CN204212167U - Lowering level of ground water structure - Google Patents

Lowering level of ground water structure Download PDF

Info

Publication number
CN204212167U
CN204212167U CN201420534997.4U CN201420534997U CN204212167U CN 204212167 U CN204212167 U CN 204212167U CN 201420534997 U CN201420534997 U CN 201420534997U CN 204212167 U CN204212167 U CN 204212167U
Authority
CN
China
Prior art keywords
pilot tunnel
precipitation
construction
main body
ground water
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420534997.4U
Other languages
Chinese (zh)
Inventor
罗富荣
徐凌
曹伍富
张成满
汪玉华
王刚
李铁生
郝志宏
金淮
雷崇红
张丽
夏瑞萌
高亚彬
黄齐武
张建海
张昊
张瑜
陈明昊
林纯鹏
杨壮志
赵宝华
刘涛
代昱昊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Tunnel Group Co Ltd CRTG
Beijing MTR Construction Administration Corp
Original Assignee
China Railway Tunnel Group Co Ltd CRTG
Beijing MTR Construction Administration Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Tunnel Group Co Ltd CRTG, Beijing MTR Construction Administration Corp filed Critical China Railway Tunnel Group Co Ltd CRTG
Priority to CN201420534997.4U priority Critical patent/CN204212167U/en
Application granted granted Critical
Publication of CN204212167U publication Critical patent/CN204212167U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

The utility model relates to lowering level of ground water field, in particular to a kind of lowering level of ground water structure.It construction main body comprising precipitation pilot tunnel, dewatering well and be made up of many constructing pilot tunnels; Constructing pilot tunnel, precipitation pilot tunnel are adjacent or crossing with construction main body; Dewatering well is arranged on precipitation pilot tunnel and connects.The lowering level of ground water structure that the utility model provides, combines precipitation pilot tunnel and constructing pilot tunnel, and make both adjacent crossing or directly do precipitation pilot tunnel by double for constructing pilot tunnel, temporary works amount is little, and engineering is discarded to be measured little, and construction costs is lower; Do not set up new precipitation pilot tunnel, the disturbance of pilot tunnel construction formation is less, is conducive to the protection of periphery construction of structures; Additionally do not take the urban underground space outside station, the later development being conducive to the underground space utilizes; Little to the construction infection of the successive projects such as station accessory structure.

