CN101560770A - Novel deep building foundation pit supporting system - Google Patents

Novel deep building foundation pit supporting system Download PDF

Info

Publication number
CN101560770A
CN101560770A CNA200810027548XA CN200810027548A CN101560770A CN 101560770 A CN101560770 A CN 101560770A CN A200810027548X A CNA200810027548X A CN A200810027548XA CN 200810027548 A CN200810027548 A CN 200810027548A CN 101560770 A CN101560770 A CN 101560770A
Authority
CN
China
Prior art keywords
campshed
foundation pit
line
water
piles
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CNA200810027548XA
Other languages
Chinese (zh)
Other versions
CN101560770B (en
Inventor
李奇逊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Sitong Group Co Ltd
Original Assignee
Guangdong Sitong Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong Sitong Group Co Ltd filed Critical Guangdong Sitong Group Co Ltd
Priority to CN200810027548XA priority Critical patent/CN101560770B/en
Publication of CN101560770A publication Critical patent/CN101560770A/en
Application granted granted Critical
Publication of CN101560770B publication Critical patent/CN101560770B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Tents Or Canopies (AREA)

Abstract

The invention discloses a novel deep building foundation pit supporting system which comprises front-line piles, a water-retaining curtain, a top beam, rear-line piles, an anchor rope and sand pulp, the front-line piles are positioned at the side of a building foundation pit, the water-retaining curtain is tightly abutted against the inner sides of the front-line pile, the rear-line piles are positioned in soil body at the inner side of the water-retaining curtain, the tops of the front-line piles and the rear-line piles are provided with the top beam integrally poured by reinforced concrete, wherein the top beam is provided with a protruding part towards the inner side at the top of the rear-line piles and is provided with the vertical anchor rope in the soil body at the inner side of the rear-line piles, the lower end of the anchor rope vertically extends into rock body and the sand pulp is poured into the rock body for concretion, and the upper end of the anchor rope is tightened with and is concreted with the protruding part of the top beam. Because the vertical anchor rope is arranged in the soil body at the inner side of the rear-line piles and the drilling in the soil body is fast and good, the invention greatly improves the speed, increases the construction efficiency, saves the time, reduces the loss of a drill bit, lowers the construction cost, and achieves better profit.

