes along with sb. to guard him or braced structures, realize the synchronous of two foundation ditches if can change, then can shorten the overall duration.
Summary of the invention
The utility model provides a kind of steel support structure that can realize Adjacent Pit synchronous construction for solving in known technology the technical problem that exists.
The technical scheme that the utility model is taked for the technical problem existed in solution known technology is: a kind of steel support structure that can realize Adjacent Pit synchronous construction, described Adjacent Pit is made up of station pit and tunnel foundation ditch, described station pit and described tunnel foundation ditch share space enclosing structure, described shared space enclosing structure comprises shared ground-connecting-wall, be provided with the n road station pit diagonal brace being positioned at described station pit bight in the side of described shared ground-connecting-wall, wherein n is greater than 2 integers being less than 6; In described tunnel foundation ditch, be provided with horizontal steel tube to support, be provided with the balance diagonal brace of station pit diagonal brace described in the n road being positioned at foundation ditch bight, described tunnel at the opposite side of described shared ground-connecting-wall.
Described balance diagonal brace has n-1 road, from top to bottom with station pit diagonal brace one_to_one corresponding described in n-1 road, and the most lower balance diagonal brace that described station pit diagonal brace is not corresponding with it together.
Balance diagonal brace described in per pass and comprise a reinforced concrete slab angle brace and a steel pipe diagonal brace, the sectional dimension of described steel pipe diagonal brace is identical to the sectional dimension supportted with described horizontal steel tube.
Described steel pipe diagonal brace is connected with described shared space enclosing structure by power transmission box.
The advantage that the utility model has and good effect are: in tunnel foundation ditch, utilize balance diagonal brace to provide counter-force to the space enclosing structure shared, and construct again, can realize synchronous construction, can compress about 4 months duration after making open trench tunnel construction that station need not be waited to complete; And then have compressed the life cycle of mechanical hoisting, can improve the work efficiency of hoisting transportation equipment, save lease expenses, rough estimate, can save lifting cost 600,000.Set balanced support is identical with the support absolute altitude of station pit diagonal brace, and stressed shortest path, to space enclosing structure without subsidiary stress, on space enclosing structure without impact.Compared with supporting with increase concrete, bracing members is easy for installation, and material can have enough to meet the need use, and can avoid the impact of later stage dismounting on space enclosing structure.With reserved back-pressure soil phase ratio, provide counterforce structure to take up room little, do not need excavation and construction point two stages, interval without impact on open cut.
Accompanying drawing explanation
Fig. 1 is structural representation of the present utility model;
Fig. 2 is the sectional drawing of Fig. 1.
In figure: 1, station pit; 1-1, station pit diagonal brace; 2, tunnel foundation ditch; 2-1, reinforced concrete slab angle brace; 2-2, steel pipe diagonal brace; 2-3, steel pipe are to support; 3, ground-connecting-wall is shared.
Detailed description of the invention
For summary of the invention of the present utility model, Characteristic can be understood further, hereby exemplify following examples, and coordinate accompanying drawing to be described in detail as follows:
Refer to Fig. 1 and Fig. 2, a kind of steel support structure that can realize Adjacent Pit synchronous construction, described Adjacent Pit is made up of station pit 1 and tunnel foundation ditch 2, described station pit 1 and described tunnel foundation ditch 2 share space enclosing structure, described shared space enclosing structure comprises shared ground-connecting-wall 3, be provided with the n road station pit diagonal brace 1-1 being positioned at described station pit 1 bight in the side of described shared ground-connecting-wall 3, wherein n is greater than 2 integers being less than 6; In described tunnel foundation ditch 2, be provided with horizontal steel tube to support 2-3, be provided with the balance diagonal brace of station pit diagonal brace 1-1 described in the n road being positioned at foundation ditch 2 bight, described tunnel at the opposite side of described shared ground-connecting-wall 3.
In the present embodiment, described balance diagonal brace has n-1 road, from top to bottom with station pit diagonal brace 1-1 one_to_one corresponding described in n-1 road, and the most lower balance diagonal brace that described station pit diagonal brace 1-1 is not corresponding with it together.Balance diagonal brace described in per pass and comprise an a reinforced concrete slab angle brace 2-1 and steel pipe diagonal brace 2-2, the sectional dimension of described steel pipe diagonal brace 2-2 is identical to the sectional dimension supportting 2-3 with described horizontal steel tube.Described steel pipe diagonal brace is connected with described shared space enclosing structure by power transmission box.