Description

Lowering level of ground water structure
Technical field
The utility model relates to lowering level of ground water field, in particular to a kind of lowering level of ground water structure.
Background technology
Cavern-pile method is built subway station and is required to implement under anhydrous condition, needs to adopt dewatering measure by below near for groundwater table excavation face before tunnel excavation.Usual dewatering well AT STATION structural perimeter is arranged, sets from ground.But, because hidden construction process station multidigit is in the compact district of the facilities such as building, road and underground utilities, along with the complexity day by day with surrounding enviroment condition of carrying out in a deep going way of subway construction, the condition that ground sets dewatering well will become more and more difficult, therefore be necessary to study the engineering construction scheme setting dewatering well (abbreviation lowering level of ground water) in subterranean tunnel.
The lowering level of ground water scheme of current domestic application is all apply separately precipitation pilot tunnel in underground, in pilot tunnel, set dewatering well.Such as station, Beijing Metro No. 15 line Olympic Green, east side adopts headroom in Mining Method excavation to be the precipitation pilot tunnel of 3.5m × 4.5m AT STATION, then precipitation in hole.
For arranging separately the scheme of precipitation pilot tunnel AT STATION, precipitation pilot tunnel is arranged on outside station structure, is separated construction with station, and there are the following problems for the program:
(1) precipitation pilot tunnel belongs to temporary works, needs to carry out backfill process after work, and the discarded amount of engineering is large, and cost is high;
(2) the contiguous main structure construction of precipitation pilot tunnel, multiple electrodes is obvious, and soil body stability is between the two poor, and the disturbance of formation of constructing is larger;
(3) precipitation pilot tunnel applies separately, takies the urban underground space outside station, is unfavorable for that the later development of the underground space utilizes;
(4) precipitation pilot tunnel occupies the route of the accessory structure such as station entrance-exit, air channel, causes larger obstacle to the construction of successive projects;
(5) the building of precipitation pilot tunnel and both sides, structure close together, be unfavorable for the protection to it.
Utility model content
The purpose of this utility model is to provide a kind of lowering level of ground water structure, to solve the above problems.
A kind of lowering level of ground water structure is embodiments provides, the construction main body comprising precipitation pilot tunnel, dewatering well and be made up of many constructing pilot tunnels of the present utility model;
Constructing pilot tunnel, precipitation pilot tunnel are adjacent or crossing with construction main body;
Dewatering well is arranged on precipitation pilot tunnel and connects.
Further, precipitation pilot tunnel is arranged on the both sides on the top of construction main body, and adjacent with construction main body;
Dewatering well is arranged on construction main body both sides.
Further, precipitation pilot tunnel is arranged on the inside on the top of construction main body;
Dewatering well is arranged on construction body interior.
Further, precipitation pilot tunnel is arranged on the centre position on the top of construction main body;
Dewatering well connects the below of precipitation pilot tunnel, and at the middle part of construction main body.
Further, one end of dewatering well is connected with the below of precipitation pilot tunnel, and the other end is lower than construction main body.
The lowering level of ground water structure that the utility model provides, combines precipitation pilot tunnel and constructing pilot tunnel, and make both adjacent crossing or directly do precipitation pilot tunnel by double for constructing pilot tunnel, temporary works amount is little, and engineering is discarded to be measured little, and construction costs is lower; Do not set up new precipitation pilot tunnel, the disturbance of pilot tunnel construction formation is less, is conducive to the protection of periphery construction of structures; Additionally do not take the urban underground space outside station, the later development being conducive to the underground space utilizes; Little to the construction infection of the successive projects such as station accessory structure.
Accompanying drawing explanation
In order to be illustrated more clearly in the utility model detailed description of the invention or technical scheme of the prior art, be briefly described to the accompanying drawing used required in detailed description of the invention or description of the prior art below, apparently, accompanying drawing in the following describes is embodiments more of the present utility model, for those of ordinary skill in the art, under the prerequisite not paying creative work, other accompanying drawing can also be obtained according to these accompanying drawings.
Fig. 1 is the structural representation of the utility model lowering level of ground water constructive embodiment one;
Fig. 2 is the structural representation of the utility model lowering level of ground water constructive embodiment two;
Fig. 3 is the structural representation of the utility model lowering level of ground water constructive embodiment three.
In figure, 1: constructing pilot tunnel; 2: top precipitation pilot tunnel; 3: dewatering well; 4: construction main body; 5: upper precipitation pilot tunnel.
Detailed description of the invention
For making the purpose of this utility model, technical scheme and advantage clearly, carry out clear, complete description by the technical solution of the utility model below.Obviously, described embodiment is only the utility model part embodiment, instead of whole embodiments.Based on the embodiment in the utility model, other embodiments all that those of ordinary skill in the art obtain under the prerequisite not making creative work, all belong to the scope that the utility model is protected.
In description of the present utility model, it should be noted that, unless otherwise clearly defined and limited, term " installation ", " being connected ", " connection " should be interpreted broadly, and such as, can be fixedly connected with, also can be removably connect, or connect integratedly; Can be mechanical connection, also can be electrical connection; Can be directly be connected, also indirectly can be connected by intermediary, can be the connection of two element internals.For the ordinary skill in the art, concrete condition the concrete meaning of above-mentioned term in the utility model can be understood.