Description

A kind of novel deep building foundation pit supporting system
Technical field
The present invention relates to the building foundation technical field, particularly adopt the deep foundation pit of construction support technology of the vertical anchor cable of double-row pile.
Background technology
Along with the development of urban construction, highrise building increases gradually, and the city building is intensive day by day.Because the requirement of the function of use and the exploitation underground space, highrise building generally all design the basement of the big planar dimension and the degree of depth.The exploitation of the underground space relates to the safety of deep building foundation pit, and this is particularly important to the building dense area that is located on the soft foundation.
In weak soil bed thickness, area that groundwater table is high, the foundation ditch neighboring buildings is intensive, contiguous urban road, wagon flow, visitors flowrate are big, and under the condition of city planting ductwork complexity, stability of slope when how to guarantee excavation of foundation pit, surrounding enviroment safety, normal live and work order are unaffected, are the great technical barriers that engineering construction stands in the breach.The preferred pattern foundation pit supporting structure scheme in ground of how suiting measures to local conditions, suit measures to differing conditions in terms of time directly relates to protection surrounding enviroment and excavation safety, is the cardinal task of engineering construction.
Foundation ditch has multiple support system, and definite principle is under the prerequisite that guarantees foundation ditch safety and surrounding enviroment safety, considers preferred from combined factors such as duration, expenses.
The support system that the deep building foundation pit in weak soil high water level area adopts usually has: pile-anchor system, campshed inner supporting body are and the diaphragm wall system, and take measures such as precipitation or water-stop curtain according to groundwater condition.Pile-anchor system is subjected to the restriction of building line and adjacent building underground structure.For excavation plane big deep building foundation pit, campshed inner supporting body system need be provided with baroque inner supporting body system, carries out because of interior support must intersect with excavation, and is not only long in time limit, expense is high, and the earth moving face is also had certain influence; Diaphragm wall also exist need be provided with interior support, long in time limit, expense is high, influence the problem of excavated surface.
Past attempts has the minority engineering to adopt double castinplace pile to add the support system of water-stop curtain, double bored pile is by 2.0m or bigger array pitch design, the stake top is provided with Guan Liang (Guan Liang longitudinally and between two campsheds is provided with), press portal-rigid frames and consider, other establishes cement earth pile (deep-mixed pile or churning, pendulum spray stake) and does water-stop curtain.Because of the support retaining height generally about 6.5m, computation schema is with actual that situation is set is variant, so all in various degree certain errors of existence of the engineering that adopts this support system, effect is not ideal enough, therefore this support system is not applied.
The paper " intensive building area weak soil deep foundation pit support design and construction " that " Building technology exploitation " the 30th the 3rd phase of rolling up of publishing in March, 2003 was once published the Li Qixun of our company etc. has disclosed " the vertical cable bolting of cantilevered double-row pile-prestressing force " technology, it adopts double bored pile, and campshed adds the vertical anchor cable of prestressing force in the back.It must pass through at this by anchor cable by the subdrilling through hole, and then carry out next step perfusion mortar on the campshed of back.Because the back campshed is a cast-in-place concrete pile, boring is thereon wasted time and energy, and tool loss is big especially, brings very inconvenience to construction.
Summary of the invention
The present invention is a kind of novel deep building foundation pit supporting system, and technical problem to be solved is to avoid holing on campshed behind the concrete spouting, improves efficiency of construction, saves time, reduces the loss of drill bit, reduces construction cost.
Technical scheme of the present invention is: a kind of novel deep building foundation pit supporting system, comprise preceding campshed, water-stop curtain, Guan Liang, back campshed, anchor cable, mortar, preceding campshed is positioned at the building foundation pit side, water-stop curtain is near the inboard of preceding campshed, back campshed is arranged in the soil body of water-stop curtain inboard, at preceding campshed, back campshed top is provided with steel concrete builds all-in-one-piece Guan Liang, wherein: described Guan Liang is provided with projection to the inside at campshed top, back, in the soil body of campshed inboard, back, be provided with vertical anchor cable, this anchor cable lower end vertically stretch in the rock mass and perfusion mortar fixed, the upper end also is consolidated with hat beam projection tensioning.
Because the present invention is provided with vertical anchor cable in the soil body of campshed inboard, back, in the soil body boring faster and better, improved speed greatly, improved efficiency of construction, saved the time, reduced the loss of drill bit, reduced construction cost, obtain good benefit.
Description of drawings
The invention will be further described below in conjunction with accompanying drawing 1:
Fig. 1 is the horizontal layout schematic diagram that the present invention forms;
Fig. 2 is the A-A sectional view on Fig. 1.
The specific embodiment
Among the figure, preceding campshed 4, water-stop curtain 5, hat beam 6, back campshed 7, anchor cable 8, mortar 9, preceding campshed 4 is positioned at building foundation pit 3 sides, water-stop curtain 5 is near the inboard of preceding campshed 4, back campshed 7 is arranged in the soil body 2 of water-stop curtain 5 inboards, at preceding campshed 4, back campshed 7 tops are provided with steel concrete and build all-in-one-piece hat beam 6, wherein: described hat beam 6 is provided with projection 61 to the inside at campshed 7 tops, back, in the soil body 2 of campshed 7 inboards, back, be provided with vertical anchor cable 8, these anchor cable 8 lower ends vertically stretch in the rock mass 1 and perfusion mortar 9 fixed, the upper end also is consolidated with hat beam 6 projections, 61 tensionings.
Like this, during construction, make preformed hole 62 at projection 61 places of hat beam 6 earlier, in the soil body 2, vertically hole to rock mass 1 facing to this preformed hole 62, then anchor cable 8 lower ends are seen through projection 61 place's preformed holes 62 of hat beam 6, vertically stretch into hole in, perfusion mortar 9, treat mortar 9 with anchor cable 8 and rock mass 1 fixed after, with projection 61 tensionings of anchor cable 8 upper ends and hat beam 6 and fixed.

