CN206111238U - Prevent that tunnel from just propping up structure of seepage and drainage system thereof - Google Patents

Prevent that tunnel from just propping up structure of seepage and drainage system thereof Download PDF

Info

Publication number
CN206111238U
CN206111238U CN201620887012.5U CN201620887012U CN206111238U CN 206111238 U CN206111238 U CN 206111238U CN 201620887012 U CN201620887012 U CN 201620887012U CN 206111238 U CN206111238 U CN 206111238U
Authority
CN
China
Prior art keywords
tunnel
blind pipe
pipe
frame
prevent
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201620887012.5U
Other languages
Chinese (zh)
Inventor
张贺南
邢振兴
高明鹤
凌健
任富芝
房浩
侯世锋
江宁
敖吐根巴依尔
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Sixth Engineering Division Water Conservancy and Hydropower Construction Group Co Ltd
Original Assignee
China Construction Sixth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Sixth Engineering Division Co Ltd filed Critical China Construction Sixth Engineering Division Co Ltd
Priority to CN201620887012.5U priority Critical patent/CN206111238U/en
Application granted granted Critical
Publication of CN206111238U publication Critical patent/CN206111238U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

The utility model discloses a prevent that the tunnel from just propping up the structure and the drainage system of percolating water, prop up a plurality of annular blind pipe and an at least vertical blind pipe in the grid steelframe outside and fix at the inboard a plurality of A -frame of grid steelframe first including fixing the A -frame upper berth is equipped with the flier the drain pipe has been laid in the A -frame, drain pipe and sewage pump connection, the sewage pump sets up in the tunnel sump pit, the annular blind pipe with vertical blind pipe is connected, the play water end (W. E. ) setting of vertical blind pipe is at the face with just between the structure. The utility model discloses an at tunnel pre -buried blind pipe just and between the country rock, in the sump pit of planning in advance in groundwater drainage to the tunnel, rethread sewage pump exhausting to the drain pipe tunnel of discharging prevents that the tunnel from just propping up percolating water, reduces surface subsidence, guarantees tunnel zhi anquan just, improves operation environmental quality and civilized construction level.