As shown in drawings, the utility model provides lowering level of ground water structure, the construction main body 4 comprising precipitation pilot tunnel, dewatering well 3 and be made up of many constructing pilot tunnels 1;
Constructing pilot tunnel 1, precipitation pilot tunnel are adjacent or crossing with construction main body 4;
Dewatering well 3 is arranged on precipitation pilot tunnel and connects.
The utility model mainly can be applied in the lowering level of ground water technology of cavern-pile method subway station.In cavern-pile method metro station construction pilot tunnel 1, apply dewatering well 3 specifically, suitably adjust pilot tunnel pattern and reasonable arrangement construction way, under construction costs and construction risk increase little prerequisite, solve the lowering level of ground water problem that cavern-pile method builds subway station.Its feature is that precipitation pilot tunnel is combined with station construction pilot tunnel 1 and arranges, compared with the scheme of precipitation pilot tunnel is set separately outside station, reduce the discarded amount of engineering, reduce construction costs, little to surrounding enviroment disturbance, additionally take little to the underground space, and little to the construction infection of follow-up ancillary works, for cavern-pile method subway station lowering level of ground water problem proposes the solution of novelty.
Adopt the subway station built of cavern-pile method when ground does not set the condition of dewatering well 3, can by precipitation pilot tunnel with station construction pilot tunnel 1 in conjunction with setting, set dewatering well 3 in constructing pilot tunnel 1 AT STATION.Because cavern-pile method structural shape is flexible and changeable, the combination of precipitation pilot tunnel and constructing pilot tunnel 1 also has kinds of schemes.Below by three embodiments, the utility model is described in detail.
Embodiment one
Precipitation pilot tunnel is arranged on the both sides on the top of construction main body 4, and adjacent with construction main body 4;
Dewatering well 3 is arranged on construction main body 4 both sides.
Conventional cavern-pile method constructing pilot tunnel 1 is mainly used in applying skirt piles, and the pilot tunnel outer space later stage needs backfill, and inner space formwork erection builds two lining structures.For meeting precipitation space requirement, constructing pilot tunnel 1 size suitably can be expanded, in pilot tunnel, lay rig and set dewatering well 3, dewatering well 3 is arranged in outside agent structure, and we are referred to as external constructing pilot tunnel 1 precipitation scheme.
In this scheme, in order to make full use of precipitation pilot tunnel 2 space, top, first can apply dewatering well 3 and skirt piles in pilot tunnel, then setting up pilot tunnel median septum again.This scheme should optimize the rig scale of construction setting dewatering well 3 as far as possible, reduces top precipitation pilot tunnel 2 size.
Embodiment two
Precipitation pilot tunnel is arranged on the inside on the top of construction main body 4;
It is inner that dewatering well 3 is arranged on construction main body 4.
For meeting precipitation space requirement, constructing pilot tunnel 1 and upper middle drift are merged, form new large scale constructing pilot tunnel 1 (namely once detaining arch method), then in pilot tunnel, lay rig and set dewatering well 3, dewatering well 3 is arranged in agent structure inside, and we are referred to as constructing pilot tunnel 1 precipitation scheme in body.
Embodiment three
Precipitation pilot tunnel is arranged on the centre position on the top of construction main body 4;
Dewatering well 3 connects the below of precipitation pilot tunnel, and at the middle part of construction main body 4.
For meeting precipitation space requirement, two upper middle drift are merged, forms the upper precipitation pilot tunnel 5 of new large scale, then in upper precipitation pilot tunnel 5, lay rig and set dewatering well 3, dewatering well 3 is arranged in agent structure inside, and we are referred to as upper middle drift precipitation scheme in body.
It should be noted that, for external constructing pilot tunnel 1 precipitation scheme, because constructing pilot tunnel 1 extends out, if walk sequence construction routinely, to cause first and two lining button arch stages, cannot provide thrust at springer outside stake apical cap beam, this problem solves by the construction way of reasonable arrangement top precipitation pilot tunnel 2.When setting dewatering well 3, precipitation pilot tunnel needs larger space to lay rig.After dewatering well 3 has set, precipitation pilot tunnel has only been used for laying and safeguard precipitation pipeline, therefore certain altitude scope bottom precipitation pilot tunnel can be backfilled, and balances the thrust at springer in button arch stage.
In addition, it is pointed out that one end of dewatering well 3 is connected with the below of precipitation pilot tunnel in above-mentioned three kinds of embodiments, the other end is lower than construction main body 4.
Such setting, effectively can be transported to the below of construction main body 4 by dewatering well 3 by the water in precipitation pilot tunnel, make it can not impact construction main body 4 again.
The process characteristic that the utility model is constructed in conjunction with cavern-pile method, innovatively precipitation pilot tunnel is combined with cavern-pile method station construction pilot tunnel 1, suitable adjustment pilot tunnel pattern reasonable arrangement construction way, under construction costs and construction risk increase little prerequisite, successfully solve the lowering level of ground water problem that cavern-pile method builds subway station.
The lowering level of ground water structure that the utility model provides, combines precipitation pilot tunnel and constructing pilot tunnel 1, and make both adjacent crossing or directly do precipitation pilot tunnel by double for constructing pilot tunnel 1, temporary works amount is little, and engineering is discarded to be measured little, and construction costs is lower; Do not set up new precipitation pilot tunnel, the disturbance of pilot tunnel construction formation is less, is conducive to the protection of periphery construction of structures; Additionally do not take the urban underground space outside station, the later development being conducive to the underground space utilizes; Little to the construction infection of the successive projects such as station accessory structure.
The foregoing is only preferred embodiment of the present utility model, be not limited to the utility model, for a person skilled in the art, the utility model can have various modifications and variations.All within spirit of the present utility model and principle, any amendment done, equivalent replacement, improvement etc., all should be included within protection domain of the present utility model.