Claims (1)

1. novel deep building foundation pit supporting system, comprise preceding campshed, water-stop curtain, Guan Liang, back campshed, anchor cable, mortar, preceding campshed is positioned at the building foundation pit side, water-stop curtain is near the inboard of preceding campshed, back campshed is arranged in the soil body of water-stop curtain inboard, at preceding campshed, back campshed top is provided with steel concrete builds all-in-one-piece Guan Liang, it is characterized in that: described Guan Liang is provided with projection to the inside at campshed top, back, in the soil body of campshed inboard, back, be provided with vertical anchor cable, this anchor cable lower end vertically stretch in the rock mass and perfusion mortar fixed, the upper end also is consolidated with hat beam projection tensioning.
CN200810027548XA 2008-04-15 2008-04-15 Novel deep building foundation pit supporting system Expired - Fee Related CN101560770B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN200810027548XA CN101560770B (en) 2008-04-15 2008-04-15 Novel deep building foundation pit supporting system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN200810027548XA CN101560770B (en) 2008-04-15 2008-04-15 Novel deep building foundation pit supporting system

Publications (2)

Publication Number Publication Date
CN101560770A true CN101560770A (en) 2009-10-21
CN101560770B CN101560770B (en) 2011-05-25

Family

ID=41219728

Family Applications (1)

Application Number Title Priority Date Filing Date
CN200810027548XA Expired - Fee Related CN101560770B (en) 2008-04-15 2008-04-15 Novel deep building foundation pit supporting system

Country Status (1)

Country Link
CN (1) CN101560770B (en)

Cited By (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101775807A (en) * 2010-03-03 2010-07-14 天津二十冶建设有限公司 Structure for supporting deep foundation pit of soft soil foundation
CN102605792A (en) * 2012-03-16 2012-07-25 浙江理工大学 Multi-row mini-pile enclosing structure for blocking soil and construction process
CN102644286A (en) * 2012-04-10 2012-08-22 广东天竟建设有限公司 Deep foundation pit supporting structure
CN103195069A (en) * 2013-04-01 2013-07-10 北京工业大学 Method for shoring prestressed double-row-pile strong-constraint deep foundation pit
CN103306289A (en) * 2013-06-28 2013-09-18 中国三冶集团有限公司第一建筑工程公司 Foundation pit piled anchor dado concrete anchor cable top beam structure and construction method thereof
CN103469803A (en) * 2013-09-30 2013-12-25 中国建筑股份有限公司 Pile beam vertical anchor support system used for supporting foundation pit and construction method of pile beam vertical anchor support system
CN103543025A (en) * 2013-10-21 2014-01-29 广东省六建集团有限公司 Method for testing tall concrete formwork supporting system
CN103590408A (en) * 2013-11-25 2014-02-19 中国建筑股份有限公司 Novel double-row pile beam vertical anchor supporting system and construction method thereof
CN104060614A (en) * 2013-03-20 2014-09-24 中国二十冶集团有限公司 Construction method of support pile of earlier constructed top beam
CN104846832A (en) * 2015-06-03 2015-08-19 中船第九设计研究院工程有限公司 Construction method of circular deep foundation pit enclosure of discrete pile support
CN106320345A (en) * 2015-06-30 2017-01-11 上海勘测设计研究院有限公司 Foundation pit support structure
CN107034895A (en) * 2017-04-25 2017-08-11 广东工业大学 A kind of prestress anchorage cable stirring pile pit enclosure and its construction method
CN109162284A (en) * 2018-10-31 2019-01-08 中国十九冶集团有限公司 Coastal beach underground structure deep foundation pit support and construction method thereof
CN110512620A (en) * 2019-07-30 2019-11-29 中铁大桥局集团有限公司 Embankment slope excavating area protection structure and construction method

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1163654C (en) * 2000-07-07 2004-08-25 蔡昌斌 Support structure and construction process of foundation pit
CN2457209Y (en) * 2001-01-09 2001-10-31 李象范 Prestress anchor rod compensation gravity type building enclosure
CN1338543A (en) * 2001-09-29 2002-03-06 梁炯均 Anchor-tube guniting support of frame and its construction method
JP2007247308A (en) * 2006-03-17 2007-09-27 Takenaka Komuten Co Ltd Pulling-out bearing strength reinforcing for pile group comprised of inclined piles and structure constructed according to the same