Description

A kind of structure and its drainage system for preventing a seepage at the beginning of tunnel
Technical field
This utility model is related to a kind of structure for preventing percolating water, and particularly one kind prevents city underground bored tunnel to be located at The structure and its drainage system of a percolating water at the beginning of water rich strata.
Background technology
Now domestic metro industry is in the ascendant, flourishes in the whole nation one, tier 2 cities, subsurface excavation method as it is a kind of more The construction method of science, in being verified and being widely used in Subway Tunnel construction in practice.Subsurface excavation method tunnel is more typical Support form is served as a contrast for first+waterproof+two, is to consider tunnel cost, just props up general with water resistance, then positioned at rich water ground Easily there is percolating water situation during construction is just in the tunnel of layer, more very just as " Water Curtain Cave ", surface subsidence, construction can be caused Bad environments, and tunnel just Zhi Zhiliang is endangered, there is potential safety hazard, affect civilized construction in tunnel.
The content of the invention
This utility model provides one kind to solve technical problem present in known technology and prevents a percolating water at the beginning of tunnel Structure and its drainage system, a percolating water at the beginning of tunnel can be prevented using the structure and its drainage system, reduce surface subsidence, protect The first Zhi Anquan in card tunnel, improves task environmental quality and civilized construction level.
This utility model is adopted the technical scheme that to solve technical problem present in known technology:One kind prevents tunnel The structure and its drainage system of a percolating water at the beginning of road, including the multiple annular blind pipe being fixed on the outside of a just grid steel frame and at least A piece longitudinal blind pipe and the multiple A-frames being fixed on the inside of grid steel frame, are equipped with the A-frame and mark time Plate, is laid with drain pipe in the A-frame, and the drain pipe is connected with sewage pump, and the sewage pump is arranged on tunnel collection In puddle, the annular blind pipe is connected with longitudinal blind pipe, and the water side of longitudinal blind pipe is arranged on face and just props up Between structure.
The annular blind pipe diameter 50mm, is fixed with a just grid steel frame using tied silk I.
Longitudinal blind pipe diameter 80mm, is fixed with a just grid steel frame using tied silk II.
Longitudinal blind pipe and the annular blind pipe are connected using four-way.
The A-frame is formed using 50x50mm square steel pipe weldeds.
This utility model has the advantages and positive effects that:By propping up the pre-buried blind pipe and country rock between at the beginning of tunnel, will Subsoil water is drained in the catch pit planned in advance in tunnel, then is evacuated to drain pipe discharge tunnel by sewage pump, prevents tunnel Just a percolating water, reduces surface subsidence, it is ensured that the first Zhi Anquan in tunnel, improves task environmental quality and civilized construction level.
Description of the drawings
Fig. 1 is structural representation of the present utility model;
Fig. 2 is section structure schematic diagram of the present utility model.
In figure:1st, annular blind pipe;2nd, longitudinal blind pipe;3rd, A-frame;4th, step plate;5th, drain pipe, 6, tunnel catch pit, 7th, sewage pump.
Specific embodiment
For the content of the invention of the present utility model, feature and effect can be further appreciated that, following examples are hereby enumerated, and coordinated Accompanying drawing describes in detail as follows:
Refer to Fig. 1 and Fig. 2, a kind of structure and its drainage system for preventing a percolating water at the beginning of tunnel, including being fixed on just Prop up the multiple annular blind pipe 1 on the outside of grid steel frame and at least one longitudinal blind pipe 2 and be fixed on multiple on the inside of grid steel frame A-frame 3, is equipped with step plate 4 on the A-frame 3, and in the A-frame 3 drain pipe 5 is laid with, described Drain pipe 5 is connected with sewage pump 7, and the sewage pump 7 is arranged in tunnel catch pit 6, and the annular blind pipe 1 is blind with the longitudinal direction Pipe 2 connects, and the water side of longitudinal blind pipe 2 is arranged on face and just props up between structure.
In the present embodiment, the diameter 50mm of the annular blind pipe 1, is fixed with a just grid steel frame using tied silk I.It is described vertical To the diameter 80mm of blind pipe 2, fixed using tied silk II with a just grid steel frame.Longitudinal blind pipe 2 and the annular blind pipe 1 are adopted Four-way connects.The A-frame 3 is formed using 50x50mm square steel pipe weldeds.
Operation principle of the present utility model:
Subsoil water is drained to longitudinal blind pipe 2 by annular blind pipe 1, and subsoil water is drained to tunnel catch pit 6 by longitudinal blind pipe 2 Interior, the water converged in catch pit is drained in the drain pipe 5 by sewage pump 7, and finally discharges tunnel.
Although being described to preferred embodiment of the present utility model above in conjunction with accompanying drawing, this utility model is not Above-mentioned specific embodiment is confined to, above-mentioned specific embodiment is only schematic, is not restricted, ability The those of ordinary skill in domain under enlightenment of the present utility model, without departing from this utility model objective and claimed In the case of scope, many forms can also be made, these are belonged within protection domain of the present utility model.

Claims (5)

1. it is a kind of to prevent a seepage and the structure of draining at the beginning of tunnel, it is characterised in that just prop up grid steel frame outside including to be fixed on Multiple annular blind pipe and at least one longitudinal blind pipe and multiple A-frames for being fixed on the inside of grid steel frame, described three Step plate is equipped with angle support, drain pipe is laid with the A-frame, the drain pipe is connected with sewage pump, described Sewage pump is arranged in tunnel catch pit, and the annular blind pipe is connected with longitudinal blind pipe, the water side of longitudinal blind pipe It is arranged on face and just props up between structure.
2. it is according to claim 1 to prevent a seepage and the structure of draining at the beginning of tunnel, it is characterised in that the annular blind pipe Diameter 50mm, is fixed with a just grid steel frame using tied silk I.
3. it is according to claim 2 to prevent a seepage and the structure of draining at the beginning of tunnel, it is characterised in that longitudinal blind pipe Diameter 80mm, is fixed with a just grid steel frame using tied silk II.
4. it is according to claim 3 to prevent a seepage and the structure of draining at the beginning of tunnel, it is characterised in that longitudinal blind pipe Connected using four-way with the annular blind pipe.
5. it is according to claim 3 to prevent a seepage and the structure of draining at the beginning of tunnel, it is characterised in that the A-frame Formed using 50x50mm square steel pipe weldeds.
CN201620887012.5U 2016-08-14 2016-08-14 Prevent that tunnel from just propping up structure of seepage and drainage system thereof Active CN206111238U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620887012.5U CN206111238U (en) 2016-08-14 2016-08-14 Prevent that tunnel from just propping up structure of seepage and drainage system thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620887012.5U CN206111238U (en) 2016-08-14 2016-08-14 Prevent that tunnel from just propping up structure of seepage and drainage system thereof