Although be described preferred embodiment of the present utility model by reference to the accompanying drawings above; but the utility model is not limited to above-mentioned detailed description of the invention; above-mentioned detailed description of the invention is only schematic; be not restrictive; those of ordinary skill in the art is under enlightenment of the present utility model; do not departing under the ambit that the utility model aim and claim protect, can also make a lot of form, these all belong within protection domain of the present utility model.
Claims (4)
1. one kind can realize the steel support structure of Adjacent Pit synchronous construction, described Adjacent Pit is made up of station pit and tunnel foundation ditch, described station pit and described tunnel foundation ditch share space enclosing structure, described shared space enclosing structure comprises shared ground-connecting-wall, be provided with the n road station pit diagonal brace being positioned at described station pit bight in the side of described shared ground-connecting-wall, wherein n is greater than 2 integers being less than 6; In described tunnel foundation ditch, be provided with horizontal steel tube to support, it is characterized in that, be provided with the balance diagonal brace of station pit diagonal brace described in the n road being positioned at foundation ditch bight, described tunnel at the opposite side of described shared ground-connecting-wall.
2. the steel support structure that can realize Adjacent Pit synchronous construction according to claim 1, it is characterized in that, described balance diagonal brace has n-1 road, from top to bottom with station pit diagonal brace one_to_one corresponding described in n-1 road, and the most lower balance diagonal brace that described station pit diagonal brace is not corresponding with it together.
3. the steel support structure that can realize Adjacent Pit synchronous construction according to claim 1, it is characterized in that, balance diagonal brace described in per pass and comprise a reinforced concrete slab angle brace and a steel pipe diagonal brace, the sectional dimension of described steel pipe diagonal brace is identical to the sectional dimension supportted with described horizontal steel tube.
4. the steel support structure that can realize Adjacent Pit synchronous construction according to claim 3, is characterized in that, described steel pipe diagonal brace is connected with described shared space enclosing structure by power transmission box.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520184150.2U CN204551487U (en) | 2015-03-30 | 2015-03-30 | A kind of steel support structure that can realize Adjacent Pit synchronous construction |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520184150.2U CN204551487U (en) | 2015-03-30 | 2015-03-30 | A kind of steel support structure that can realize Adjacent Pit synchronous construction |
Publications (1)
Publication Number | Publication Date |
---|---|
CN204551487U true CN204551487U (en) | 2015-08-12 |
Family
ID=53826620
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201520184150.2U Expired - Fee Related CN204551487U (en) | 2015-03-30 | 2015-03-30 | A kind of steel support structure that can realize Adjacent Pit synchronous construction |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN204551487U (en) |
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107313431A (en) * | 2017-08-02 | 2017-11-03 | 中铁隧道集团二处有限公司 | Close on not contour foundation ditch method for synchronously constructing |
CN111236255A (en) * | 2020-03-06 | 2020-06-05 | 华东建筑设计研究院有限公司 | Support structure capable of realizing cross implementation of adjacent foundation pits and application construction method thereof |
CN112609699A (en) * | 2020-12-14 | 2021-04-06 | 上海市基础工程集团有限公司 | Construction method for synchronously constructing deep foundation pit beside existing pile anchor system deep foundation pit |
CN113530571A (en) * | 2021-07-20 | 2021-10-22 | 中铁第一勘察设计院集团有限公司 | Inner support supporting system for excavating underground excavation tunnel to station end of underground station and construction method |
CN113982623A (en) * | 2021-10-22 | 2022-01-28 | 中建八局西北建设有限公司 | Construction method and counter-force structure for subway tunnel and station interface part |
CN115288155A (en) * | 2022-08-19 | 2022-11-04 | 中国一冶集团有限公司 | Efficient building method of square-round combined ultra-deep permanent foundation pit supporting structure |
CN115387344A (en) * | 2022-08-19 | 2022-11-25 | 中建三局第三建设工程有限责任公司 | Double-foundation-pit double-working-condition rapid construction method |
CN113530571B (en) * | 2021-07-20 | 2024-04-30 | 中铁第一勘察设计院集团有限公司 | Inner support supporting system for excavating underground tunnel to station end of underground station and construction method |
-
2015