Cited By (18)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101775807A (en) * 2010-03-03 2010-07-14 天津二十冶建设有限公司 Structure for supporting deep foundation pit of soft soil foundation
CN102605792A (en) * 2012-03-16 2012-07-25 浙江理工大学 Multi-row mini-pile enclosing structure for blocking soil and construction process
CN102644286B (en) * 2012-04-10 2015-06-24 广东天竟建设有限公司 Deep foundation pit supporting structure
CN102644286A (en) * 2012-04-10 2012-08-22 广东天竟建设有限公司 Deep foundation pit supporting structure
CN104060614B (en) * 2013-03-20 2016-03-30 中国二十冶集团有限公司 A kind of soldier pile construction method of first building Guan Liang
CN104060614A (en) * 2013-03-20 2014-09-24 中国二十冶集团有限公司 Construction method of support pile of earlier constructed top beam
CN103195069A (en) * 2013-04-01 2013-07-10 北京工业大学 Method for shoring prestressed double-row-pile strong-constraint deep foundation pit
CN103306289B (en) * 2013-06-28 2015-04-22 中国三冶集团有限公司 Foundation pit piled anchor dado concrete anchor cable top beam structure and construction method thereof
CN103306289A (en) * 2013-06-28 2013-09-18 中国三冶集团有限公司第一建筑工程公司 Foundation pit piled anchor dado concrete anchor cable top beam structure and construction method thereof
CN103469803A (en) * 2013-09-30 2013-12-25 中国建筑股份有限公司 Pile beam vertical anchor support system used for supporting foundation pit and construction method of pile beam vertical anchor support system
CN103543025A (en) * 2013-10-21 2014-01-29 广东省六建集团有限公司 Method for testing tall concrete formwork supporting system
CN103590408B (en) * 2013-11-25 2016-06-15 中国建筑股份有限公司 The perpendicular anchor support system of a kind of double-row pile beam and constructional method thereof
CN103590408A (en) * 2013-11-25 2014-02-19 中国建筑股份有限公司 Novel double-row pile beam vertical anchor supporting system and construction method thereof
CN104846832A (en) * 2015-06-03 2015-08-19 中船第九设计研究院工程有限公司 Construction method of circular deep foundation pit enclosure of discrete pile support
CN106320345A (en) * 2015-06-30 2017-01-11 上海勘测设计研究院有限公司 Foundation pit support structure
CN107034895A (en) * 2017-04-25 2017-08-11 广东工业大学 A kind of prestress anchorage cable stirring pile pit enclosure and its construction method
CN109162284A (en) * 2018-10-31 2019-01-08 中国十九冶集团有限公司 Coastal beach underground structure deep foundation pit support and construction method thereof
CN110512620A (en) * 2019-07-30 2019-11-29 中铁大桥局集团有限公司 Embankment slope excavating area protection structure and construction method

Also Published As

Publication number Publication date
CN101560770B (en) 2011-05-25

Similar Documents

Publication Publication Date Title
CN101560770B (en) Novel deep building foundation pit supporting system
CN104612162B (en) A kind of Deep Foundation Pit of Metro Stations excavation construction method
CN207633352U (en) A kind of slope reinforcement structure for rapid rescue construction
CN205776249U (en) A kind of combined inner supporting structure
CN101270579B (en) Foundation pit guard method for expansion construction from deep foundation pit to shallow foundation pit
CN106013171B (en) A kind of semi-rigid supporting construction semi-flexible and method of deep-foundation side wall
CN105089670B (en) Construction method for enlarging and excavating subway station on basis of parallel interval shield tunnel
CN103114595A (en) Support method and device of support pile preformed core-soil double-buttress inclined inner-strut foundation ditch
CN206034454U (en) Supporting construction
CN109184699B (en) Construction method for passing existing river channel under open trench tunnel
CN104131566B (en) A kind of basement is without the construction method of horizontal support foundation ditch
CN106884431A (en) One kind building pit foundation construction safety supporting construction
CN204282399U (en) A kind of subway space enclosing structure
CN206902783U (en) For reducing the adjustable reinforcement and rectification structure of house differential settlement
CN107542152A (en) A kind of pavement comprehensive pipe network and drainage system
CN105040707A (en) Combined densely-arrayed pile deep foundation pit supporting and enclosure structure used as basement external wall
CN209760299U (en) light and shade of avoiding house to tear open and move is dug and is combined subway station structure
CN204059341U (en) Bamboo joint type mortar pile
CN103711123B (en) The construction method of bamboo joint type mortar pile
CN205502070U (en) A dual -purpose underground gallery structure
CN212225231U (en) Protective structure for bias tunnel portal
CN110645003B (en) Completely weathered granite bias steep slope tunnel entry construction method
CN107218057B (en) Drainage portal structure suitable for water-rich stratum
AU2016102393A4 (en) A Method of constructing a column, a tunnel, and a tunnel made from the method
CN205475252U (en) Compound snap -in stake retaining wall structure

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20110525

Termination date: 20160415