Claims (5)

1. a lowering level of ground water structure, is characterized in that, the construction main body comprising precipitation pilot tunnel, dewatering well and be made up of many constructing pilot tunnels;
Described constructing pilot tunnel, described precipitation pilot tunnel are adjacent or crossing with described construction main body;
Described dewatering well is arranged on described precipitation pilot tunnel and connects.
2. lowering level of ground water structure according to claim 1, is characterized in that, described precipitation pilot tunnel is arranged on the both sides on the top of described construction main body, and adjacent with described construction main body;
Described dewatering well is arranged on described construction main body both sides.
3. lowering level of ground water structure according to claim 1, is characterized in that, described precipitation pilot tunnel is arranged on the inside on the top of described construction main body;
Described dewatering well is arranged on described construction body interior.
4. lowering level of ground water structure according to claim 1, is characterized in that, described precipitation pilot tunnel is arranged on the centre position on the top of described construction main body;
Described dewatering well connects the below of described precipitation pilot tunnel, and at the middle part of described construction main body.
5. the lowering level of ground water structure according to any one of claim 1-4, is characterized in that, one end of described dewatering well is connected with the below of described precipitation pilot tunnel, and the other end is lower than described construction main body.
CN201420534997.4U 2014-09-17 2014-09-17 Lowering level of ground water structure Expired - Fee Related CN204212167U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420534997.4U CN204212167U (en) 2014-09-17 2014-09-17 Lowering level of ground water structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420534997.4U CN204212167U (en) 2014-09-17 2014-09-17 Lowering level of ground water structure

Publications (1)

Publication Number Publication Date
CN204212167U true CN204212167U (en) 2015-03-18

Family

ID=52980853

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420534997.4U Expired - Fee Related CN204212167U (en) 2014-09-17 2014-09-17 Lowering level of ground water structure

Country Status (1)

Country Link
CN (1) CN204212167U (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107227961A (en) * 2017-06-29 2017-10-03 中铁十二局集团有限公司 Heavy caliber dewatering well construction method in metro built by mining method hole
CN107503774A (en) * 2017-09-08 2017-12-22 中铁十六局集团地铁工程有限公司 A kind of construction of combination piping lane without surface precipitation Construction Method of Metro Station
CN107574830A (en) * 2017-09-08 2018-01-12 中铁十六局集团地铁工程有限公司 A kind of subway station combines the precipitation method of piping lane construction
CN107964971A (en) * 2017-11-23 2018-04-27 北京地矿工程建设有限责任公司 A kind of precipitation method of subway station using the construction of PBA engineering methods
CN111022118A (en) * 2019-12-12 2020-04-17 中铁北京工程局集团有限公司 Construction method for dewatering in pile
CN112709247A (en) * 2021-01-20 2021-04-27 北京城建道桥建设集团有限公司 Subway construction dewatering system and method for complex ground
CN114183150A (en) * 2022-02-15 2022-03-15 中铁隧道局集团路桥工程有限公司 Construction method for underground excavation station of ultra-shallow buried canopy