- 2015-03-30 CN CN201520184150.2U patent/CN204551487U/en not_active Expired - Fee Related
Cited By (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107313431A (en) * | 2017-08-02 | 2017-11-03 | 中铁隧道集团二处有限公司 | Close on not contour foundation ditch method for synchronously constructing |
CN111236255A (en) * | 2020-03-06 | 2020-06-05 | 华东建筑设计研究院有限公司 | Support structure capable of realizing cross implementation of adjacent foundation pits and application construction method thereof |
CN112609699A (en) * | 2020-12-14 | 2021-04-06 | 上海市基础工程集团有限公司 | Construction method for synchronously constructing deep foundation pit beside existing pile anchor system deep foundation pit |
CN112609699B (en) * | 2020-12-14 | 2022-07-08 | 上海市基础工程集团有限公司 | Construction method for synchronously constructing deep foundation pit beside existing pile anchor system deep foundation pit |
CN113530571A (en) * | 2021-07-20 | 2021-10-22 | 中铁第一勘察设计院集团有限公司 | Inner support supporting system for excavating underground excavation tunnel to station end of underground station and construction method |
CN113530571B (en) * | 2021-07-20 | 2024-04-30 | 中铁第一勘察设计院集团有限公司 | Inner support supporting system for excavating underground tunnel to station end of underground station and construction method |
CN113982623A (en) * | 2021-10-22 | 2022-01-28 | 中建八局西北建设有限公司 | Construction method and counter-force structure for subway tunnel and station interface part |
CN115288155A (en) * | 2022-08-19 | 2022-11-04 | 中国一冶集团有限公司 | Efficient building method of square-round combined ultra-deep permanent foundation pit supporting structure |
CN115387344A (en) * | 2022-08-19 | 2022-11-25 | 中建三局第三建设工程有限责任公司 | Double-foundation-pit double-working-condition rapid construction method |
CN115387344B (en) * | 2022-08-19 | 2023-09-12 | 中建三局第三建设工程有限责任公司 | Double-foundation pit double-working-condition rapid construction method |
CN115288155B (en) * | 2022-08-19 | 2023-10-27 | 中国一冶集团有限公司 | Efficient construction method of square and round combined ultra-deep permanent foundation pit supporting structure |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204551487U (en) | A kind of steel support structure that can realize Adjacent Pit synchronous construction | |
CN105298507B (en) | A kind of underground pipe gallery construction method of top open cut bottom tunneler construction | |
CN203308470U (en) | Cover arch structure suitable for large-section unsymmetrical loading tunnel portal section | |
CN104879144B (en) | The excavating construction method of the underground space is built with array push pipe in soft clay area | |
CN104963705B (en) | A kind of underground space tunneling construction method | |
CN102654055A (en) | Construction method for compound construction of large-scale underground space structure by holes, groove and piles | |
CN103924602B (en) | Deep Thick Soft Ground foundation ditch construction method | |
CN104131565B (en) | A kind of against making the construction method that the earthwork is just made to excavate | |
CN104563128A (en) | Synchronous excavation supporting system for deep and large asymmetric pit in soft soil area and implementation method of supporting system | |
CN105781595B (en) | A kind of rectangle or class rectangle cross-section underground engineering machinery branch tunneling method of construction | |
CN204212167U (en) | Lowering level of ground water structure | |
CN104863597A (en) | Transverse tunnel cover method for shallow-buried underground excavation large underground space construction | |
CN101793023A (en) | Foundation pit construction method | |
CN103244143B (en) | A kind of underground construction excavating construction method and underground station | |
CN104518473A (en) | Suspension protection structure and method of cable box culvert pipeline | |
CN203716046U (en) | Steel trestle for earthwork transportation of foundation pit | |
CN104404949A (en) | Root-shaped filling pile | |
CN202610677U (en) | Auxiliary tool for soft soil earthwork construction | |
US11821316B1 (en) | System and construction method of single-layer lining tunnel structure based on mine-tunnelling method | |
CN104405402A (en) | Symmetric middle separation wall construction method for hidden type middle wall multi-arch tunnel | |
CN110924960A (en) | Subway construction method for shield starting before constructing station structure | |
CN103775094B (en) | Gravel soil stratum medium-sized section water-conveyance tunnel two step three step excavation construction method | |
CN103485366B (en) | Safe stress conversion construction method for improvement on main structure of subway station | |
CN106337373B (en) | Construction method for obliquely penetrating existing line overhead jacking box culvert | |
CN104404963B (en) | A kind of subway transfer station deep basal pit crossed construction method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20150812 Termination date: 20200330 |