Publications (1)

Publication Number Publication Date
CN206111238U true CN206111238U (en) 2017-04-19

Family

ID=58511531

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620887012.5U Active CN206111238U (en) 2016-08-14 2016-08-14 Prevent that tunnel from just propping up structure of seepage and drainage system thereof

Country Status (1)

Country Link
CN (1) CN206111238U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108019220A (en) * 2017-12-12 2018-05-11 成都汇智远景科技有限公司 The intelligent transportation tunnel of buried structure in casing
CN108049915A (en) * 2017-12-12 2018-05-18 中国水利水电第十工程局有限公司 The drainage system of underground traffic tunnels
CN108757027A (en) * 2018-05-23 2018-11-06 中铁二院工程集团有限责任公司 Multi-functional lobby water system in a kind of tunnel

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108019220A (en) * 2017-12-12 2018-05-11 成都汇智远景科技有限公司 The intelligent transportation tunnel of buried structure in casing
CN108049915A (en) * 2017-12-12 2018-05-18 中国水利水电第十工程局有限公司 The drainage system of underground traffic tunnels
CN108049915B (en) * 2017-12-12 2019-06-18 中国水利水电第十工程局有限公司 The drainage system of underground traffic tunnels
CN108757027A (en) * 2018-05-23 2018-11-06 中铁二院工程集团有限责任公司 Multi-functional lobby water system in a kind of tunnel
CN108757027B (en) * 2018-05-23 2023-11-21 中铁二院工程集团有限责任公司 Multifunctional drainage system in tunnel

Similar Documents

Publication Publication Date Title
CN102418347B (en) Drainage construction method for blind drain and sump wells in deep foundation pit
CN103510528B (en) For the blind drainage structure of underground structure anti-floating
CN108547639B (en) Tunnel closes on the advanced same more conduit delamination pour slurry construction methods in hole of existing buildings
CN101701461B (en) Method for constructing energy-saving underground tube structure
CN206111238U (en) Prevent that tunnel from just propping up structure of seepage and drainage system thereof
CN101560770A (en) Novel deep building foundation pit supporting system
CN205420945U (en) Concrete road permeates water
CN106168142A (en) The water discharge method of tunnel bedrock underground water
CN202247920U (en) Construction structure for water drainage of blind ditch and water collecting wells in deep foundation pit
CN103382850B (en) Roof crack water guiding device and method
CN207619996U (en) Precipitation well construction
CN202730786U (en) Well-sealing waterproof construction structure of dewatering well
CN104847365B (en) A kind of small interval Four-Lane Road Shallow-buried Large-span Tunnel construction method
CN104847375A (en) Supporting method for small-clear-distance four-lane shallow-buried large-span tunnel
CN104131566B (en) A kind of basement is without the construction method of horizontal support foundation ditch
CN103343690B (en) Construction method of shaft antiseep structure used when large section of inclined shaft passes through aquifer
CN107326928A (en) A kind of part is related to the construction method in the deeper subsurface garage of basement
CN207176700U (en) A kind of solid matter perfusion inner support of pile foundation ditch permanent support structure under complex environment
CN104196046B (en) Reduce the water proof drainage system of underground hydrostatic water table
CN104088296B (en) Soft clay area basement adds a layer construction method
CN205277434U (en) Tunnel portal pre -reinforcing structure
CN204311464U (en) A kind of foundation pit dewatering constructing structure
CN207176737U (en) A kind of mechanical underground parking of inclined shaft
CN204646253U (en) A kind of small interval Four-Lane Road Shallow-buried Large-span Tunnel structure
CN101660418B (en) Box culvert jack-in replacement rectangular pipe support method used for tunnel construction

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20200428

Address after: No. fifty-two Dongting Road, Hexi District, Tianjin

Patentee after: Water conservancy and Hydropower Construction Group Co., Ltd. of China Construction Sixth Engineering Bureau

Address before: 300457, TEDA Tanggu District, Tianjin First Street, block MSD-C1, 21

Patentee before: CHINA CONSTRUCTION SIXTH ENGINEERING DIVISION CORP., Ltd.