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107227961A (en) * 2017-06-29 2017-10-03 中铁十二局集团有限公司 Heavy caliber dewatering well construction method in metro built by mining method hole
CN107503774A (en) * 2017-09-08 2017-12-22 中铁十六局集团地铁工程有限公司 A kind of construction of combination piping lane without surface precipitation Construction Method of Metro Station
CN107574830A (en) * 2017-09-08 2018-01-12 中铁十六局集团地铁工程有限公司 A kind of subway station combines the precipitation method of piping lane construction
CN107964971A (en) * 2017-11-23 2018-04-27 北京地矿工程建设有限责任公司 A kind of precipitation method of subway station using the construction of PBA engineering methods
CN107964971B (en) * 2017-11-23 2019-11-22 北京地矿工程建设有限责任公司 A kind of precipitation method of the subway station using the construction of PBA engineering method
CN111022118A (en) * 2019-12-12 2020-04-17 中铁北京工程局集团有限公司 Construction method for dewatering in pile
CN112709247A (en) * 2021-01-20 2021-04-27 北京城建道桥建设集团有限公司 Subway construction dewatering system and method for complex ground
CN114183150A (en) * 2022-02-15 2022-03-15 中铁隧道局集团路桥工程有限公司 Construction method for underground excavation station of ultra-shallow buried canopy

Similar Documents

Publication Publication Date Title
CN204212167U (en) Lowering level of ground water structure
CN104047623B (en) A kind of big across cavern excavation construction method
CN102606167B (en) Settlement control construction method for transverse grouting guide pipe of shallow underground excavation tunnel
CN103981898B (en) A kind of inverse underground engineering construction method done of overall open cut node
CN104278993B (en) A kind of bias voltage Skew Tunnel enters the constructional method in hole
CN103485790A (en) Shallow tunneling method for pipe-proof-supporting structure combined system
CN106948823A (en) Combine the construction method applied with mining sectbn in station air channel
CN104612696B (en) Overpass column hole method construction method is passed through in big cross section tunneling subway station in fine sand layer
CN105927272A (en) Floor anchoring constraint tunnel lining structure
CN102704957A (en) Shed-frame method for shallowly burying large-sized underground structure construction
CN102182464A (en) Construction structure and construction method of channel structure
CN204098043U (en) After staying soil, excavation is in conjunction with inner support Retaining Structure with Double-row Piles
CN103939105B (en) A kind of construction method and structure laying construction shaft above underground construction
CN105587320B (en) Rich water sand-pebble layer abnormal shape deep shaft structural system and its construction method
CN107542115A (en) Underground project waterproof structure and its construction method
CN102913249B (en) Inclined shaft transverse-through positive hole single horn lifting construction method
CN105370288A (en) Construction method of shallow-buried large-span tunnels
CN103993885A (en) Construction method for underground excavation tunnel side-direction hole opening supporting system
CN104963705A (en) Underground space excavating and constructing method
CN105804765A (en) Permeable-rib type double-arch tunnel
CN107905794A (en) Method is widened in a kind of subway station for retaining tunnel part section of jurisdiction
CN103527204B (en) A kind of method for tunnel construction of first wall rear arch intersection median septum
CN205503149U (en) Special section mine method tunnel structure of circle varies from top to bottom
CN205036380U (en) Block of four encircles PBA and secretly digs subway station major structure
CN105275483B (en) A kind of big arch section method for digging of city offspur tunnel

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150318

Termination date: 20160917

CF01 Termination of patent right due to non-payment of annual fee